Work Centre Settings

Hi,
A person is authorized to add people in the work sentre through T-code IR02 but every time he is adding a person in the work centre it indirectly affects the HR Master Data.I have a business requirement which has to make sure that the changes to the data in the work centre should be independent of the HR Master Data and the data should remain the same before and after the changes.Is there anything i am missing on my part.
Regards
Madiha

Hi Madiha,
             These changes reflecting were due to Dynamic Actions.check is there any DA is defined for this Work Centre field in the Table T588Z using TCode SM30. IF exist based on u r requirement De-Active those Statments and check.
Regards,
Narendra.

Similar Messages

  • Creating/Copying a Work Centre,also a Production Scheduler and Cost Centre.

    Hi All,
    I am trying to create a new work centre based on the settings of a previous one? First of all,how I can do this?
    Secondly,after I have created the new work centre (having copied being copied from another),I need to create a new production Scheduler and Cost Centre? How I will be able to do so,also?Will the Production Scheduller and Cost Centre assignments fom the old work centre be copied,too,or I will need to create/copy these from scratch?
    All help greatly appreciated,will award points to all useful answers.
    PAPJ1.
    Edited by: PAPJ1 on May 20, 2011 11:01 AM

    Hello,
    You can create a new work center by copying an existing work center. in the cr01 screen in the copy from column put the plant name and Ref. work center name and put enter. all the existing data will be copied to the newly created work center. no need to create new assignment to  Production Scheduller and Cost Center.
    Hope it helps.
    Regards
    Alok

  • Activity type in work centre

    Hi,all,
    I have a requirement as mentioned below-
    I have certain pm work center like engineer,fitters.But under engineer i have 3 different activity type like Sr.engineer time,Asst.engineer time,Jr.engineer time.I have assigned all these 3 activity type in my work centre in cost tab page along with standard formula SAP008.Now , my requirement is when I assign this work center in my equipment or maintenance order ,in operation tab pages of maintenance order ,only these three activity type should flow from where I want to select my relevant activity type.But instead of this,all the activity type around 10 nos whatever defined by CO consultant , is flowing to my order from where i need to select.I want only those 3 activity type which I had defined in my work center.can anybody please explain how to fulfill my requirement.thanks in advance.
    rgds
    rajib

    hi
    you can make the default cost element by creating the external profile in IMG and assigning to the order type ,also in easy access screen during order creation you can mention as default values in the menu Extras>settings>default values
    As per what cost element has to be specified kindly consult with the CO team,regarding the mandatory field may be you have specified the fields as mandatory in IMG settings,kindly check
    regards
    thyagarajan

  • Pm querry regarding work centre

    hi
    1.any one plz tell me about formulas and how they are given in work centres and related parameter settings for formulas.
    regards
    sharath

    For standard as Thyagarajan said..
    Capacity - SAP008
    Scheduling - SAP004
    Costing -  SAP008
    Formula in Workcenter:
    http://help.sap.com/saphelp_erp2004/helpdata//EN/b1/c03348439a11d189410000e829fbbd/frameset.htm
    Hope this helps-

  • RESOURCE & WORK CENTRE

    What is the difference between Resource & Work Centre?Is it necessary to create
    Resource before creating Work Centre.Please make me clear.

    Dear,
    Normally PP-PI is recommended for process oriented industries like pharmaceutical,chemicals industries,cement industries etc. It is similar to the discrete but instead of routing, it uses the master recipe where the process messages are maintained.
    1) Batch Oriented process manufacturing.
    2) Process order based manufacturing.you copy the process described in a master recipe and adjust it to the actual production run.
    3) Master Data includes Master Recipes and resources.
    4) Process Management:In this area, you coordinate the communication between PP-PI and process control during the execution of a process order
    Discrete manufaturing  is used in  manufacturing companies
    This method is applicable to the manufacturing set up where small lots are manufactured with frequent changes in the settings.This manufacturing is accounted through production orders. With normal routing.
    Please check this thread to get more idea.
    /message/3760818#3760818 [original link is broken]
    Hope clear toyou.
    Regards,
    R.Brahmankar

  • Work centre capacity utilization

    Dear guru ,
    i have a work centre that always work in the same moment for 3 different production order.
    If my total daily available capacity is 11 hours for my 1 individual capacity is right that I assign to the work centre a capacity utilization of 300 percent in order to have a daily available capacity of 33 hours and I can use capacity levelling in the best way ?
    Or there is other better solution for solving this problem ?
    Thanks for your help.

    you can also put no. of individual capacity as 3.

  • Airprint no longer working – router settings wrong?

    Airprint no longer working – router settings wrong?  Network TP-Link TD-W8951ND router.   version 5.1, Firmware build 120522.  As far as I know the settings are factory defaults with two exceptions.  My ISP input various settings to reflect my proper internet connect configuration.  I have assigned one static port “100” to a printer not currently on the network. Auto DHCP now starts at “101”.  Epson Artisan 837 printer.  New, Bonjour service name EPSON3FC9CA (Artisan 837),   auto IP address (currently 192.168.1.103), firmware WB15D3 38.38 linked wirelessly not by Ethernet.  iPhone 4S Software 6.1.3 (10B329).   iPad 3 Software version 6.1.3 (10B329)   Windows Vista 32-bit laptop, linked wirelessly, auto IP address  Windows 7 64-bit desktop, linked via Ethernet, auto IP address  MagicJack Plus, linked via Ethernet, auto IP address   Installing Epson On June 6, 2013, using my laptop, installed it wirelessly on my network.  Updated firmware etc.  All worked well.  Same for the desktop.  Again all functioning as planned.  The installed printer name was Artisan 837 (Network)  When I tried to use the Airprint function on my iPhone it could not find any Airprint printers.  I downloaded and ran the Bonjour print services wizard.  This created a printer named EPSON3FC9CA (Artisan 837).  I could now print wirelessly as planned. Problem solved I thought.  As of June 6, 2013 all software and firmware is current.  On June 12 attempted to link my iPad to Airprint for the first time.  It could not find an Airprint printer.  I tried my iPhone and it could no longer find an Airprint printer. I tried numerous powerdowns, reboots, reinstalls etc. to no avail.  I can point Safari wirelessly to the printer IP address on both iPhone and iPad and see the printer’s “web page” to check ink level, settings etc.  I downloaded Epson iPrint to both iPhone and iPad and that software works as planned allowing wireless printing.  I tested the Epson on my older Linksys router  and my iPad found it as an Airprint printer!  Worked wirelessly as planned.  Conclusions The only thing that is not working as planned is Airprint functionality on my TP-Link network. I am thinking there is a setting on the TP-Link router that needs to be adjusted to keep the Bonjour established software path open and persistent.  From the time I first established the Airprint connection to the next time I tried to establish a connection was some 6 days.  Although the iPad and iPhone renew their network lease every 90 days, the other equipment lease runs for 3 days before renewal.  I don’t know if the IP address of the Epson changed on renewal.  (Even if it did, I would hope the discover functionality should follow to the new address.)  Over that 6 day period there were no software or firmware changes.  As far as I know the only environmental change would be related to IP addresses or something else at the router level severing the connection.   Before trying a static IP setting for the Epson (and I don’t know if that will work) are there any other router settings to check that will clear up this situation?  I am sending this to TP-Link, Epson, Apple, and my ISP in hopes that a solution can be found.

    Thank you for your reply.  What I didn't mention was that I have spent days googling to find an solution.  I have tried most alternatives suggested to no avail.  My problem is quite technical and most probably has a very specific and simple solution related to my router (set ABC to 123XY).  All alternatives ended, "if this doesn't work contact the supplier".  So I have - Apple (here), Epson, TP-Link and my ISP.  When (if?) I find a solution I'll post it here for others to learn from.

  • WORK CENTRE IN EQUIPMENT MASTER DATA

    Hello All,
    In IE01 tcode > creation of equipment , pls tell me what is the relevance of work centre in location tab ??
    Thanks,
    Sunny

    Hi
    Work Center
    Definition:Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example:
    Machines, machine groups
    Production lines
    Assembly work centers
    Employees, groups of employees
    Use
    Together with bills of material and routings, work centers belong to the most important master data in the R/3 production planning and control system. Work centers are used in task list operations and work orders. Task lists are for example routings, maintenance task lists, inspection plans and standard networks. Work orders are created for production, quality assurance, plant maintenance and for the Project System as networks.
    Data in work centers is used for
    Scheduling
    Operating times and formulas are entered in the work center, so that the duration of an operation can be calculated.
    Costing
    Formulas are entered in the work center, so that the costs of an operation can be calculated. A work center is also assigned to a cost center.
    Capacity planning
    The available capacity and formulas for calculating capacity requirements are entered in the work center.
    Simplifying operation maintenance
    Various default values for operations can be entered in the work center.
    Look at CR01 ,CR02,CR03 Transaction
    table : CRHD Table
    <b>Reward points for useful Answers</b>
    Regards
    Anji

  • Work centres for employee of more than one plant

    Hello experts
    I have a question regarding work centres. Our department is managing a pool of workers which consist of employee from more than one plant. Somebody had made experience concerning this issue?
    Furthermore we have to manage external workers as capacity. How can I build up this in SAP?
    Best regards

    >
    > I confused plants with company code.
    >
      This bit difficult for me to decide and say something.
      Depends on the business requirement and business process and legal statuses it will be decided.
      some time plans can also be company 'codes'.
      if the management wants to differentiate plants in financial terms plants may become company codes.
    >
    So we have employees of different company codes which get managed by one department manager. Is that possible to make one work center so that we are able to manage them together. Seems infeasible.  So we have to create for every company code one work center, but we never have an overview of our total workers...
    >
    One thing you need to get clarified here. Company is a separate legal entity.
    if you want one employee to work in different companies on different assignments you support use (MGE and CE concept)
    >
    > If he/she working in two different site we can manage the situation with dual reporting concept.
    > and with:
    > For cost center you can always use cost center split. while posting to FI/CO.
    >
      Dual reporting is to manage the people.
      Cost is for final analysis ( where employee work how much incured, how much profit/loss earned)

  • Restricting the change of workcentre in CO11N to selected work centres

    Dear PP Gurus,
      I have included the following screen
    0420: Personnel: incl work center and posting date  in the confirmation profile, so that the user can change the work centre at the time of confirmation. However the user wants that there should be a check where in only the workcentres which are used in parallel to be allowed for the perticular operation.
    Please guide how to achieve this? Can we have a check thorugh any of the user exit below:
    CONFPP02  PP order conf.: Customer specific input checks 1
    CONFPP03  PP order conf.: Cust. specific check after op. selection
    CONFPP04  PP order conf.: Customer specific input checks 2
    CONFPP05  PP order conf.: Customer specific enhancements when saving
    Eg.
    For operation 0020 the user may perform the confirmations on Weld1 /Weld2 /Weld 3 machine. Now the system will allow to select any work centre other than these three. That may lead to wrong confirmation. The user wants to restrict the work centres to be selected to these three only. These three machines are mentioend as parallel sequence in the routing.
    Regards
    Ankush

    Hey..
    How did u resolve this? i have the same kind of requirement and getting the same error as direct navigation not allowed.
    Can you please let me know. It's urgent.
    Thanks,
    Mahesh

  • How to Create New Activity Type  for Assiged to work centre Costing in Acti

    Dear Sir,
    We have four activity type to assigned in workcentre Costing Activity. Details are as under
    AIRJET     2010     AIRJET
    DONIER     2010     DORNIER
    SULTEX     2010     SULTEX
    SULZER     2010     SULZER
    in addition one more loom is comming in our unit and require new activity type.
    How can i create new.
    Please guide.
    Thanks in advance
    Regards
    Ajit

    Dear ,
    To create new Activity Type  , you need to follow the below steps :
    KA01 - Create Primary Cost Element for the new activities type.
    KL01 - Create Activity Type tied to the primary cost element. 
    KP26 - Change Activity Type/Activity Price Planning - maintain the Variable price
    Assign the activity type to cost center using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal Year as 20xx.
    Click on Overview tab on top and key in costing details in this screen.
    After performing this ,while creating the work center ,this combination of activity type & cost center should be assigned.
    At work centre level , you should have
    1.Create Standrad Value Key -OP19 and Formula Key in OP49.
    2.Create Formula Parameters in OP7B or u can use existing one to assing in the Standard Value Key
    3.In CR02-Assing the Standard value key in Basic Data  and select the Formula Key in Costing tab with cost centre assingement .Save
    Try and check
    Regards
    JH

  • How to assign work centre in OM

    Hi,
    In organizational structure how to assign work centre.
    it is necessary to assign cost centre to org structure.how ?
    President has to be given personnel no.?
    if employee is reporting to two superiors of different depts or different regions ,how the employee should be placed i.e dual reporting?
    Urgently reply.
    Thks
    Archana

    Hi Archana,
    1. To assign Work Center the T-code is PO01.
    2. Yes. In SAP HR every employee has to be given Personnel Number irrespective of their designations.
    3. No its not possible according to me (Gurus Pls correct me too if I am wrong)
    Hope above answers are helpful to you.
    Regards
    Pavani
    Remainder: Points to be given on answered.

  • Multiple hierarchies in Work Status settings

    Hi,
    I have datasouce dimension with more than one hierarchy and  I need to set work status using multiple hierarchies but Work Status Settings in Admin console allow to specify only one hierarchy in Base Hierarchy.
    A possible solution could be to create a new hierarchy that includes the others but I don't like.
    Do you have any other idea?
    I'm working on SAP BPC 10 MS
    Many thanks
    Dina

    Hi Dina,
    as per note 1339135 - How to set dimension hierarchy on work status settings
    <If you set "Base Hierarchy" to 2 for a dimension has 3 hierarchies, you cannot set work status for members included in hierarchy 1 and 3 on BPC for Web. Only you can set work status for members of hierarchy 2.>
    so I think the only solution is yours.
    Regards
         Roberto

  • Work centre change in production order

    Hi,
    During creation of production order, i want  to change the work centre if in the existing operation, that particular work centre is overloaded.
    Could any one let me know what are the steps involved in it.
    Re

    Hi,
    Goto CM25 & select the Overload workcenter &  underload workcenter .
    Inside the planning tabel select the Operation  from "Order (Pool) tabel"  and drag manually to the "under load workcenter " displayed in  upper table (workcenter) for required date. Now the operation workcenter has become changed & rescheduled.
    Regards
    Pradeep

  • Work Centre in Org Management

    Hi Gurus,
    How to view work centre object A wither in organization & staffing or simple maintenance
    I assigned workcentre to the position through PP01 but couldn't view in either above.
    Sunny

    Hi,
    to view the Workcenter with the orgunit create the evaluation path (OOAW tcode)accordingly.
    then execute the report RHSTRU00 with the eveluation path.
    then you can see the work center..
    Try the std Evaluation path
    A_TASKS

Maybe you are looking for

  • 2 yrs worth of music on my ipod nano 5th gen just vanished while I was trying to add four new tracks.

    Most of the music I've put on my ipod nano 5th gen in the last 2 years just vanished while I was trying to add four new tracks. Stuff from before that seems to be still there (I add stuff manually, not sync, and the ipod wasn't full). It was a bit gl

  • How can I convert pdf to word in Argentina

    I tried to buy the subscription package but it is not available in Argentina. Does that mean I cannot convert my pdf files? That doesn't sound right. Please help, thanks

  • HINCREMP/Claims Disbursement report

    Hi Experts, I am running this report for disbursement of unclaimed medical allowances; it updates infotype 267 for an offcycle payment. but i want it to update IT 15 for a regular payroll run. Can please some one tell how i can achive this. its very

  • Unable to run URL from a servlet program

    Hi , I have some problems in executing a URL which is coded to run the reports in HTML format from the J2EE-Oracle Web application. The servlet is coded to set the browser properties such as content type, content length, etc....The content length is

  • How to connect another database

    I have installed ORACLE 10g database express edition and want to connect to another oracle 8i database, that have installed at server how to connect.