WRP1 and planned orders

Hi, we have SAP Retail and we have installed a plant which manufacture some products. At this point we have configured all the production process with recipes and all the stuff related however we have experienced some troubles. We have discovered that if we create materials with MM01/MM02 we could not modify them with MM42, we have also discovered that the materials saved with MM01 cannot be replenished using WRP1. Our produced articles are FERT, ROH  and HALB and what we plan to do is to run the MRP with WRP1 and generate planned orders that will be converted in production orders.
We run the WRP1 but SAP is generating us purchase requisitions but we would like this transaction to produce planned orders. Or if its posible, transform this purchase requisition in production order, which as I read it doesn't seem posible. I tried to generate a PO document with this purchase requisition and it generates a Framework purchase order (FO) and I don't know what that is.
The overall strategy is to configure with MM41/MM42 the supply source of the stores as 'Stock transfer' (2)  and set procurement type 'F' so WRP1 generates purchase requisitions that eventually will be transformed as stock transfer orders which the vendor/supplier is going to be our distribution center. The DC is the place we are mounting the in-house production.
Our supplying plant has procurement type 'X' or 'E' but with this one we want WRP1 to generate planned or production orders with the replenishment requirement that includes all the requirements from the stores, so when we have all the production we could supply articles for the stores.
Is this the right approach? What should we do in this situation?
Thanks in advance
PS. We do not plan to use the MD01, MD03 or MDBT for MRP.

Assign checking group in material master
Define checking rule
Define scope of check.Scope of check is to include what type of stock/Receipts/Reqmts are to be considered during ATP
Define checking control(Here you check the availability either at order creation or Release for plant/order type)
Based on the above settings when ATP is carried out,Missing parts list is determined for the order.
For planned orders additionally we can have the check against planned independent requirements. Here system only checks the dependent requirement quantities against the open planned independent requirements created for the components.Therefore, neither the ATP quantity nor the receipts or stocks are included in this availability check

Similar Messages

  • Mass update for production and planned order MRP controller

    Hi Gurus,
    It's anyway possible to mass update MRP controller for Production orders and  Planned orders. If any please provide me step by step process.
    Thanks,
    B.Deethya.

    I feel You have changed the MRP controller in Material master and want to incorporate same in production order & plan order.
    For Planned order Run MRP with delete and recreate mode, system will create a new plan order with MRP controller in Material master
    For production order, Mass change is not possible, create a simple BDC or LSMW, And change the MRP controller

  • Req. delivery date and plan order finish date relationship

    Dear Experts,
    I have a question on setting the req. delivery date and plan order finish date relationship. Now, I want the plan order finish date is one day before the req. delivery date, is it possible to set it in configuration? Please advised! Many thanks!
    Regards,
    Matt Yim

    Matt,
    Please use a schedule margin key(SMK) in the material master MPR2 view which has float after production defined as 1day.
    If there are no SMK with that defination then you can define you own in customisation and assign the same in the material master. (SPRO--->Production ->MRP->Planning ->Scheduling and Capacity Parameters->Define Floats).
    Regards,
    Prasobh

  • Process Orders and Planned Orders data

    Hi,
    I am working on extracting process order and Planned Orders data into BW. I could not find any standard DataSources available for my req, so I want to develop generic extractor. the main key figures are Actual Labor and Machine Hours, Target Labor and Machine hours.
    Please help me if there are any standard datasource available or ECC tables to pull the data or any standard function modules available.
    Thanks,
    Reddy

    Hi Sanath,
    Thanks for your reply. I want to pull Actual Machine hours, Target Machine hours, Actual Labor hours and Target Labor hours.
    these fields are not there in PLAF table.
    I am looking for a table or datasource which can give those details.
    Thanks,
    Reddy

  • Table for process order and planned order in apo

    I would like to know the table for stratagy profile for particular process order and planned order.
    in /sapapo/rrp3 there is one filed RECEIPT/Reqt.Element ( process order ) for this  field which table it is coming and i required particular strategy profile for that process order .
    Please help me the table in apo.

    Hi Venkat,
    This value is stored in structure /SAPAPO/RRP_ORDREQ_STR
    under the field name EXTRA.
    You can check the details of the same in transaction se11
    Regards
    R. Senthil Mareeswaran.

  • Settings for the relation of requirement type and planned order type

    Dear Gurus
    Where we maintain the settings for the relation of requirement type and planned order type?Actually I have maintained strategy 60 for a particular material (planning material) so the requirement type is vsev and along with that the planned order type is coming is vp i.e non convertible planned order.That is ok the system is behaving right.But nowhere I can find the setting of vp with vsev how the system is picking vp?
    Regards
    Sandip Sarkar

    Hi!,
    That is an inbuilt sytem setting and you can't change that.
    Regards,
    Uday

  • Dependant Requirements and Planned Orders

    Hi,
    For dependant requirement, question is whether once the planned orders (of independent requirements) are converted to production orders, then only will the dependant requirements be converted to planned orders…or it is converted once independent requirements are converted to planned orders? I.e. independent requirements are blown down all the way in MRP.
    Thanks.
    Rgds,
    Sue

    Hi,
    Let us take some example so that it is easier to explain.
    Material A - Finished Good
    Material B - Raw material
    PIR generated for A - 100 Nos , MRP is run and Planned order created for A - 100 Nos. Now
    For Mtl B Dep reqt is generated for 100 Nos.
    If No stock is available then a planned order for 100 nos generated.
    IF Stock is availabel then no planned order is generated.
    When production order is created for Mtl A then the "dep reqt" status of Mtl B changes to
    "ordres"(order reservation)status.U can check this MD04.
    Thanks and regards,
    Rajesh

  • VSF and planned orders same day

    Hello,
    When running MD04, forecast (VSF) and planned orders are landing on the same day. This is causing confusion for the users.  Is there a setting that's causing this to happen? We are using checking rule PP. Should we be using A instead?  The planned order should actually be showing up before the forecast because we don't want the inventory to show negative from the forecast.   Any  help will be appreciated.
    Thank you.
    MZ

    Hi MZ
    On the standard MRP process, the planned order basic finish date will generally match the requirement date.
    Check this document which explains the scheduling in more detail:
    Backward Scheduling for In-House Production - Material Requirements Planning (PP-MRP) - SAP Library
    BR
    Caetano

  • Production order and planned order qty should not consider in MRP

    Dear All,
    i do not want to consider the previous month production order qty and plenned order qty (Nothing but WIP qty) in the current momth MRP, but the stock has to consider in MRP.
    Example,
    Before MRP,
    material : XYZ
    Stock : 1000
    Prod Qty : 500 for 02.04.2008
    PIR Qty : 2000 for 02.05.2008
    After MRP, the requirement should be as below said,
    material : XYZ
    Stock : 1000
    Prod Qty : 500 for 02.04.2008
    PIR Qty : 2000 for 02.05.2008
    Pld OrdQty : 1000 for 02.05.2008
    For the above requirement ,i have done settings in the availabilty check like , for include planned order and include production order are "DO NOT TAKE IN ACCOUNT".
    Even then also the planned order qty is generating for the "500" only.
    please give the solution for the above said requirement.
    thanx in advance
    Regards
    Srinivas

    hi
    MRP will always consider the prod order qty while doing nert req calculation.One thing u can do is TECo the prod orders and un MRP then it wont consider prod order qty.
    The Availability check will check whether the components r avalaible or not based on ur scope of check
    Reward points if useful
    Amit

  • Exception message for PrdOrd and Planned order

    Hi Gurus,
    It possible based on prdord and planned ord we need to get the Exception message information. It's there any standard transaction code or any sqvi report?
    Note:
    Exception Message:
    10 - Reschedule in
    20 - cancel
    05 - Opening date in the past
    26 - Excess in individual segment
    Please find this information in MD04 (single order). i am looking for same time multple orders with exception message report.
    Thanks and regards,
    Deethya.B

    Hi
    You can use MD06 with refrence to you plant and MRP Controllers. Also you can define your own traffic lights so that based on these you get your exception messages.
    Hope this helps,
    Regards,
    Ravi

  • Availablity Check and Planned order

    Hi,
    In Material Master Record in MRP3 view , we have a field for "Availablity Check".
    Whether it is required for MRP run ?
    As we are not doing any stock transfer orders , as SD module is not implemented.
    So my Question is :
    1) Whether "Availablity Check"field is required for MRP run?
    2) While running MD03 Transaction we see Planned order getting generated....What is the use of it and Can we avoid this Planned orders to get generated?
    Utsav

    Hi,
    Availabilty check will check the available stock of the material as per its defiunition .
    When the material is MRP material if there exists a requirement for the material either in the form of a sale order or planned independant require ments, SAP checks these requirements anb compares with the available qty and generates the requirements like planned orders , which in turn will get converted into either PRs or Orders depending upon the procurement type of the material in MRP view.
    If your material is not related to MRP this data need not be maintained
    For more details please refer to the link
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d327a44af11d182b40000e829fbfe/content.htm
    and
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d326d44af11d182b40000e829fbfe/content.htm
    and
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d315744af11d182b40000e829fbfe/content.htm
    ansewe to your first question yes
    second question:Planned order is a requirement generated for the short fall of the material when checked with the avauilability check.It can be converted into either PR or Order depending upon the procurement type.
    If do not want the planned order to get generated means material need not be maintained with MRP.Means you does not want the shortfall requirement to get generated(if this is your criteria)
    Please reply back if you are not satisfied with the answer.
    Regards,

  • Externally processed operation and planned order

    Hello experts,
    When an operation is defined as externally processed, once the production order (from a planned order generated via MRP) is created, the purchase requisition for that operation is automatically generated. My question is if it is possible to generate the purchase requisition before generating the production order, I mean, with the planned order.
    Although this external operation is defined in the routing, the planned order does not show it and it means that the purchase requisition is not generated.
    In our scenario we want to convert the production orders as late as possible to have automatic changes in BOM, but if we do not convert the planned orders to production orders, we won’t have this purchase requisitions.
    Is there any way to solve this?
    Regards

    Hi Laura
    No, it's not possible to generate the purchase requisition for an externally processed operation before the creation of the production order. The planned order routing is only exploded for scheduling and capacity requirements calculation and an operation is not actually created.
    As an alternative, you can create a separated material number and assign the special procurement 30 for subcontracting to this material. If you add this component to the BOM of the parent material, MRP will directly generate a purchase requisition for subcontracting.
    BR
    Caetano

  • Plan Order Conversation in to Process Order and Plan Order in Back Dates

    HII
    we are working in a process industries with three plants each of them have three order type. we have define MRP group in "OPPR" then assign each MRP group to Orde types in "OPPE". Now the problem is whn i convert plan order in process order for any material systme automaticaly pick the order type PIi01.
    2nd Problem is system system is not creating plan order for prrevios dates. say i enter PIR for month of november from first november to 30th november and run MRP on 29th the sytem create plan order on 30th of november with exception message 30.
    Regards
    Ahmed

    Dear
    Problem No 1 : we are working in a process industries with three plants each of them have three order type. we have define MRP group in "OPPR" then assign each MRP group to Orde types in "OPPE". Now the problem is whn i convert plan order in process order for any material systme automaticaly pick the order type PIi01.
    Answer :
    1.Please check the OPPR -Plant and MRP group -Select Order Type Button -Check what Order Type you have assinged here ( PI01( May be the default Process Order Type )
    2.If you are maintaing MRP group ( 0001 or 0002) , did you asisng the same in MRP1 view ?? because
    3.Did you maintain the similar Order type in OPKP -Define Production Scheduling Profile ? -This has highest priority .
    4.Did you maintain correct order type in OPJH-Maintain Order Type ??
    Refer the expert comments on the same issue : Strategy group to define production order type
    Problem No 2: 2nd Problem is system system is not creating plan order for prrevios dates. say i enter PIR for month of november from first november to 30th november and run MRP on 29th the sytem create plan order on 30th of november with exception message 30.
    Answer : You can plan the order in back dated , if you maitain Satrt date in the Past optiuon in OPU3/OPU5-Define Scheduling parameters .Goto OPU3 -Select the Order Type -Double click -Maintain 90-60 days in the Start Date in the past in Scheduling Control and Details scheduling tab .
    Hope it helps
    regards
    JH

  • Modeling dummy product and planned orders

    Hi SAP Gurus,
    I have requirement where i need to model particular business requirements on subcontracting and the same is resulting in need of modeling of dummy product and dummy planned orders. Please share your inputs on what would be impact of dummy product and dummy planned orders in ECC. and also how to make sure that it does cause any issues in costing.
    I am modeling subcontracting requirement and i need to create following master data.
    All the below products are at plant P.
    P has the components as Q_D
    Q_D has the components as Q
    Q has the components as R
    Where Q_D is the dummy product produced at plant P.
    P and Q are subcontracted items to the vendor V.
    P is the finished good, Q and Q_D are Semi finished goods, R is raw material.
    When we plan we are creating Purchase orders for P and Q. And Q_D is made inhouse and we need to create planned order for it. how do we handle the planned orders created for Q_D. we dont want them to convert to production orders. we want a way to clear off these dummy planned orders once we close the POs of P and Q.
    Please advise.
    Thanks.
    Jagadeesh

    Hi senthil,
    Check if the forecast date is beyond PPDS horizon.
    Also in product master on PPDS tab, you should maintain 4 in PP Planning procedure.
    Bye.
    Nitin

  • Process Order and planned order issue

    Hi people,
    1. While creation of process order using COR1, production version is determined by the system automatically and after that BOM is determined. My requirement is when BOM components are determined it has to compared with ZTABLE which contains restricted components and if entry exists in ZTABLE, then determine a new production version from MKAL but i am not abkle to find any enhancement point or BADI or user exit for the same.
    2. During conversion of planned order to process order, it is always required to read PP master data before saving the order.
        Can't find any enhancement for the same also.
    Please help guys how to get this done.
    Regards,
    Dheeraj

    Kinldy check the below user exit, one of them should help you ....
    PPCO0001            Application development: PP orders
    PPCO0008            Enhancement in the adding and changing of components
    PPCO0004            Sort and processing exit: Mass processing orders
    reg
    Dsk

Maybe you are looking for