Wrong Production Date Copied in Batch Master during GR of STO

Hi Gurus,
Currently, we are facing an issue that the batch master was created wrongly in the following process:-
STO >      Goods Issue of Mat A - Batch 1234 from Plant A >     Goods Receipt of Mat A - Batch 1234 to Plant B
Batch 1234 -Plant A
Production Date: - 02.04.2010
Shelf Life Exp. Date: -  15.05.2010
During GR into plant B, we noticed that the batch master is created with wrong data:-
Production Date was copied wrongly into Shelf Life Expiration Date. Whereas the Shelf life Expiration Date become the production date?
Batch 1234 -Plant B
Production Date: - 15.05.2010
Shelf Life Exp. Date: -  02.04.2010
May I know this happened? Hope to get advice from you all. Thanks!
Mi

this looks pretty much like an error in a user exit that is supposed to copy batch data from one plant to another plant.
I guess your batch level is plant level, in thise case a batch A in plant 1  can be totally different from a batch A in plant 2. hence mayn companies that do not want to switch to a different batch level, implement user exits to control how data gets copied.

Similar Messages

  • Production date updation in batch (REM)

    Hi Experts,
    Is there any standard procedure available to update Production date in batch header from backflushing (Date of Manufacture). Batches are created manually through MSC1N.
    Regards

    Julfikar,
    Please ensure that you are using Standard batch characteristics "LOBM_HSDAT" to the batch class what is assigned to the material. Also check in transaction OMCV whether for movement type 131 batch classification is active.
    Regards,
    Prasobh

  • Data copied from GP master to Ship-To on A/R and A/P

    Copying this from another thread ... really think this has to be reworked in B1:
    Thank you guys.
    I'm having a hard time to believe that 'this' really is the out-of-the-box solution from SAP. IMHO, this is far away from any practical experience.
    The solution with the additional UDF is 'half' a way to go, at least to add the Name field to the address in GP master (which SAP probably just forgot ;-). This still leaves the problem of still not being able to just overwrite the Ship-To in an Sales Order to enter a free name + address specified by the customer. Even for a 'one-time' used name + address, I will have to add it to the GP master, which is nonsense, IMHO.
    I simply can not understand why B1 does not copy the name and the address to the ship-to field - just that plain easy. This would leave all the possibilities for every situation open.
    Franz

    Thank you guys.
    I'm having a hard time to believe that 'this' really is the out-of-the-box solution from SAP. IMHO, this is far away from any practical experience.
    The solution with the additional UDF is 'half' a way to go, at least to add the Name field to the address in GP master (which SAP probably just forgot ;-). This still leaves the problem of still not being able to just overwrite the Ship-To in an Sales Order to enter a free name + address specified by the customer. Even for a 'one-time' used name + address, I will have to add it to the GP master, which is nonsense, IMHO.
    I simply can not understand why B1 does not copy the name and the address to the ship-to field - just that plain easy. This would leave all the possibilities for every situation open.
    Franz

  • Production GR Batch master u2013 Country of origin code Mismatch with Material

    Hi Friends,
    As per my scenario, after production confirmation (Cor6 u2013T code) batch master is getting created (101-GR). But the country of origin is updated wrongly in the batch master.
    Letu2019s say, MM master Foreign trade view-import/export has country of origin X.  Here some time, system is updating in the GR-master correctly as X when the GR happens by COR6. But some time it is taking some other valueu2014say-Y u2013other country code.
    FYI...we are not using classification value and all....only reference is MM master
    Need help..
    1, From where the country of origin is captured in Batch master during the time of confirmation? ( here the material is for inhouse-E item)
    2. My requirement is, it has to follow only the MM master-X. But some time it is correct. (taking X)u2026.some time, for the same order confirmation,it is taking Y---From where ?  Any Idea?
    Thanks,
    Mani

    Hi  Rafael &  Jürgen L.,
    Excellent solution........The Exit is ( EXIT_SAPLV01Z_013) active........I got the way. Thanks Rafael and Jurgen. ( Awarded points)
    Thanks,
    Mani

  • Production date in inbound delivery in batch split

    Hi,
         I have a issue with production date update in inbound delivery.
    I have created a inbound delivery for 10 PC. The inbound delivery has only one line item and there are no batch details on it. As soon as the inbound delivery is created a message is sent to the 3PL . Once the 3PL receives the goods from vendor he send us a message with the batch details. Say the 3PL has received multiple batches from the vendor. So he send us back an SHPCON message with multiple batch details. That  is batch A with QTY 6 and batch B with QTY 4. He also send us the production date for each batch via the shpcon idoc. say batch A has production date as 10.02.2011 and batch B has production date as 21.03.2011.
    The IDOC is created successfully in our system and the inbound delivery is also updated correctly with the batch split details with correct QTY. That is line item 10 has batch split line items 900001 with batch as A and QTY as 6 and line item 900002 with batch as B and QTY as 4. The issue is only with updation of date of production for each of the above batch. Both batch A & B are updated with date of production as 21.03.2011. Instead of batch A being updated with date of production as 10.02.2011 it is updated with the batch B date of production. I checked in the idoc. In the idoc each batch has correct production date. only when updating the inbound delivery it has updated wrongly..   Has any one come across similar kind of situation. ? How did u manage it?
    Ram

    I found out the issue and the approriate changes has been made in the message handling

  • Varinat configuration copy of batch characteristics from Sale order to production batch

    hi experts ,
    below is the scenario :
    the characteristics and its value which are maintained in the sale order must be copied to batch produced during process order GR .
    it was not available in 4.7 but availbale in ECC 6.0 i guess by SAP.
    i have created configured material with class type 300 and KMAT . have mainatined CU41 . created material variant and have filled  MRP 3 fields.
    have created material variant with class type 023 . (also tried with class type 300) .
    created sale order for confgured material and item category is also correct . i do not get pop up for material variant which has same charcateristics as that of material configured.
    also on after MRP run and process order creation w.r.t Sale order i did GR . but the batch was created with 023 class type and no characteristics were copied .
    kindly guide  , i have not worked much on variant configuration.
    regards,
    satish

    Satish Yadav,
    the problem start as you havent got pop up saying there exist a material variant with values you selected for configurable material in sales order, so please check settings related to item catagory.
    Also as sales order is created for configurable material , for which material you run MRP?
    check below link for more information on material variant and its replacement in sales order.
    http://scn.sap.com/docs/DOC-31570
    checka nd reply back, Hope it will solve your issue.
    Thanks
    Ritesh

  • Warehouse stock with production date of batch

    Hello,
    Can somebody tell me any report where user can see warehouse stocks along with production date of a batch. User wants to do FIFO while doing inventory transactions. And user wants to first transfer oldest produced batch first.
    Please suggest.

    Hi Sudhir,
    Thanks for your response. LX02 shows only GR date for quant- for certain quant GR date is updated as todays date if some stock transaction is done for that quant.
    User wants report
    He will then be able to move oldest stock based on production date.  Example quant has GR date as 24th Feb 2011. But its production date is 24th Feb 2010. So ideally this stock should be moved in FIFO method based on production date.
    To summarise, I require standard SAP report  stock in LX02 as well as production date/receiving date of a batch in quant.

  • Controlling batch production date when using PI sheets

    Hello,
    The batch production date for some products is first entered at process order release. However, the GR is done using PI sheets. The GR entry via PI sheets takes the current date as the manufactured date and overwrites the old batch production date in the batch
    Does anyone out there know if there is a way to control this so that old production date is not overwritten with the GR entry date?
    many thanks.

    Dear,
    For this you need to use the setting..Batch classification in foreground for the movement type. Do the setting in OMJJ.
    Coem back after you try.

  • Batch number format setup and auto batch creation during first GR

    Dear all,
    This is a batch question.
    I know that both the master batch and the stock data for the batch are created automatically during the first goods receipt. Thus, I do not need to create this data manually.
    My question are following:
    1 - what is the machnism that trigger this auto-batch creation in the system during the first goods receipt? is it from some kind of configuration?
    2 - If I want my batch number to appear in certain format, for example, first four digit is customer code, middle two code is country code (i.e. US, UK), and the remaining as goods receipt date. How do I setup this in the SAP system.
    3 - If batch classification is active, one can assign characteristic values to the batch when entering the goods receipt. HOwever, normally when I perform a goods receipt in MIGO, after putting in the production date and the batch number, I will hits the checkbox and if no problem, I will post the 101 document. WHERE in the MIGO screen I can assign the characteristic value to the batch?
    Thanks.

    My question are following:
    1 - what is the machnism that trigger this auto-batch creation in the system during the first goods receipt? is it from some kind of configuration?
    ==> Yes - See IMG activity 'Define batch creation for Goods Movements'
    2 - If I want my batch number to appear in certain format, for example, first four digit is customer code, middle two code is country code (i.e. US, UK), and the remaining as goods receipt date. How do I setup this in the SAP system.
    ==> See exit EXIT_SAPLV01Z_003
    3 - If batch classification is active, one can assign characteristic values to the batch when entering the goods receipt. HOwever, normally when I perform a goods receipt in MIGO, after putting in the production date and the batch number, I will hits the checkbox and if no problem, I will post the 101 document. WHERE in the MIGO screen I can assign the characteristic value to the batch?
    [[> See IMG activity 'Activate Batch Classification for Goods Movements in IM"

  • Production date in mm/yyyy format at MIGO

    Hi All,
    I am doing MIGO for a purchase order and entering the production date for a batch managed material. I have noticed that if I enter the date in format mm/yyyy i.e 10/2010 then the date is interpreted as 10/20/2010. Is there a way I can force it to accept and enter production date in mm/yyyy format only.
    Thanks a lot.

    Hi ,
    In users profile own data , System - user profile - own date , in the default tab you can change the values of the same .
    Else if you have authorizations then you can use the T code SU01 to make the changes in defaults tab.
    Select the format in which you intend to enter the data , please remeber that in case of batch management you need to give - date/month/year - you simply cant give month and year .
    Hope this helps .
    Regards ,
    Dewang T.

  • Send production date by Idoc

    Hi,
    What is the (best-practice) Idoc message to send the production date (from the batch - MSC3n) to the customer? Is there a standard solution?
    I tried to use the QCERT message, but there is only the shelf-life date, but I would like to send the production date.
    Thanks in advance.
    Best regards,
    Thomas

    Hi,
    My understanding is that LOIPRO is used to send Production Orders to external systems. But we have to send this information to the customer and if possible we want to include the information in an existing message (QCERT or DESADV).
    Has anybody experiences in this? How did you implement this?
    Thanks,
    Thomas

  • Performance Point Services data source pointing towards wrong datasource after production instance copied in development

    Hi
    We have copied our Project Server 2010 production databases to development server. We have few reports created by using Performance Point Services, but here when we try to open the reports the data source is  pointing towards production data source
    instead of dev.
    We are getting some issue while executing the reports
    Request you to let me know what exactly the cause and steps to rectify the issue.
    Thanks 
    Geeth If you feel that the answer which i gave you is Helpful please select it as Answer/helpful.

    As you have copied data from Prod to Dev reports are pointing to production data sources and reports are unable to display data. Whenever we copy the data from one environment to other then this kind if issue occurs.
    We need to modify the data source of all the reports manually so that report point to dev data source.
    You have to open data source for your reports and change it from prod to dev then reports will display correct data.
    http://blogs.msdn.com/b/performancepoint/archive/2011/09/19/performancepoint-data-connection-libraries-and-content-lists-in-sharepoint.aspx
    http://www.networkworld.com/community/node/57687
    kirtesh

  • Copy of Material Master charac. values to the batch classif. in GR for PO

    Dear gurus,
    Could you please help me with the following issue. I have a material managed in batches, and it has a classification type 023 in material master. I fill one chaacteristic of this classification with some value. Now I want this value to be copied to the batch classification during the creation of new batch while making GR to production order.
    Is it possible?

    Hi Nikolaj,
    What I am understand your requirement is like,
    You want to fetch the value of Characteristic maintain in Batch class in Material master to the Batches, correct?
    But my Friend if you maintain value of characteristic in Batch Class in material master then it will works as a validation.
    For Example,
    Suppose your Characteristic is Colour and in Material Master Batch classification view you have maintain value as Red.Then system will not allow you any other colour in Batches.You will find that value in Drop Down list.
    Regards,
    Dhaval

  • Auto creation of Batch master data when external batch no entered in PR

    Dear All,
    At persent we can auto create batches at production order creation level, Goods receipt level.
    In same way how we can achive auto creation of Batch master data at Purchase Requisition level.
    Regards,
    Manoj

    There is no auto-creation of batches that are entered in ME51N. SAP issues message ME178 telling you that the batch entered does not exist.
    You have to maintain the batch in MSC1N first, then you can enter it in the PR.

  • Copy of Batch characteristics value from material master to Batch

    Hi Gurus,
    I have maintained some values in the characteristics under batch classification in material master and want to copy the values in batch characteristics during batch creation at process order release.
    Can any one help me to achieve this in standard way?
    Thanks
    Sandip

    Hi,
    Try to understand the batch classification functionality...In batch classification characteristic values changes from batch to batch...Values should not be maintained in the material master...it does not have any meaning...in the material master we need to assign only the batch class with class type 023 in classification view ...no need to assign the values there....Batch classification means characteristics values differs from batch to batch...
    Thanks
    Kumar 

Maybe you are looking for

  • My MacBook Pro will suddenly quit while I'm working on it and restarts itself.

    I have a 2012 MacBook Pro running OSX 10.8.2 Mountain Lion with a 27-inch Apple Cinema Display connected to it that I use at work. I am an art director so I am constantly in Adobe Creative Suite 6. In the past month my MacBook Pro has suddenly quit o

  • Skype click to call wont install in firefox

    skype click to call wont install in firefox. It will install in IE11 and Chrome but not Firefox. Any ideas on how to fix?

  • Spry Effects - Grow/Shrink

    Hello DW people - Trying to use the Spry behaviors in CS3. I need to put 200 photos on a commercial site I'm building and I want the photo to start small on the page and grow on mouseover . I think the spry behavior is close - but it puts the startin

  • Neo V Update is available

    hi i have read the discussion of ICS, that ICS is available for Sweden, Denmark, Iceland, Finland and Norway this country. So can you tell me when the update is available in india. Solved! Go to Solution.

  • How do I modify an Image Navigator Image?

    I'd like to modify one of the symbols in the image navigator by adding color to it and use it on a Labview panel. I can easily export or copy the image to a graphics application and add the color or otherwise modify it, but when I put it back into th