Work force planning & tracking graph.

Hi all,
I am stuck up  with a issue on creating a report on Work force.
The scenario is such:
Suppose the quantity of work is 1000 m3.
the work is to be completed in 30 days duration.
What is the no. of manpower needed to complete the work on per day basis?
When the actual work starts. The engineer will feed the manpower available per day.
A graph is to be generated which will show the actual manpower present on each day against the planned manpower.
Still now I have tried in the following way:
i) I have created a work center.
   In the capacity I have defined 5m3 = 1 hr.
So if per day the work takes place for (say) 10 hrs. then 50m3 can be done.
ii) In Project Builder cj20n -
in the internal activity I have put 30 days in normal duration.
   Now , when I am puting 1000m3 in WORK and taking the option calculate capacity from the drop down the system is asking to maintain the unit in Time unit.
How to map this scenario?
And after this how to feed the manpowre on per day basis?
This report is only for tracking purpose . The manpower is external.
Pl. help me out regarding this.
Thanks.
...A. Bose

Hi,
Create a work center for Labor    1 Man - 1 workcenter
Create a internal activity
Select the work center for labor-- LABOUR
Put the work requirement aagainst Work -- 1000 M3
Against the next  cell Number Put number of Labor-- 5 and Percent 100
Against calculation key Select Calculate duration
Enter
In normal duration u can see the System calculated duration
Rgds

Similar Messages

  • Work center-CApacity-Work force planning

    Dear Expert !
    Please tell me all necessary steps to configure Work center , Capacity and workforce planning .........please provide me all the information of business scenerio where I can use this at user level....with screen shot.
    Thanks in Advance
    ROBERT SMITH "HP"

    Check out below links....
    http://help.sap.com/bp_bblibrary/600/Documentation/Q60_BB_ConfigGuide_EN_US.doc
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPCRPPS/PPCRP_PS.pdf
    Venkat

  • CMP2 work force planning available capacity shows less

    In CMP2 workforce planning : The available capacity for a person (assigned to activity) shows 7.5 Hrs each day although Capacity for that one resours is 8 Hrs (=Operating time). There is only 1 capacity in the work center.
    Can some one give any idea why this descrepancy ?
    Thanks.

    Hi,
    Also check the formula used in the capacities tab of the workcenter.
    BR
    Anjali

  • Reg; Capacity & Work force Planning

    Hi Experts
    I would like to do capcity & workforce planning. I would like to assign resources to WBS rather than workcenter.
    pl let me know the procedure
    regards
    pavan

    Hello Pavan,
    You should elaborate your query before posting so that we can understand your requirements. These topics are a subject for Production Planning module and the same should be posted there.
    Kind Regards // Shaubhik

  • Why don't Grapher's Frame Limits work correctly with saved Grapher files using multiple equations on Mountain Lion?

    Hi,
    I generally enjoy using Grapher in OS X (I am using Mountain Lion v10.8.2). However, I have repeatedly encountered what seems to be broken basic functionality in setting the limits on the display frame  (View> Frame Limits…). When opening saved Grapher files with multiple valid equations in them (equations which include constant terms defined as sets of numbers), I repeatedly get the following behavior:
    1. Frame limits are not correctly saved. As in, the file opens with a different view than it was saved and closed in.
    2. Frame limits no longer work as expected. For example, I might set the Y axis frame limits to be -2 to 2, but the Y axis of the frame display will run from about -1.95 to about -0.35.
    3 Performance is degraded. Making a change to the frame limits (for ecxample, changing the Y frame limits to -2.2 and 5 in an attempt to display something approximating the range -2 to 2) take an inordinate amount of both processor time and clock time. The spinning ball appears and hangs out far longer than is welcome, and at times seems to hang requiring a force quit of Grapher.
    These problems occur regardless of coordinate system.
    Is there a solution? If I create a new file and start from scratch the problems reappear. The problems reappear across a wide range of 2D equation types.
    Is Grapher simply broken in this regard?
    Thanks for the input.

    Bonjour Lexy-Lou,
       You are right, the bug was born with Grapher as you may read on the website
    <http://y.barois.free.fr/grapher/> :
    Grapher’s bugs and their remedies (OS X in French).
              Bug nr. 1. (Grapher 1.1, 2.0, 2.1, 2.2, 2.3). When modifying the main 2D window size, the graph length and height already formatted (menu Format) are changed : axis scale values stay the same, added objects remain same size on the same places (unit pixel) relative to the graph left upper corner ; but the graph view changes for the ratio H/L do so : very annoying !
                        The remedy : To restore the 2D graph after changing the window size : menu Format > Layout > Size > redo the initial choice (paper size or L and H values)… or avoid having to do so by selecting a window large enough to begin with.
                        Proposed correction : making the graph size independent of the main window’s one.
              Bug nr. 2. (Grapher 1.1, 2.0, 2.1, 2.2, 2.3). Saving is wrong in 2D (menu File > Save, Save as, Save a copy as). Are not seved : the last location on the screen of the main window, the graph size, the maximum and minimum values of the ordinate scale : very very annoying !
                        Note : The new windows of Grapher 1.1 (Grapher secondary window > New Graph > 2D or 3D Graph) always open in the same place on the screen( OS X 10.4.11 configured in French) depending on the language used by Grapher : if it’s English, well placed and covering most of the screen, if it is French, the windows are half length but same height and are located on the right side of the screen. This anomaly disappeared with Grapher 2.0, 2.1, 2.2 (English or French).
                        The remedy : to restore the 2D graph after opening a GCX files (.gcx) : menu Format > Layout > Size > redo the initial choice (Paper size or L and H values) to be done twice ; then menu View > Frame limits... > enter minimum and maximum vaues of the y scale. This requires to note four numerical values, L, H, y-min, y-max, for example at the top of the equation list (or at the bottom : see bug nr. 27).
                        Proposed correction : complete saving in 2D.
    For the full list of Grapher's bugs please download "Instructions for Use - Grapher" (English) or "Mode d'emploi de Grapher" (French). Quick glance at the Contents (pages 2 & 3) you'll be surprised by the possibilities of Grapher.app despite the bugs.
      Enjoy,
    Au revoir,
    YB24

  • My left click does not work on my track pad on my macbook pro 13 inch, is there a fix

    my left click does not work on my track pad on my macbook pro 13 inch, is there a fix

    I recommend you to run Apple Hardware Test > http://support.apple.com/kb/ht1509 It's possible that something is damaged, and Apple Hardware Test will help you finding it. Make sure you tick the option to run an extended test, and connect your Mac to the charger.
    If your Mac came with DVDs, you have to insert the Mac OS X DVD to run Apple Hardware Test. As you haven't got the SuperDrive, you will have to buy an external optical drive

  • No data on BlackBerry 10 even with a working data plan

    Hi,
    Q10, unlocked, 10.1.0.4181, Estonian SIM card with a working data plan, correctly set APN, a bunch of restarts, etc - still no data connectivity. With WiFi on, data works, BBM works, everything except for the App World (which is n/a here) works.
    Now. Where is the problem, and how do we solve it? I'm not going to be very keep on accepting answers like "lol you've just spent 650 EUR on a phone and a 10EUR/mo data plan with a 12 months contract which you can throw out of the window."
    Thank you kindly for your answers and suggestions.

    So, have you specifically asked your carrier about any of this, or are you operating purely on assumption? You see, it's entirely possible that your carrier has erroneously mis-provisioned something about your plan, and that's what is causing you to not have any services. It's also possible that you simply cannot have the services you desire on this carrier. But, as has been from the start here, only your carrier can answer these questions, for we have no visibility into anything beyond the words you provide us here -- and so far, all of those words indicate that you must have a discussion with your carrier, but for some reason you are refusing to do so...I really don't understand why you are so reluctant...
    Good luck!
    Occam's Razor nearly always applies when troubleshooting technology issues!
    If anyone has been helpful to you, please show your appreciation by clicking the button inside of their post. Please click here and read, along with the threads to which it links, for helpful information to guide you as you proceed. I always recommend that you treat your BlackBerry like any other computing device, including using a regular backup schedule...click here for an article with instructions.
    Join our BBM Channels
    BSCF General Channel
    PIN: C0001B7B4   Display/Scan Bar Code
    Knowledge Base Updates
    PIN: C0005A9AA   Display/Scan Bar Code

  • Macbook Pro (2011) froze while working, forced shut down, now won't turn on. Grey screen with apple logo and spinning wheel for hours. Help?

    Macbook Pro (2011) froze while working, forced shut down, now won't turn on. Grey screen with apple logo and spinning wheel for hours. Help?
    Unfortunately do not know the operating system since I never updated anything and I can't get in to it.
    Thanks for your assistance.

    If you want to preserve the data on the boot drive, and it's not already backed up, you must try to back up now, before you do anything else. It may or may not be possible. If you don't care about the data, you can skip this step.
    There are several ways to back up a Mac that is not fully functional. You need an external hard drive to hold the backup data.
    1. Boot from the Recovery partition or from a local Time Machine backup volume (option key at startup.) Launch Disk Utility and follow the instructions in this support article, under “Instructions for backing up to an external hard disk via Disk Utility.”
    2. If you have access to a working Mac, and both it and the non-working Mac have FireWire or Thunderbolt ports, boot the non-working Mac in target disk mode. Use the working Mac to copy the data to another drive. This technique won't work with USB, Ethernet, Wi-Fi, or Bluetooth.
    3. If the internal drive of the non-working Mac is user-replaceable, remove it and mount it in an external enclosure or drive dock. Use another Mac to copy the data.

  • Pen Tool doesn't work on Video Tracks

    Hi there,
    Today I woke up and found that video tracks in my timeline I could no longer just grab the pen tool, click, and change the levels (such as manually configuring a fade in or out dissolve)
    There is just no line in the Video track where I can click and drag the levels up and down.
    But the pen tool still works in audio tracks. I can raise lower my volume no problem and also manually configure sound transitions.
    The only thing I can think of that I did was I used some h.264 video that had some frame blending in it (not sure what its called but were not every frame is Independent) but now when I go into any project including projects that I clearly used the pen tool before-- no go. The line for the level is just not there anywhere anymore.
    Anyone know what it is or if there is a setting that allows you to fudge with the video levels in the timeline. Maybe I disabled it somehow and need to re-enable it?
    thanks!

    I have just had the same problem thi fixed it for me:
    Right click on the clip, go to show clip keyframes, then select opacity. the opacity keyframe line appeared after i did that.

  • Installation/Work center/Plan number combination

    Hi,
    How/Where  to view the work orders for given Installation/Work center/Plan number combination? What is the transaction for this?
    Thanks & Regards,
    Jegashree

    Hi Not sure aout installation, but by work cneter and plant  you can chck report COOIS for production orders.

  • Work Force Management 8.5 Video Demonstration

    Good Morning,
    I just wanted to know if anybody has a good demonstration to present to our client.  They would like a video demonstration that showcases the functionality of work force management in a concise manner, prior to implementing.  This will also expedite the process of completing the design and configuration sessions with them.   I have the end user guides for agents, supervisors and administrators as well as the installation guides, but they want to see a quick demo to see if it will still fit their desired business need still.
    I found some demonstration for Work Force Optimization but it was a dead link from the Cisco site.   Any information is useful.
    Best Regards,
    Maybelyn

    A couple things I'd try would be:
    1) Check the "Call Statistics" on each phone (during a call) to confirm they think they are sending and recieving video.
    1) Is a privacy shutter closed on one end or the other? Is one side or the other muted?
    2) factory reset both of the phones...
    3) Remove both phones from UCM and reregister them.
    4) Grab a capture on a port connected to one of the phones..to see what traffic you're actually seeing
    5) Are there any firewalls/ACLs that would block the video stream?

  • Oracle work force certificates not yet received

    Hi all,
    am not sure whether i can post this.if seems wrong,will delete it.
    i did a course in an oracle work force development program institute in chennai,india.i did it 2 months back.
    but till now they haven't give me the certificates and dis-count voucher,which they said would be given in 10 days after the completion of course.when asked,they keep on saying,its the delay from oracle and have to wait.what shall i do now.may i contact oracle education,else whom should i contact regards this. could you please guide as i have to request for OCP only after i receive those certificates.

    raoofdba wrote:
    Hi all,
    am not sure whether i can post this.if seems wrong,will delete it.
    i did a course in an oracle work force development program institute in chennai,india.i did it 2 months back.
    but till now they haven't give me the certificates and dis-count voucher,which they said would be given in 10 days after the completion of course.when asked,they keep on saying,its the delay from oracle and have to wait.what shall i do now.may i contact oracle education,else whom should i contact regards this. could you please guide as i have to request for OCP only after i receive those certificates.Lets be clear:-
    To obtain Oracle Certification you need to achieve:-
    (1) Relevant Exam Passes
    (2) For DBA OCP ... submission and verification of course attendance.
    Now to achieve (1) you need to sit the exams, and you would wish to have dis-count vouchers to reduce the cost of the exams.
    You may already have enough information to do (2).
    The issues you have are between yourself and the WDP Instution. If you have a concern then I recommend contacting the Oracle WDP representative for you region in the first instance.
    ( https://workforce.oracle.com/pls/wdp/rd_psp_contact )

  • Can I playback track and work on another track before recording it

    Can I record an audio track and instrument track at the same time? Can I work on a track and hear it before recording the track?

    Can Larry read the manual......
    http://help.apple.com/logicpro/mac/10/

  • Can't get the desktop app to work - forced to sign out and it shuts down

    I was unable to install the most recent update for Adobe Story, so I uninstalled the app, went online and re-downloaded. Now, when I try to launch I get an error that user preferences weren't found, and it forces me to sign out, so I can't work offline.
    I've tried a system restore, but it did not fix the problem. At this point, I am unable to use Adobe Story on my computer, just online.
    Please help me fix this.

    I solved this myself by creating a second Adobe ID, sharing my project files with myself under the new ID.
    The app works with the new ID I created.

  • Dynamic Height in Graphs does not work properly when the graph is in an list

    Help please,
    I have an report in SQL Server 2008 (SP1) Reporting Services which uses Dynamic Height to dynamically increase the size of the graph for the data. For a single dataset this works great!
    When I place this graph in a list/tablix (to display this graph on each group) things go bad... Only the first graph on every page is resized, all other graphs on the same page are equal in size of the first!
    When I place a pagebreak on the lists property all graphs are drawn fine!! But then I will have a page for every question in my data (which can be a lot!)
    What is going on here? Please help.

    Hi Jerry,
    thanks for your reply, but this does not work. The graphs are now all the same size (the size of the first one that is), and on the same page for that matter...
    It looks like the renderer calculates the value of the dynamic height only once on a page in stead of each graph. That's a bug in my opinion.
    Any suggestions on how to fix this?
    The inner workings of the report are like this: The data contains anwers from a survey by question, so i have a unknown count of answers with each question; I placed a list on my report with a groupingproperty on the question asked. On this list i place a horizontal bar-graph which must grow in height when it is too small. The dynamic height should be calculated like this =70 + (CountDistinct(AnswerValue.Value)*10) & "pt".
    When i place this calculation in a textbox, every item in the group is calculated correctly. Each graph is drawn, but the graphs are sized only to the size of the first graph on the page. When I place a pagebreak after each list-repeat (so i get each question on a seperate page) each graph is drawn correctly! This results however in more than 100 pages with all used for just a few centimeters (think about trees!).
    I'm using SQL 2008 / SSRS2008 with SP1 by the way ( without SP1, the behaviour is the same).
    Any more suggestions are appreciated.
    Danny

Maybe you are looking for

  • Cannot edit a photo in Iphoto goes to a black screen

    I can see my photos in the thumnail view but when I double click the image in EDIT mode it enlarges then goes to a black screen. It is not allow me to edit any more---after a few years of doing this. What can I do? I rebuilt it already. What next?

  • Will the Thunderbolt Display work when I close the lid?

    I have a 2012 Macbook Pro. I'm thinking about buying the Thunderbolt Display, but only if it can simulate a desktop and I can close the lid of my Macbook. I'm asking this because I know it goes to sleep when closed and was wondering if the Display ma

  • Passing in Parameters other then the list of paramters in PL/SQL based Item

    When you create an Item Type based on PL/SQL there is a section where you choose the parameters such as Page ID, Page Group... I wanted to pass the parent id to the proc but I dont see an attribute for Parent ID.... how pass the parent id as a parame

  • Elements 11 organizer

    I have Elements 11. I have liked and used the organizer for years, but I do not like this one.  Can I delete all photos from the organizer but not the computer.  I want to use the Picture file to organize and the editor to manipulate photos and then

  • How do I Show date and time when I hover over clip like in iMovie

    How do I get FCPX 10.6 to show date and time when I hover over a clip? I can so it in I movie and as I move over my clips the date/time is shown. I need it for that specific point in the clip not just the record start time.