Work scheduling view should be preselected while creating semifinish matl.

Dear Sirs,
I have a specific requirement - that while creating  the material master through MM01 I want preselected work scheduling view.
*Pls don't suggest user specific settings and screen sequence settings.
Thank you,
Anup.

2 options available
1.select that view for your plant and save as default values .Every time you create it will be defaulted
2. or USe screen variant in SHd0 for the t-code MM01

Similar Messages

  • Work scheduling view query

    even though i have made settings in customisation i am unable to get work scheduling view while creating material master can you explain me why?

    Hi
    Have you maintained  in SPRO->Logistics-Genral->Material Master->Basic settings->Define atributes of material types
    workscheduling view for the new material type.
    please check and come back.
    Regards,
    srihari.M
    Edited by: Srihari.M on Apr 21, 2011 6:52 AM

  • Work scheduling view

    Hi,
    In production order, basic dates are coming what we are maintaining as in house production time in material master.
    I want to maintain basic dates as per the quantity.
    Ex: To produce 100 pc, in house prod. time will be 5 days. And if the order quantity is 200 pcs then basic dates should show 10 days.
    In work scheduling view, I maintain base quantity and in house prod. Time. When I run MRP for order quantity of 200, basic dates shows 5 days only.
    What is the purpose of having base quantity, in house prod. Timeu2026 in work scheduling view?
    Regards / US

    Dear,
    Your master date is correct. Go to OPU3. In scheduling - Adjust Dates Set 2 Donot adjust basic dates, dep req to operation dates.
    It Determines if and how the basic dates or the dependent requirements dates are adjusted during lead time scheduling. You can customize this in OPU3 for planned order & OPU5 for Production Order.
    Regards
    Abhijit Gautam
    Edited by: Abhijit Gautam on Nov 28, 2011 5:11 PM

  • Work scheduling view via MATMAS idoc

    Can somebody tell me which segment and field is used in MATMAS idoc to create Work scheduling view?

    Hi,
    Identify the various Basic Types available for MATMAS and then provide the basic type in transaction WE30 and you can check the various segments being generated.
    Thanks
    Krithika

  • Change/ removal of Unit of Issue in Material master Work scheduling view

    Hi,
    Is there a way to remove Unit of Issue from Work scheduling view? it is giving error message as "this is being used in BOM". Even if we put deletion indicator also it is showing same error message.
    Regards,
    R. Srinivasan

    Do a CS15 for the material in question and make sure you go in the BOM and select the material and click on delete/remove you can then do this.
    I have tested it and it works.
    Regards
    Adeel

  • Work scheduling view and warehouse management view

    Can any one explain what is Work scheduling view and where it need to be extended fro raw material or Finished or Semi finished

    Hi,
    Work schedule is purl related to PP where as warehouse management related to warehouse
    where it need to be extended fro raw material or Finished or Semi finishe
    It can be for three
    check following link also
    [work schedule|http://www.sap-img.com/production/work-scheduling-view-in-material-master.htm]
    Regards
    Kailas Ugale

  • Work scheduling view-material master

    Hi, wht is meant by lot size depenedent parameters and lot size independent parametrs? how to use that data in manufacturing industry? pls advise.

    Dear Yadav,
    case1: If you have maintained the Inhouse production time for any product in the MRP2 view,this get's automatically reflected
    in Work scheduling view as lot size independent Inhouse production time.
    At this point if basic scheduling is carried out during MRP then the date calculation will be based upon this number of days
    irrespective of the order quantity.
    case2:Once after maintaining the operation timings in the routing,you can update the same using CA97,for the relevant task list
    type ,group and group counter no and include the check box for update material master directly,you can find the timings
    maintained on hour basis in the setup,processing and inter operation (This calculation is based on the timings maintained in the
    routing and also your work center capacity details,like the number of hours this capacity will be available for a day).
    Once after performing this,even if you have maintained the inhouse production time in days,that value gets removed.
    This time will be considered for basic scheduling purpose during MRP.
    So in my understanding this will be helpful during the scheduling purpose for the date calculation.
    Check and revert back with your further queries.
    Regards
    Mangalraj.S

  • Duplication in part numbers should not accepted while creating  material ma

    Hi all,
    How can i set Duplication in part numbers should not accepted while creating  material master. How can do this requirment plz help me.
    thanks
    ramesh

    hi,
    please check is there any user exit or BADI available and make use of it.

  • PR00 should automatically display while creating sales order

    Hi,
    PR00 should automatically display in sales order and i have to enter price only without maintain condition record.
    i dont want to enter PR00 and price.
    PR00....................................1000
    Defaultly that pr00 should be display in the sales condition and price filed should be blank.
    so that i can enter price for that condition type PR00.
    my client dont want to enter condition type every time.
    Thanks in advance
    by
    babs

    Hi,
    Thanks for ur reply.
    But my requirement is not that.
    I am creating sales order and entered customer number, material and qty.
    now system throw an error PR00 Mandatory pricing missing
    In Item overview  select condition tab
    There u have to enter PR00 ............1000
    Instead of this, PR00 should be there and price field should be blank.
    now i can enter only price for PR00 condition type.
    I dont want to select condition type(PR00) each and every time while entering price.
    I hope now you understand my requirement.
    Thx in advance
    babs

  • Error while creating Materialized View step 3 of 6 using wizard

    have oracle 9i Rel 1 on Windows 2000 server. Master Site has been setup. Database links are created at Materialized view site. But while creating Materialized View Group using wizard there is following error on step 3 of 6.
    Statement:----------------
    /*OracleOEM*/ SELECT 1 FROM SYS.dba_constraints@masterdbname WHERE OWNER='username' and table_name='tabname' AND constraint_type='P'
    Stack Trace:----------------
    ORA-00942: table or view does not exist.
    ORA-02063: preceding line from masterdbname.
    All parameters for replication are correct.
    Please help me early.
    Thanks

    Hello,
    In the masterdbname, logging as sys user, you must grant select permission on sys.dba_constraints view to mvadmin_dbname user (where dbname is the replicated database name).
    Regards,

  • Error while creating Materialized View step 3 of 6

    I have oracle 9i Rel 1 on Windows 2000 server. Master Site has been setup. Database links are created at Materialized view site. But while creating Materialized View Group there is following error on step 3 of 6.
    Statement:----------------
    /*OracleOEM*/ SELECT 1 FROM SYS.dba_constraints@masterdbname WHERE OWNER='username' and table_name='tabname' AND constraint_type='P'
    Stack Trace:----------------
    ORA-00942: table or view does not exist.
    ORA-02063: preceding line from masterdbname.
    All parameters for replication are correct.
    Please help me early.
    Thanks

    Hello,
    In the masterdbname, logging as sys user, you must grant select permission on sys.dba_constraints view to mvadmin_dbname user (where dbname is the replicated database name).
    Regards,

  • Problem in creating part time work schedules

    Hello All,
    I have to create some part time work schedules rules for part time employees
    Work: Tuesdays to Fridays
    a)Tues-Thurs 6.5 hours per day   i.e. 9.30 to 5
      9:30 u2013 14:30 work
      14:30 u2013 15:30 - 1hr lunch break
       3:30 u2013 17:00
    b) Friday - 7 hours (9:30 to 14:30)
    Total hours per week are= 26.5
    1) I created one fixed break schedule 14:30 u2013 15:30 (unpaid)
    2) I created 2 Daily work schedules
    Tuesday to Thursday u2013 NOR & (created variant A)
    Only Friday u2013 NOR1
    3) I created one Period work schedule u2013
    P/Time u2013 Mon is FREE, Tue to Thursday as NOR , Fridayas NOR1 & Sat, Sun as FREE
    4) When I try to create Work schedule rule I got stuck in between:
    I configured weekly working hours as 26.5
    I configured monthly & annually working hours.
    But  I had problem to put daily working hours???
    because Tue u2013 Thurs are 19.5 hours (6.5 into 3) & Friday (7Hrs) =26.5
    Hence how to I club both the working patterns in one Work schedule rule???
    Please help me out in same
    Regards,
    Nithi

    niti
    actually i dont have SAP Login here
    in the Table V_T508A
    u define the annul working hours , Monthly working hours  right
    Can u tell wht are the other feilds there
    26.5 hrs is the Combination of two Periodic Work Schedule right ..........if yes
    26.5/31  31 is ur working days
    Edited by: Sikindar on Apr 6, 2009 10:10 AM

  • Error while creating a production order

    Dear PP gurus
    I am trying to create a production order of a material  through CO01 , I am getting a error   05.05.2016 date comes after end of valid factory calendar. (Please correct
    Although  for all other  material , no error is coming.
    My factory calender is till 2015, but i am not able to understand why and how it is capturing the above date.
    please help me how to correct it?
    Thanks in advance
    Regards

    Dear Aadi,
    When your in operations screen
    Extras > Scheduling > Schedule > operation overview = operation segments > Click on Gang chat icon
    it should show you the days for ur base qty
    then click on scheduling results then click on update material master & save
    then Go to CA96
    input plant
    then mark a tick for ur material & click on update material master icon
    then check in material master work scheduling view
    Regards
    Madhu

  • Points to remember while creating master data

    Hi Gurus,
    My client is using QM but inspection set up is not done.In material master check box for post to inspection stock is activated.Now they want to go for inspection set up in material master & using inspection types.In such case what care should be taken while creating master data. Because inspection stock will be already available while doing inspection set up & they have some batches in inspection stock which are created in year 2006- 2007.What care to be taken if we use mass processing(QA08) so that all batches which are manufactured in previous years will also get incorporated in new inspection set up.
    Any suggestions are most welcome.Thanks in advance
    Regards
    Amit

    Dear Amit
    Long back I worked for similar assignment where only QM has to be introduced.
    First you
    1..identify the Material and Plants needs to be setup for Inspection
    2. Create MIC for identified material
    3..Create Task Lists
    4..Make list of Material in Quality Stock with Plant and Batch number
    5. Create new Inspection type (Copy of 08) for material already in QI stock
    6..Move QI stock to UR
    7.. On non working day or in mid night assign Inspection setup to all material (It's a QM Go Live dt)
    8 .. Move identified stock back to QI stock so that Inspection lots will get created (IL origin 08)
    Hope this information will give you some clarity & less hassle to move forward
    Atul

  • Work scheduling data of material  is not maintained

    Hi,,
    Work scheduling data of material SAREE is not maintained
        Message no. CO070
    Diagnosis
        You are trying to create a production order/process order for a material
        before the work scheduling data has been maintained.
    System Response
        The production order/process order has not been created.
    Procedure
        Maintain the data for material SAREE in the view for work scheduling in
        the material master.
    please kinldy help me to maintain this work scheduling data,. i cant find this in MM01.
    Thanks

    Hi,
    To maintain work scheduling view go to transaction code MM50 & then in selection fields select maintenance status as A (work scheduling, then enter plant no, material no & material type. After this execute this transaction.
    This will lead you to WS view, on work scheduling view maintain the details as needed.
    Hope this will resolve your problem.
    Best Regards,
    Avinash.

Maybe you are looking for