Wrong assignment of plant to asset

Dear Expert
During the asset creation we assigned the plant no 1296 but the actual required was 1210 user changed after certain time and faced a problem of difference in amount.
Is there any way to sort out the problem.
Thanks - VG

solved by self effort

Similar Messages

  • Wrong assignment of Balance sheet accounts for Asset Classes...

    dear all,
    there is wrongly assignment of acquisition balance sheet account in asset class in t code is AO85 that is, Acquisition:Acquis. and production costs an Accumulated Depreciation Balance sheet account have been assigned. Also in t code  AO93 for ordinary depreciation same correct accumulated depreciation Balance sheet account have been assigned.
    Now i can say that Acquisition balance sheet account and accumulated depreciation balance sheet account are assigned with same GL (i.e. accumulated depreciation account). 
    The transactions data have been posted for the asset class with different tcodes i.e. 
    ABAVN Enter asset transaction: Asset Retirement
    OASV Enter Transfer Posting
    AIBU   AUC Settlement
    ABUM Enter asset transaction: Transfer in company code
    AB08 Documents from asset
    I wanted to post transaction data with correct acquisition account. What should i do to correct posted transactions..
    Waiting for positive response.
    regards
    saqib usman

    The best way is to create a new asset class and to transfer the existing assets.
    An other option is to change the G/l account in the development system and transport to production. In development it is only possible to this when there are no posting in this asset class. When there are posting you have the option to reset in development asset accounting. Then you can change the G/L account. Have a look to SAP-notes with your error there is a note for.
    When the changes are in production you can make a manual correction with the transaction ABF1 (SAP note 69225).
    With this option you have the problem that the original postings are no longer in line with the asset account assignment. When you want to do a currency conversion in the future you have to make correction posting again in the old fiscal year

  • Wrong factory calendar assignment to plant

    Hi,
    We define new plant in customizing and assign a factory calendar  ( table T001W ).
    I have wrongly assigned a factory calendar BE to German plant in customizing system and moved to changes to production system. Now I want to change this factory calendar from BE to DE in customizing, but the field is greyed out.
    Kindly advice.
    Regards,
    Abhijit

    Abhijit k wrote:
    Hi,
    > We define new plant in customizing and assign a factory calendar  ( table T001W ).
    > I have wrongly assigned a factory calendar BE to German plant in customizing system and moved to changes to production system. Now I want to change this factory calendar from BE to DE in customizing, but the field is greyed out.
    >
    > Kindly advice.
    >
    > Regards,
    > Abhijit
    Hi,
    Open Enterprise Structure-Define, copy-Logistics - General-delete, check plant-Define Plant-select your plant and open in detail view-click on Table view from your header and select Displaay-changes.Now you can see your factory calender as editable.
    Thanks

  • Wrong combination of Plant and Co code at the time of PO creation

    Dear all,
    At the time of creating PO when I am entering Plant and Company code system is not giving any error message if I am entering other Co code , i.e. Co code which is not assigned to the plant. I want an error message in case of maintaining wrong combination of plant and Co code.
    Any suggestion ??
    Reward assured for helpful answer.
    Thx and regds
    Amitava

    Go to SPRO - MM - Purchasing - Environment Data - Define Attributes of System Messages - System Messages
    Then maintain system messages 00 06 167 and then set as E (error) in category field.
    Reward if useful

  • Plant specific asset

    Hello All,
    In asset accounting can we have a plant specific asset so that depreciation can be done for it for the period when it is in that plant.
    thanks
    Rakshita

    Hi,
    Yes, it is possible to calculate depreciation once you assign the asset to a particular plant.You will have to maintain Screen layout in Asset acounting-master data-screen layout-define for asset master data here goto time dependent data for the asset class.Make plant as a required entry here & save.
    Regards,
    Satish Muvva.

  • IM Storage location has been wrongly assigned to a WH

    Hello MM Sapperu2019s,
    I have wrongly assigned one storage location which is relevant for IM to a WH.Now I need to deactivate the assignment which I have made in the below SPRO path,
    SPRO-->Enterprise Structure >Assignment>Logistics Execution-->Assign warehouse number to plant/storage location
    Please let me know what all the prerequestie / activity I need to take before I deactivate the assignment in the above path.
    Awaiting for Your valuable replies.
    Br
    Kumar.S

    Hello again,
    Thnks for your valauble replies.I have checked the below tables in Prodution system and observed that there are no documents observed,
    1.Checked any TRs available or not (LTBP Transfer requirement - item) - 0 (No Documents available)
    2.Checked any TOs available or not (LTAP Transfer order - item ) - 0 (No documents availalbe)
    3.Checked any Qunats available or not (LQUA Quants) - 0 (No documents availlable)
    4.Checked any inventory data per quant available or not (LINV Inventory data per quant ) - 0 (No documents available)
    So let me know the table details for PCN also.I can cross verify once in my production system.
    Also please let me based on the above observation can i go head and deassign or deactivate the st location  for the WH or not.
    Please guide me with your valuable inputs.
    Br
    Kumar.S

  • Manual cheque wrongly assigned to payment doc.

    Hi,
    User wrongly assigned cheque number 111 to payment doc#15-1 via F-53,  it should be assigned to doc#15-211.
    Manual cheque 111 was already issued to vendor.   How can i correct the assignment of cheque from payment doc# 15-1 to 15-211?  Seems no way to edit it. 
    Please advise.
    Eve

    hi,
    other wise 1 solution is their as per i know you have to cancel that cheque and document in fch8 give that voild reason and then you can go for new cheque ie., document will be reversed along with cheque and you can proceed with new cheque in manual ...
    i hope this will solve your issue.
    satishkumar.m

  • How to link Purchase Order using account assignment category "F"* to asset

    Hello,
    I'd like to know how to link Purchase Order, using account assignment category "F" to asset .
    When I enter asset no. in my ANEK table, po no(ebeln) and po item(ebelp) field is blank.
    whether every line item in a Purchase order have differrent asset.
    can anybody give me the link between asset and materal no?
    Regards,
    Rachel

    Hi Rachel,
    Your message is a little bit confusing. There is no link between the asset and material number. If you want to post your purchase order, using account assignment F - that is internal order - you may do it. Futher, you can settle the postings from this order to asset.
    You can read more here:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/4f/71e7cd448011d189f00000e81ddfac/frameset.htm
    Regards,
    Eli

  • Sales Org assign to Plant

    Hello Everyone,
    I would need your help to confirm the following is true or clarify some doubts:
    1. I understand that Sales Org (SOrg) is assigned to Plant   , thus :  Sorg := Plant
    2. Does this also Implies : SOrg + Distr Channel := Plant? Not necessary right? For this case, its not true / an invalid assignment right?
    3. Plant is assigned to Sales Org + Distr Channel.  Is it implicit that the Reverse is true? Is it implicit that Always the reverse is true, in general, for Any other organizational unit assignment relationships?   
    I believe that Sales Org := Plant and Plant  := Sales org + Distr Channel  and the reverse of each of both relationships are not true. Please confirm.
    4. Sales Org is Assigned to Plant but Plant is not Assigned to Sales Org right? Plant is also higher level in the organizational structure than Sales Org right?
    Thanks.
    Sincerely
    Bass
    SD Newbie
    Edited by: Bass Aton on Jan 2, 2011 5:20 PM

    Hi,
    I guess this will help you
    How to Configure a New Plant in SAP?
    Plant 0001 is the SAP defaults provide for your reference.
    OX14 - Define Valuation Area (Tick one only- Once your system go live, no more changes) Most company take the SAP recommended choice - Value Material Stock at Plant level Value Material Stock at Plant or Company Level If you valuate material stocks at plant level, the plant is the valuation area. If you valuate material stocks at company code level, the company code is the valuation area. The decision you make applies to the whole client.
    OX10 - Create / Change / View Plants
    OVXB - Create / Change / View Division
    OX18 - Assign Plant to company code e.g. 0001 - 0001 - All Plants Px1 - Plant Px1 Px2 u2013 Plant Px2
    OX19 - Assignment of company code to the Controlling Area
    OB38 - Assign company code to Credit Control Area
    OMJ7 - Assign business area to Plant/Valuation area and division e.g. Plant Px1 - Business Area Bx1 Bx2 Assign Valuation area to the Business Area .e.g. Valuation area Vx1 - Business Area Bx1 Business Area Bx2
    OMS0 - Assign Factory Calendar to the Plant and Business Area The plant plays an important role in the following areas: If you want to create by copying from existing plant: 1. Copy existing plant A to new plant B. All of plant Au2019s data in throughout the IMG will be created/copied for plant B. In some cases with plant A data that is not desired. In step 3 you must go through and correct invalid entries 2. Correct address information 3. Correct data copied to plant B as plant A (a) In Sales and Distribution -> Shipping -> Picking -> Determine Picking Location -> Assign Picking Locations (OVL3), delete entry where Shipping Point = plant A and Plant = plant B and press save. (b) In Sales and Distribution -> Shipping -> Basic Shipping Functions -> Shipping Point Determination -> Assign shipping points u2013 wherever plant B is found the shipping point is plant A. This must be changed to plant B. (c) In Enterprise Structure -> Maintain Structure -> Assignment -> Sales and Distribution -> Assign shipping point to plant u2013 delete plant B shipping point from the plant A assignment. (d) In Enterprise Structure -> Maintain Structure -> Definition -> Sales and Distribution -> Define, copy, delete, check shipping point u2013 copy shipping point plant A to shipping point plant B. Correct the description in the define section of this node. (e) In Sales and Distribution -> Shipping -> Picking -> Determine Picking Location -> Assign Picking Locations (OVL3), copy plant A entry to plant B entry, changing all data to plant B. (f) Check with Reorder buying group to determine MRP controllers for new plant. Remove plant A MRP controllers from plant B, and add controllers received from reorder buying group. IMG is Materials Management -> Consumption Based Planning -> Master Data -> Define MRP controllers (g) Define special procurement. IMG is Materials Management -> Consumption Based Planning -> Master Data -> Define special procurement type. (h) OMGN u2013 Assign customer in u201CSet up stock transport order u2013 [Plant]u201D. OMGN u2013 in u201CSet up stock transport order u2013 [Purchasing Document type]u201D; an entry was created for source plant B and plant A, this entry should have a UB order type and the check box should be off. Each plant needs a plant B UB entry created. (j) OMJ3 u2013 Delete incorrect entry in print parameters. Remove entry where plant = plant B & storage location = plant A. Create entry for plant B storage location B (k) Verify entry for new plant exists in OVLT picking output (l) Verify entry for new plant is correct in VP01 4. Manual configuration (a) Create plant customer number and assign to plant in OMGN. (b) OMJ3 u2013 set correct printer for plant B (c) OPK8 u2013 Set printer for plant for list LG01. This is for production orders. (d) Output determination OVLT (set printer), In addition to above, other changes based on customization in your installation needs to be done as well. Plants Definition : /NSPRO-IMG-Enterprise Structure-Definition-Logistic General-Define,copy,delete,check plant-Define Plant (In this, we are defining plants(s) under company which is defined earlier) /NSPRO-IMG-Enterprise Structure-Definition-Logistic General-Define,copy,delete,check plant- copy,delete,check plant-F6 to copy org. object from plant 0001 to defined plant(s). Storage Location : /NSPRO-IMG-Enterprise Structure-Definition-Materials Management-Maintain Storage Location-New Entries (Define required storage location(s) under different plant(s) ) /NSPRO-IMG-Enterprise Structure-Definition-Materials Management-Maintain Storage Location-Storage Location Description---- New Entries ( enter here addresses of each plants)
    Thanks
    Anil Hooda

  • Vendor Assignment to plant

    Hello,
    i am new to MM. i have one requirement where i have to create vendor and assigned to plant.
    can you let me know customizing path for assigning vendor to plant.
    i have one doubt whether shipping point and vendor are same ?
    Thanks and regards,
    zubera

    Hi, Generally vendor need not be assigned to plant
    But in intecompany STO, the supplying plant need to be created as vendor and assigned to the plant
    for this go to vendor master purchasing data>extras>add purch data--> here in plant assignment

  • Assign Planning Plant for PM orders

    I am working on the configuration of PM and need help to assign a Plant to be able to creat PM order.
    Currently in my Dev, I have about 4 plants and ONLY 2 plants that allow the users to creat PM Orders and the other 2 are not yet assgned and I need to assign them as well.
    Will Reward points!
    Tim

    Hi Tim,
    Please check this documentation as well.
    http://help.sap.com/bestpractices/BBLibrary/documentation/J13_BB_ConfigGuide_EN_UK.doc
    Hope this will help.
    Regards,
    Ferry Lianto

  • Assigning of plant

    hi
    friends iam facing a proble when iam assigning with my own ccode,sales org,salesdistr,div and plant inthat time plant is not assigned with my sales org.distr to plant at that time iam taking 1000 plant plz tell the solution

    See friend,
    i told you last time and again reiterate, please create your own plant and never just copy from existing cos this will have multi level assignment. You should know that most people always copy from existing 1000 Ccode and this generally leads to cross assignment of plants and divisons and distribution channels. Anyway to avoid further probelms just ignore the plants assigned in other sales orgs and proceed to find your own plant and div and dch. if the assignment is not showing a option of ur sales org, please go ahead and check the original comp code with the assignments, if its there, delete it there and then come back to your company code and try assigning it again to the corresponding div and plants
    please reward if problem is solved.
    Thanks
    Adi

  • SLD  -  Solman wrong assignement in SMSY

    Hello,
    we add a new ERP 6.0 (Doublestack) System to SLD, but by starting the job LandscapeFetch the Solution Manager make a wrong assignement in transaktion SMSY.
    The new ERP 6.0 System is now below the Netweaver JAVA Components and there is no Abap, but why?
    I can´t find a solution, any help ?
    thanks
    Steven

    Hi
    Check the following notes - recommend to have latest LANDSCAPE_FETCH code
    SV-SMG-SYS     1361991     2     39     SMSY: Incorrect database host names for Java systems
    SV-SMG-SYS     1392489     1     52     SMSY: Übernahme eines Einzelsystems aus dem SLD
    SV-SMG-SYS     1360590     3     36     SMSY: systems are created more than once
    SV-SMG-SYS     1301106     11     49     SMSY: Enhancements and errors in Enhancement Package 1
    SV-SMG-SYS     1319149     2     49     SMSY: Transferring the product information from SLD
    SV-SMG-SYS     1376733     2     32     SMSY: Indicator NO_ABAP_INCLUDED cleared
    SV-SMG-SYS     1303097     4     51     SMSY: Capitalized instance names from SLD
    SV-SMG-SYS     1342337     1     38     Instances remain inactive
    SV-SMG-SYS     1370396     1     37     JAVA installation number is not transferred from the SLD
    SV-SMG-SYS     1350401     1     37     Incorrect leading product version set (data source SLD)
    SV-SMG-SYS     1283307     24     33     SMSY: Product version cannot be determined correctly
    SV-SMG-SYS     1335225     5     35     LANDSCAPE FETCH job: Termination with SCDT_LIS_IF 011
    SV-SMG-SYS     1296512     4     39     SMSY: Product version transferred from deleted system
    As mention before - pre-existing entries in SMSY with different data sources can cause problems - once a data source
    has been decided upon creation you need to stick to it - or delete the system a re-create it via a different data source - deletion however can cause loss of existing customizing and inconsistencies if existing customizing has already been set up - changing data source after configuration has taken place is not recommended
    Duplicates in SMSY or SLD can also mix import lines and target objects - both should be as consistent as possible before
    a landscape fetch from SLD - you may even need to compare SLD with SMSY for any pre-existing entries
    Best wishes
    Stuart

  • Wrong assign messages in the collector logs

    Hi,
    Does anyone know what causes this type of errors to show up in the vCenterDC_Errors.log file for the embedded data collector?
    2014-04-02T08:01:23.180-0400 ERROR [(32) HostsClustersAndVMTemplatesInventorySyncJob on VC 528] [propertyContent.PropertyContent] 7657: wrong assign : path=customValue[304], value=com.vmware.vim.CustomFieldStringValue@c6125d47 
    2014-04-02T08:04:12.968-0400 ERROR [(32) HostsClustersAndVMTemplatesInventorySyncJob on VC 528] [propertyContent.PropertyContent] 7445: wrong assign : path=customValue[304], value=com.vmware.vim.CustomFieldStringValue@64b6f789 
    2014-04-02T08:22:52.488-0400 ERROR [(32) HostsClustersAndVMTemplatesInventorySyncJob on VC 528] [propertyContent.PropertyContent] 6965: wrong assign : path=customValue[304], value=com.vmware.vim.CustomFieldStringValue@cae4c46a 
    2014-04-02T08:27:23.475-0400 ERROR [(32) HostsClustersAndVMTemplatesInventorySyncJob on VC 528] [propertyContent.PropertyContent] 7952: wrong assign : path=customValue[304], value=com.vmware.vim.CustomFieldStringValue@d33a1a8b 
    Cheers,
    Milos

    Hi Lakshmi,
    I suspected as much, but it is great to have it confirmed.
    We have been having some issues with the stats collection jobs failing and turning the status of the collector to down, so I was trying to wade through the voluminous  logs and noticed these ERROR messages occurring regularly. One less thing to look into now
    Thanks.
    Cheers,
    Milos

  • Employee group have been wrongly assigned during Hiring in PA40

    Dear Guru,
    I have one scenario where an employee; employee group have been wrongly assigned during Hiring PA40. The user has entered and assigned the employee group as Contract - Local instead of Contract - Foreigner in the Employee group field.
    Please advice how to change and rectify this incident.
    Thanks & Regards,
    Wai Cheng - Yokota

    Dear Guru,
    Many thanks for all your advice.
    I have use PA41 Transaction code to make the correction. However, I noted that the wrongly assigned Employee group remains unchanged in PA30 HR Master data.
    Hence, I decided to use PA40 Hiring Action to make the correction by selecting Position/Band Change field. After save the correction in Copy Actions screen, it will lead you to Copy Organizational Assignment and save your entries. There will be a message appear at the bottom in regards to the position. Just click next arrow icon and click yes.
    Go to PA30 HR Master data again, to verify that the correction and noted that it has change.
    Regards,
    Wai Cheng - Yokota

Maybe you are looking for