Workflow for release strategy in PO
Dear All,
Will anybody tell me how to configure the workflow for release strategy for PO.
Regards
R Panda
Dear Manish,
I have done all the configuration as per your guidance.
But I am not getting the mail in mail box. I have done the following config
Gr Cd WF Descrip
02 I6 1 HOD Logistics-JSR
02 I7 1 GM Logistics-JSR
Gr Cd Descrip OT Agent it
02 I6 HOD Logistics-JSR US RP
02 I7 GM Logistics-JSR US DD
OOCU---
MM-PUR
1) Activate event linking- WS 20000075---BUS2012-RELEASESTEPCREATED-ACTIVATED (I ticked both the check boxes)
Linkage status-no errors error feedback---system defaults
2) Assign agents----WS 20000075Create agent assignments-I assigned above two user ids against user......
In attributes it was no general task & not classified.
In trxn code SWETYPV both the check boxes are ticked with no error.
Please reply.
Regards
R Panda
Similar Messages
-
Workflow for release strategy of Po's
Dear Experts,
We want to have Workflow for release strategy of Po's please let me know what settings are to be done from MM side. & form Abap what developments are required.Hi
Pl check the below link
http://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/bpx-community/enterprise-resource-planning/sap%20mm%3a%20purchase%20requisition%20with%20classification%20and%20workflow%20approval.pdf
SAS -
Customizing steps of workflow for Release strategy
Hi Experts,
Iam looking for step by step customizing details of workflow for Release Strategy for Purchase Requisition.
I need necessary classification and Customizing settings for a release procedure in the purchase requisition to the workflow.
I am looking for the steps, in which the purchase requisition can be edited straight from the workflow inbox.
Regards
NaniHi Nani,
First you have to confirm what kind of release it is in Purchase req you have Item level release and over all release.
Item level release - WS00000038
Over all Release - WS20000077
Now please confirm with your MM consultant that he has done the release Strategy and tesed it Ok.
Escecially things like assigning plant, Assigning Agents,Release codes and so on when everything is done by him in SPRO.
Now your work starts If it is just release use the standard workflow.
If they need additional notification mails and things like that copy the standard workflow and do the customization in the copied version and deactivate the standard workflow.
You can also do dead line monitering (Factory Calander) and many more things.
also please go through these 2 links you will get better idea.
http://www.****************/Tutorials/Workflow/POReleaseStrategy/Details.htm
http://www.****************/Tutorials/Workflow/PRRelease/PRRelease1.htm
If you have any othere queries please feel to ask.
Regards,
Dheepak
Edited by: dheepak on Dec 1, 2008 7:48 PM -
User exit for workflow for release strategy
HI,
I got the user exit M06E0005 for workflow for release strategy. Is there any user exit during PO saving time, so that depending upon the PO no and the release code, the mail will go to respective person for the release of PO.
Regards,Hi,
Refer the below Link for PO workflow set up, for more information you can co-ordinate with your workflow team.
http://help.sap.com/erp2005_ehp_05/helpdata/en/4c/16443c4a089537e10000000a114084/frameset.htm -
Can we implement workflow for release strategy in 4.7
can we implement workflow for release strategy in 4.7 for PO's please provide some documents.
HI,
Check the links
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/30c81e21-cd00-2c10-bbba-edb8ce4961be?quicklink=index&overridelayout=true
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/70fef212-b6cb-2c10-e085-c84b80d7068e?quicklink=index&overridelayout=true
Regards
KK
Edited by: Kishore Kumar Galla on Mar 19, 2010 3:40 PM -
Dear All,
PLz let us know the step by step procedure for worflow for release strategy.
Regards,
Arati.Hello Arati,
Please see that you have maintained the release strategy and the same is getting affected in the PO.
In PO -> Header Data -> Release Strategy (Last Tab) please check the Release Strategy and Release Grp.
Now go to T - Code /nPFAC .. and enter the ID as 90100005 (PO Approver) and click on display.
After this on the new screen there are different tabs.. in that click on last (fourth) tab: Responsibilities.
There you will find responsibilities IDs assigned to each release strategy and Release grp.. of you cant see the same please adjust the layout.
once you get the responsisbilities ID there for the referenced Release Strategy and Release Grp then go to T - Code /nPP01.
There you need to do the maping. in the first field it please enter Responsibility and second tab you can put the same responsibility ID whihc u obtained from /nPFAC.
Then select on applications and then click on new.. n there you can assign the user as a approver. Please check that proper authorization si also given to a user who is mapped for the release strategy...
Let me know if any confusion ...
Thanks And Regards,
Krupesh Kothari. -
PO Workflow for release strategy approval process (BUS2012)
Hi Experts,
I have configured a workflow that should get triggered by the event "RELEASESTEPCREATED" in the Business Object BUS2012.
The workflow is triggering perfectly and is working exactly as per the requirement, but the problem I am facing is the event "RELEASESTEPCREATED" is getting triggered twice.
I went to SWEL and saw that the above event is getting triggered twice by the system. I am not calling the event in any user exit. I have de-activated the event linkage in the standard workflow. Only my custom workflow link is active.
Due to this all my workitems, mails are getting duplicated as the workflow is being called twice.
I just need to know, why the event is getting triggered twice in the system.
If you need more details in the issue, I will provide that.
Your help is highly appreciated. Points will be awarded to the helpful answers.
Thanks
AnirbanHello,
First off a small comment on terminology because a lot of people say this:
Events are not triggered, they are raised or published by the application (regardless of workflow). An event is the trigger for a workflow.
Now we have that cleared up, have a look at the workflows that are triggered by your events and check the container to determine the release codes for each workflow. It seems to me like you are probably processing two different release codes at the same time. This could be perfectly normal (e.g. you may want to perform two approvals at the same time) and is controlled by the MM config for the release strategy. If this is not what you want then this should be adjusted by your friendly MM people.
Cheers,
Mike -
PR Workflow for release strategy
Hi,
Could you please let me know the steps how to configure the workflow for the PR release strategy for both item level as well as header level.
Thanks in advance
ShpHello,
If you wish to work with procedure 1, define the following:
Release codes
Release indicators
Assignment of release indicators
Release prerequisites
Determination of release strategy
1. Release codes
Create the release codes.
2. Release indicators
Define release indicators and branch to the detail screen. Here you define whether fixed purchase requisitions may be changed by Materials Planning, for example, and whether an RFQ or a purchase order may be created from the requisition.
You can also determine the field selection here.
In the area "Changes after the start of the release procedure", you specify whether a requisition may be changed after the release procedure has begun. You specify whether the strategy has to be redetermined after changes, or whether the release procedure has to start all over again from the beginning.
This parameter bears a relation to the parameter "Value change". For example, previous releases are not cancelled if the value of the requisition item after the change does not exceed plus 10% of its original value.
Attention:
Be sure to create a release indicator (e.g. B for "blocked") that serves as the starting point for subsequent indicators. Do not set the indicators for release for the issue of RFQs and PO on the detail screen for this indicator.
Also create a release indicator characterizing the released status. Set the indicators for release for the issue of RFQs and PO on the detail screen.
3. Assignment of release indicators
Assign a release indicator in dependence on the status of the release.
Example:
You create a release strategy S1 consisting of two release codes 01 and 02. Release with 01 is a prerequisite for release with 02. If release has been effected with 01, the requisition has been given the "all clear" for the issue of RFQs.
You have created the release indicators B (blocked), 1 (cleared for issue of RFQs) and 2 (cleared for RFQs and PO).
Now enter the following as assignment:
Strategy C1 C2 C3 ...
S1 B (blocked)
S1 X 1 (RFQ)
S1 X X 2 (RFQ/PO)
4. Release prerequisites
Define which release codes are involved in a release strategy. Specify whether a code is set for a release status following release, and whether one release status is a prerequisite for another (+).
Example:
Strategy Code C1 C2 C3 ...
S1 01 X
S1 02 + X
5. Determination of the release strategy
Determine the conditions under which each release strategy is assigned. The criteria are account assignment category, material group, plant, and value of the requisition item. -
Work flow for release strategy for PO & PR
Hi Gurus
Can anybody explain workflow for release strategy for PO and PR
Thanks in advance.
Atul KulkarniHi,
First you set your all required configuration fro release strategy(Class,Char,Rel.Group,Release Strategy ,Release Indicator )
For Work flow settings,You have to do follwoing configuration:
MM - purchasing - purchase order - release procedure - Define Release Procedure for Purchase Orders - Work flow - Enter release code, group, user ID, object type as user.
Creation of work flow object,activation of workflow and other related settings will be done by Techinical work flow consulant.
Thanks,
AMIT -
Workflow with Release Strategy for PR & PO
Hi Experts,
I have configured the PR & PO Release strategy and it is working fine. My client wants the Workflow concept in Releases.
So User should get the information about the releases for PR & PO.
But I don't have much idea on Workflow, how it works for Release strategy. Can anybody give information on how to configure the Release strategy with Workflow in PR & PO.
Points will be awarded .
thanks & rgds
SwamySwamy,
There are several posts available for this requirement, I would suggest you to search this forum and you would hit many threads which address this in more details and handy explaination
check this link for PR
http://help.sap.com/saphelp_47x200/helpdata/en/04/92768046f311d189470000e829fbbd/content.htm
http://help.sap.com/saphelp_47x200/helpdata/en/04/9276e846f311d189470000e829fbbd/content.htm
For PO:
/thread/743773 [original link is broken]
Standard workflow template for PR and PO are:
WS20000075
WS20000077
These can be viewed using PFTC/SWDD etc.
Cheers
Jai -
Dear All,
Do you know how to use workflow in Release Strategy? I have used the standard workflow (1) in order when every document is released an e-mail to be sent to the next releaser. I maintained also the users at the "workflow". Can you please specify some settings??
thanxhi,
You shd check, it could be very usefull for you....check in the tree structure as per the document:
[WORKFLOW SETUP|http://help.sap.com/erp2005_ehp_04/helpdata/EN/6f/9eeb85cd6b11d1ad77080009d2232d/frameset.htm]
Regards
Priyanka.P -
Hi Guys
I need know one bapi for release strategy.
Anybody can help me?
Thanks Comunitty.Hi Ronaldo,
Could you be more specific? Do you need to Release a PR, or you need to read/check the strategy or what?
If you need to release a PR, check this ones (and others in FuGr MEWF):
BAPI_REQUISITION_RELEASE Release Purchase Requisition Item by Item
BAPI_REQUISITION_RELEASE_GEN Release Entire Purchase Requisition
Cheers,
Custodio -
EXIT_SAPLEBND_002 -- user exit for release strategy
Hi,
This is regarding help on user exit for release strategy, ref: note no. 365604, however after going through all the config part given in the given note we activate the fm in cmod.... but after activating the release tab goes off from me29n.
That is after you activate in cmod and then if u create po and go to me29n the relese tab is not there.
if u deactivate and create po and then relese the release tab in me29 would appear.
All we are trying is that the po in me29n should be open to release again if we change the delivery date. However what coding and how is still a second step , first is as soon as the exit is active the tab goes off.
New to user exit . plz help.Hi Again,
I guess I have solved the issue temporarily, however Am not sure if this is the best which cld be doen to the issue.
I didnt make any new characteristics in ct04, for the delivery dats since i didn't want to restrict the delivery date. All I did i yje coding below in the exit :
DATA wa_eket TYPE LINE OF mmpur_beket.
DATA wa_eket1 TYPE LINE OF mmpur_beket.
data: c type i.
data: p type i.
break1.
break2.
e_cekko = i_cekko.
loop at it_beket into wa_eket . " for comparing previous and the current del date
e_cekko-usrc1 = wa_eket-eindt.
SELECT SINGLE * FROM eket INTO wa_eket1 WHERE ebeln = wa_eket-ebeln
AND ebelp = wa_eket-ebelp.
if wa_eket1-eindt <> wa_eket-eindt.
import c from memory id 'CID'.
c = c + 1.
clear p.
p = c mod 2.
if p is not initial. " adding 0.01 to the characteristic value for p.o amt.
e_cekko-GNETW = e_cekko-GNETW + '0.01'.
else.
e_cekko-GNETW = e_cekko-GNETW - '0.01'.
export c to memory id 'CID'.
endif.
endif.
endloop.
The logic I tried using is since the relese gets reset incase of p.o amnt and hence indirectly po amnt so i changed the value of p.o value by 0.01 incase of change in delivery date. cekok-gnetw doesnt reflect anywhere in the p.o as amnt, I guess its for defing range for relese stragey's amont in ct04 characteristics.
However anything better incase u know plz let me know, or do u think this can cause any problems later....new to exits.
Rgds,
Anu. -
Hello Friends,
I need a workflow for releasing the PR. For this I had used the default workflow WF_REQ_REL. Its working fine.
My problem is, if I am rejecting and saving the release of an item in the PR, the workflow is currently choosing the outcome 'Purchase requisition item significantly changed'. Is this correct?
When I reject the release of a particular item in the PR, I think the outcome to be executed should be 'Release of purchase requisition item refused'.
Can someone give an appropriate explanation & a solution for this ? Is there anything wrong from my side ?
Regards,
AbijithHi Abijith,
Yes it will follow the significantly changed branch only if you cancel or reject a purchase requisition. The reason is if you check the status of purchase requisition then whenever the PR is rejected, the status becomes changed.
If you want to take any action in the workflow when the PR gets rejected, then you need to read the field BANPR of table EBAN. If BANPR = 08(REJECTED) , this implies that the PR is rejected and you can take the further actions thereafter based on it.
There is nothing wrong from your side. But try to look into more technical things like values of fields in table EBAN etc. to know why exactlly it is following the SIGNIFICANTLY CHANGED branch.
Feel free to ask more if you don't get this.
Regards,
Guddan -
USRC1, USRC2 in CEKKO table for Release Strategy.
Hi all,
Can anybody shed some light on how i can make use of USRC1 and USRC2 in CEKKO table for Release Strategy?
I see it in the table but i have no idea on how to use them.
Thanks all.Hi,
SAP has given user defined fileds in CEKKO communication structure which you can use by using user exits to fill in CEKKO.
These fileds you can use as characteristics for release strategy.
Details of user exit:
M06E0004 Changes to communication structure for release purch. doc.
EXIT_SAPLEBND_002, Changes to Communication Structure for Release of Purchasing Documents
Description: User exit that control the values in CEKKO for the Release Strategy.
Regards,
Shailesh Mackwan
Maybe you are looking for
-
HT4623 please help how do i load ios sofware to an iphone 3gs? thanks
my daughter has a iphne 3gs for christmas and I dont know how to upload the latest software can you pls help ? many thanks
-
Discoverer reports migrated into OBIEE
HI, One of my client is having some discoverer reports and he wants to migrate it from Discoverer to OBIEE. Can any one give me some info that how to migrate those into OBIEE. Is that we need to develop a new rpd ? Regards, Mall Edited by: user106756
-
Apple Wireless Keyboard on iMac 20
Good morning everybody, two months ago i have installed an apple wireless keyboard model M9270T/A (not aluminium), model with numeric pad. It runs properly since yesterday, when it stops to run. I have tried to reinstall, it is discovered, but it doe
-
X79-GD45(8D) with multiple raid0 arrays
Hello everyone, I would like to upgrade my computer soon and I was checking different motherboards for an i7-3930K processor. The X79-GD45(8D) seems pretty good for such a low price motherboard for this socket. However I intend to have 2 different ra
-
Play an action on a batch of files
This question was posted in response to the following article: http://help.adobe.com/en_US/illustrator/cs/using/WS714a382cdf7d304e7e07d0100196cbc5f-62a7a .html