Wrong factory calendar assignment to plant

Hi,
We define new plant in customizing and assign a factory calendar  ( table T001W ).
I have wrongly assigned a factory calendar BE to German plant in customizing system and moved to changes to production system. Now I want to change this factory calendar from BE to DE in customizing, but the field is greyed out.
Kindly advice.
Regards,
Abhijit

Abhijit k wrote:
Hi,
> We define new plant in customizing and assign a factory calendar  ( table T001W ).
> I have wrongly assigned a factory calendar BE to German plant in customizing system and moved to changes to production system. Now I want to change this factory calendar from BE to DE in customizing, but the field is greyed out.
>
> Kindly advice.
>
> Regards,
> Abhijit
Hi,
Open Enterprise Structure-Define, copy-Logistics - General-delete, check plant-Define Plant-select your plant and open in detail view-click on Table view from your header and select Displaay-changes.Now you can see your factory calender as editable.
Thanks

Similar Messages

  • Factory Calender assigned to Plant & resource/Work center

    Hello,
    If we have assigned the Factory Calender "XX" which has 5 working day(Monday to Friday) with no Special rules & no Holiday Calender to Plant & "YY" Factory Calender to Work center which has 365 days working with no no Special rules & no Holiday Calender.Now, when MRP creates Planned Orders for FERT material It did not create it on Weekends(i.e. on Saturday & Sunday) though the factory calender assigned is  "YY" (which has 365 days working )in work center.Why?
    Actually it should have consider the Work center assigned Calender for Capacity planning & Schedulling purpose.
    If I assign the Factory Calender "YY"  to plant then it will create the procurement proposal on weekends which is not acceptable to external procurement MRP Controller as plant office works only 5 days.
    Please guide.

    Dear
    Goto CR02/03 , select the Capacity tabe "hat" and u will fined there is tabe "Available Capacity " .U have to maintain the Active version ok.
    Basically , the active version is used for scheduling and capacity planning. If you have not entered an active version, the standard available capacity is used, even if an available capacity version has been entered.
    At the same u have to check out the below requirement :
    you must maintain the following data in the capacity header:
    1.The grouping, that defines which shift sequences and shift definitions can be used to maintain the available capacity
    2.The number of the active version of available capacity
    3.The base unit of measure of the available capacity
    3.The factory calendar, that is the basis of the available capacity-Workcentre
    If you do not enter a factory calendar , the system uses the default calendar for the plant.
    I hope in your case , u have the shift sequence of 5 work days for the calander you have assinged in work centre .
    Please check all those n come back .
    Reward points if usefull.
    Regards
    Jia

  • How to set 2 factory calendar in 1 plant?

    Now I setup 1 factory calendar and assign to plant and it contains 5 workday (Monday-Friday) per week.
    In the future , For 1 plant we want to separate into 2 production lines and the workday are different. What should I do?
    Sample of different workday
    Production 1 , workday are 1-15 of each month
    Production 2 , workday are Monday-Friday
    Look forward to hear any suggestion.

    Dear DB49
    Thanks for you recommendation,Could you please tell me which parameter I have to set in OPU5?
    Now I set parameter as below detail but it still have problem about basic date in planed order.
    Parameter in OPU5
    Detail Scheduling -> SelID:Detailed = 01
    Scheduling = Checked
    Generate capacity reqs. = Checked
    Scheduling level   = Via Detailed Scheduling
    Adjust dates = Adjust basic dates,adjust dep. reqmts to operation date
    For capacity scheduling = Always basic dates, dep.reqmts to operation dates
    Scheduling type = Backwards
    Reduction type = All operation in the order will be reduced
    Maximum reduction level = Do not reduce
    Example
    I set 3 working days on factory calendar (Monday,Tuesday,Wednesday)
    PIR   -> requirement date 18.10.2010
    Total Operation time = 5 Days (from tcode c203)
    When run MPS (MD40/MD41) with scheduling = Lead Time Scheduling and Capacity Planning
    Planned order
                          Basic Dates                                  Production Dates
    Finish              18.10.2010                                  20.10.2010
    Start                05.10.2010                                  05.10.2010
    Why basic finish dates is not equal 20.10.2010?
    Best regards,
    Jariya

  • Change Factory Calender assigned to Plant

    Dear All,
    Currently I have assigned Calender 01 (05 days working) to a plant. Now I want to switch to Calender 02 (All Days Working) & want to assign the same to Plant.
    What will be the implications in system transactions if I change calender assigned to plant ?
    Please share your views if already caome across such situation.
    Regards,
    Rakesh

    No as such change. after assigning the new factory calendar, when you will run MRP they the exixting orders will be re-scheduled. Since you are changing from 5 working days to 7 working days , no such problem in SAP you will find. But the reverse may create change the planning scenario.
    Go ahead.
    Warning: The new factory calendar should have the same valid start date as of before. Otherwise if any pending PR/PO exists in the system which are pending will create a lot of problem and hampered in MRP. I have faced the issue once upon a time.
    Don't forget to give point if the purpose is solved.
    Thanks
    Krishna

  • Factory calendar assignment

    Hi Gurus,
    Can anybody please exaplain me the following. We are now running our plant in terms of production process 7 days a week. All these days the the 5 day factory calendar was only assigned. Now the business is wanting to assign the 7 day factory calendar. Here are my questions and this calendar is only for 1 plant.
    1) Is there a plaace specifically for each module where the calendaar gets assigned, like sperately for MM,  PP etc. Or everything is the same?
    2) Where do we assign the new calendar to the plant? Is it in the plant definition in config? or is there a separate place in config for PP modiule only. Please clarify this
    Thanks
    ANusha

    Dear,
    Better change 5 days and 4 days calander to 7 days in SCAL.
    Else In OX10 , CR02 change to 7 days. IF plant maintenance not working for 7 days then don't change it.
    Do i need to make change on all work centers related to production along with OX10 or what?.
    YES
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Switching Factory Calendars

    Hello,
    I have recently discovered that we are using the wrong factory calendar for both SD and PM.  The wrong one may have been used to generate the scheduled work hours in HR too.  We have 2 different custom calendars that need to be used - neither is currently used.  One was designed for our 24/7 treatment plant operations.  The other was for designed for HR, SD, and equipment with maintenance that is on a typical M-F, excluding holidays.  Our current configuration is that all equipment is in one plant.
    Would there be any issues switching the calenders in SPRO for SD and PM?  After reading many other forum posts, I understand that only one calendar may be assigned to a plant.  Is there any problems with using a different calendar in the maintenance plans than the plant calendar?
    Any help or advice would be appreciated.
    Thanks.

    Hi YM,
    The calendar would be assigned to the plant in Logistics and in SD for the sales organization.  With only one calendar to be able to be used, we would be selecting the one with the M-F, excluding holidays.  Ironically, PS already uses the correct calendar.
    Based on your reply, it would be best to just use one calendar and not allow the maintenance plans to use a different one.
    When the plant and sales organization calendars are changed via SPRO, will this create any problems other than having to change the current maintenance plans to use the new calendar?
    Thanks.

  • Factory Calendar issue in creation of Sales Order/ Delivery Order

    Hi all,
    There is one issue. Our user is not able to create Sales Order/ delivery order as he is getting the below error message u201CDate 2010-12-27 lies after the end of Factory calendar F1u201D. But when I checked the plant in customization, the Factory calendar assigned is u201CKRu201D and not u201CF1u201D. So I donu2019t understand why this error message is appearing. But when I checked Factory calendar u201CF1u201D, it was valid only up to 2010 and there are special rules also set. Only few days in the year are working days. Factory Calendar u201CF1u201D description says u201CKOR customers billed on the 25th of every monthu201D
    Please advice.
    Regards,
    Brijesh

    Dear
    If F1 is the correct calander , then goto OP03-Calander Maintenece -select the Holoiday Caleneder  and extende the Valaidity till 2020 and also Select the Factory Calander  do the same till 2020 .Now Goback to main screen of OP03-Plant asisngement -re-assing the same F1 calaneder .
    Secondly check the factory calender of the plant in OX10.Then in SPRO > enterprise structure >Definition > logistic execution>define shipping point .Select you shipping point and assgin the proper factory calender
    .Goto OVX5 , choose your sales organization, click on details, Detailed information tab - Sales Org Calendar (maintain your factory calendar here not Sale Org Calander )
    .Check in VOV8, use the "Propose delivery date" and "Lead time in Days" options to default today's date as the requested delivery date.
    Refer : Public holiday dates issue
    Regards
    JH

  • Sales Org assign to Plant

    Hello Everyone,
    I would need your help to confirm the following is true or clarify some doubts:
    1. I understand that Sales Org (SOrg) is assigned to Plant   , thus :  Sorg := Plant
    2. Does this also Implies : SOrg + Distr Channel := Plant? Not necessary right? For this case, its not true / an invalid assignment right?
    3. Plant is assigned to Sales Org + Distr Channel.  Is it implicit that the Reverse is true? Is it implicit that Always the reverse is true, in general, for Any other organizational unit assignment relationships?   
    I believe that Sales Org := Plant and Plant  := Sales org + Distr Channel  and the reverse of each of both relationships are not true. Please confirm.
    4. Sales Org is Assigned to Plant but Plant is not Assigned to Sales Org right? Plant is also higher level in the organizational structure than Sales Org right?
    Thanks.
    Sincerely
    Bass
    SD Newbie
    Edited by: Bass Aton on Jan 2, 2011 5:20 PM

    Hi,
    I guess this will help you
    How to Configure a New Plant in SAP?
    Plant 0001 is the SAP defaults provide for your reference.
    OX14 - Define Valuation Area (Tick one only- Once your system go live, no more changes) Most company take the SAP recommended choice - Value Material Stock at Plant level Value Material Stock at Plant or Company Level If you valuate material stocks at plant level, the plant is the valuation area. If you valuate material stocks at company code level, the company code is the valuation area. The decision you make applies to the whole client.
    OX10 - Create / Change / View Plants
    OVXB - Create / Change / View Division
    OX18 - Assign Plant to company code e.g. 0001 - 0001 - All Plants Px1 - Plant Px1 Px2 u2013 Plant Px2
    OX19 - Assignment of company code to the Controlling Area
    OB38 - Assign company code to Credit Control Area
    OMJ7 - Assign business area to Plant/Valuation area and division e.g. Plant Px1 - Business Area Bx1 Bx2 Assign Valuation area to the Business Area .e.g. Valuation area Vx1 - Business Area Bx1 Business Area Bx2
    OMS0 - Assign Factory Calendar to the Plant and Business Area The plant plays an important role in the following areas: If you want to create by copying from existing plant: 1. Copy existing plant A to new plant B. All of plant Au2019s data in throughout the IMG will be created/copied for plant B. In some cases with plant A data that is not desired. In step 3 you must go through and correct invalid entries 2. Correct address information 3. Correct data copied to plant B as plant A (a) In Sales and Distribution -> Shipping -> Picking -> Determine Picking Location -> Assign Picking Locations (OVL3), delete entry where Shipping Point = plant A and Plant = plant B and press save. (b) In Sales and Distribution -> Shipping -> Basic Shipping Functions -> Shipping Point Determination -> Assign shipping points u2013 wherever plant B is found the shipping point is plant A. This must be changed to plant B. (c) In Enterprise Structure -> Maintain Structure -> Assignment -> Sales and Distribution -> Assign shipping point to plant u2013 delete plant B shipping point from the plant A assignment. (d) In Enterprise Structure -> Maintain Structure -> Definition -> Sales and Distribution -> Define, copy, delete, check shipping point u2013 copy shipping point plant A to shipping point plant B. Correct the description in the define section of this node. (e) In Sales and Distribution -> Shipping -> Picking -> Determine Picking Location -> Assign Picking Locations (OVL3), copy plant A entry to plant B entry, changing all data to plant B. (f) Check with Reorder buying group to determine MRP controllers for new plant. Remove plant A MRP controllers from plant B, and add controllers received from reorder buying group. IMG is Materials Management -> Consumption Based Planning -> Master Data -> Define MRP controllers (g) Define special procurement. IMG is Materials Management -> Consumption Based Planning -> Master Data -> Define special procurement type. (h) OMGN u2013 Assign customer in u201CSet up stock transport order u2013 [Plant]u201D. OMGN u2013 in u201CSet up stock transport order u2013 [Purchasing Document type]u201D; an entry was created for source plant B and plant A, this entry should have a UB order type and the check box should be off. Each plant needs a plant B UB entry created. (j) OMJ3 u2013 Delete incorrect entry in print parameters. Remove entry where plant = plant B & storage location = plant A. Create entry for plant B storage location B (k) Verify entry for new plant exists in OVLT picking output (l) Verify entry for new plant is correct in VP01 4. Manual configuration (a) Create plant customer number and assign to plant in OMGN. (b) OMJ3 u2013 set correct printer for plant B (c) OPK8 u2013 Set printer for plant for list LG01. This is for production orders. (d) Output determination OVLT (set printer), In addition to above, other changes based on customization in your installation needs to be done as well. Plants Definition : /NSPRO-IMG-Enterprise Structure-Definition-Logistic General-Define,copy,delete,check plant-Define Plant (In this, we are defining plants(s) under company which is defined earlier) /NSPRO-IMG-Enterprise Structure-Definition-Logistic General-Define,copy,delete,check plant- copy,delete,check plant-F6 to copy org. object from plant 0001 to defined plant(s). Storage Location : /NSPRO-IMG-Enterprise Structure-Definition-Materials Management-Maintain Storage Location-New Entries (Define required storage location(s) under different plant(s) ) /NSPRO-IMG-Enterprise Structure-Definition-Materials Management-Maintain Storage Location-Storage Location Description---- New Entries ( enter here addresses of each plants)
    Thanks
    Anil Hooda

  • Factory calendar doesnt exist

    Hi,All........
    We are creating production order manually with matrl, Prod. Plant and order type as input...When we  enter required quantity for Production and finish date as we are using Backward Scheduling.
    The system throwing a messgae that factory calendar Z3 does not exist.
    Message no:co034......
    Pls guide me to resolve the issue.
    what needs to be checked in the system.
    Rgds,
    Yogesh.....

    Hi Yogesh,
    It seems that you have assigned the factory calendar Z3 to plant or to the workcenter used in the routing for the material.
    This customizing you may have carried forward but probably you have not carried the factory calendar Z3 customising to the client where you are trying to create the order.
    Hence create the factory calendar in customising (SCAL-Tcode) in the client you are working.
    I hope this will help resolve your problem once the factory calendar has being defined in the client you are working.
    Thanks & Regards.
    Santosh Joshi

  • Which Factory Calendar is used to determine the Sales Order delivery date

    Hi ,
    There is Factory calendar assigned to sales Org and shipping point as well.
    I want to know which Factory calendar is used to determine the promise date on sales order acknowledgement and which one is used to determine the delivery date?
    Appreciate your help/inputs.
    Regards,
    Ram

    Ramy,
    I am not sure what you mean by 'promise date'.  For a given sales order item confirmation schedule, the system calculates the following dates:
    Delivery Date
    Goods Issue date
    Loading Date
    Material Availability date
    Transportation planning date.
    These dates are dependent upon what you have configured, and what your master data is.  If you have transportation scheduling turned on (IMG>SD>Basic Functions>Delivery scheduling and transportation scheduling), then the durations are:
    Route duration (transit), - affected by factory calendar assigned to the route (0VTC, that's a zero)
    Picking time, packing time, Transportation planning time, and Loading time- affected by the factory calendar assigned to the shipping point (OVLZ, not a zero)
    In addition, the Material availability date will be affected by the calendar assigned to the plant (WB03).  The calculated dates may also differ on a given order schedule line, based on whether the sales order is backward scheduled or forward scheduled.  This is particularly important when the calendars all have different holiday schedules.
    Standard SAP help on the matter, with a couple of nice pictures.
    http://help.sap.com/saphelp_erp60/helpdata/en/dd/5607e7545a11d1a7020000e829fd11/frameset.htm
    Rgds,
    DB49
    Edited by: Dogboy49 on Feb 16, 2010 5:08 AM

  • Factory Calendar Issue

    HI Gurus,
    I have a problem with the factory calendar assignment. I created the factory calendar directly in production. Now, I want to assign it to a particular plant. So, I created a similar calendar in DEV and assigned it and transported it. However, this calendar is not available in QA and what happened was all the assignments in that transport from DEV was transported to QA.
    I just want to transport the assignment of only one plant to QA & PRD. What is the procedure? How to do that? I am afraid that if I move this to PRD, it will overwrite all other assignments as it did in QA.
    Please help...
    John

    Hi John,
    you have to transport all the factory calenders in the system at once i.e. all the factory calenders for different plants. you can not transport only one factory calenders for one plant. try to transport all the factory calenders and check it out.
    cheers
    jagan

  • System does not propose the delivery date based on factory calendar

    Hi,
    I am creating a sales order for a delivery date for this sat which is (2/22/09)
    I have maintained 2 separate calendars for
    1) shipping point
    2) for the route
    The route has a transit time of 1 day and the calendar has sat and sunday as non working.
    the Shipping point has a pick/pack time of 1 day and the calendar has sat and sunday as non working
    The material is available in the warehouse
    Now when i create this sales order i enter the delivery date as 2/22/09, the system does not propose me the delivery date of monday (i.e 2/23/09) It accepts the 2/22/09 delivery date.
    In the schedule line i do see the date as 2/22/09 only.
    The delivery was created with the following dates
    Picking = 2/17/09
    Transportation Planning = 02/18/2009
    Loading =02/18/2009 
    Planned GI= 02/18/2009
    Delivery Date = 02/22/2009
    How can the system give me the delivery date of a sunday when the calendar doesnt allow sunday as working day.
    Also the route time is 1 day in transit so i am not sure why the system is proposing a 3 day transit time?
    Can any one explain the behaviour of SAP for the delivery date logic

    Dspsac,
    Delivery date can be any date.  For instance, if your customer insisted on a Sunday delivery, you would accommodate him, regardless of any calendar.
    From the delivery date, the system counts backwards USING THE FACTORY CALENDAR ASSIGNED TO THE ROUTE by the number of days in the route.  You have to consult the FC assigned to your Route to determine if the GI date has been properly calculated.
    From the GI date, the system counts backward Pick/pack time, using the shipping point calendar, to arrive at Material availability date.
    Calculations are explained in SAP online help
    [Transportation and Delivery Scheduling|http://help.sap.com/erp2005_ehp_04/helpdata/EN/dd/5607e7545a11d1a7020000e829fd11/frameset.htm]
    Regards,
    DB49

  • Assigning of factory calendar to plants

    Hi Guys,
    I want to assign 3 factory calendars to plant, could you plz tell me where to assing in IMG.
    Thanks,
    Bhanu

    Hi ,
    As per me u can assign only one factory calender to plant
    SPRO > Enterprise structure >definitin > logistics general > define copy delete check plant>define plant
    wht is logic behind assigning 3 calenders to single plant ?
    Rgds

  • Assignment of factory calendar ID to company code

    Hello,
    I want to implement a report where I need the Assignement of the ID for the factory calendar to the company code. Is there a table in the system?
    thx
    Robert

    Hi Robert,
    Read the factory calendar & plant link from T001w & then read the link between plant & company code in T001k. I am sure you would then be able to get the fields into your report as you want.
    If helpful award points
    Regards,
    Vivek

  • Risks associated with changing to new Plant Calendar assigned in OX10

    Our site is considering changing the factor calendar from 5 days a week to 7 days a week in OX10 for the plant.  We curently use all supply chain modules and otc.  Can anyone tell me the warnings/risks associated with doing this?
    Thank you.

    Hello,
    Orders for Production , Maintenance, Deliveries, Transfer Order  etc. are created according to the factory calendar .
    You must be sure that all operations can be carried out in the seven days of the week (e.g. deliveries), because SAP can be scheduling aTransfer Order for a Sunday and somebody can be calling you for fixing the issue!
    The normal case is that some operations can take place in the weekend (Production, Maintenance) but other Logistic Operations ( Deliveries) are done only from Mo to Fr. If this is your case, I would create an additional seven days calendar and assign it to the work centers in Production and maintenance, but the Plant would remain linked to the old five days calendar
    Hope this can solve your issue.
    Dario

Maybe you are looking for

  • Clarification on Patches applied after installing NCOMP

    Clarification on Patches applied after installing NCOMP and reapplying patchset Note : 293658.1 10.1 or 10.2 Patchset Install Getting ORA-29558 JAccelerator (NCOMP) And ORA-06512 Extract: "Note: If you have one-off patches on top of a 10.1.0.x or 10.

  • IMac Freezes and curser pinwheels

    iMac freezes with pinwheel several times a day. Have to force restart. Control/option/escape has no affect. Usually occurs when I am trying to open something in mail or trying to launch a video link. I am using an airport to connect to the internet.

  • RTMT logs Analysis tool

    Dears, is there any tool to analyse the RTMT logs and IOS logs. it is hard to go line by line for troubleshooting thanks in advance Anas

  • Configurat​ion Utility - Is this supported on new Thinkpads

    Can anyone confirm whether the Lenovo Configuration Utility is still supported on new Thinkpads. Looking at the Lenovo website it doesn't look as though anything has been updated since 2006 when the X60/T60 were current models. http://www-307.ibm.com

  • Adobe Flash Player update 11 gave me a virus

    The newest adobe flash player update gave my computer a virus that required me doing a system restore and completely removing adobe flash player from my system. It was sending spam emails in different languages and spam videos. It was able to slip th