Wrong  ' valuation type' in production order - SAP AFS

Hi guru,
We have production orders for material AFS with Valuation
Category 'X'(automatic batch)and with split valuation.
During release of production order, the field 'valuation type' (AFPOD-
BWTAR) in folder ''Good receipt' is valuated with a wrong value.
In debugging we found the function /AFS/_LCOKO1F09 that in reading the
table MBEW the first value different from 'blank' fill the
fields 'c_bwtar' (value C), but the correct value is 'P'.
It seems some confusion among the value of field AFPOD-BWTAR and MBEW-
BWTAR because the help value (F4) on AFPD-BWTAR is different from help
value of MBEW-BWTAR.
So if you can help us.
Best regards

Hi
U v mention that u r using valuation category (X). Which is ment for automatic batch creation.
generally valuation is ment for origion of prod., quality lebels, etc.
If this is ur requirement then u can't use valuation category (X).
U need to create seperate valuation category based on parameters on which u want valuation.
Regards
Ashish

Similar Messages

  • Changing Valuation Type in Production Order

    Hi
      How to change the valuation type in production order, when there is partial delivery?
    Regards
    Ravi

    Hi,
    Before release the final authority you can change the order value but after the release and made the po not possible.
    Anil

  • Wrong Valuation type import to be removed from Purchase order

    Hi experts,
    By mistake , valuation type import is maintained in our system.  Correct valuation class which is also maintained is Imports. 
    The wrong valuation type import is automatically captured every time when the user makes an imported  Purchase Order which in turn creates problem at the time of GR.
    We want to disable the wrong valuation type Import from the purchase order screen.
    Please suggest. Suggestion / Solutions will be highly rewarded.
    Regards,
    ( Rajneesh Gulati )

    Hi,
    Go to path, SPRO - MM - valuation - split valuation - configure split valuation.
    then click on Global categories and then in this screen select the valuation category that was created and next to it there should be a default valuation type assigned for this category under DVT ExtPr field. Remove this by changing it to blank and then save.
    In case if you dont want to use the valuation type then why dont you deactivate the types under the category.
    Thanks & Regards,
    Kiran

  • Default valuation type in sale order

    Hi,
    We have some materials which are split valuated. We need to have default valuation type which will appear in the sale order when we create sale order for that material.
    At present it looks that SAP does not have any provision to provide the valuation type defaults for sale order.
    Does anybody know if we can set up default valuation types for sale order and how to do this?
    Thank you for all your help.
    Thanks,
    -Shekhar

    Hi Shekhar
    Please check wheteher split valuation is applicable for FG
    Coz split valution is used in cases
    Split valuation is necessary if, for example:
      Stock from in-house production has a different valuation price than externally procured stock.
      Stock obtained from one manufacturer is valuated at a different price than stock obtained from another manufacturer.
      Different batch stocks of a material have different valuation prices.
    Check whether the Valuation Class ,Catogory is assigned to the Valuation area.
    Also Refer the Follwoing thread:
    Split valuation not possible for FG
    And the help Doc
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/LOMDMM/LOMDMM.pdf
    regards
    Shailesh Meshram

  • Restrict Valuation type in Refurbishment order

    Dear All,
    Is it possible to restrict valuation type in refurbishment order? like i only want to maintain C3 to C2
    not C1 to C2 or C2 to C1 etc.
    Regards,
    Rana Adeel

    Hello ,
    You can create C2 & C3 valuation using MM01, and leave C1 .
    But i guess it is required to maintain the inventory records.
    LINK: [STEPS|http://www.sap-img.com/plant/the-steps-regarding-refurbishment-order.htm]
    Regards !
    Ajay

  • Output type for production order

    Hi, when we save the production order, we wants to transfer the prod order header details in legacy system thru idocs. Trying to define output type for production orders in NACE t-code, could not find production order option there. Pls advise in this case how to define the output type for production order so that the header data will be taken by idoc and transfered to legacy. Pls advise.

    Hi,
    production orders don't have output types like SD orders.
    But they have status control and events. Look into the object type BUS2005 in transaction SWO1. There you find the events which are fired by SAP, eg. ProductionOrder.Released.
    Which Idoc type do you want to use?
    I think you have to programm your own method for the Idoc creation. Put it into a workflow task and assign it to the event.
    Regards
    Michael

  • Valuation Type in Sales Order

    I extand some materials for another plant. i also maintain Valuation class, valuation category and valuation type in material master. When i create sales order and deliver it system is not picking valuation type automatically in delivery document due to which i m not able to do PGI. This problem also occur when I work on STO process. In this case system does not pick valuation type in purchase order. But when i Work on earlier plant it works fine.
    Please give me suggestion how to resolve it.

    Hi,
    May be, you have some account determination error during PGI for which you have to configure the OBYC screen. Please let us know the exact message you are getting, when you are trying to do PGI. Then somebody can help you

  • Scheduling type for production order.

    Hi Gurus,
    i have some doubts about production order scheduling. i have run a scenario OF MTO to Understand The Scheduling. i had created a BOM with  two components. The inhouse production Time of header Material is 3 days.and the scheduling Margin key is op2   flt aft1  flt bfr 1    rl per 2
    after creating a sales order i had run MRP in MD50 by selecting scheduling 1 Basic Date Determination. it has taken the 3 days of in house production time and praposed dates.18th as starting date and 20th as finish date.and planed opening period is in past. and it has not praposed any scheduled dates in planned orders.
    if i convert the planned order in to production order it is praposing the scheduled dates.
    scenario 2.
    if i run the mrp for the same order by taking scheduling type as 2 lead time scheduling.       in planned order itself it is showing sheduled start date and scheduled finsh date. (which not shown in basic date run).
    1.so is it mean that what ever the scheduling type we are using in MRP run is only applicable to create Planned orders only while convrting the planned orders in to production order dates will be re detemind. is this currect or wrong?
    2.in which scheduling type system will not consider the scheduling margin key?
    please help me to understand these questions.
    Thanks&regards,
    Venkat Bolla.

    Hi Venkat,
    When MRP is run with '1' Basic Scheduling - Schedule Margin Key is not considered. As you rightly observed it considers the Inhouse Production days mentioned in materials master for fixing the start date. This is exactly to days.
    When MRP is run with '2' Lead Time Scheduling - Schedule Margin Key is considered. Dates are calculated from Routing and Capacity requirement calculations are also done. Here calculation are exact to the seconds.
    Schedule Margin Key takes effect only for lead time scheduling. Production dates are calculated from the float times of the SMK in the material master and times from the individual operations maintained in routing.
    When planned order derived from Basic scheduling is converted to production order it is subjected to lead time scheduling and thus production dates are calculated
    Refer to the below discussions on the same topic.
    http://scn.sap.com/thread/1535577
    http://scn.sap.com/thread/1554548
    Thanks & Regards,
    Ramagiri

  • IDOC Message Type LOIPRO (Production order)

    Hi All,
             How I can setup Process code for inbound Production order (Message Type LOIPRO)
    I receive idoc file from external SAP system I try to use "BAPP" , "ABI_AIDN_IN" , "APLI" it not work for
    this message type. Idoc error message "Function module not allowed: APPL_IDOC_INPUTI"
    Regards,

    It should go with BAPI..have you tried that?

  • Partial conversion of planned order into production order of AFS material

    Dear Experts,
    I am working with SAP 6.0 EHP4 with AFS add-on. My material is AFS specific material. I am not able to convert planned order into production order partially from MD04 screen as all the fields in the CO48 screen is grayed out. 
    Please help...
    Regards,
    Alok Tiwari

    Hi,
    I am not able to get what is passing the start date.
    Second thing is how you are generating the serial number - manually or automatic?
    If you are generating serial number automatic, then it is not possible to generate it considering the basic start date.
    But if you are entering the serial number manually, then there should not be any problem as system will accept that serial number which you enter at the time of conversion of planned order to production order.
    Regards
    Amit parkhi

  • Restrict Production Order type to Production order transaction

    We have multiple Production order types. We would like to associate order type to order create transaction codes. For example Order type PP01,PP02 to transaction CO01 and order type say XYZ to transaction CO07.
    The reason for doing this is to lock down users from creating material Production orders using CO07 and non-material orders using CO01.
    Any feedback will be appreciated

    Hi Ramesh,
    from your number of posts, I gather you're rather new to SDN.
    The reason why someone asked if this is a suggestion or a comment is that this part of the forum is intended for suggestions and comments only.
    I suggest you click this link: <a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/forums">https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/forums</a>
    And search for a forum which suits you.
    Kind regards, Rob Dielemans
    Message was edited by:
            Rob Dielemans
    null

  • Revoke TECO Status for CO Production Order SAP R/3 3.1H

    Hi All,
    We are still on SAP R/3 3.1H
    Recently, a user accidentally TECO a CO Production Order and now required to revoke the TECO status. There was a similar case back in 2004 and I posted the issue to SAPOSS but did not get it resolved. At that time I was told that it is not possible to revoke TECO status on 3.1H. Furthermore, I was told that a solution can be provided but it is 'billable' due to the nature of the issue which is not a system bug but more of an operational issue.
    On the recent case, the chronicle events are as follow:
    1. User A created, released, and created settlement rule for the order. This was done on month end (previous period as suppose to the current period).
    2. User A then proceed to do good receipt of the order but 'forgotten' to indicate that it was a complete delivery. This was done on current period but posting & document date is on previous period.
    3. Another user, B, try to issue settlement for previous period but failed. System return message saying order delivery is not complete and advice to 'complete technically' the order (error message is misleading).
    4. User A then proceed to 'TECO' the order without further checking. Apparently, no period selection for doing this posting; system just take the current date (current period).
    5. User B still not able to settle the order on the previous period which it is supposed to settled. Settlement only possible for current period, the period the order was 'TECO'.
    The CO Production Order is now 'stuck'; no movement type can done on it, cannot settle on previous period as required. If at all possible, 'TECO' status need to be revoke so that other posting for previous period can be done on the CO Production Order.
    Is there anyone out there know a workaround or solution, including ABAB program to revoke 'TECO' status for SAP R/3 3.1H.
    Any advice appreciated.
    Regards,
    Wilson Rotop

    Hi,
    Again, revoke TECO option not available on SAP R/3 3.1H.
    Rgds
    WR

  • Valuation error for production order

    Hi
    For a material, valuation type was not maintained initally. At that time production orders was created (Settlement rule created).
    Later valuation type was maintained. The production order was TECOed and settlement run was done. But during the settlement run (in Tcode: KO88) showing an error  , "valuation type not maintained for this material.
    That particular production order was not having any output confirmation done for last operation.
    Please do help me with your valuable suggestion.
    Regards
    Manikandan .J

    Hi Brahmankar
    As i mentioned, since there is no confirmation entered but the order is TECOed we cant check with material document.
    For RM movement, there is no issue with valuation type.
    There is no confirmation (movement with FG).  Ideally the cost (of RM & SFG) should come to FG price variance. But it is not
    Also checked in MBEW for FG. Valuation type exist.
    My doubt is since the valuation type was entered after the prod order created , is that the reason for the error during settlement run. If yes how to solve it.
    Thanks & Regards
    Manikandan .J

  • Valuation Type Stock Transport Order

    Dear All,
    Can a Stock transport order be created without specifying valuation type in it? If YES, then how to configure the same in SAP??
    If NO, then how to ensure that valuation type and batch of a material in receiving plant remains same as in the supplying plant. In our case there are always multiple valuation types/batches for a given material in one plant.
    regards,
    Baljit

    Hello,
    Would you mind to rephrase your question so we can see the relationship between <b>Oracle</b> and the stock transport?
    If you can't, perhaps you could post it in a more suitable forum. Like, perhaps, SAP ERP Financials
    You can find the list of forums here:
    https://www.sdn.sap.com/irj/sdn/forums
    Thanks

  • Suggest order type to production order

    Hi,
       I have a small query pls clarify me.
          I have an outbound interface for production order.There is no corresponding order type to trigger this.My qeury is how to trigger this interface , using which method can i do.
        Hope from all early response.
           Thanks...

    Hi Kalyani,
    Welcome to SDN.
    If you are using IDoc, then you can use standard SAP program <b>RCCLTRAN</b> or <b>RCCLORD</b> to generate outbound production order.
    Hope this will help.
    Regards,
    Ferry Lianto
    Please reward points if helpful.

Maybe you are looking for

  • Power Mac Mirror Door DVI or ADC to SINGLE RCA VIDEO OUT to a TV...adapter?

    I have a Mirror Door G4 tower that I would like to use as a media center, with an old(er) Magnavox 19" television that only has the single yellow VIDEO IN jack, and the red and white audio L and R. Is there a converter cable that is similar to the on

  • MacBook Pro - 10.6.8 - Logitech USB devices - Gray Screen

    After moving to 10.6.8 my Logitech wireless keyboard/mouse and usb wired mouse cause immediate gray screen after usb connection.  On advice from consultation at Genius Bar I did a full re-install of OS and re-install of 10.6.8 and the problem immedia

  • Certain links on the iPad won't open on some sites...

    So we have two websites which we'd like to make sure look good and work correctly on iPads and iPhones. One is the production site and one is the development site. Both sites currently have the exact same code. When accessing links on the iPad, only

  • Purchased TV series' cannot be watched!

    I have purchased 2 full TV series', 10 episode of the one (Luther) and 3 episodes of the second TV series (Zen) from iTunes. I had endless problems watching Luther because I could see the episodes but most of them wouldn't play on either my iMac or m

  • Transport Domain Controller delete

    Hello, I have created a new BI dev system and need to set up the transport connectionns. I have deleted the TMS for the old BI dev and now try to set it up for the new BI dev.. I assume i first have to delete the setting that the old system is the Tr