Work centre capacity utilization

Dear guru ,
i have a work centre that always work in the same moment for 3 different production order.
If my total daily available capacity is 11 hours for my 1 individual capacity is right that I assign to the work centre a capacity utilization of 300 percent in order to have a daily available capacity of 33 hours and I can use capacity levelling in the best way ?
Or there is other better solution for solving this problem ?
Thanks for your help.

you can also put no. of individual capacity as 3.

Similar Messages

  • Work-Centre Capacity

    Hi Experts,
    We want to maintain the capacity of work centre can you please answer the following :
    1.We have created workcenter such as AUTO at second level & AUTO-WELD,AUTO-FITT on third level in Hierarchy.
    Could you tell me how I have to maintain the capacity, should i maintain on third level or second level basically what is the process of maintaining capacity to work centre.
    2.If i maintain capacity only on third level could i see the total capacity on second level of hierarchy summation of welder & fitter workcentre .
    3.IF I Have one engineer common for  4 welder  & 4 fitter under the AUTO-WELD & AUTO-FITT workcenter, what could be the indual capacity 5 or 4 for one workcentre.Here ,should i consider engineer also for both the workcenter or should i skip this engineer for both workcentre.
    AR
    Edited by: Amit  Rana on Feb 8, 2010 7:22 PM

    Hi experts,
    I have modified the question, & expecting your valuable input.
    AR

  • Work centre capacity tables

    Hi gurus,
    I need to extract data from CM50 report output. I need to extract the values from following fields.
    Pegged requirements
    Activity/operation
    Pegged rqmts type
    Pegged reqmt qty
    Total capacity reqmts
    Material
    Work Center
    Plant
    Available Capacity
    Can you please tell me the list of corresponding tables to do this.
    Regards
    Rajib Pathak

    Hi
    KAKO - Capacity Header Segment
    KAKT - Capacity Description
    KAZY - Intervals of Capacity
    KBKO - Header record for capacity requirements
    KBED - Capacity requirements records
    KBEZ - Add. data for table KBED (for indiv. capacities/splits
    TC26 Capacity category
    TC26D Default values for capacity
    TC26T Description of the capacity category
    TC27 Capacity planner groups
    TC27T Text for the capacity planner group
    CYAFVG - View for Capacity Planning: "Order Operatns/netw.activities"
    CYOPR_MOVE - Order-/operation data

  • Inconsistent - Work Centre's Long-term Planning (KAKO-KAPLPL)

    Hi Experts,
    we're upgarding from SAP4.5 to ERP6.
    I reviewed OSS note 950834, but it's not related.
    We extracted from SAP4.5 Work Centre - Capacity Header - Long-term
    Planning.
    It's ticked (X) in CR03, but blank () in table KAKO-KAPLPL.
    We loaded into ERP6 Work Centre - Capacity Header - Long-term Planning.
    It's blank () in CR03, but ticked (X) in table KAKO-KAPLPL.
    Please advise the fix for this issue.
    Thanks,
    Thomas

    Dear Thomas,
    I suggest you to check relevant OSS notes. Also creaete a OSS message for this issue.
    thanks and regards
    muru

  • Work center capacity graphical view

    Greetings!
    How do I see work center available capacity in graphical form?
    Also how can I see work center capacity utilization in graphical form?
    -Hemant

    Hi
    I don't exactly remember, the T-CODE is CM02 or CM03.
    Regards
    MUHAMMAD HUNAIN AHMED

  • PP Work centres actual capacity Utilization

    Dear All,
    I want to have some information about the cube from which i can extract the data of PP work centre's capacity utilization. thanks

    Hi Amir,
    Did you try 0PP_C13?
    Hope this helps,
    Rgds,
    Guru

  • Capacity category in work centre

    Hi, we maintained the two different capacity categories (001 and 002) in work centre. Please advise in which table these 2 capacity categories will be saved in sap? Thank you.

    Dear Raju,
    Please refer the table KAKO to view the capacity categories.
    Refer the table CRHd and enter the work center to get the object ID.
    Enter the Object id while using KAKO and get the capacity category.
    regards,
    Joseph charles Vaikathussery
    Edited by: Joseph  Charles on Feb 10, 2011 12:54 PM

  • Capacity utilization report (Labour)

    Hi
    We are developing workcenter capacity utilization report.
    We have taken available capacity from KAKO table and function module.
    Actual finished set up hrs we are taking from AFRU -ISM01/ILE01
    My issue is for capturing confirmed set up hrs AFRU is the correct table or any other table is there.
    when i am testing some production orders set up time values are not flowing into the developed report.
    In which table we can see confirmed set up/processing times etc.
    regards,
    srihari.M

    Dear
    Check the Work Centre assingin in the operation overview screen -then double clcik on this -Goto Work Centre Basic data Tab -Check the Standrda Value Key -Stndard value drives the three Setup , labout , machine to be entre or must be entred or not .
    If Rule for maintainec is not for Set up , then this will not come up in Confirmation screen also and hence in  your customised report .Or you may be having Set up hrs which have not confirmed yet .Based on this SVK , you will choose the Formula key for Scehdule , capactiy and also Csoting tab to calcuate the same.
    Check this and come back
    regards
    JH

  • 2 machines in 1 work centre

    Hi Experts,
    In my scenario there are 2 machines in 1 work centre. So when I go to capacity tab then where can I maintain that I have 2 machine capacity? Please answer me ASAP....

    Hi,
    You can maintain two machine as one work center in the Capacities tab enter 001 (Machine capactiy) and enter the system will take to another screen, where you can enter the time ofthe workcenter and capacity utilization and number of individual capacity, there you can enter 2. So the the capacity available will be multiplied by the number of capacity.
    for Ex: you have enter time 08:00:00 to 17:00:00 then for one machine the available capacity is 9 hrs for 2 machines, it will be 18 hrs, the system will calcutate andit will show the capacity as 18 hrs.
    Thanks,
    JK

  • Tcode for display of capacity utilization

    Gurus,
    can u please supply me with the t code for display of capacity utilization at all work centres at plant level. I also need scheduling reports.
    Thanks

    Hi
    In CM01 ,enter work center and plant.click on standard overview.You get week wise(you can change settings as per your wish day wise/month wise also)requirements,available capacity ,capacity load and remaining available capacity.
    select one period and click on capa details/ period .The report shows tha materials, scheduling dates and pegged requirement qty.
    Regards,
    Rajaram.K

  • Report for calculating capacity utilization and Efficency

    Hi,
    We are following REM in our company. The production line is defined in the production version. While backflushing the production line is called automatically and hence backflushing is done.
    We calculate the capacity utilization by using the formulae.
    Capacity Utilization = (Backflushed Qty/ Available capacity)*100.
    My queries are:
    1. Is there any standard report to determine the capacity utilization of a production line.
    2. Is there any standard report to calcualte the efficency of a production line.
    waiting for reply.
    With regards,
    Afzal

    Hi afzal
    1. you have mentioned ; Available capacity = Std.time per piece * no. of working hrs
    Let me explain with example
    suppose per piece if it takes 10 mins, now according to your formula
    A.C = 10* 24 * 60 = 14400 per day, but which is not correct
    normally if 10 mins/ peice means 6 peices/hr and for 24 hrs 24*6 = 144.
    so it must be A.C =  no. of working hrs / Std.time per piece.
    2. You have mentioned = capacity utlilised = total Backflushed qty per day., which means you are caluculating capacity utilization based on input material.
    3. Utilization = (Avaliable capacity/ Capacity utilised) * 100
    suppose let  us consider Available capacity per day =100
    capacity utilized = 50
    Utilization = (100/50) * 100 = 200%, which is not correct it should be only 50%
    Here my main doubt is why You are caluculating capacity based on input material.
    Please explanin  me you business process and whats the exact requirement so that I can help you out.
    Please check the formulae

  • Employment percent and Capacity Utilization Level

    What is the significance of the Employment percent field on infotype 0007 and the Capacity utilization field on infotype 0008?  Are either one of them used by the Payroll processor to determine salary and net pay if the CATS time system is not implemented?
    We want to pay part-time monthly employees, for example, at 80% of their salary if they have an 80% work schedule.  We do not wish to change the salary, but can't figure out how these percent fields would change their pay.  They don't seem to in our testing.
    Regards
    Janice Ishee

    If you  are  using Indirect valuation of wage types  & Specyfying  Reduction Method as 2  in wage type characteristics , the Amount is reduced According to the capacity Utilization specified in IT 8 .
    Subhash

  • Break the link between IT0007 and IT0008 for Capacity Utilization Level

    Hi Gurus!
    We have a system that connects the field "Employment Percentage" from IT0007 with the "Capacity Utilization Level" from IT0008. That means that every change in the Employment Percentage changes also the percentage in the Capacity Utilization level.
    Our idea is to disconnect those two fields and make them independent, because the HR Department preffer to introduce this information manually twice (once in each infotype).
    Do you have any idea of how I should do that?
    Thank you in advance!
    Abel

    I know what it means... The problem is for what they are using this infotype.
    For them IT0007 has the schedule of the person, and the percentage can change (<100% means part-time employee)... but in IT0008 they WANT ALWAYS the 100%, because for them this percentage is based in how many hours of all the hours informed in IT0007 the employee worked.
    In other words, if the employee has a Work Schedule Rule of 8 hours a day, but he is contracted part-time for only 4 hours a day, In the IT0007 he will be informed with an Employment percentage of 50%, but in the IT0008 he will have a Capacity Utilization Level of 100%, because he will work the 100% of the hours informed in the IT0007 (the 4 hours informed in Daily Working Hours).
    I know it is a little bit confusing, but it's the way they are working now... probably in the future they will correct their processes, but now we must adapt to their requirements and work in this way.
    Any Idea will be welcomed
    Edited by: Abel Raya on Jan 27, 2011 11:21 AM

  • Capacity utilization rate (percent)

    Experts,
    If I set up a shift 6:00:00 to 14:00:00:00, length of breaks 00:30:00, cap. util. 100% I get 7,5 hr Operation time / Capacity.
    If I reduce the cap. util. to 80% and leave the start-, end- & breaktimes as they are I get 6,0 hr Operation time / Capacity.
    My question is how does the reduced operating time influences the start and end times/dates in regard to scheduling ?
    I am Looking for the logic behind.
    Thanks in advance
    Jörg

    Jorg,
    Capacity utilization is more frequently used with referance to viewing available capacity against requirements on CM01 screen.
    It helps determine if there will be a capacity overload due to capacity inefficiency.
    For ex. On Cm01 screen for Work center say W1, if a production order requires 7.5 hours to complete an operation on W1
    & if Cap ultil=80% at W1, system will show that order with RED overload view as available cap is reduced to 6 hours.
    However if your using finite scheduling then this cap util rate would be cheked to determine scheduling.
    You control the capacity availability check and the finite scheduling with the help of the overall profile that you entered in Customizing for the availability check.
    Hope this gives you some insight on this concept.
    thanks,
    Ram

  • Capacity Utilization Level on Basic Pay IT0008

    Can the capacity utilization level be automatically set based on the weekly/monthly/yearly hours of the work schedule rule?  For example, if 100% capacity utilization is defined as 2,000 hours per year and the employee's work schedule is 1,500 hours per year I want the percentage to be automatically set to 75%.

    The problem is that a full time employee would work 1,950 hours per year (7.5 hours per day, M-F).  We have defined part time work schedules that may be 6 hours per day, M-F, or 1,560 hours per year.  The ratio of 1,560 to 1,950 is 80%, but when I assign the part time work schedule indicated above, the planned working time Employement percent for the work schedule is 100%.  This means the 100% refers to the work schedule with a total of 1,560 hours per year, not 100% of the 1,950.  I would like the capacity utilization to be set based off the planned work schedule hours in IT0007 compared to some fixed full time hours amount (like the hours value in V_T510I)

Maybe you are looking for

  • Using a Statefull Session Bean with RMI on Multiple JSP pages

    Heya all, i have a JBoss server running with a statefull bean on it. I want to use it on my JSP pages. But every time I start my JSP-page a NEW INSTANTION of the bean is created! For each user using my page, I want ONE bean. Is there anyway to do thi

  • How can I get my equalizer settings to work??

    Since installation of vs 7. and 7.01, I find that my eq settings that I have meticulously and painstakingly set on almost all songs are not always working. Specifically: 1) When playing songs, if you were to select "show equalizer", you would find th

  • How do I roll back from Premiere Pro CC 2014.0.1 to 2014.0.0?

    2014.0.1 destroys my ability to upload large files to YouTube which I need to be able to do. The functionality was fine before the new .01 which went online Thursday 7/25. Tech Support advised me to uninstall then stop the re-install at 90%. All that

  • Catching Events from Com side using ActiveX bridge

    Hi, I have packaged a java swing application into an activex control using the ActiveX bridge. I now need to be able to fire events from my java code which the com/VB code needs to be able to trap. The event handler on the com side looks like this: f

  • CHM help file and java

    is there any way to open a chm help file using java (so that the help viewer starts up)? this program will probably display a chm if it's running on a windows machine and in html if not