Workflow For material Creation

Requriment is that   :   After creation of Material by End User   Workflow Should  be Triggered and   Internal Mail Should be  goes into the Superwiser Inbox (i.e   in SWBP   )  only Superwiser can see whos has created the Material  .........
So if Anybody having the Steps for this Senario  then Give me the  Link
Regrads,
Sandeep

thanks Sharath   but this  not    problem which i am facing  ,  my problem is that   ,
enduser  :  Who is  creating Material   after creation of  material his  Role is finished  .  Now  the Workflow is Triggered 
superwiser   :         As soon as Worklfow is Triggered   Mail  comes to his  Inbox  Like  "  Material is created  by   abc  ( end user )  .
I have develoed  the workflow  but   the things is that    after creation the  material   i myself  geting the  mail in my  INBOX  that "  material is created " but fact is that that mail should goes to superwiser  and this is not happened    ?
I thing   their is problem with agent assignment .  i also try lot's of things  but  still my Problem  is not solved   if you have any  screen shotes of  Real time Senario then please guide me
regrads,
Sandeep

Similar Messages

  • Key performance indicators (KPI) for material creation

    Dear all,
    I need to define some Key Performance Indicators (KPI’s) to measure the data quality during the material creation (MM01) process. The objective is to get concrete statistics about data quality/accuracy for fields related to material from all views created with MM01 (basic data, classification, unit of measure...).
    I would like to get your expertise on how to measure these KPI’s : which transactions, table (...) to use ?
    I have already few ideas :
    -Table CDHDR
    -Transaction MM04
    -Create “checkpoints“ into the workflow for material creation (ZWF01)
    Do you have any other idea in mind?
    I am open for all advices: transaction, table, process, approach…
    Thanks in advance for your help !

    I have a few ideas, but the accuracy of the master data is based on your system config.
    Some things that are helpful in most of the cases:
    - If material type is HAWA (trading goods) your procurement indicator should always be External procurement (check those for other material types if you have it uniformed). You can also check purchasing group based on material type if you have it distinct by material type.
    - Check if sales views are opened in all org.levels
    - Check if storage loc.views are opened for all SLoc
    All in all, you need to have a link of two or more data in material master to be able to check it in some way automatically, otherwise you won't be able to determine if the data is correct or not.
    E.g. How would you every know if lot size of 120.000 PCS is OK or not for a specific material or if you need to assign a specific purchasing group to your material.
    You know the logic behind your material master data best so you can create the best rules to check for your KPI.
    Regards.

  • EDI FOR MATERIAL CREATION AND CHANGE

    Hello all,
    I have a requirement that when a material is created it whole detial about that material is saved at a given location as idoc.
    ie EDI configration.
    How know to configure EDI process order. How can we do for material creation.

    Since we are not using any message control, we don't need to setup the process code in WE41.  
    The function module has already been assigned to the message type in WE57.          
    Step1: Create a logical system - BD54.
    Step2: Create a distribution model - BD64.
                     Create a model view and add the Sender (SAP ECC)  and Receiver (Logical System you created).
                     Then add the message type MATMAS.
    Step3: Create a RFC Destination - SM59
    Step4: Create a port and assign it to the RFC Destination created above. - WE21.
    Step5: Create Partner profiles - WE20
                       Partner type - LS
                      Message type - MATMAS
                      Basic type - MATMAS05
    Step6: Trigger the material material through BD10.
    Hope it helps.

  • Are there any standard web dynpro ABAP or JAVA for material creation(mm41)?

    Hi SDN,
          I have got the requirement to provide Web Dynpro application for material creation (transaction code is MM41) and I would prefer to enhance standard Web Dynpro more than develop from scratch. Now I got only the Web dynpro ABAP component for create sales order called "LO_OIF_MAIN_COMP" and GUI HTML for purchasing order that come with business package Eh4.
          Anyone who know please kindly help me.

    >but I afraid that I'm not able to find out what is its component name from application
    You could just lookup the WD Application in SE80 and then it will show you the component name. From SE80 choose Edit Object from the toolbar. Go to the Web Objects tab in the dialog. Type in the WD Application name and hit enter.  You will then see the details of that application.

  • Adobe interactive form for material creation

    Hi experts,
    I f an adobe interactive form for material creation was created using JAVA... what part is involved in the ABAP pgm.
    Thanks in advance

    Hi,
    Pleaes find the sample codes for WD Java...
    https://www.sdn.sap.com/irj/sdn/developerareas/webdynpro?rid=/library/uuid/49f2ea90-0201-0010-ce8e-de18b94aee2d
    Regards,
    <i><b>Raja Sekhar</b></i>

  • Workflow for Material Create

    Dear All,
    I am new to SAP workflow n i have a requirement to create a workflow for Material Create .
    I have created workflow for Notification of Absence from SAP help as a practice.
    But not able to do it for material create because i dont know the methods n all for that.
    Please guide me in this .
    If anybody have any documentation for workflow for material master, it will be a big help for me.
    Regards
    Manik L Dhakate

    Hi,
    please check the Developer's Guide in general:
    http://www.sdn.sap.com/sdn/developersguide.sdn
    the concrete information on workflow you can find here:
    Business Process Management
    http://help.sap.com/saphelp_nw70/helpdata/en/9c/8d8442dcaad665e10000000a155106/frameset.htm
    Embedded processes (workflow)
    http://help.sap.com/saphelp_nw70/helpdata/en/fd/517b42303e0e53e10000000a155106/frameset.htm
    plz check in
    http://www.easymarketplace.de/online-pdfs.php
    <b>Reward points</b>
    Regards

  • Workflow for Vendor Creation through a portal.

    Hi All Workflow Experts,
                                         I have a scenario here.In my project  vendor is created through a portal.On submit button from portal the workflow is to be triggered.I have to design the workflow process.So can you please guide me through what all should i consider while i design this workflow?
    This is my first workflow assignment so if you explain in detail it will be a great help.
    I will just pen down what all scenarios i can think of:
    1.Start workflow after vendor creation or modification.
    2.Check whether approver are maintained in Org structure through  standard FMu2019s.
    3.Check If approvers are maintained ?
    4.If yes,approve or reject the vendor.
    5.If no,get the agents from the custom table who can take an action on this.
    This is what i can think of.
    Please guide me.
    Thanks in Advance,
    Saket.

    The corresponding BO related with the vendor creation or changing is LFA1 but this Business object doeanot have any events that are related to Create and Change , so try to create a ZLFA1 and add you own events or make use of delegation concept where you will create a delegation for LFA1.
    For your first isssue
    Start workflow after vendor creation or modification
    EXIT_SAPMF02K_001 Vendors: User Exit for Checks prior to Saving is the user exit where in you can call the workflow when ever you change or create , because this user exit will trigger when ever you try to save the vendor. so i think you can make use of this user exit
    For your second Issue
    Check whether approver are maintained in Org structure through standard FMu2019s.
    Make use of SWI_GET_USERS_OF_ORG_UNIT this fucntion mdoule to get the user of the ORG unit
    or you can create a Rule(for determining the agents dynamically) to find the approvers.

  • Trigger workflow for material reservation via IW32 (PM order)

    Hi,
    How can I implement workflow process for material reservation using tcode IW32
    - PM order.
        Thanks,
                      Amos

    Hello,
    when there is no material in the store if the order is showing the availablity,then check the Availability Check for Material, PRTs, and Capacities node in IMG.
    In order there are two material availability check,one is over all material availability check,which will shows shortage only before release or during release once the order is relased it always shows that the material is available.
    other material availability  check is individual line item check,when you check with this it will take to the ATP quantities of the material where it will shows the availability same as the MMBE,including the Reservation,PR & PO quantity.
    So better check this.
    Regards,
    Raj.

  • Workflow for material changed

    Hi Gurus,
    I would like to implement a workflow with a mail which wil be triggered whenever a material is changed.
    I have created a workflow using SWDD..How can I link this workflow to Material change transaction(MM02)..
    I am new to this workflow...Pls help me...
    Thanks in advance...
    Regards,
    Saj

    Hi,
    you need to create an event for your change document  BOR 1001006 thru SWEC.
    create a similar event in your BOR Event and use this event in the Basic Data of your WF.
    So whenever a material is changed your event would trigger your WF.
    Hope I am clear,
    any issues reply back to this thread.
    Aditya.
    P.S
    just a suggestion, could you put in your name instead F1 (as I like referring to names, though I just address all by initials) offcourse no hard n fast rule,
    but since its a <b>wonderful Forum</b>, lets know each other .
    Well my friend I still have no issues with your Display Name, it was just a thought.

  • Workflow for User Creation

    Hi
    I would like to implement the Work Flow for User Creation, i.e.whenever the admin creates the user id, it should go to manager for approval and after that it pwd should be delivered to the respective user.
    Can any one guide me on how to implement the same. Also I would like to know the use of customisation under Set Approval Indicator in IMG settings.
    Suitable points will be awarded.
    Regards,
    PKM

    Hi,
      Pls refer the foll link:
    http://help.sap.com/saphelp_srm40/helpdata/en/5a/af5f0b85d011d2b42d006094b92d37/content.htm
    BR,
    Disha.
    Pls reward points for useful answers.

  • Workflow for Material Master and Vendor Master Creation

    Hi
    Has anyone mapped creation of Material Master & Vendor Master through SAP Workflow.
    Seek your valuable inputs.
    Best Regards
    --Vikas

    You may not get the complete standard form which will match this functionality. But you can develop your business logic in custom code for fetching the data and the interface and use the standard templates for layouts if any template matches your requirement. You can see the complete lest of templates in : "transaction SFP->Form->Layout->Tools->Template Manager
    Most of the common templates are available here.

  • Workflow For PO Creation

    Hi,
    I have configured the release strategy and assigned the agents accordingly in release strategy.
    but when i create PO, Standard workflow WS20000275  for PO create is not triggered for event RELEASESTEPCREATED.
    when i check the event trace this event is not displayed for BUS2012.
    Thanks,
    Ps
    Edited by: Naveen P.S on Sep 30, 2011 7:30 AM

    Hi ,
    Release strategy has been configured correctly in SPRO, release strategy & release codes are being updated correctly in PO document.
    I have switched on the trace as well.
    when i create PO and check the event trace there is no event with BUS2012, instead i found a entry as below,
    FREBUS2012    ->Event created-> Handler/Action: message says No receiver entered.
    Thanks,
    PS

  • Create an Approval Workflow for User Creation in AD

    Hi
    Anyone, tell me how to create an approval workflow to create users into AD. For example, before provisioning user into AD resouce the request should go to the Manager of the user for approval.
    P.S: I am using OIM 9.1
    Thanks
    Sireesha

    Hi Sireesha
    You want to create a new Process definition, selecting "Approval" as the process type.
    Then associate it with the AD User Resource Object. Add a "Manager Approval" process task and use a Task Assignment Adapter to to assign the task to the manager of the request target.
    In order for the Approval Process to fire, you need to ensure that you provision the AD User Resource Object via a Request, rather than directly.
    HTH
    Cheers
    Rob

  • UWL Workflow for Purchase creation and Requisition

    Hello Friends,
    Could you please help me on the following UWL configuration scenario?
    1. Workflow process for purchase requisitions (create purchase requisition ME51N)
    2. Workflow process for purchase orders (create purchase order ME21N)
    For the above scenario, what need to be done in portal. I already established SSO, and other connectivity between portal 7.0 and SAP System.
    For the above scenarios do we need to import any package into portal...like business packages?
    Or will it work in UWL automatically? (I am not sure about this line...I am new to UWL)
    Please help me on this.
    Thanks,
    Vasanth

    Hi
    U need to register the system with portal
    Registering the SAP ECC system that will provide work items to UWL. For example, registering the system on which Business Workflow runs
    Each SAP system that will provide work items must be registered as follows.
    1.Navigate to System Administration &#61614; System Configuration &#61614; Universal Worklist and Workflow &#61614; Universal Worklist - Administration.
    2.Choose the New button.
    3.In the dialog box:
    In System Alias, enter the system alias.
    In Connector Type, select WebFlowConnector.
    4.Choose Save to store the current configuration object.
    Register Work Item Types:
    The work item registration process involves identifying each system by its alias, and then generating the XML description of how to process the work item types to be received by UWL from each system.
    1.Choose System Administration &#61664; System Configuration &#61664; Universal Worklist & Workflow &#61664; Universal WorkList - Administration. The system displays the iView titled Registration for item types of Universal Worklist Webflow. The system displays a list of system aliases for which the work item types are not yet registered.
    2.Select Register Item Types for New Systems Only button.
    Register Item Types for All Systems button is selected to perform the registration for all configured systems. Register Item Types for New Systems Only button is selected to perform registration for systems whose XML processing description has not been downloaded before.
    Regards
    Krishna.

  • How to Debugg workflow for Article Creation using MM41 In IS Retails System

    Existing system they are using business BUS1001006,Event Created for triggering workflow when you create article using transaction code MM41.
    I could see one more business object named ZBUS100106 for triggering workflow when you Create an article.
    I just want to debugg the workflow to add some additional validations to trigger workflow when i can create article using transaction code MM41.
    Let me know how to debugg the workflow.
    Thanks in Advance.

    ZBUS100106 is nothing but Custom Business Object of BUS100106 creating by extending BUS100106.
    You can debug Business Object code thru putting breakpoint in Code and executing the Business Object thru SWO1.
    For your requirement you could possibly use SWB_COND Tcode so as to limit workflow lanches.
    Refer [this|http://mailman.mit.edu/pipermail/sap-wug/2003-November/011005.html].
    Regards
    Shital

Maybe you are looking for

  • Error in while applying database patchset

    steps to upgrade EBS database from 9.2.0.6 to 10.2.0.2 while applying this patchset p4547817_10202_LINUX.zip i am getting error like [oradev@sql Disk1]$ ./runInstaller Starting Oracle Universal Installer... Checking installer requirements... Checking

  • Using XML File as a Data Server

    OK - here's my scenario: - Have an XML file that I am holding parameters (i.e log file folder) in - I have set the XML file as a data server (which test connects OK) and created physical and logical schemas in Topology Manager - In Designer, have cre

  • If I change my Orange Sim UK to an Orange Sim CH (Switzerland).....

    ..... when I am in Switzerland, will my Blackberry email still be pushed to my phone if I have set up Data Services with the Swiss Sim?  Will there be any conflicts. I basically go between UK and Switzerland several times a month and am on a Pay as Y

  • How to get back deleted data logically

    Hi Friends Once again need your guidance to solve my this problem. If I have deleted data and commited.Now I want to bring that data back. How m I to do this.I want to do it logically. Pls help me.Is there any thirdparty software to do it logically i

  • How to retrieve the current User using PL_/SQL code?

    Hi, How can find the current logged user within a Dynamic Page using PL/SQL code? Thanks.