Workflows to migrate from 4.6C to ECC 6.0

Hello,
We have to migrate from 4.6C to an ECC 6.0 with a lot of workflows already existing.
My problem here is that the ID's of the workflows/Tasks I have to transport are overlapping.
Do you have any idea on how I can transport them without modifying all IDs / tasks in steps ?
Thx in advance,
Sebastien

Hi Sebastien,
This is probably not what you want to hear, but I don't think you can transport them without changing the tasks and workflows so they don't overlap. It will probably just as much work as recreating them in the ECC system.
Regards,
Martin

Similar Messages

  • Migration from 4.7 to ECC 6.0 - Deactivate Update of Classic General Ledger

    My client has migrated from 4.7 to ECC 6 version. In the ealier version we had a report developed in FI Module, which was created as a local object. 
    Now when we are trying to activate the same development in ECC 6.0 and I am trying to use the dynamic selections option of this report, system is throwing an error and taking to this customisation node :
    Fin Accounting Global Settings (New)->Tools ->Deactivate Update of Classic General Ledger (GLT0).
    Can I know the implications of this option ? Can I deselect the check boxes mentioned in this node ? What could be the consequences ?
    Please guide me.
    Thanks
    Ravi

    Hi
    GLTO is the table that used to get updated with the totals prior to ECC 6.0 (in 4.7).
    After migrating into ECC 6.0 the GLTO is no more valid and the new table FAGLFLEXT replaces GLTO.
    SAP also recommends to deactivate the update of GLTO via Fin Accounting Global Settings (New)->Tools ->Deactivate Update of Classic General Ledger (GLT0) once you have establised that the new GL is working correctly.
    I dont foresee any consequences of deactiavting GLTO if the new GL has been activated in your new client and you are sure that the NEW GL is working correctly.
    Good Luck
    Hari
    null

  • Data Migration from Legacy system to ECC systems via ETL through SAP PI

    Hi All,
    I wanted to know if we can migrate the data from Legacy systems to ECC systems via PI.
    What I understand is there is ETL tool is used to extract the data from legacy system, and what client is looking to load that data via PI?
    Can we do that ? I am concerned because this will involve mass data?
    If I have to use PI , I see option of  PROXY / IDOC /FILE as receiver in ECC system (take the data from ETL)?
    Can somebody has done this earlier , please share the approach.
    Thanks,
    Pushkar Patel

    Hi ,
    I require few details from you.
    1. What ETL tool you are using, If Informatica, it already have PowerConnect to connect to SAP. So you can create source and Target Structure and also you can use RFC's to send data to R/3. Else, for other ETL tools, can you prepare RFC's or any other way to send data to R/3. let me know the tool.
    2. Does R/3 contains the master data tables? If yes, then try to use LSMW for Mass upload of data to tables.
    If your client don't want to use either of these options please elaborate, what is the case.
    Regards
    Aashish Sinha

  • Data Migration from R3 to new ECC System

    Hello,
    We are doing a fresh implementation for SAP MDM. Currently we have 3 SAP R/3 systems and 1 non-R3 system (BPCS system). One of the project goals is to do data migration from all these 4 systems into a new SAP ECC system and to MDM for Vendor Master, Customer Master and Material Master. My manager says that we need Business Objects tool to Migrate these data. But, my question is that is it not possible to achive this through XI/PI itself ? Can anyone let me know the entire process in XI/PI as to how do I receive the Idocs from R/3, convert into XML and then send it to the new ECC system in Idoc format ?
    Thks & Rgds,
    Hema

    Hi Gandhi,
    You have SAP MDM, BPC and R/3 systems in your landscape, when you are migrating data to new ECC system, what is the role of mdm, did you moving the same data to MDM to avoid duplicate/redundant data??is there any data migration from R/3 to MDM(any integration required)or MDM to R/3,
    You have to develop different interfaces to transfer data from MDM to ECC, BPC to ECC.definelty you required one middleware, the option definitely SAP PI. it offers very easy of integration between MDM and R/3 system, you can use MDM-PI adapter to connect to directly MDM syndicator file port from there you can pull the XML file and convert it in to IDoc format use Receiver IDoc adapter in PI, the same way we can integrate BPC system with R/3.
    Search in sdn, there are some scenarios integration of R/3 and MDM using PI, refer those links, if still you have any doubts let me know,
    Regards,
    Raj

  • HR Payroll Data Migration from 4.6C to ECC Upgrade

    Hi
    We are going to Upgrade our 4.6c R/3 system which includes HR to ECC6.
    After this upgrade we going to start the Data migration of all data inclduing HR payroll from 4.6c to ECC.
    1).Can anybody advise what are the options for loading Payroll data from 46c to ECC ..? After Payroll data migration we must be able to see all the Payroll results from the previous system.
    2) is there any standard programs availble for Payroll data migration  ..?
    Also if anybody have any info/links on Payroll/HR data migration please help to advise.
    Thanks a lot for your info/Time.,
    Edited by: Dp on Apr 3, 2008 11:41 PM

    Hi Somar,
    I could not find the mentioned post "HR Upgrade". Please let me know the details of the "HR Upgrade" details which need to be kept in mind during upgrading R/3 4.7 to ECC 6.0
    Yes, we have got the list of "Modification Objects" using the SPAU. Please confirm that during our upgrade, we just need to work on these objects which were changed/repaired by us according to our business need.
    And, apart from that, please let me know should I need to worry about any OSS notes specific to 4.7, which is not applied to our system and got released after the ECC 6.0 Enhancement Release 3.
    I understand that if we have a system that has the Patch and SP level as in our production system and do the upgrade to ECC 6.0 all the HR functionalities will be automatically taken care. Please confirm.
    Thanks in advance for your help.
    Regards,
    Vijay

  • Data  Migration from 4.7 to ECC 6.0

    Dear Friends,
    We are doing upgration from sap4.7 to ECC6.0.
    We have activated new gl. We have configured all ecc6.0 functionality.
    But we stuck on data migration from classic gl to new gl.
    We want to activate the migration cockpit but system is asking license key.
    My question is, which license key it is?
    From where we will get this?
    Kindly don't send me any links and any documents related to ecc6 functionality.
    Please guide us on this.
    Thanks & Regards,
    Reva Naik

    Hi,
    following link may give you some hints:
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/2e/9e4638a28b2763e10000009b38f8cf/frameset.htm
    Regards
    Bernd

  • Data Migration from 4.6C to ECC 6.0

    Hi all,
            Can you suggest me solution for data migration from 4.6C to ECC6.O which technique to be used!!
    if you have the documents regarding the above post it which will be useful!!!
    Thanks,
    Yogeshwaran K S

    Hi Yogesh
    OS migrations are more or less painless beside the fact, that most "Unix" operating systems are using a different endianess (aside from Solaris on X86_64). For RFC and other SAP proprietary communication this is done in the kernel but if you use own software to read BINARY data (not talking about textfiles) you need to take care of that in your software.
    Hope ths helps
    Please reward points
    Sunil

  • Migration from 4.7 to ECC 6.0

    Hi All,
    We are doing a new implementation but migrating HR data from a 4.7. system into the 6.0 system.
    I am thinking that LSMW would be the way to go as a the technology to perform the data transfer but does anyone have a specific thoughts on migrating OM and PA data into SAP and whether LSMW is going to be the best route to go? or whether there are better products or methods of doing this?
    Many thanks,
    Danny boy

    Better you can go with IDOC, thsi is best method to transfer data from SAP to SAP.
    Thanks
    Yogesh

  • Data migration from 4.7 system to ECC 6.0

    Hi All,
    I am a Solution Architect. Currently working on a typical pursuit requirement. the requirement is as below:
    One of our customer is currently on SAP 4.7 system.  Their current system is shared by 2 companies & the companies got demerged now. Hence they are palnning for fresh ECC 6.0 implementation & migrating Master data & transactional data related to this customer from the current 4.7 system to ECC 6.0.
    I am seeing possible way for data migration is through ALE or LSMW. But I am not confident about the execution plan & process.
    I would wish to know from you people is:
    1. The different methods to do data migration from 4.7 to ECC 6.0 with pros & cons
    2. How to plan for data migration
    3. Risks & mitigations during data migration
    4. different kind of skill set & duration required to accomplish this requirement
    Currently we are planning for 6 months for the ECC 6.0 core modules implementation.
    If you have undergone this kind of project then request you to share your experience. Any information on this regard is appreciated.
    Thanks & Regards,
    Suresh

    Hi
    Go through eh below link for Best Practices
    http://help.sap.com/bp_hcmv1600/HCM_US/HTML/master_data.htm
    [Risk Factors|http://www.informatica.com/INFA_Resources/article_sap_netweaver_mag_data_migration.pdf]
    [Different Methods|http://www.sap-img.com/general/what-are-the-methods-to-migrate-data-from-a-legacy-system-to-sap.htm]
    [Best Practices|http://partners.netapp.com/go/techontap/NGS_migration.pdf]
    Regards
    Pavan

  • Migrating from Picasa to Elements

    I have always used picasa, and have many thousands of pics on Picasa. I want to move my entire workflow to Elements 7 on windows 7.
    Is there any simple way to migrate Picasa albums to Elements?

    Interesting Query...
    I myself have migrated from Picasa to Photoshop Elements long time back.... But I had few images that time.. I have one solution for you if you were organizing through Folders and if you want those folders as Albums in Photoshop Elements...
    Simple workflow is:
    - Launch Organizer
    - Import all the files into a new Catalog of Organizer
    - Go to Folder View
    - Select one Folder.. you get an optoon to create instant Album >> Just click on that option and an album will be created. This album will have all the files in that folder and same name will be assigned to that Album...
    If files are not organized in folder, there is no standard workflow to migrate from Picasa to Photoshop Elements..
    And I have used Photoshop Elements 7 .. Now converted PSE7 catalog of 14000 images (Most of them are NEF) to PSE8 and it works fine for me :-)
    I am very happy with this great Product having rich features.... Ohh, Did I miss to mention that Face Recognition in 8th release of Photoshop elements rock!!!

  • Migration from SAP 4.7 to ECC 6.0

    Hi Friends,
      We are currently using 4.7 version and we are moving to ECC 6.0(it's not an upgrade project, we are building a new system). We have some workflow templates in 4.7 and we want to migrate it to ECC 6.0. What is the best practice for this. If we save the existing workflow templates and BOR objects in 4.7 in a transport request and move this transport request to ECC 6.0 system will it work? or do we need to create the entire workflow template again in 6.0? Keep in mind that we are not doing the upgrade here. Please advice.

    Hi,
    It better download a XML file (from 4.7) and upload it in the ECC 6.0
    In Menu, Workflow > Import/Export> Export to Xml file (in 4.7)
                  Workflow > Import/Export> Import from Xml file (in ECC)
    If you did any customizing in the BO, copy it manually, Because in the ECC the Most of BO are enhanced some attributes & method are included in the std.
    Regards,
    Surjith

  • Migrating BADI from 4.7 to ECC 6.0

    Dear Gurus,
    We r migrating from SAP 4.7 to ECC 6.0
    We have one BADI - ME_PROCESS_PO_CUST where we have made changes according to the requirement
    After upgrading to ECC 6.0. This BADI is not working even though it is in active mode.
    Any specific procedure for BADIs during upgrade
    Please let me know how to make it work ?
    Rgds,
    Saurabh

    hi Saurabh,
    did you got solution
    pls let me know that, we have same problem...
    thanks in advance.

  • ECC 6 Migration from 4.7 Query

    Dear SAP Experts,
    My client is migrating from 4.7 to ECC6 . While migrating from 4.7 to ECC6 , what are all the precautions we have to do in ECC6.
    Our client is using business area concept.
    While running the FAGLB03 - We are not able to see the Business area which
    was already apparing in FBL3n.
    Pls provide the input to resolve the issue.
    regards
    Kumar

    Dear SAP Experts,
    My client is migrating from 4.7 to ECC6 . While migrating from 4.7 to ECC6 , what are all the precautions we have to do in ECC6.
    Our client is using business area concept.
    While running the FAGLB03 - We are not able to see the Business area which
    was already apparing in FBL3n.
    Pls provide the input to resolve the issue.
    regards
    Kumar

  • Migration of Cost Centre Hierarchy from 4.7 to ECC.0

    Hi Gurus
    Our client is upgrading from 4.7 to ECC 6
    Now currently we have a standard hierarchy in Legacy system and multiple alternate hierarchies.
    I would request your suggestions on the best way to be able to combine and modify the Hierarchies outside Legacy System before uploading into ECC.
    I could find an IDOC COGRP01 which can create cost centre groups which requires data in a particular format.
    Best Regards
    Varun

    Hi Varun
    Choice is yours! Whether you modify it in the Source system 4.7 version and then transfer it to ECC or you move it as it is to ECC and then modify it in ECC
    you will have to choose between the two
    Regards
    Ajay M

  • Could I migrate scheduled jobs from 4.6C to ECC 6?

    Hi experts,
      I need to copy all background jobs from 4.6C to ECC 6? Is there a tools supported by SAP?

    Dennis,
    Does it work?
    Regards,
    Faisal

Maybe you are looking for

  • IPod will not update properly - What is going on?!

    I've just got a new computer and I accidentally managed to delete all my music files. Since I couldn't retrieve them, I started putting my music onto this new computer.. the iTunes on it was working fine. But when I came to update the songs onto my i

  • MMC finds error with a snap-in when launching Hyper-V manager

    From a clean install of Win 8.1 Pro 64-bit I had used the Hyper-V manager to test some virtualization.  After tinkering around with a few virtual machines I put that aside for a while.  Over the following weeks I continued applying updates as Microso

  • [SOLVED] Timezone issue with Mythtv

    I've just gotten home and have gone to use Mythtv frontend in the lounge room but I am getting the issue: Your frontend and backend are configured in different timezones. You must correct this mismatch to continue This has also recently happened on t

  • Transferring photo stream from iPhone 4 to 4s

    I just switched from an iPhone 4 to a 4s. I made sure that my recent photos were backed up in photo stream but not on my computer before I did this. Is there anyway to access those photos from my new iPhone? They are not showing up in my new photo st

  • Windows 8 crashes after wake

    I'm running the latest version of bootcamp 5 on Lion.  The hardward is an iMac with an AMD Radeon 6770M video card. Whenever windows wakes from sleep, it is unresponsive, and then will crash without getting to the login screen.  The driver that cause