Work scheduling view-material master

Hi, wht is meant by lot size depenedent parameters and lot size independent parametrs? how to use that data in manufacturing industry? pls advise.

Dear Yadav,
case1: If you have maintained the Inhouse production time for any product in the MRP2 view,this get's automatically reflected
in Work scheduling view as lot size independent Inhouse production time.
At this point if basic scheduling is carried out during MRP then the date calculation will be based upon this number of days
irrespective of the order quantity.
case2:Once after maintaining the operation timings in the routing,you can update the same using CA97,for the relevant task list
type ,group and group counter no and include the check box for update material master directly,you can find the timings
maintained on hour basis in the setup,processing and inter operation (This calculation is based on the timings maintained in the
routing and also your work center capacity details,like the number of hours this capacity will be available for a day).
Once after performing this,even if you have maintained the inhouse production time in days,that value gets removed.
This time will be considered for basic scheduling purpose during MRP.
So in my understanding this will be helpful during the scheduling purpose for the date calculation.
Check and revert back with your further queries.
Regards
Mangalraj.S

Similar Messages

  • Change/ removal of Unit of Issue in Material master Work scheduling view

    Hi,
    Is there a way to remove Unit of Issue from Work scheduling view? it is giving error message as "this is being used in BOM". Even if we put deletion indicator also it is showing same error message.
    Regards,
    R. Srinivasan

    Do a CS15 for the material in question and make sure you go in the BOM and select the material and click on delete/remove you can then do this.
    I have tested it and it works.
    Regards
    Adeel

  • Work scheduling view and warehouse management view

    Can any one explain what is Work scheduling view and where it need to be extended fro raw material or Finished or Semi finished

    Hi,
    Work schedule is purl related to PP where as warehouse management related to warehouse
    where it need to be extended fro raw material or Finished or Semi finishe
    It can be for three
    check following link also
    [work schedule|http://www.sap-img.com/production/work-scheduling-view-in-material-master.htm]
    Regards
    Kailas Ugale

  • Work scheduling view

    Hi,
    In production order, basic dates are coming what we are maintaining as in house production time in material master.
    I want to maintain basic dates as per the quantity.
    Ex: To produce 100 pc, in house prod. time will be 5 days. And if the order quantity is 200 pcs then basic dates should show 10 days.
    In work scheduling view, I maintain base quantity and in house prod. Time. When I run MRP for order quantity of 200, basic dates shows 5 days only.
    What is the purpose of having base quantity, in house prod. Timeu2026 in work scheduling view?
    Regards / US

    Dear,
    Your master date is correct. Go to OPU3. In scheduling - Adjust Dates Set 2 Donot adjust basic dates, dep req to operation dates.
    It Determines if and how the basic dates or the dependent requirements dates are adjusted during lead time scheduling. You can customize this in OPU3 for planned order & OPU5 for Production Order.
    Regards
    Abhijit Gautam
    Edited by: Abhijit Gautam on Nov 28, 2011 5:11 PM

  • Work scheduling view query

    even though i have made settings in customisation i am unable to get work scheduling view while creating material master can you explain me why?

    Hi
    Have you maintained  in SPRO->Logistics-Genral->Material Master->Basic settings->Define atributes of material types
    workscheduling view for the new material type.
    please check and come back.
    Regards,
    srihari.M
    Edited by: Srihari.M on Apr 21, 2011 6:52 AM

  • Work scheduling view should be preselected while creating semifinish matl.

    Dear Sirs,
    I have a specific requirement - that while creating  the material master through MM01 I want preselected work scheduling view.
    *Pls don't suggest user specific settings and screen sequence settings.
    Thank you,
    Anup.

    2 options available
    1.select that view for your plant and save as default values .Every time you create it will be defaulted
    2. or USe screen variant in SHd0 for the t-code MM01

  • Work flow in Material Master

    How to configure work flow for Material Master creation or change?

    Hi Anamika
    For configuring material master , you can use BDC or LSMW .
    This  would reduce your input time and effort
    link:[http://www.sap-img.com/general/lsmw-steps-for-data-migration.htm]
    link:[http://www.saptechies.com/learning-bdc-programming/]
    Regards
    Vikrant
    Edited by: Vikrant Choudhary on Feb 26, 2009 1:27 PM

  • Work Schedule in HR Master Data Feeding Work Center!

    Hi,
    I have several questions on how work schedule in HR master data relates to the work center for capacity planning.
    1. How do we assign the employee to a work center? is that in the HR master data or work center or some other transaction?
    2. If we can assign an employee to a work center, how the work schedule in the HR master data feeds the work center capacity? Is there any button that I can control whether I want to feed the work center capactiy from HR master data work schedule or from manual input directly to work center?
    3. If I can feed the HR master data work schedule to work center, what do I need to do to reflect the vacation time or sick time which is not in the work schedule in the HR master data to the work center?
    Thanks,
    Ting

    Hi,
    For starters, please take a look at the following discussion:
    Logistics Work Center and HR Work center.
    Credits: SDN members
    Hope this helps.
    Donnie

  • Work scheduling view via MATMAS idoc

    Can somebody tell me which segment and field is used in MATMAS idoc to create Work scheduling view?

    Hi,
    Identify the various Basic Types available for MATMAS and then provide the basic type in transaction WE30 and you can check the various segments being generated.
    Thanks
    Krithika

  • Old material number - Field in Basic Data 1 View Material Master

    Hai Techies,
    We have a field called old material number - MARA-BISMT in material master basic data 1 view. Is that field is just for reference of old material or does it have any effects in the SAP MM when using the material for purchasing or in BOM or so on.
    Could any one please highlight me the consequences of using this field to refer a old material number for the new number created.
    Thanking you in advance.
    Regards,
    Kris.S

    Hello Kris,
    Number under which you have managed the material so far or still manage it,
    for example, in another system or in a card index.
    You can use the old material number to systematically search for material
    master records via matchcodes.
    Your understanding for the use of this field is correct.
    regards
    Ray

  • CLASSIFICATION VIEW / MATERIAL MASTER

    HI EXPERTS,
    I am facing a problem regarding classification view of a material master.
    In my organisation for a perticular material type I have to maintain CLASSIFICATION view. But by mistake I forgot to maintain classification view of some material.
    There are more than 1000 material , so it is not possible to check each material individually and if classification view is not maintained that I have to maintain it.
    Kindly reply me with some standrad method, so that I will check for which material classification view is maintained or not. According to that I will proceed.
    Regards.
    raghu.

    MM50 is the way.
    If you didn't add the classification for a material then you have to extend the material with the classification view. If you enter Maintenance Status C and your material type, it will lsit all materials that DO NOT have a classification view created.
    If however, you created the classification view, but didn't enter one of classification values, this will not help. You could try the tools in Classification System --> Environment -->Reporting.
    Rgds
    Richard

  • BAPI or FM to do scheduled(planned) material master change

    If this is has been asked and answered before I apologize in advance.  Sorry, but I can't seem to find it.
    I am quite happy with using fm BAPI_MATERIAL_SAVEDATA.  But as far as I am aware, this does an immediate change only.  I am trying to find a similar FM to schedule material master changes like can be done with transaction MM12.
    Do you know of FM to do this?
    Thanks,

    Hi,
    I would suggest you perform the BDC recording for the transaction ME52 istead of the ME52N, as it wil be easy to record and perform the necessary updates later.
    AS for the FM to be used you can useFM 'ME_UPDATE_REQUISITION'  field ' PLIFZ (Planned delivery time in days) ' from the structure UEBAN (Change Document Structure; Generated by RSSCD000)
    Hope it helps
    Regards,
    Mansi.

  • Views material master.

    Hi,
    where can I find all possible views for material master?
    What is the table containing the material master views?
    Best regards

    Hi
    You can find in the table MARA. Field PSTAT contains list views extended. for more information press F1 on the field PSTAT.
    regards
    Srinivas

  • Procurement Type in MRP2 view - material master - configuration?

    for the life of me, i cannot find how to configure this field. does anyone have any knowledge how to configure this field to have more options from a material type standpoint?
    for example, if i use a VERP material type, i want to have the ability to choose in house (E) or external (F) procurement.
    thanks in advance.

    HI,
    SPRO > Logistics - General > Material Master > Basic Setting > Material Types > Define Atrributes of Material Types.
    Choose the desired material type > double click > on 'Internal/external purchase order' tab (section) please set '2' (or '1') for both external and internal PO.
    BR
    Csaba
    Edited by: Csaba Szommer on Jul 10, 2008 5:36 PM

  • QM view material master (Inspection Type)

    Hi there,
                 I didn't understood the pragmatic usage of the check box <u><b>inspection by configuration</b></u> &  <u><b>inspection by characteristics</b></u>.......that can be set for the inspection types..........
    Please enlighten me ......
    Thanks
    Kaushik
    Message was edited by:
            Kaushik Choudhury

    If you set this indicator, the system takes the configurations from the sales or production order into account when inspection lots are created and changes or supplements the inspection specifications in the task list or material specification.
    The indicator only works for the following inspection lot origins:
    o   01 Goods recipt for purchase order
    o   03 Production
    o   04 Goods receipt for production order
    The indicator cannot be used for the inspection lot origins 10 and 11.
    Example
    When creating the sales order, the customer defines that the pH value of the product to be manufactured should be between 5.0 and 5.5. When an inspection lot is created for the resulting production order, this tolerance is then copied into the inspection.
    Dependencies
    The specifications are only copied into the inspection lot if there is a link between the class characteristic and a master inspection characteristic.
    Hope this helps you.

Maybe you are looking for

  • How can I set up a screen screen sharing VNC at a resolution higher than display?

    I have a mid 2010 MacBook Pro 13in, and i have set up screen sharing to access over VNC. I want to view my mac on my 1920x1080 display hooked up to my PC. But when i do it is not full screen, it is the same resolution as my MBP. how can i run it at a

  • Is there any way to print directly from InDesign CS3 to Mavericks 10.9.4?

    Are there any fixes or workarounds that allow me to print directly from InDesign CS3 to Mavericks 10.9.4. Everything I try now causes InDesign to freeze if I attempt to print. The only way is to export the file as a PDF. Thank you.

  • Overlap with payment run 25.02.2008

    Hello friends,   While running APP at F110, i got the error as "overlap with payment run 25.02.2008 HMY1(Co. code)" The description is given below: Diagnosis Accounts to be processed in this run have already been processed in payment run or proposal

  • Authorization of movement types

    Dear All, I want to restrict users for Movement type, Material type wise. As per requirement ROH materials will pass through the 103,105 (quality check cycle) during procurement. For HIBE material quality check (103,105) is not required. GRN will be

  • Login fails b/c computer is off line

    I have read the forums enough to determine that my problem with not being able to log in is due to the fact that I must be able to access the internet at least the first time I log on after I have gone off line. (such as traveling from home to work).