Work Status error BPC NW 7.5

Hi,
I am having some trouble with Work Status for BPC NW 7.5.
When trying to change status I always get same message: "Controlled by rule has been violated". I've tried with differente ussers and I am suer they have all rights necessary to change status but, there is no way.
Please help.
Thanks in advance,
Raul

We have already made all tasks related to Work Status:
1. Configuring Work Status u2013 Like Unlocked, Submitted and Approved
2. Enter the Owner property in dim Entity
3. Configure the work status setting at the application level: Entity as owner, Time and Category "YES"
4. Aplication Administration --> Define the hierarchy as H1. We have defined the hierarchy in Entity PANETH1 also
But still didn't work... as we though it should. We have gone through the Admisnitration manual for BPC NW75 and check everything again. Everythign was correct. But, we checked all appendix also. There is where SAP explains how is all working. In some stage, BPC thogh we were the manager (because of the Entity hierarchy structure) but our Work status was not define for a Manager (because we don't need it). We made a try with everything in BOTH and is Working!!! Cool.
We are going to adjust everythign to our requirements now. But, we now itiis working correctly.
Thank you very much for you help.
Raul

Similar Messages

  • What is Work Status in BPC?

    Dear All
    I'm looking for a clear explanation regarding the Work Status in BPC. What is this think for and how it works?
    Hope someone can help me. Provide me a doc or a link where I can find out the answer is also welcome. Thank you.
    Regards,
    Halomoan

    Hi,
    SAP is providing the Academy training for BPC.
    CPM310 and CPM320
    the recorded demos:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/webcontent/uuid/50e76db5-874d-2a10-1abc-c757bd5d3a71 [original link is broken]
    You can find some user guides on the Support Portal, under Installation & Upgrade guides. The click on SAP Business Planning & Consolidation, and then Release 5.1. Here's the link as well. https://websmp203.sap-ag.de/instguidescpm-bpc
    Also review the HTG guides:
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/bpx/corporatePerformanceManagement%28CPM%29How-to+Guides&
    Regards
    CSM Reddy

  • Manage work status in BPC 7

    Hi experts,
    I would like to know if we can  manage work status in bpc excel. I have see that we can use evlck to get the status of the work status and we can use MNU_esubmit_modify to open the bpcweb page to modify work status.
    But I want to modify the workstatus in bpc excel.
    Do you have any solution ? with macro or other ?
    Thanks in advance

    Dear Janeth Sarai Ripert,
    I suggest you to update the work status using BPC Web. If you want to force it using macro, I will give you information likes as:
    1. SAP BPC will write the work status data into the table "dbo.tblfinancelock". It's for Finance Application
    2. If you want to directly write data into that table, please you use the uppercase format.
    3. SAP BPC never update data when the user updated that work status. SAP BPC will create one record.
    4. You only can update work status data directly but not for update sub menu at BPF
    Thanks,
    Wandi Sutandi

  • Work status error

    Hi gurus,
    When i`m implementing the work status when i lock a data region and i try to send data instead of receive a message like "this data region has submitted work status" i received and error message that says "Error when try to check work status".
    It doesn't allow me to send data but when i try to open the region via BPC for web to change the work status it shows me an incorrect current work status.
    Anyone has the same problem
    Thanks in advance.

    Hello eljosetxu,
    This may be related to some problem in UJW_STATCODE table.
    In this table, you should see in STATUS colums an indentifier number for the work state and an sequential number in column ORDERN (for each apset) starting in 0.
    The other columns will show what you have defined during work status configuration where 0 is manager, 1 is owner and 2 means both.
    In table /1CPMB/LKWS<APPSET_PREFIX><APPL_PREFIX> you can check what is the SATUS for each locked intersections and compare.
    As far as I know, the numbers in ORDERN must be sequential. Confirm that the column STATUS for the data region in the LKWS* and UJW_STATCODE tables are the same.
    Hope it helps! Let me know what you'we found
    Debora

  • How to configure Work Status in BPC?

    Hello everybody,
    I have some problems with the hierarchy of work status control. I will explain it with a simple example.
    I have 3 entities: A, B and C. A is B's parent, and B i C's parent.I have the status: Opened, submitted company, submitted subgroup, approved.
    C is entering data with the status opened. When C finish, C change the status to submitted company. In that moment, C can´t enter more data because BPC desn´t let it. B's owner can enter data in C, but not C's owner.Ok, perfect.
    Then B enter some data in C and change the status to submitted subgroup. In that moment, A can enter data in C but B continue being able to enter data too, and I would like that B couldn't enter data in C although A could.How can I configure this? Is it possible?
    Thank you very much.

    Hi Fernando,
    The issue that you have is really familiar for me. We have exactly the same problem in a client a had.
    As you explain, SAP BPC approval process have this problem. The conclusion is BPC approval process (Workstatus) only have 2 approval level, Owner and Manager.
    Sorry but in your case when C have the power of introduce data, B could introduce data as well.
    You should use reviewer option. Maybe with this functionality you can increment an approval level. For example C could be reviewer of each entity B is owner.
    I expect my explanation solve your doubts
    gabriel Garcia

  • Displaying current work status in BPC Excel report

    Hi All,
    Could any of you tell me how do we retrive the current work status that has been set for a particular application on to a Excel?
    We would get this in BPC WEB reports, but we are lookin gto display it in excel itself.
    Does EVLCk function have any link with this?
    can any one share the details of list of EV functions that can be used in BPC 7.0.
    Regards,
    Swetha

    Hi Swetha-
    SAP Note 1348997 "BPC NW 7.0 SP03 Work Status Explanation" provides a detailed PowerPoint deck that explains the specifics around Work Status.  Please note slide #39 and the mention of EVLCK.
    A few additional notes that may be of interest:
    EVLCK became available to SAP BPC 70 NetWeaver with SP02 (pls review SAP note 1310443, as well as the "BPC 7.0 SP03 NW Documentation Updates" in Note 1349538).
    Regards,
    Sheldon

  • BPF an Work Status in BPC v10

    Hi averybody,
    I am working in a project of BPC v10 and i have a question i would like to solve. Specifically i want to know if the new version of SAP BPC allow you to associate a step of the BPF with a change of the work status strictly.
    Does anybody know something concerning this item? Any additional information about new functionalities of BPF and work status?
    Thanks in advance,

    Hi
    You can certainly do that. When you've created a set of work statuses and want to associate the work states to a BPF, you can associate with a setting for Related Action along with the Input you are providing to the suers (scrnsht below). I am not sure you can make it mandatory for the user to change work status setting, but you can allow a change in the work status.

  • Work Status Issues - BPC 10.0 NW

    Hello,
    I am having trouble changing a work status setting that is approved to open.
    We have three settings, default, open, and approved. Approved has data loads locked to everyone. The other two are open to everyone.
    Only a manager can modify the statuses. I am a technical support analyst so I have full access and can change any work status. However, when I look at the selection for the new status, all I see is approved. It will not let me choose another option. And this is for a specific company and month (June 2013). If I take that same company I can modify the closed status to open for other months and for the same company.
    Status is set on company code and time.
    Does closing at different hierarchies cause issues like this? Just not sure why I am unable to change it. Any thoughts?

    Hi
    When you need open a company code, make sure you open the parent node first and try to open individual company code.
    You also need to populate the OWNER property for company code dimension.
    thanks
    ravi

  • Work status from the BPC for Excel interface

    Hello everyone !
    I got an issue on version 7.0M of BPC with WorkStatus. When i try to access to the work status from BPC the page won't load but i can access to it by the Web. Do you have any clue about that ? 
    It it the BPC server configuration ? The web site is with ASP2.0 is it an issue ?
    Best regards,
    Damien

    The problem seems to be related to how you configured the BPC application and web server.
    Just check table tblapsetinfo and tblserverinfo from database appserver to see if you have right configuration.
    I mean if you have the same name (FQDN or IP) for both application server and web server.
    Osoft virtual directory must work using .Net 1.1 no t2.0.
    Regards
    Sorin Radulescu

  • Unlocking work status

    Hi,
    We are implementing BPC 7.5 NW version and having SP04.
    we have an Entity A (parent entity) and unerneath that we have two entities B and C.
    In the Entity Dimension we have an owner peroperty in which for Entity A we gave a user (say Administrator as the owner) and for both Entity B and C we gave another user (say-BPcuser as the owner)
    So the user Administrator of Enitity A is the owner of Entity A and he is also now the Manager for Enitity B and C.
    After making these settings, when we try to modify work status through BPC for Excel it takes to BPC for WEB and in BPC for WEB we make the following selection.
    Category-Actual
    Entity- A
    Time -2010.April
    And in the next screen we are changing the satus from sUBMITTED to APPROVED ( TO lock the Data region) and save it.
    Now when we input any data for this data we are getting Check work status settings.( which is our desired output)
    However when we try to change the work status setting From Approved to Submitted (to unlock the data region) with the ID Administrator (i.e Owner of Parent Entity A) it is getting saved.However when we try to input the data it is still showing check the Work status settings.
    So can you please suggest me how to unlock the work status settings now so that we can post the data for that data region.
    Thanks,
    Shankar.v

    Hi,
    If you are in a development system and if you want to delete all the locks on the data at one go......you could try reordering your work states (rearrange your last work state for example by moving it one step further up). You get a message on the screen that this will delete all the locks on the data....just confirm the message. You could change the order again back to the original order.
    Above is only if you are working on a development system and for test if you want to delete all the existing locks at one go.
    If your system wants only to unlock a specifc dataset, select the required members of the work state dimensions (refer to your appliation and work staus to know what the work status dimensions are for your application). Note, if your selection includes any parent member for a dimension current work status is not displayed.(This is again as per the work status set up in BPC that work status is stored at non-parent members).
    Please let me know if you still have any issues in deleting the locks

  • Work Status Saved Incorrectly

    In SAP Note 1941785 say that's in BPC 10 MS in previous version respect to SP 12 Work Status Are Saved Incorrectly in sql tables.
    What does it means? Have You Had Issue With Work Status in BPC 10 MS ?
    Thanks
    Samuele

    Anybody has problem with work status ?
    Thanks
    Samuele

  • Work status SPRUNCONVERSION

    Hi,
    We are using script logic in the package.
    We would like to prevent the packed from running on u201Clockedu201D data.
    Below is the code of the script. The statuscode of locked data is 3. The maxstatus parameter in stored procedure is set to 1 (unlocked).
    *SysLib Stored_Procedure_Wrapper.lgl
    //=============================================
    // Currency translation logic
    //=============================================
    *RUN_STORED_PROCEDURE=SPRUNCONVERSION('%APP%','%CATEGORY_SET%','','GLOBAL','%SCOPETABLE%','%LOGTABLE%','' ,'' ,'', 1)
    Unfortunately we still can write to the locked intersection.
    We are using BPC MS 5.1.
    Could you give us some advise how to solve this problem?

    Mariusz,
    If you define a business rule in a script logic file and call the script
    logic file from data manager, the data generated by the business rule   
    will be posted to a locked data region since the business rule engine   
    cannot check Work Status. BPC has the limitation of the business rule. It has been earlier requested as an enhancement.        
    Regards

  • Work Status --ABAP error at BPC Web Interface

    Hi,
    I'm receiving an error in the Web Interface for adjusting                                                            
    the Work Status settings. When selecting Active CV or Another CV and                                                               
    then clicking on the arrow at right the error message that pops up                                                                 
    says: “
    Error: a dump occurred on the ABAP stack”.
    Thanks,

    Hello - I received the same error message. I would look at the 'how to' paper on Work Status. It was very helpful.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/70f99970-8c09-2d10-d486-8989be63d8cc?QuickLink=index&overridelayout=true&47047071760394

  • BPC 7.5 - Multiple Usernames in the owner property for Work Status Update

    Good Day,
    We have an issue in our BPC system, where our organisation dimension(entity) has an owner property which is maintained with multiple usernames. The issues comes in when we have to update the Work status for locking. The system recognises the first username as the owner property and only that first username can change or update the workstatus in BPC. We have a problem with that because we have a team of people that manages process.
    The error that we get when one of the usernames other than the first one tries to update the work status is - "User not a Manager/Owner, Work status cannot be updated".
    Please advise of the solution we are BPC 7.5 SP17
    Thanks,
    Themba

    Hi Themba,
    We are combining Team and multiple users without issues:
    Vadim

  • Error checking work status

    Dear ALL,
    I'm working on SAP BPC 10.0 NW version.
    So, I'm launching a script logic for a particular company, actually working on the currency translation but unfortunately I got an error "Error checking work status".
    I did enable the Work Status in my model, and I did also put 2 Controls in it. But, I'm very sure the 2 Controls are all pass which I could also see the same from Control Monitor.
    Any part which I could have missed out or any steps I have to work on in order to skip the error?
    BR,
    Antony

    Hi Antony
    Finally the problem was bigger than I thought; the user uploaded data from previous period and it’s affected the currency conversion, because it is configured at periodic way
    The access member profile for each group was configured wrongly, too
    We fix this point and the currency conversion and the work status pass OK
    Thank for your time answer its
    Regards
    Ariel

Maybe you are looking for

  • Adobe AIR will not Install

    I am having trouble running the packaged adobe Air installer (downloaded from http://get.adobe.com/air). The .dmg image mounts fine, then when I double-click or select the package nothing runs. I even tried to run the installer inside the package (fr

  • Remove quality stock

    Hi, we currently have stock in quality inspection, but no inspection lots. I've tried to manually create an inspection lot (QA01) and then in QA11 release this stock to unrestricted. So far, I have not been able to move anything from quality stock. I

  • Information Broadcasting

    Dear Experts, We are in 3.5. I have an workbook which includes 5 woksheets. Out of 5 work sheets, 3 work sheets has been derived from different queries and other two is an static report which includes some calculations dereived from all three queries

  • When I'm in Safari, it automatically opens new tabs that I did not request.  How do I stop this?

    Help!  Every time I do a new search or open a bookmarked page in Safari, another tab/window opens up with different ads.  How do I stop this?  It's so annoying!

  • Find Soap Message Output Format

    Hi, I am trying to send message with receiver soap adapter to the client but the message i have in sxmb_moni is different than the one the client receives. I found this weblog that could help finding the message that is going out of the adapter : /pe