Wrong Release date in Purchase requisition wh later than requisition date

Hi,
Purchase requisition created through Planned order then Source (contract) is assinged through Transaction ME57.
After that in display of PR as found below mentioned below,
Release date is 27.11.2008 and Requisition date is 04.12.2008. MRP type maintained in Material is Auto Reorder point.
Checked In display changes of PR as Planned delivery time new value is 45 (45 maintained in Contract and contract assigned in source list) and old value is 0 (Material master-MRP 2 view) on 04.12.2008.
My question is How come PR release date as past as 27.11.2008 when requisition (PR creation date) date is 04.12.2008. Suggest any setting required to check.
Looking forward to your expeditious response.
Regards,
C. Sundar Rajan

Hi,
If I guess, there is an exception message "06" on the PR.
check with MDO4,  if there is the exception message 06 that means :
In order to get material at requested time you have to release the PR in the past. This message help the purchaser to detect the problem and try to reduce to lead time by calling the supplier.
PR release date = Requested date - safety time- lead time - setup time - processign time- ....
If you want to change the system behaviour you have to change to chage the item strategy ont the:
MRP3/Planning/Strategy group.
best regards

Similar Messages

  • How can I validate date to be half year later than current date?

    Can anybody help me with validating date selected by user with Date picker?
    If the Date is later half year from today - it is valid, otherwise invalid. I need to keep focus within the field if invalid input supplied.
    Thanks inadvance,
    Peter.

    In essence time in javascript is stored as a long (just like in java) this means that increasing this number by 1000 increases the date by 1second.
    We know that 1 day = 24 hours = 1440 mins = 86400 seconds (*1000 for ms)
    So what you need to do is calculate the number of days you have during those months and multiply this by 86400000 and add this to the date.
    I would also suggest calculating the max time (date + 6months) up in front, if the user specifies a higher date (userdate - currentdate > date_in_6_months), it's actually invalid and you could just replace the userinput by your calculation. This way the end-user is never able to store a date further in time and your validation is already done. You could also try replacing when user_date < current_date, but thats up to you, i don't know your business-logic.
    If possible try to provide this data using XML binding, this way you could do the calculations in java/.net or whatever programming lanague you use. JavaScript is one of the most horrible environments to work with dates. It's just a hint.

  • Date in External Content Type 1 hour later than MSSQL date

    I have an MSSQL table with a date column. I have created an external content type which pulls data from from this MSSQL table. But when the content type is shown in a list in Sharepoint 2010 site, the date is 1 hour later than the date from the MSSQL table?
    This is my MSSQL dates:
    This is my SP 2010 dates:

    I'm going to guess that this has to do with server time and sharepoint time. SharePoint time can be found under regional settings. Check to see that it's consistent with the time zone of your other server.
    Andy Wessendorf SharePoint Developer II | Rackspace [email protected]

  • When the new release of PM Designer is available (Late than 0.9.6)?

    When the new release of PM Designer is available (Late than 0.9.6)?
    I need the fix of loading schemas.

    0.9.10 is in the process of being pushed to OTN as part of the 2.1.1 release. So it should happen tomorrow or on Thursday depending on how quickly it replicates to the download server. -Edwin

  • Bill Date not later than PGI date

    D/ Friends,
    Suppose PGI date is 3.6.2010 & user is creating bill doc on 5.6.2010 but entering a date later than PGI date say e.g 2.6.2010. Now we want that sys shd not accept a manually entered bill doc date later than PGI date. I think, Iu2019ve made my issue very clear. So how to achieve this thru std. config? We know that thru ABAP a u201CZu201D chck is possible to apply for this scenario but we want to do it thru std. config. Pls help.
    Thanks.

    Go to VTFL, select the item category for the combination of your delivery type and billing type and maintain routine 011 for the field "Data: VBRK/VBRP".  If you have already assigned a different routine, then add this code
    VBRK-FKDAT = SY-DATUM"
    Also the above routine will only propose the system date but it can be changed manually.  In order to prevent this, you can make the date field as grey through billing exit USEREXIT_FILL_VBRK_VBRP (Module pool SAPLV60A, program RV60AFZC).  By doing so, system will always system date (if you applied routine 11) or the actual GI date which cannot be changed.
    thanks
    G. Lakshmipathi

  • Wrong Release strategy in purchase order

    Hi,
    I have a specific purchase order with wrong release strategy.
    I had been creating others documents with the same total value and the release strategy work correctly.
    The release strategy configuration are right.
    How I can correct the release strategy in a specific document?
    Thanks.
    Best Regards.

    Hi,
    The release strtegy is basically conssitss of Different type of characters.
    What characters you are highlighting plays in release strategy.
    First you comapre the characters you mentioned in two purchase orders,
    eg: p.org, Pur Grp, Value,------
    o to bith release strategies and compre the things or characters you mentioned Release strategy and found wher you missed to get the required Strategy.
    SPRO>>MM>>Purchase order>>Release Procedure for Purchase Orders>>Define Release Procedure for Purchase Orders>>Click on release strategies
    Select your release strategy and go to Classification , here you chck the parameters in both release strategies and compare with your purchase orders.
    Regards,
    Andra.

  • Comparing dates (Start date should not be later than End date etc ...)

    Hello All,
      I have a table (5 rows) with 7 columns. Of which the first to columns are the start date and the end date. Can someone kindly advise on how I can go about to ensure that there is some validation mechanism in place such that the start date is not later than the end date and vice versa ? Thank you very much.
    from
    Kwok Wei

    Hi
      Use calculated attributes as Pran suggested. It should work. Where are you getting the data from. Is it from R/3. The node bound to the table ui element is it a model node. Anyway Here is the link on how to use the calculated attribute.
    http://help.sap.com/saphelp_nw04/helpdata/en/7f/a0384162316532e10000000a1550b0/frameset.htm
    regards
    ravi

  • Billing date comes later than PGI Date

    Dear Friends
    For a particular customer, billing date is getting generated two days after the PGI date. But for all other customers we are getting billing date on the same date as PGI is done. This problem is occurred soon after we have started invoicing through scheduling agreement instead of sales order. But I went to sceduling agrement , header &item, billing . There billing date is depicted same as PGI and delivery date. The TOP in customer, Bitting tab is 30 days credit. In customer billing Tab page there is no entry that can make this change in PGI and Billing date.
    Pls tell me how do I make Billing date and the PGI on the same date?
    Thanks
    Sangeeta

    Hi Sangeeta
    Just check in scheduling agreement document type in VOV8 wheather you have maintained Lead time in days or not
    Check in VD02->sales area data tab wheather you have assigned the standard  factory calendar 01 or not . Because this might be because of the factory calendar also.As it considers weekends has holidays
    Check in your  shipping point details also wheather you have assigned factory calendar or not
    Regards
    Srinath

  • Can a master data will have loading from more than one data source

    Dear gurus,
          I have a master data object which has every day loading from one particular data source. Now I got a requirement to load data from another data source. If we load data from more than one data source , will there be any problem with data? Will it accept loading from more than one data source.?
    Regards
    Rs

    Hi Ram,
    We can load the data to target morethan one datasource.Thats advantage in BI compare to BW. It will accept loading from more than one datasource.but you have to take care about characteristic and attributes are the same in both datasources like that.
    Regards,
    SVS

  • Posting date later than system date

    There are certain times that I would like to enter an AP invoice into a future date. SAP does not allow. Is there an override to this that would allow to enter invoice to a future date??
    I would like the ability to be able to post an Expense Item (AP Invoice) to a future period, and then subsequently cut a check, ex. On 9/28/08 with a date of 10/1/08.

    Hi Expert,
    I am currently using B1B PL34 and confirmed that I set "Allow Future Posting Date" in Document settings as well as in Authorizations.  However, I still cannot create an Aug'08 invoice even I setup my current period as Jul'08 as at today (20/10/2008). 
    Can anyone advise which patches has already solve this issues?
    Thank you and regards,
    Joan.

  • Data in PSA content is different than the data source

    Dear Experts,
    I am using Process chain to update info cube from data source of a z table.  In the process chain, the PSA request request step is having the PSA table number of the correct data source. The info package and the DTP also have the correct data source.
    But after executing the process chain, the info cube is not updated with the required data source. It is updated with data from some other data source which is belonging to a different custom table.
    I have checked the Extraction of the data source in RSA3. This is extracting from correct data source. But when I check PSA contents through process monitor in process chain log for DTP, I found the  PSA content data is different from the data source.
    I am totally confused, how this is possible. Can anybody advise me to troubleshoot and fix this issue.
    Thanks and regards
    Murugesan

    Dear Igor,
    The PSA request is being deleted in a previous step prior to loading the info package.  I can see every time when I run the process  chain, the old request number is deleted and a new request number is created.
    Still the same issue is persisting.
    I also observed one more thing that the second time when we repeat the same process chain, the correct data source data is loaded in the info cube and PSA table. Only during the first time, the PSA table and Info cube  it is not updating with the right data.
    thanks and regards
    Murugesan

  • How to execute availability check against delivery date in purchase order

    Hi all
    In MD04, I know that "available date = delivery date in purchase order + GR processing time" & "GR date = delivery date in purchase order". When I execute availability check in production order, I will get material's committed date = available date. But I hope to get material's committed date = GR date in purchase order.
    For example. delivery date in purchase order is 2012/02/06 and GR processing time is 2 days. After ATP in production order, I will get committed date 2012/02/08. But I hope it show 2012/02/06. How to customize it.
    (The GR processing time must be set 2 days for MRP calculation. it can be changed to 0.) Thanks!!

    Hi Rita,
    One Doubt, If you say that material commited has to be the GR date and you do not wish to wait for GR processing time, then why do you have the GR processing time in first place.
    For ex. My client, we get the stock as per GR in Quality inspection and so we have GR processing time considered for available time in MD04. But since the business considers the Inspection stock as avialble, The stock gets reflected in avialibility check the moment GR is done.
    So please explain your requirement in detail. There could some way to do so. If not the raise an issue with SAP.

  • Purchase organisation Field in Vendor master data

    Hi All
    During the creation of  Vendor master ,Needs to make the Field Purchase organisation as a mandatory. I have checked the in the following configs.
    Define Account Groups with Screen Layout (Vendors
    Define Screen Layout per Company Code (Vendors)
    Define Account Group and Field Selection (Vendor)
    The option is not available. for the above requirement.
    thanks & Regards
    DP

    In many companies the address data is maintained by different people than accounting data and purchasing org data.
    I would not like that accountants to create my purchasing org data, and I am certain that my accountants dont want the buyer to create his accounting data.
    if you could make this combination mandatory, then the user would have to maintain all screens at the same time, which may result in delays. as he can only start once he has all data available. SAP standard allows to create a vendor with general data and purchasing org data and purchasing can start buying. the company code data is only needed in the moment the goods arrive.
    So you gain time to collect the data while you already started business.
    Further, not all vendor master need to have  purchasing org data. and not all vendors with purchasing org views need a company code view.
    e.g. a restraunt may send you bills for lunch, but you do not place purchase orders with this restaurant. No purchasing org view needed here.
    a goods supplier, that is needed for Intrastat purposes only, does not need a company code view, as you will never get invoices from the goods supplier.

  • What is consignment data in purchasing?

    Hi,
    Can anybody here explain me what excatly is consignment data in purchasing?
    is it a delivery data ? shipment data? pls explain me
    Thanks,
    Ravi

    Hi Ravi,
    Pl check the following link to understand clearly Consignment in Purchasing:
    http://www.sap-img.com/materials/what-is-vendor-consignment.htm
    Regards,
    Mani

  • How do I view photos in a folder by date taken rather than by date imported?

    Hi, I've got some 500 photos in a folder which were imported on two different dates. I've created a new album on the right hand side under "Organize" and just the photos I want are in there. When I look at the folder on the right, all the pictures are there. But I can't call up just that folder; instead what I get on my screen is all 2500 photos in all my photo albums! Not what I want! What I want to get is all the photos in the order in which they were taken on the actual day as all 500 photos were taken at the same day. And I want to be able to view just the 500 photos in that folder by the time those pictures were taken. But, when I imported the second batch of photos it showed the date the file was created rather than the date the photo was taken so, basically, I've got one batch of photos showing the date they were taken (which I downloaded via a link a few days later), and one showing the date they were copied! I've clicked on various tabs on the Organize and Display tabs but can't get it to work so any advice would be appreciated.
    Many thanks.
    Yours sincerely,
    Anthony Armstrong

      Once you have all 500 in the album you should be able to use the dropdown menu - there are three choices. Try switching to oldest first. Album order lets you drag into any order of your choice and they remain in fixed positions.

Maybe you are looking for

  • IBook G4 freezing, and nothing much more

    I’m hoping for some creative help with a very troubling problem I’m having with my G4 iBook. Bought in 2004, this 14-inch iBook is running Tiger (though it came with Panther) and has 768 MB of RAM, a 60 gig hard drive, and a 1.07 GHz processor. It ha

  • Termination does not appear as fail sequence

    Hi, I have I a subsequence than include some Action type step.  The step set a local variable.  Based on that variable I decide whether to continue or to terminate. In the event of termination, the process is indeed terminated, but when I look at the

  • Does FCP X check for Duplicate Imports?

    When importing video from iPhone 5 does FCP check to see if the video has already been imported?

  • Setup SAPRouter FTP Access

    Hi, Is there anyone who use the webdynpro for SAPRouter FTP Access? When I call http://host:port/sap/bc/webdynpro/sap/ags_saprouter_edit I see the message "No SAProuter have been maintained yet". How do I configure this? Is there any documentation ab

  • RDCMan Remote desktop connectionmanager - constant scrollbars since new version

    Hi all, i've downloaded RDCMan v2.7 build 1406.0 (I have no idea where I can place this forum post..) I had an older version on my previous desktop and now since this new version, running on Windows 7, I constantly get scrollbars and cannot see the f