Work Centre and Transacion Launches

I have 3 logical links - these are transaction launches
I have a Work Centre, that shows these launches in the sub menu from the bavbar
But I also want, when I click the work centre, to see the three launches in the work centre page
I can't seem to do this in config (do I need to develop it?)

Hi David,
  You have made them in "In Menu " so you are able to see in Second level Navigation So need to make it to "Visible "in the Adjust Work Center Group Links in Define Business role .
Regards,
Kiran Posanapalli
Edited by: posanapalli kiran on Sep 4, 2009 11:22 PM

Similar Messages

  • Difference in Main work centre and Operation workcentre

    Hello PM Gurus,
    In CS order, we have two work centres. One at header level called as Main work centre and another at operation level.
    Why do we have two work centres. The one at operation level itself should have been enough.
    There is a main work centre at functional location too ( Organisation tab). So what is the connection if we use this functional location as the reference while creating a CS order.
    Please reply soon.
    Cheers
    Sunny

    Hi Sunny,
    The work center at haeder i.e., Main Work Center is the reponsible work center(say a department). It means it takes the reponsibility of the whole job mentioned in that work order(or job given by production dept.). Now, assume , it further distributes the whole work to its own sub-dept or different work centers as per nature of job. Say, electrical related work to elec work centers etc., by ,means of assigning to different operations.
    The Main work center's cost center will be copied as responsible cost center in Additional data TAB of the order.Now thus you see commercially the responsibility of doing the job lies with the responsible cost center (or say Main work center).
    Hope it is clear.
    Regards,
    Rajesh

  • Difference between PP work Centre and Main work centre in a floc ?

    Hi,
    Can someone tell me the difference between the PP work centre in the location tab of a functional location compared to the Main Work Centre listed in the Organizational tab ?
    Thanks

    Kent,
    The way I understand it, is that the main work centre (Field name: GEWRK) in the organizational tab refers to the actual group who are reponsible for carrying out the maintenance of the object.  Costing and capacity planning is carried out through this Work Centre.  However the PP Work Centre (Field name: ARBPL) in the location tab is a different work centre.  And I'm not sure what it controls (if anything).  I think it refers to the location of the unit, but other than that I don't know what it controls.

  • Link with Work Centre and Order Number?

    Can anybody give me a link between the Work center(CRHD-ARBPL) and Order Number(AUFK-AUFNR)?
    Regards,
    Subhasish

    aufk-aufnr = afko-aufnr.
    afko-aufpl = afvc-aufpl.
    afvc-arbid = crhd-objid.
    now take arbpl from crhd.
    regards
    shiba dutta

  • Work centre wise total running time and production

    Hello,
    I have a requirement to show total running hours for work centres and total production quantity produced by work centres.
    Is there any cube for this in PP?
    Please respond.
    Best Regards,
    AI

    Well cube 0pp_c04 provides work centre wise GR quantity. The key field is 0GR_QTY. But i need workcentre (machine) hours used to produce the material.
    Got it?

  • Work Centre within BOM

    Hi all,
    I am working in a manufacturing company, and the company is considering to use SAP B1 to replace the current system. However, we are not fully confident on how SAP B1 handles work centre within BOM.
    The current system:
    We have 10-12 work centre that works as a cost centre and it is associated with the machineries we have. In that work centre setting, we set labour cost, production speed, number of production in an hour etc, the purpose is to enable calculating the production cost per item and for other purposes as well.
    We also have work sequences, that will pretty much handle the sequences in producing items. The relationship between work centre and work sequence is one to many or one to one.
    Does SAP B1 have this capability?
    Another question will be in regard to barcoding. I understand that there is add-on to handle barcoding and RFID. My question is whether the SAP B1 add-on can handle the automatic process of updating the system when the barcode scanner is used, or do we have to update the system manually?
    Thanks in advance for the help.
    Regards
    Ferdinand

    Hi Hendry,
    Many thanks for your suggestion. My company's objective is replicating the the current DBA Manufacturing system, that means saving monies whenever possible to do so. The primary option is AIO, however the Board asked project members to explore the possibilities to implement B1.
    I will conclude now that B1 is be good enough to fully replicate DBA Manufacturing without hassles of implementing heaps of add-ons.
    Thanks everyone.
    I'd like to keep the thread on, in case if I have further questions.
    Regards
    Ferdinand

  • Pm querry regarding work centre

    hi
    1.any one plz tell me about formulas and how they are given in work centres and related parameter settings for formulas.
    regards
    sharath

    For standard as Thyagarajan said..
    Capacity - SAP008
    Scheduling - SAP004
    Costing -  SAP008
    Formula in Workcenter:
    http://help.sap.com/saphelp_erp2004/helpdata//EN/b1/c03348439a11d189410000e829fbbd/frameset.htm
    Hope this helps-

  • Unable to receive Buyer Work Centre Complex PO

    Dear All,
    I created Complex PO through Buyer Work Centre and approved it but when i go to receive this PO system not found the PO, even i select the same organization. Kindly help me regarding this issue.
    Regards,

    user12217438 wrote:
    ok so how can i create invoice and match with this PO
    Regards,Hi,
    There are two options.
    1. Run the Receiving Transaction Processor once the work confirmation is created which will create a receipt. Then you create invoice manually and match accordingly.
    2. If you are using RCTI, then the invoice will also be created automatically along with the receipt.
    Thanks,
    PS.

  • Error wrt work centre

    Hi all,
    Can any one please clear this error, i mean why does it occur.
    "Only Global or Domestic Outsource Work Center allowed on Labor NWA".
    This error for the activity for which i had planned hours wrt the work centre and activity.
    I have maintained the unit price for the activity and the cost centre in KP 26.
    Kindly look into it, i am unable to save the project.
    Somesh.N

    Hi,
    This doesnt seem to be standard SAP message. Check for any validation related to control key of act and work center assigned assigned to Project profile. May be some development/code change in this aspect has been made.
    Regards

  • Cost centre and Profit centre in one query - Authorisations not working!

    Hiya,
    I have another problem related to Analysis Authorisations.
    I have created an AA with Cost Centre and Profit centre access restricted to a certain node of a hierarchy (type 1 - this node and below). For example, the User can only run a query at Cost Centres level of Country Belgium - the query works fine. Now, the user wants to drill down by the relevant Profit centres. According to the log, the system checks for Profit centres like * and says the user is not authorised. All this, despite the fact that all Profit centres belong to country Belgium and user has been given access to see these profit centres.
    What do I need to do to enable drilldown by Profit centre? I can't make a "*" access to Profit centre as the user will be able to run other queries at global level, which is not what I can allow.
    Any suggestions?

    Hello,
    I don't know if it is relevant, but I had a similar problem when I had two characteristic each with hierarchy restrictions in one authorization object.
    I "solved" it by separting each characteristic into its own authorization object.
    BR
    Ondrej

  • Creating/Copying a Work Centre,also a Production Scheduler and Cost Centre.

    Hi All,
    I am trying to create a new work centre based on the settings of a previous one? First of all,how I can do this?
    Secondly,after I have created the new work centre (having copied being copied from another),I need to create a new production Scheduler and Cost Centre? How I will be able to do so,also?Will the Production Scheduller and Cost Centre assignments fom the old work centre be copied,too,or I will need to create/copy these from scratch?
    All help greatly appreciated,will award points to all useful answers.
    PAPJ1.
    Edited by: PAPJ1 on May 20, 2011 11:01 AM

    Hello,
    You can create a new work center by copying an existing work center. in the cr01 screen in the copy from column put the plant name and Ref. work center name and put enter. all the existing data will be copied to the newly created work center. no need to create new assignment to  Production Scheduller and Cost Center.
    Hope it helps.
    Regards
    Alok

  • DV7-1279WM microphone and quick launch buttons stopped working

    For some reason my quick launch buttons and microphone have stopped working on my DV7 laptop. I know that I recently used the microphone on a Skype call, but believe since that time that Vista SP2 was installed. I am not sure when the quick launch buttons were not working, but have just literally (talking less than a week ago) got the laptop back from HP for a warranty issue with the display. A strange thing I noticed is that if i look under the settings in Skype, the microphone will record a level for a split second, but then go back to nothing again (someone I was trying to talk to said they could hear me for a second).
    I thought it might be the same problems as in the 35 page thread on here, but I have sound, its only the microphone and quick launch buttons that are not working. So far I have rolled back, installed and updated sound drivers, BIOS and Quick Launch software, but no luck.
    Any suggestions? Thanks.

    Sometimes electrical components needs to have all power sources removed and reintroduced to work properly.  Try performing a hard reset first, if it doesn't work then we'll move to the next step.
    To Perform A Hard Reset
    Shut down the computer by going to the Start menu and selecting shut down. (If you have no display, hold the power button down for  5 seconds)
    Disconnect the AC Adapter from the notebook.
    Remove the battery from the bottom of the notebook.  There will be a switch/button to eject the battery.
    Wait at least 1 minute with all power sources disconnected.
    Re-insert the battery and reconnect the AC Adapter and then attempt to power on the notebook.

  • Itunes has stopped working. This comes up everytime I launch ITUNES.  I've uninstalled, reinstalled, removed support programs reinstalled support programs, created different user and problem still persists.  Quicktime and Safari launch fine.  Just itunes.

    Itunes isn't working properly.  I get this message every time I try and open Itunes.  I've uninstalled, reinstalled itunes and all the support programs.  Quicktime and Safari launch fine. Tried it with Nortons antivirus turned on and turned off etc.   I've gone through the Apple Support file and removed the itunes preference files, I've started in safe mode and it still persists.  This only started about a week ago when I changed over to my Iphone 4s.  My phone loaded fine and backed up etc and now NOTHING....
    I've got a Dell Inspiron 9400 with updated BIOS running Windows Vista Home Premium.
    HELP..THIS IS WHAT I GET.  Looks like a ntdll.dll error????????????????????????????????????????????
    Problem Event Name: APPCRASH
    Application Name: iTunes.exe
    Application Version: 10.5.1.42
    Application Timestamp: 4ebf7d7c
    Fault Module Name: ntdll.dll
    Fault Module Version: 6.0.6002.18327
    Fault Module Timestamp: 4cb73436
    Exception Code: 80000003
    Exception Offset: 0004884e
    OS Version: 6.0.6002.2.2.0.768.3
    Locale ID: 3081
    Additional Information 1: fd00
    Additional Information 2: ea6f5fe8924aaa756324d57f87834160
    Additional Information 3: fd00
    Additional Information 4: ea6f5fe8924aaa756324d57f87834160

    I had a similar error, but relating to a different .dll file and on 32-bit Win7.  I think I isolated the problem to Norton Internet Security 2012 v 18.6.0.29 - iTunes would start fine with NAV Antivirus Auto-Protect disabled but crashed if Auto-Protect was on.  I tried running iTunes as administrator (right click on the icon and select "Run as Administrator"; to make this permanent right click on the icon > Properties > On the Shortcut tab, click Advanced > tick Run as Administrator) and iTunes now runs fine.  Maybe give that a try?

  • How to measure work centre performance in the pp point and pm pinot of view

    Dear Guru`s,
    how to evaluate the work centre performance in the pp,pm point?
    how to evaluate the OEE (overall equipment efficieny)?
    can anybody suggest that, if there is any transactions are avialable to get the reports or any process is to be followed to evaluate these?.
    regards,

    hi
    you can evaluate the PM work center using t-codes
    CR05 - Work Center List
    CR06 - Cost Center Assignment
    CR07 - Work Center Capacity
    CR08 - Work Center Hierarchy
    with this you can get the requirment,available and overlaod of the capacity
    OEE cannot be directly calculated you can develop the custom based program to calulate the one with available input,( available hrs,down time hrs)
    regards
    thyagarajan

  • Phone 5 freezes at lock screen but control centre and answering calls woriks, to work again i should press lock button then it works normally and freezes again if i leave it for 1min or less icant understand what problem isit,restored in dfu,normal no use

    phone 5 freezes at lock screen but control centre and answering calls woriks, to work again i should press lock button then it works normally and freezes again if i leave it for 1min or less icant understand what problem isit,restored in dfu,normal no use i still have problem please try to sovle it

    i tried it but no use
    i restored it as new device and kept it idle over night but no use

Maybe you are looking for

  • Looking for a query to find first/last dates in overlapping dates...

    Hi, I'm looking for a query to find the first dates and last dates in a table conaining overlapping dates. I have a subscription table which has for each Customer start and end date for different subscriptions. I want to know the different ranges of

  • Itunes not recognising any of my devices?

    I plugged in my iPod nano 7th generation the other day to sync a new album to it and a message popped up saying: 'An iPod has been detected, but it could not be identified properly. Please disconnect and reconnect the device.' The iPod worked fine th

  • Is Pages a good 'reader' app for Word documents ?

    In doing a few searches in this forum on the subject I find some conflicting reports ( what a surprise ) so I am compelled to ask : How good a job does Pages do in reading Word documents particularly Word documments from PCs? Most of our word proc ne

  • ICloud refuses to work with me.

    I know this question has been answered before, and I've even read some replies. But nothing seems to be working. I simply want applications like iCal, Reminders, Notes, etc. to sync properly from Macbook to iPhone. It never wants to synchronize. Am I

  • Opentype fonts do not appear in any applications

    I recently discovered some opentype fonts that came with Adobe CS3. The fonts are in the font folder in the root library and appear in the application Font Book. However, the fonts do not show up in any other application, including the Adobe applicat