Friends
I have created a production order.
Wrong Operation number(Activity  Number - RESBD-VORNR) is  showing for some of the Production Order components(all are phantom components only)   where as the activity number in its  Routing components (RCM01-VORNR) is different. So we need to change the activity to correct activity manually in change production order screen(CO02)
I found one  SAP Note 104322 - Error in reallocating phantom (When reallocating phantom components in a production order to another operation, different errors can occur:
--  not all dependent components are allocated to the correct operation). We are on ECC 5.0 . This note already exists in our system
This issue happened only with one BOM . Many other BOMs ( similar type) donot have this issue.
Can some one from the group help me to resolve this issue?
Thanks in advance
Please let me know if you guys need more details
Thanks
MVSSAI

Hi MVSSAI,
I am just a bit confused if you are talking about wrong operation nos. or wrong activity nos. If I am correct, it should be wrong operation nos. which fetches the activities that are defined in that work center.
If wrong operation nos. is getting selected then
Please check if the system is configured with alternative sequence under T.Code: CA01 for a particular group & group counter (just in case you are using nos. of routings for the single material).
If yes, then check if you have defined priority of the sequence i.e. in which order it has to taken.
If yes, further check if you have aligned automatic routing selection depending upon the B.O.M. alternatives in routing itself.
Just in case you have maintained any of these the routing will get automatically selected depending upon the priority that is given to work center and hence different operation nos.
Regards,
Pankaj

Similar Messages

  • Revision number for Header material in Production order.

    I have maintained Revision number in material mster  for Header material in Production order and also for components.
    1)Revision number for Header material in Production order is not appearing in AFKO table against production order.
    2)Revision number for components in Production order is not appearing in RESB table against reservation.
    Any settings for that please guide.

    Hi,
    Revision number generation is using ECM only possible. Are you using the ECM with revision levels. Check this.
    Regards,
    V. Suresh

  • Actual activity price calculation for production order

    Hi
    Can any one guide me in how many ways we can assign actual activity price calculation for production order?
    I knew only one way by assigning PPP2 costing variant?
    I have another doubt is: if we don't mention any material valuation indicator (moving average, standard) in valuation variant, how system will calculate material prices? is there any other way, to recognize the prices by system?
    regards,
    Ramesh B

    Dear,
    Costing variant PPP2 is linked to some valuation variant inn OPL1
    System will check the valuation of material and activity according to this valuation variant
    For material valuation there are many stg acceding to which system will take the price the raw material,
    Valuation strategy for material component
    Strategy sequence that determines the valuation of the materials used in the cost estimate.
    Use
    The materials are valuated using the price in the material master record or the values calculated in a material cost estimate.
    Procedure
    You can enter a single strategy, or you can enter multiple strategies in the form of a strategy sequence. If you enter multiple strategies, the priority of the strategy determines what price or what values are selected.
    Examples
    Assume that the following strategy sequence is entered for material valuation:
    1. Planned price 1
    2. Standard price
    3. Moving average price
    If the system finds a value in the Planned price 1 field (costing view), this value is taken as the value for valuating the material.
    If the system does not find a value, the value in the Standard price field (accounting view) is used.
    If the material does not have a standard price, the system uses the value from the Moving average price field.
    if you have not mentioned, then system will give error that "valuation stg not found"
    Valuation strategy for internal activities and processes-
    Strategy sequence that determines how internal activities and processes are valuated in costing.
    Use
    The activities and business processes used are valuated with the prices from Cost Center Accounting or Activity-Based Costing to determine the production costs or process costs. The prices can either be calculated iteratively through price calculation, or entered manually by the user.
    Procedure
    You can enter either a single strategy or more than one strategy in the form of a strategy sequence. If you enter more than one strategy, the priority of the strategy determines which price is selected.
    Examples
    The following strategy sequence is entered:
    1. Actual price of the previous period
    2. Plan price of the previous period
    3. The most current plan price
    If the system finds a price for the activity type, this price is used for valuating the internal activities. If no price was calculated for the previous period, the plan price from the previous period is used to valuate the activity type.
    If the system cannot find a plan price for the previous period, it looks for a future plan price, using the next price in the posting period to valuate the internal activities. For example, if plan prices have been entered for periods 2 and 3, and a plan price is calculated in period 1 for period 4, the system uses the price from period 3 in accordance with the valuation strategy Most up-to-date plan price.
    Again if you have not mentioned, then system will give error that "valuation stg not found".
    You can use any costing variant for actual (PPP2)and planned(PPP1) according to your requirement.. check in OPL1

  • Serial number error while creating the production order

    Hello frds,
    I am getting the following error while creating the production order.
    "Item 000000 requires exactly 100 serial numbers for the asset".
    If i give 100 serial numbers in the order, the error is solved. But i do not want to assign 100 serial numbers, i want to assign only 2 numbers.
    I have tried using the new serial number profile also, but it is giving same error.
    Kindly guide.
    Regards,
    Narendra Bora

    Dear Narendra
    Select the serial number profile and go to serialization procedure and set the ser. usage status 02 - Optional as below.
    Procd Procedure description Ser.Usage
    PPRL PP order release 02
    since the serail number creation is optional for order relase this will allow you to relase with out error and with serail number assigned in partial.
    Regards
    Soundar

  • Serial number creation while confirmation of production order

    Hi team
             Can we crete serial numbers while confirmation of production order. I know how to create serial no while creation of proudction order, while taking usage decision in quality. Is there any way to create serial no while confirmation of production order.
    regards
    ssp

    Hi siva
        There is no way to create serial number at production order confirmation, only at creation and release the order.
    but u can maitain MMSL profile and the sno will create at GR from shop floor to warehouse
    I hope it will help to u
    Regards
    S.Anbalagan

  • Serial number assignment to components during production order confirmation

    Dear all,
    When confirming a production order (Tcodes CO11, CO11N, CO15) the user should have the possibility to add serial numbers for components directly in the goods movements overview.
    A modification for that is describe in the SAP Training documents SCM 310, p. 485-487.
    Do you have any details on the described modification and/or any experience with similar modifications?
    Thank you in advance.
    Best regards,
    Klaudia

    Hi friend,
    Use t-code OIEN... Thr u can see the external number range given for various groups of equiments..
    hope this will help.
    Regards,
    Ravi Thakkar
    INCAT

  • Batch Number Not copied over from Production order to Confirmation

    Dear Experts,
    In the production order, I specify the batch # for the components.  But when I do the confirmation, the batch number for the components is not getting copied over. 
    Can anyone suggest what has to be done.
    Regards
    Tom

    Dario, I have not saved my confirmation.  But when I execute CO11N and go to "Goods Movement" tab, I expect the Batch to be copied from the production order for the components.  But the batch field is Blank.
    How do we make the batch field to be copied over from the production order.
    Thanks in advance.
    Regards
    Tom

  • Finding Soln. to initialise total number of pages for new production order

    Hi Experts,
    My internal table has details of Production Order which has to be printed in a smartform. The page numbers has to be initialised i.e both SFSY-PAGEand SFSY-FORMPAGES each time when it prints a new production Order.
    Example :
    Say Production Order 1 is populating in 4 Pages it should display
    1 of 4
    2 of 4
    3 of 4
    4 of 4
    and for the 2nd Production Order say it Occupies 2 pages page number should be initialized and displayed as
    1 of 2
    2 of 2
    One solution i found is having the smartform inside a loop and passing details of one production order at a time but i dont want to use it as i might be lead to performance issue.
    Kindly suggest me a Solution where i passed my internal table once to the smartform and get the output.

    Hi Experts,
    My internal table has details of Production Order which has to be printed in a smartform. The page numbers has to be initialised i.e both SFSY-PAGEand SFSY-FORMPAGES each time when it prints a new production Order.
    Example :
    Say Production Order 1 is populating in 4 Pages it should display
    1 of 4
    2 of 4
    3 of 4
    4 of 4
    and for the 2nd Production Order say it Occupies 2 pages page number should be initialized and displayed as
    1 of 2
    2 of 2
    One solution i found is having the smartform inside a loop and passing details of one production order at a time but i dont want to use it as i might be lead to performance issue.
    Kindly suggest me a Solution where i passed my internal table once to the smartform and get the output.

  • Serial Number status update - GU against production order

    Hello,
    I have a question regarding updating the status on serial numbers. After having posted the goods issue against production order (movement type 261), status remains "AVLB". Should not system status be set by SAP to some another status when I post the goods issue for serial number?
    Any idea ?
    Thanks in advance.
    Esra

    Hi,
    No, the status will remain in AVLB only. (Raw Material)
    During Goods receipt for the finished product the status of that material & serial no will be in  ESTO.
    After delivered to customer by sales order it will be in ECUS.

  • Serial number of components issued to production order

    Hi Guys,
    I want to get a report for components issued to production orders with Serial numbers. Is there any report available.
    thanks and regards
    Murugesan

    Hai Murugesan,
    Try MCRE or MCRX here you can get the materials list which you have issued to production order. Other wise goto MB51 mov.type 261. and execute here also you can get the details.
    Reg/ Shankar G.

  • Activity is calculated on Production Order Quantity based .

    Hi Experts,
    My requirement is Planned Activity cost should be calculated based on Production order Quantity. and not on timing mentioned in Routing.
    For Example-   My PO Quantity is 10 - and activity assigned rate is 1 then = 10 RS is my planned activity Price
                                IF PO quantity is 1  then planned Activity Price is 1 RS
    pour some light on this
    Regards,
    Girish

    Hi
    Create an Activity Type and assign in work center / Routing... Keep the Activty Qty same as Base Qty in Routing....
    if you create Prod Order for 10, system would automatically propose Qty as 10.... Assign a fully variable formula in the work center to this activity
    Then maintain a price for this n KP26
    br, Ajay M

  • System Status WCRE is active unalbe to release production order

    Unable to release production order,
    System status is WCRE is active.

    Hi
    WCRE - Indicates Workcenter Until Release.
    Please check the status of you work center
    Go to CR03 transaction, In the Basic Data view check click on Admin Data to view the status if it is in Locked Status.
    Regards
    Venugopal

  • Personalizaed Amount Number field Not showing in proper order

    Hi,
    I have personalized the table RN where I have added a Column of Amount field.
    Now when I view the Region the amount filed appears as Right aligned
    Ex : 182699 right aligned
    but it should be : 182699 left aligned
    properties I set for that filed are
    ID : Amount
    Datatype : NUMBER
    prompt : Amount
    View Instance : OppAmountVO1
    View attribute : Amount
    And one more thing is that the personalized items are not affeted by the system profile values.
    like Standard amount filed displays 182699.00
    but personalized item display 182699 with out the decimals what might be the reason.
    How to over come this kind of issues
    Regards,
    Krishna

    If you want to make it left aligned then change the Data type of the item to VARCHAR and you will be able to see the number in right align format.
    Thanks
    --Anil                                                                                                                                                                                                                                                                                                                                       

  • Serial Number. Production Order Confirmation. GR. UD. Sales Delivery

    Hi Gurus,
    Please help on this issue to get any user exits .....
    As part of Serial number management, we have a certain issues on serial number confirmation, goods receipt from production order and quality inspection with UD.
    Master data:
    Finished product material master, Workscheduling view, Serial number profile maintained " ASRN"
    Process flow:
    1) Avalon Specific Serial numbers generation for finished goods through production order release status.
                  (A11206000001)
                                        A  - Avalon
                                        1   - PCB Unit 1
                                        12 - Year 2012
                                        06 - Week
                                        000001 - Running serial number for the week.
    2) Production order confirmation through CO11n transaction.
    3) Production order Goods receipt through MIGO transaction against order.
    4) Quality Inspection with Usage Decision through QA32 transaction.
    5) Goods Issue for Delivery.
    SAP Product Error:
    1) System does not track and control the operation wise confirmed serial numbers during order confirmation.
    2) System does not track and control the finally confirmed serial numbers during order goods receipt.
    3) System does not track and control the last goods receipt qty in Usage Decision.
    4)  For semi finished product, if we maintain serial number profile in workscheduling view, system is not showing goods issue material list in Co11n transaction for the finished goods.
    5) Interfacing the serial number reading scanner with SAP,  is not working without entering material number and serial number manually.
    6) System does not tracking and controlling the last Usage Decision done serial number during Goods issue to Sale order Delivery.
    Regards,
    Santha

    Hi Santha,
    This is a bit vast, but I'll try to address at least some of the issues:
    1- serial number in operation confirmation is not possible, for the reason that serailization is part of stock management, and as WIP in an order, this is not stock yet. Actually you cannot confirm the manufactured material either, and those 2 go together.
    For tracking specificly WIP, there's something called WIP batches; you may look into it to see if you can use it.
    2- during GR system will propose those SNs that you have defined for the order at release or creation.
    3- ?
    4- GI in CO11N is provided only for BACKFLUSHED material components. Serialized materials CANNOT be backflushed.
    5- You can use a barcode reader to read the serial number (instead of keyboard entry) when cursor is on the right field in the respective screen.
    6- ?

  • Serial number when production order creation in MTO

    Dear sir
    serial number profile assinged in the material master of finfished product . i have sales ordernumber    x  and  qty for finished product 10EA.
    when i run md50 for mto . then pland order qty converted to production order for 10ea. then production order created for 10 ea and serial number s generaqted x1 to x10.like x1,x2,x3,x4,----
    x10.fro production order number y
    but when i convert pland order to producton order qty for 2EA , then production order created for 2ea, and serial number generated x1,x2. like this iam spliting the custmer order qty . then i run md 50 for same sales order iwill get pland order for remaning qty 8EA , now iam converting to production order for 2 ea only . but production order created for 2 ea and serial number generated  same number which was generatd first production order y like x1,x2.but it should generated x3,x4
    for 2nd order  for 3rd order x5,x6 like this.
    pl tell me solve my problem .
    regards
    Baswaraj

    Hi!,
    Please try follow:
    Go to path IMG > Plant Maintenance and Customer Service > Master Data in Plant Maintenance and Customer Service > Technical Objects > Serial Number Management > Define Serial Number Profiles. There enter "2" in Stkck column for your serial profile.
    Regards,
    Uday

Maybe you are looking for

  • How can I add a red line below all those words, which are not technically correct? And how can I do Pages to do it automatically?

    So, how can I add the red line below all those words, which are not technically correct. I have tried everything, but nothing works. Red line should come there automatically, but I can't find nothing from settings to do this. Can you guys help me?

  • Strange Issue When Logging Out

    Hello, I noticed the other night when I was shuttingdown, the little popup that asks if I want to reopen windows seemed to change and show blue "Shutdown" rather than the graphite color which I've chosen as a general color scheme. It seems ok now, bu

  • HT1386 IOS7 & New Itunes

    Outlook does not have any duplicates in Contacts, Calendar, or Notes yet when synced to IPhone get duplicates in all three Reset Phone, delselected all three and resynced no help. Removed all three from Outlook and synced and all three were now empty

  • EoIP Tunnel across two locations

    Hi, Appreciate if some one advise on how to configure EoIP tunnel. One wireless LAN controller is in a DMZ acting as an anchor controller...and this needs to get traffic from foreign Wireless LAN Controllers from other remote locations over an EoIP T

  • Deactivate Group Currency

    Hi Gurus, What is the step to deactivate group currency in a productive company? Are there any impact to other modul if we deactive the group currency? We use FI, TR, CO, MM, QM, SD, PS, PM, PP. Regards, Handy