Work Flow of  a Support Project

Hi Gurus,
             Could Anyone mail the work flow of solving tickets by introducing new configuration in a support project and its authorizations to [email protected]
Regards,
Sarosh

Any AE project requires some planning. The more elements that are involved, the greater the level of planning. I just recently completed a project that involved 3D modeling, client supplied video to be used as a texture, and AE for final composite. We didn't draw any storyboards, but we did look at a bunch of similar animations and make a fist full of notes. If I were to attempt a James Bond style open I'd be sketching out storyboards, looking at every James Bond open that I could find, looking at every similar movie or TV show open that I could find, and brainstorming with colleagues, and working out a production timeline and budget. There's nothing worse than shooting some footage without a plan then trying to bend it into an concept that just doesn't fit.
I suspect you wanted a to do list. Well here it is.
1. Write a script for your open including all the elements that must be there
2. Turn the script into a storyboard
3. Block out the required shots so that they will work with your concept (IOW shoot your greenscreen footage with the same lens angle of view that you're going to use for the 3D camera in AE so that the perspectives match)
4. Do some tests in AE using at least shape layers for the elements
5. Make sure that you have all the tools you need (IOW plug-ins, cameras, lights, skills, music, sound effects)
6. Shoot what you've put on the storyboard
7. Shoot some extra footage
8. Start laying out the elements
9. Render out some motion tests
10. Refine, Refine, Refine
11. Wait a day or two
12. Final polish and render
Hope this helps.

Similar Messages

  • Work Flow Process in a Support Project

    Hi Gurus,
                 Could you mail the work flow Process of Solving a Ticket.ie Introducing a New configuration and its Authorizations?
    Regards,
    Sarosh

    Hi,
    I guess there are a lot of OWB project people that have similar needs as you.
    My needs have two main reasons:
    Managing incremental loading - I need to know last time a specific mapping ran (start-, end time and status). This might be tricky however, as clocks on different instances might be out of sync - use NTP (network time protocol sync) or maintain source system mapping time in supporting tables.
    Modularizing workflows with lots of mappings - current workflow operators force you to implement everything in a single process to maximize parallellism - because you cannot wait for events outside of your subprocess. Modularizing is achieveable with a workflow event publish/subscripe scheme or a function that blocks until a specific process with the same top_level_execution_audit_id finishes. If I settle for a little less parallellism, just querying the status of the process will do.
    Such functions can be implemented around the public view ALL_RT_AUDIT_EXECUTIONS, but it would have been really nice if they were a part of the OWB library.
    Regards, Hans Henrik

  • For a beginner to work in Oracle EBS, Which is better start, support project or implementation?

    Dear Experts,
    I have just joined a company which works on Oracle ERP. and i have been assigned to a support project with an idea that there i will have more opportunities to learn and then I can shift over to Implementation project. Since I am a fresher I have no clue How the career growth goes. So my question is whether I should first take support and then Implementation or I should Take an Implementation Project Directly.
    Secondly I want to know what are differences In Roles and Responsibilities as a fresher in Support and Implementation projects.
    Please reply ASAP.

    Dear Experts,
    I have just joined a company which works on Oracle ERP. and i have been assigned to a support project with an idea that there i will have more opportunities to learn and then I can shift over to Implementation project. Since I am a fresher I have no clue How the career growth goes. So my question is whether I should first take support and then Implementation or I should Take an Implementation Project Directly.
    Secondly I want to know what are differences In Roles and Responsibilities as a fresher in Support and Implementation projects.
    Please reply ASAP.

  • Anybody got a better work flow for backing up multiple shoot day projects?

    Many of my projects are shot over multiple days. I import media at the end of each day and back up the event to another drive before deleting media from cameras/cards. So on day 2 I have one of three work flows for updating my back-ups.
    1. If I'm feeling lucky. I delete the previous back-up project from the back-up drive. And then make a new copy of the original event and add the date to the title after the word copy.
    2. I make a new copy of the event to the backup drive and date it. When it's done copying and been verified I delete the back-up event from the same back-up drive.
    3. I've just started copying new clips from the original media folder in the original event to the back-up project. It's more work keeping track of all the newly added media files and there is more chance of making an ommision.
    Anybody got a better work flow for backing up multiple shoot day projects?

    What you need:
    You will need two identical external drives and a copy of Carbon Copy Cloner. CCC is free. The drives could be USB 2 if all you are doing is backing up. If you plan on editing with the drive(s), you'll want firewire. Each needs to be large enough to contain the raw card contents for the duration of your gig.
    The Process:
    At the end of the first day's recording, connect the two drives to your computer (if firewire, daisy chain them / if USB, you'll need two USB 2.0 ports)
    On the first hard drive (Drive 1) create a folder - call it BigDealLecture
    Inside of BigDealLecture, create a folder and use the nameing convention  "BDL_Date_card number for that day" - so if you used 2 cards today, you should create BDL_2012-02-15_01 and BDL_2012-02-15_02
    Attach your card reader or camera to the system.
    Lock the cards so they can not be erased
    Insert Card 1 into the reader
    Select ALL contents of the card and copy them to the folder you created for the first card for today
    When it is complete, eject the card, insert card 2, copy its contents to the folder for card 2
    eject the card
    Launch CCC and do a clone of Drive 1 to Drive 2. You can set it to do a complete block by block clone or an incremental backup. Either will work.
    When finished cloning, test a random sample of the clips on both drives to make sure they work.
    When satisfied the copies work, put Drive 2 in the hotel safe.
    Put the Drive 1 in a place where you can grab it if there is an emergency in the night and erase the cards to get ready for the next day.
    Take Drive 1 with you to the lecture site the next day.
    Rinse and repeat daily.
    When the conference is over, send one of the drives via FedEx or some other same day service to your office. Pack the second drive in your bags for the trip home.
    A note: If you have enough downtime durning the conference between obligations, you can do the transfer from the cards to Drive 1 on site and do the clone when you get back to your room. Don't unlock and erase the cards until you are satisfied the copy/clone process was without incident.
    Have fun.
    x

  • Regarding work flow in the organisation

    Hello,
          I am new to SAP XI. I want to join as a SAP XI developer. So I want to know about the work flow in the organisation. Means who will raise issues and who will take care of it first. and how it will reach to SAP XI developer.
        What are the human roles in the SAP XI Work flow in the organization and what are their responsibilities. Who will responsible to  write the Java mapping coding or ABAP mapping coding or XSLT mapping coding.
    Thank you
    Edited by: jyotsna dm on Apr 12, 2008 6:54 AM

    Hi,
    In XI: It is separated in two parts
    1) XI basis (Administration)
    Activites are:
    1) XI installation
    2) Configuration activitie
    3) Post installation checks
    4) SLD configuration
    5) Create Users,
    6) Role assignments.
    And many more
    2) XI Implementation and development.
    Under the development you have two parts Integration repository which is desing part which involves small amount of Java knowledge whenever your requirement is not fulfilled by standard SAP XI function.
    and integration Configuration:
    This is very simple stpes once your design is over.Based on your requirement you have to use the standard adapter provided by SAP for example if file is coming then u will go for File adapter,if IDOC is psoted to R3 then you go for IDOC adapter,communication with remote client u go for SOAP adapter.
    XI Project lifecycle:
    1) Blue printing phase (Design phase).
    2) Build phase (Development)
    3) Integration testing
    4) Project go live
    5) Support.
    Now coming to ur question.
    XI Developers role and responsibilities are:
    •     Analysis of the Functional Specifications which is received from Function people.
    •      Understanding the processes related to the third party non SAP and SAP systems.
    •     Raise issue log for the business requirement which is not understood from functional spec.
    •     Prepare Technical Specification Document,
    •     Do the development: now developer has to do the coding which either involved java,XSLT,abap mapping.
    •     Prepare the UTC
    •     Reviewing Interface Technical Specifications and Unit Test Document, Interface build and Unit Test, Self and peer review of the deliverables, develop Interface Object via Design and Configuration.
    •     Project golive and give support and do bug fixing,change request n all.
    hopw u got the prefect workflow.
    chirag

  • Plz give me work flow of film editing in Final Cut Pro..

    Hello Everyone...
    I am basically a Avid Film Editor. Past 2 years I am using Final Cut Pro. Recently I finished Final Cut Pro Level 1 & T3. Right now I am working as a App. Support Engineer specially for Final Cut Pro .
    I want know the work flow of film editing in Final Cut Pro. I am very interested to do film editing in FCP but the workflow from Avid to FCP its totally different.
    I tried few options like using FCP & Cinema Tools..
    1. Captured 25fps clips and cofirmed to 24fps in cinematools.
    2. In FCP the Timeline frame rate is 24fps
    But I am not able to understand..
    1. What is Database?
    2. Cant we capture 24fps in FCP?
    3. How to Synchronize captured clips with Cinema Tools database?
    4. How to link the captured clips in to Cinema Tools database?
    5. Where do I enter the KN Start & KN End?
    6. What about Pull List & Cut List?
    Please give me the details of film technics in Final Cut Pro....
    Thanks in advance....

    I knew I'd find this same post here. That makes three versions of trhe same list of questions.
    Posting three times here implies you have posted this set of questions in many other FCP forums around the Net. If that is so, do us all the kindness of returning to all of them and closing them. Include the suggestions you have received and the solutions that were successful for you. That way your multiple threads will show up on search inquiries when other confused FCP newbies try to start complex film projects.
    It's a bummer you cannot find these answers in the FCP manuals, I'm usre you looked there first. But, since we run on volunteers around here, it may be several days before someone with enough practical CinemaTools experience can stop by and handle them for you. Please have some patience.
    bogiesan

  • Work Flow Process in OWB 9.0.3.0.1

    I would like to generate a work flow process to execute the mappings with condition as if a mapping success continues with de execution of the other mapping. In this version of OWB there is not implemented any process flow and I would like to Know how can i do this process flow.

    Hi,
    I guess there are a lot of OWB project people that have similar needs as you.
    My needs have two main reasons:
    Managing incremental loading - I need to know last time a specific mapping ran (start-, end time and status). This might be tricky however, as clocks on different instances might be out of sync - use NTP (network time protocol sync) or maintain source system mapping time in supporting tables.
    Modularizing workflows with lots of mappings - current workflow operators force you to implement everything in a single process to maximize parallellism - because you cannot wait for events outside of your subprocess. Modularizing is achieveable with a workflow event publish/subscripe scheme or a function that blocks until a specific process with the same top_level_execution_audit_id finishes. If I settle for a little less parallellism, just querying the status of the process will do.
    Such functions can be implemented around the public view ALL_RT_AUDIT_EXECUTIONS, but it would have been really nice if they were a part of the OWB library.
    Regards, Hans Henrik

  • Modify Transition element in work flow using for and not attributes to restrict access

    Hi,
    I have TFS 2013 for my premises and I am working on changing the work flow for TFS work item. I have created a work item as per requirement and it has 3 states
    Active, In Review and Closed in work flow. When developer creates a work item it is in Active state and later it is sent to In Review and then to close after successful review.
    My question is I want development team to be restricted to move the work item to Close state. At present when developer creates a new work item they see Active state. At this point they can not see any other states in the work item. Later they
    fill the details and after checkin they will put that work item to In Review state. At this point they can see Active and In Review states. When they save this work item and modify it again they see Close state as well. I want to design the Transition element
    in work flow in such a way then developers should not be able to see the Close state at all in a work item assigned to them. Only reviewer should be able to transit the work item from In Review to Close.
    I checked the for and not attributes in the transition element but I have no idea about correct syntax I should use to enforce the restriction. I would also like to mention here that I have no separate groups defined in my TFS server. Every
    one is a part of contributor's group. There is no specific group of reviewers and one developer reviews the code of another. I want to design the work flow in such a way that the developer who creates (or gets assigned) the work item should
    not be able to put their own work item in Close state but they should be able to close another developer's work item if that work item has his name in the reviewer's box.
    I have tried to simplify my question by elaborating it hope it is not complex to understand. Let me know if you want further clarification on this.
    Regards, Premal Acharya

    Hi Premal,
    For your scenario, seems the "for" and "not" attributes not are unavailable to make it happens. Because of the developers not in groups, and the same type of work items can be assigned to all the developers hence the attributes cannot
    be allow and deny users in the groups concurrently. Please check the
    page for more information about transition xml element.
    Based on your situation, you can separate the development group and test group. Then you can only allow test group to change the state.
    Best regards,
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Work flow definition.

    Give me information about Work Flow Definition?

    hi payal,
    SAP Business Workflow
    Purpose
    SAP Business Workflow® is a cross-application tool which makes it possible to integrate business tasks between applications. This component supplements the existing, comprehensive, business functions of the R/3 System.
    With this component, you can adapt the standard functions of the SAP R/3 System to the specific requirements of your enterprise. The component contains the functions and tools with which you can control and edit the cross-application processes.
    Implementation Considerations
    Many application components of the R/3 System use and integrate SAP Business Workflow functions. Therefore, be sure to execute the function Maintain standard settings for SAP Business Workflow in SAP Business Workflow Customizing.
    Integration
    Integration of SAP R/3 Functions
    SAP Business Workflow is incorporated at an integration level above the transaction level. The component uses the existing transactions and function modules. The functionality and operability of the existing transactions and function modules are neither changed nor restricted by the workflow control. SAP Business Workflow does not intervene in the programmed processes within a transaction.
    The component SAP Business Workflow, as a cross-application workflow management system, hence separates the organizational aspects of the control logic from the application logic. The component makes the R/3 System easier to operate, which is particularly useful for inexperienced or occasional users.
    Integration of Organizational Management
    The integration of the application component Organizational Management into SAP Business Workflow allows you to link tasks with the agents possible from an organizational point of view. This link allows the workflow management system to find the "right" agents and assign tasks to them.
    Tasks and agents are linked on an abstract descriptive level based on jobs and organizational units. It is therefore possible for several employees having equal authorization within the organization to receive the same task for execution. One of these employees takes on this task and processes it. This assignment principle supports automatic load distribution within work groups with the same activity profile.
    This means a high degree of transparency of business processes, including responsibilities.
    Changes to the organizational structure of the enterprise and employee turnover therefore have direct effects in SAP Business Workflow as well, without changes having to be made there.
    Features
    With this component, you can automate and coordinate several business processes:
    u2022     Complete work processes executed frequently
    The level of complexity of these processes can vary. It ranges from functions which must be called by the user to continue processing, to event-driven business processes in which the R/3 System determines the individual steps by evaluating process-dependent information, and various agents then execute all the processing steps required.
    The processing of activities is not necessarily tied to specific persons, but perhaps only to organizational units, project groups, or job descriptions.
    u2022     Subprocesses
    Examples of these include release or approval procedures involving two persons.
    u2022     Reaction to error or exception situations
    hope it helps u...

  • Is there a way of working collaboratively on a flex project with a small project group?

    Is there a way of working collaboratively on a flex project with a small project group?
    I am part of a small group of developers who wish to work on a single flex project together. Is there a way to set up flex so that the project can be developed by multiple people at the same time. I have seen one thread out on the internet about working locally and then uploading to SVn but this is not an option in this case.
    Any ideas.
    Many thanks in advance
    Dave

    I would say that rushing into development without a source-control system will cost you more in the long-run. If your organisation is serious about developing software it then it needs to invest in the necesary infrastructure, so you should get that process kicked-off as soon as possible.
    In the interim you could set-up a source control server on one developer's machine or commandeer a spare machine to use as a temporary source control server. Just make sure you have it backed-up regularly. Or you could use one of the online source control services; many will support private repositories for a small fee.

  • File not found error at Attachement link in GroupVote of Human Work Flow

    Hi Gurus
    In Human Work flow,
    I have created the GroupVote and assigned to two person.
    I checked "share attachments and comments" to share their issues.
    One signed on to WorkApplist and review the forms and attached the file,
    The file link was created but it could not be downloaded.
    it could not delete.
    I tested several times it occured same results.
    It did not be happend when this option "share attachments and comments" was not checked.
    domain log and opmn log are as below.
    <2008-08-25 14:55:15,468> <ERROR> <oracle.bpel.services.workflow> <::> Identity Service Authentication failure.
    Identity Service Authentication failure.
    Check the error stack and fix the cause of the error. Contact oracle support if error is not fixable.
    ORABPEL-10528
    Identity Service Authentication failure.
    Identity Service Authentication failure.
    Check the error stack and fix the cause of the error. Contact oracle support if error is not fixable.
         at oracle.tip.pc.services.identity.jazn.xml.XMLAuthenticationService.authenticateUser(XMLAuthenticationService.java:150)
         at oracle.tip.pc.services.identity.jazn.xml.XMLIdentityService.authenticateUser(XMLIdentityService.java:426)
         at oracle.bpel.services.workflow.verification.impl.VerificationService.authenticateUser(VerificationService.java:299)
         at oracle.bpel.services.workflow.query.impl.TaskQueryService.authenticate(TaskQueryService.java:135)
         at worklistapp.servlets.Login.handleRequest(Login.java:101)
         at worklistapp.servlets.BaseServlet.doPost(BaseServlet.java:157)
         at javax.servlet.http.HttpServlet.service(HttpServlet.java:763)
         at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
         at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:64)
         at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
         at java.security.AccessController.doPrivileged(Native Method)
         at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
         at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
         at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:621)
         at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:368)
         at com.evermind.server.http.HttpRequestHandler.doProcessRequest(HttpRequestHandler.java:866)
         at com.evermind.server.http.HttpRequestHandler.processRequest(HttpRequestHandler.java:448)
         at com.evermind.server.http.AJPRequestHandler.run(AJPRequestHandler.java:302)
         at com.evermind.server.http.AJPRequestHandler.run(AJPRequestHandler.java:190)
         at oracle.oc4j.network.ServerSocketReadHandler$SafeRunnable.run(ServerSocketReadHandler.java:260)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:303)
         at java.lang.Thread.run(Thread.java:595)
    OAS version is 10.1.3.1.
    Any advice will be appricated.
    Thanks

    You are getting : ORABPEL-10528
    Identity Service Authentication failure.
    Identity Service Authentication failure.
    This means that you have wrong username/password entries in your configuration files. Please recheck them and then things should be fine...
    Hope this helps!
    Cheers
    Anirudh Pucha

  • MSMP Work flow in GRC 10.0

    Hi Experts,
    I have a work flow requirement and would appreciate if you guys can please help me here . The actual requirement is to design a CUP Workflow and If there are SOD issues identified, the workflow will need to go to a central team for them to address each issue. If there is no SOD issue found, the workflow should end. The requirement is to configure the access request so that the end goal of work flow is just facilitation of an SOD review.  There would be no actual provisioning of users at the end of the path.
    I am wondering if this would work flow can be initiated with an function module based rule or i would have to create a BRF Rule for this . As per my understanding the flow should be Start > Access Request > Sod Analysis done > If Sod , Go to Central team otherwise end > Central team will decide on the assignment of SoD Resolution > This Team will either Assign MC or wont approve the Role assignment > Both Cases the work flow ends and request is closed.
    Would really appreciate if you guys can assist me as i am new to work flow and this is one of project deliverables . Thank for your valuable time and help .
    Vikas

    Hi Ashish ,
    Thanks for your time . Let me explain you my requirement and would really appreciate if you would have some inputs here which would help me to design this .
    The actual client requirement is to design a CUP Workflow and If there are SOD issues identified, the workflow will need to go to a central team for them to address each issue. If this group decides to apply mitigating controls to the issues, the workflow must then go to the compliance group for them to review for appropriateness. Requirement is do a SoD analysis for every role change/add request , so that this group takes the appropriate action based on the SoD Analysis . For all my CUP request raised , i want system to do a SoD analysis and let this group know whenever there is a SoD found or just end the workflow if there is no risk.
    I am aware of the Risk analysis process for GRC 10.0 , however i want it to happen as a part of this work flow requirement.
    The requirement is to configure the access request work flow so that the end goal of work flow is just facilitation of an SOD review.  I hope i was able to explain my requirement . Thanks again for your help.
    Your valuable guidance would be really appreciated.
    Vikas

  • Data/Work Flow in SAP

    Hi All,
    Plz. explain the Data/Work Flow in SAP
    Is there any difference between this if so explain,
    and kindly tell me the process.
    thank you,
    Narender

    Hii..
    Work Flow- SAP Business Workflow
    Purpose
    SAP Business Workflow can be used to define business processes that are not yet mapped in the R/3 System. These may be simple release or approval procedures, or more complex business processes such as creating a material master and the associated coordination of the departments involved. SAP Business Workflow is particularly suitable for situations in which work processes have to be run through repeatedly, or situations in which the business process requires the involvement of a large number of agents in a specific sequence.
    You can also use SAP Business Workflow to respond to errors and exceptions in other, existing business processes. You can start a workflow when predefined events occur, for example an event can be triggered if particular errors are found during an automatic check.
    SAP provides several workflows that map predefined business processes. These workflows do not require much implementation. For an overview of these SAP workflows, refer to Workflow Scenarios in Applications.
    Integration
    SAP Business Workflow uses the existing transactions and functions of the R/3 System and does not change the functions. You can combine the existing functions of the R/3 System to form new business processes with SAP Business Workflow. The workflow system takes over control of the business processes. If you are already using SAP Organizational Management, you can use the organizational structure created there to have the relevant agents carry out the individual activities. It is possible to have an activity carried out by a position. This ensures that the respective occupiers of the position can carry out the individual activities during execution of the workflow. This means that personnel changes in your organization are taken into account immediately in the execution of a workflow.
    Features
    SAP Business Workflow provides a number of tools for defining and analyzing workflows as well as for monitoring operation.
    The Workflow Builder is for displaying and making changes to workflows. You can make small extensions directly to the original workflows supplied by SAP, such as carrying out your own agent assignments or changing deadline monitoring.
    There are several Workflow Wizards to support you in the definition of workflows, with which you can create specific parts of a workflow. The Workflow Wizard Explorer gives you an overview of the existing Workflow Wizards.
    In order to make the functions of the R/3 Systems available to a workflow, you use business objects, which you can define and analyze in the Business Object Builder. These business objects are made available to the workflow in reusable tasks. The Business Wizard Explorer gives you an overview of all existing tasks.
    The end user receives information about the activities they are to carry out in their Business Workplace. This provides them with a central overview of all the activities that they are authorized to carry out. They can commence the activities from here.
    Several tools are available to the workflow system administrator, with which they can control and analyze the current workflows. The workflow system administrator is notified of problems automatically by the system.
    DATAFLOW-Data flow means flow of data from one module to another within a sap system.
    Regards,
    Aakash

  • Flash builder 4.6 with Flash CS5.5 mobile work flow

    I have a mobile application built in flash professional. For captive runtime or native extensions i use the command line.
    I now want to start using flash builder, as i hear this is the undisputed better coding environment.
    In flash builder, i created a 'flash professional project' to work on my app with both tools simultaneously.
    I thought flash builder 4.6 would give me options like captive runtime or native extensions without using the command line.
    However i dont see these options at all. When i am using a 'flash professional project' in flash builder, am i essentially just using flash builder as a code editor, and all export settings are still handled in flash IDE ? Meaning i cannot take advantage of captive runtime+ ANEs unless using an 'actionscript mobile project'
    Please advise.
    Also, even if i use it as just a better code editor, i am not finding it better so far.
    syntax highlighting seems poor
    simple things like touch events.
    function parameters or inside the function like e.touchPointID , e.stageX
    none of this is highlighted.
    or as simple as
    ball.x;
    the .x would normally be highlighted, but it is not in flash builder.
    Basically, i am finding as a tool to use with flashIDE as a flash professional project, so far i am seeing no benefits. Please help me to discover what i am missing about this editing environments mobile work flow.
    also when i hit ctrl+s to save my work, it jumps between the two programs... saving the project i suppose? hard to just quickly save as you go in case of crashes and such.
    (using winsows 7)
    thanks

    ba-bump

  • Mail sending option at the work flow lavel

    Hi all,
    i m working for a Web Dynpro java where for my project "Classified" after creation of any classified item work flow is there name as approver and publisher.
    I m in search of the functionality where mail need to be trigger for the corresponding creator for the created classified item if once approve or reject by the Approver or Publisher.
    For this from code lavel i need to do something or from Configuration side i need to work on that.
    Regards,
    Deepak

    Hi Deepak,
      If mail Triggering is what all you want,
       then please make use of mail functionality API of  java. For that you need three jar files:smtp,mail,activation.
    Regards,
    Ganga.

Maybe you are looking for