XI 3.0 post system copy issue

Hi Experts,
We are using XI 3.0 on Windows and MSSQL platform, i have made system copy sucessfully from production system with process of DB restore for ABAP and Java Import, the new server is up and running both abap and java.
Problem : In the newserver when i execute the tcode sxmb_ifr it takes me to production server url and not the new server hostname url.
when i tried the http://newserver hostname.com:50000 it works fine. but from this url except home page every other link like exchaneprofile, SLD,IR and ID links still points to the production server host name.
Please look at the following post installation activities i have performed till now in new serverand please guide where else i have to change the host name in the new server.
Note: i did not cange the logical system assignment in scc4, beacuse i was not sure about the other problems we may face after directly assigning new logical system to the productive client in new server.
1. Run installation check: Administration u2192 System administration u2192 Administration u2192
Installation Check (transaction SM28).
2. Configure the Workbench Organizer (SE06) with the option Database Copy. This
releases all transport, repair, and customizing requests that have not been released in
the source system.
3. Configure STMS
4. In transaction RZ70, change the value for the host and the gateway service in the group box
Transport Information
5. Change the pipeline to the Integration Server by running transaction SXMB_ADM   -> Configuration -> Integration Engine Configuration
6. Open Visual Administrator -> Change the new host name in the following
                services -> Jcorfcprovider all the services
                 services -> SLD Suppiler            
7. Host name Change in SLDAPICUST
Note: In the SAP system copy guide it says me to chane few parameters in exchange profile but when i go through the url http://newserver hostname.com:50000/exchangeProfile it takes me to production server, is there any option to change the exchange profile parameters ?
Please help me.
Thanks
Sonali
Subject modified
Read the "Rules of Engagement"
Edited by: Juan Reyes on Oct 31, 2008 9:48 AM

Hi,
the explanation of some of the thing you have written is clearly that the AII-Properties of the XI system have still not been switched.
The properties must be changed once - afterwards the URL to the exchange profile and all other URLs should become valid.
The key is therefore to change the exchange profile. Try please the to access the exchange profile by using the ip address or the fully
qualified name of the new server http://<newserver>:<port>exchangeProfile/connection.jsp
Did I get it right - you are redirected to the URL http://<oldserver>:<port>exchangeProfile/connection.jsp ?
Regards
Frank

Similar Messages

  • Query Designer Issues Post System Copy

    Hi All -
    We have just performed a system copy from our production to our QA systems.  Now, when we trying to view a report from Query Designer in our QA environment, we are being prompted for a username and password - which is trying to log in to our production environment!  (I know this because I locked myself out of production trying to log in via our QA Query Designer).  We've done all the BDLS runs, updated the RSLOGSYSDEST table poer OSS note 524554, and also updated the tRFC port in WE20.  What do we need to do to be able to run a query out of the BW QA system?
    Thanks for the assistance.
    Abby

    Hi Abby,
    Once you execute the query from designer you will get one URL generated in the explorer address bar here you will have to change the name of your production app server with quality app server then report will be executed on quality server.
    But this is temporary solution, you will have to check with your basis team regarding this and they will have to change some setting in system table and next time onward the system will pick proper URL.
    Regards,
    Durgesh.

  • Activities post System copy  - SAP CRM 5.0

    Dear All,
    We were having a 3 system (SAP CRM 5.0 SP8) landscape. CRM Dev(CRD), CRM Q (CRQ) & CRM P (CRP) on Oracle 10 and HP UX 11. We have the JDI 7 SP8 instance connected to the CRM dev systemand all the 3 systems were configured as the run time systems in the JDI.
    Now we have added a new tier for the Intergation testing called CRM
    IST viz CRI there by coming into 4 system landscape (CRD, CRQ, CRI,
    CRP). The CRI server is a copy of the CRP box and has been just installed and given to us. We need to do all the post installation activities.
    Can you please provide us the proper documentation/ccokbook/check points so as to what all steps to be carried out after this system copy. It would be highly appreciated if you can give us a proper documents & links. We need to give the system to the consultants and before that we need to carry out all the post refresh activities, please help us in this urgently.
    Thanks in advance.
    Awaiting response.
    Thanks & Warm Regards,
    Rajeet Mathur.

    Check
    http://service.sap.com/systemcopy
    and use both guides for NW2004s/7.0 ABAP and Java.
    Markus

  • J2ee System copy issue

    Hi Experts,
    We are using XI 3.0 on Windows and MSSQL platform, i have made system copy sucessfully from production system with process of DB restore for ABAP and Java Import, the new server is up and running both abap and java.
    Problem : In the newserver when i execute the tcode sxmb_ifr it takes me to production server url and not the new server hostname url.
    when i tried the http://newserver hostname.com:50000 it works fine. but from this url except home page every other link like exchaneprofile, SLD,IR and ID links still points to the production server host name.
    Please look at the following post installation activities i have performed till now in new serverand please guide where else i have to change the host name in the new server.
    Note: i did not cange the logical system assignment in scc4, beacuse i was not sure about the other problems we may face after directly assigning new logical system to the productive client in new server.
    1. Run installation check: Administration u2192 System administration u2192 Administration u2192
    Installation Check (transaction SM28).
    2. Configure the Workbench Organizer (SE06) with the option Database Copy. This
    releases all transport, repair, and customizing requests that have not been released in
    the source system.
    3. Configure STMS
    4. In transaction RZ70, change the value for the host and the gateway service in the group box
    Transport Information
    5. Change the pipeline to the Integration Server by running transaction SXMB_ADM -> Configuration -> Integration Engine Configuration
    6. Open Visual Administrator -> Change the new host name in the following
    services -> Jcorfcprovider all the services
    services -> SLD Suppiler
    7. Host name Change in SLDAPICUST
    Note: In the SAP system copy guide it says me to chane few parameters in exchange profile but when i go through the url http://newserver hostname.com:50000/exchangeProfile it takes me to production server, is there any option to change the exchange profile parameters ?
    Please help me.
    Thanks
    Sonali

    Hi!
    No, I haven't figured it out.
    But since we are not going to use the groupware integration for some time, I might just skip it and install it during or after the upgrade.
    rollo

  • Post System Copy Process

    Hello,
    We are getting ready to install new servers and we will be performing a homogenous copy process to the new servers which will have new names and ID on the network. We would like to run the new servers side by side with the current system so we can test. My questions are:
    1) With the systems running on the network together and we are ready to cut over to the new servers, would I just need to backup and restore the DB to the new DB server? Or do I have to go through the whole system copy process again?
    2) The first process we are using the R3Load because we have SQL 2000/Windows 2000. I understand the System Copy process with the Export file and then the migration (import) file, but do all of the post processes that are involved according to the System Copy guide have to be implemented again if I am able to simply restore the DB after doing the inital copy as described above?
    3) Any thoughts to how I can accomplish running the servers together for awhile for testing then cutting over to the new ones? Any quick notes from the field that would help make this easier?
    Thank you all so much,
    Jason

    >ERROR => DpHdlDeadWp: W14 (pid 3018) died http://dpxxdisp.c 14531
    the Work process are getting terminated.
    can you please paste full log from dev_w0 and dev_disp and std*
    >we upgraded the new kernel
    why don't you use the same kernel as same as source system?
    cheers,
    -Sunil

  • Synchronisation Points Post System Copy

    Hi Gurus,
    Can anyone pl. provide inputs on :
    - What is Synchronisation Point after System Copy ?
      i.e. Say if ECC PROD system is copied to ECC QAS. After this what steps   ( High Level Overview ) needed to ensure that 
      connected systems perform ok ?
    Any / ALL Inputs are welcome and highly appreciated.
    Many Thanks,
    Best Regards,
    - Ishan

    Post system copy steps are defined on the system copy guide.
    Also theres lots of information about this already.
    Please do some research before posting.
    Regards
    Juan

  • System Copy Issue

    I've done an homogeneous system copy using a redirected restore of our PROD system to a Sandbox system.
    In the Sandbox system, I now see the following in the system log :
    08:11:42 BTC  003 000 DDIC                  BY  2 Database error -727 at OPC
    08:11:42 BTC  003 000 DDIC                  BY  0 > SQL0727N An error occurred during implicit system action
    08:11:42 BTC  003 000 DDIC                  BY  0 > type "3". Information returned for the error includes SQLCOD
    08:11:42 BTC  003 000 DDIC                  BY  0 > "-204", SQLSTATE "42704" and message tokens
    08:11:42 BTC  003 000 DDIC                  BY  0 > "SYSTOOLS.ADMINTASKS". SQLSTATE=56098
    08:11:42 BTC  003 000 DDIC                  BY  1 Database error -727
    I also see similar messages in the db2diag.log file.
    Any ideas why ?
    Thanks,
    Robert

    Hello,
    here is explanation of error:
    http://publib.boulder.ibm.com/infocenter/db2luw/v9r7/topic/com.ibm.db2.luw.messages.sql.doc/doc/msql00727n.html
    The action attempted is shown by the action-type:
    3 = implicit revalidation of an object
    now let's check SQLCODE:
    http://publib.boulder.ibm.com/infocenter/db2luw/v9r7/topic/com.ibm.db2.luw.messages.sql.doc/doc/msql00204n.html
    name is an undefined name.
    Read both notes and continue according to instructions.
    Tomas

  • Where to post system administration issues

    friends,
    i have an issue with the SAP working which is installed in my laptop, where to post these SAP BASIS related issues ?
    the issue is when i am trying to click on SAP management console it is showing the following message
    Snap-in failed to initialize
    Name:SAP Systems Manager
    CLSID{633547EE-A302-11D1-AE59-080009B07DBB}
    Snap-in creation failed
    The Snap-in is not created
    can any one forward to known friends and provide some solution
    it was working fine and suddenly this issue has come
    regards,
    madhu kiran

    Hi Madhu,
    Please refer this thread very useful.[Thread|Snap-in Creation failed;
    Regards,
    R.Brahmankar
    Reward if useful.

  • Netweaver Java Enterprise Portal System Copy issue

    Dear friends,
    We are trying to export Production portal online without down time and install Target system using import method.
    Import process is successfull and we tried doing element.resync=true for force bootstrap from the database. We are able to see SAP standard applicaitons but all custom applications are missing. I mean all application under sap.com are available and all applicaitons under <ourcomapny>.org is not see. We checked the export dump we see all .SDA files for each application in the export dump.
    If anyone know the reason why it didn't deploy. Please let me know. We are using Production and Sandbox: NW 2004s EHP1 SP4.
    Thank You.
    Regards,
    Prasad

    Please check the note below, which you need to do at the end of import.
    Link: [Note 888718 - NW 2004s: Copy Usage EP]

  • About sap bw system Copy or backup ?(URGENT)

    Hi gurus:
         Hi friends,I saw many theads about this subject,and I found many documents,But STILL I can't find the way to solve my problem.
         It is: How to export the objects I created in develop system to a harddisk, then import it to the QA system . Dev to QA with harddisk NOT online?
         And can I backup the whole bw system in the harddisk,and restore the bw system in the qa system istead ? how to backup the bw system ?
    All useful reply will assign points
    thx
    chan

    Hi Zegion,
    I think the following may help you:
    Purpose: Preserves logical system dependent objects for restoration in case of a system copy issue when a logical source system is deleted or deactivated. BW will auto re-generate a lot, but not these objects.
    1.     Create on a development system like BWD, because the system is set as a development system in SCC4 and can create and export transports, and will include all objects. A dummy can be used for comparison if the system to be copied is production or test.
    a.     If creating on another system, like BW test (BWT) or production, you must first open the system in
       i.     SE06 – System Change option – modifiable /BIC and /BI0
       ii.     SCC4 – client settings – set like in BW Development system (BWD)
       iii.     STMS – in client 000 from BWD (domain controller)
                1.     Remove BWT from transport path
                2.     Setup new 2-system path BWT-BW? (BWS or virtual system). This creates a ZOUO transport layer, allowing creation of non-local/not $TMP package transports (see complex sample below)
    2.     Go to RSA1-Admin workbench, Transport Connection
        a.     Select Object Types
        b.     Set for Grouping-“Save for system copy”
        c.     Set for “Start manual” collection
        d.     Set for Display “List”
    3.     Drag and drop source system (select from “select objects” list and “transfer selection”) to collection window, example – SCEM, SC0CLNT575, DEVCLNT100, SAP_DEMO. I recommend only doing one source system at a time for maximum flexibility…and because the R3 sources are very large.
        a.     Then execute collection – “Gather dependent objects”
        b.     Select each category (mainly Transfer Rules, Transfer structure and InfoPackages…whatever is selected. On each header, right click and select “transfer all below”
        c.     Validate that there are no objects in the $TMP development package (DevClass). If it is, select the object and change package button to set to ZAWB. (Anything but $TMP (local))
        d.     NOTE- To reset transport connection, select anything on the left frame of the screen to refresh
    4.     You are now ready to transport…select the truck icon to create
        a.     Call it Save for System Copy and the source system name
        b.     Go to SE09/SE10 and release it and tasks to the OS level
    5.     Cleanup – reset STMS and distribute, reset SCC4 and SE06 on “BW0”/Source BW system
    6.     Verify RSA1- Tools – mapping of source system names on target BW system (i.e. BWU) for “source system” of transport (i.e. SC0CLNT575).
    7.     Verify RSA1- Modeling-Source system connection checks OK on target system
    8.     Manually import transport in STMS – Import Queue, extras, other requests, Add (to buffer). Import single with right click or partially loaded truck icon, select options as below:
    9.     LAST STEP – Validate import logs and activated objects. If there is an error, ensure the link to the new system is active, the RSA1-Tools-Mapping of source system names converts properly from say DEVCLNT100 to TSTCLNT200 (correct frame of reference) and reimport.
    if it helpful reward point are appreciated

  • System copy - CUA how to keep (merge) some of the old target system users ?

    Hi,
    can anyone suggest if the following is possible and if so, the best way to enable the following within a CUA landscape :-
    Standard SAP System Copy of Production to QA.
    Cleanup of "Production" user master records in the QA system to remove users not required in QA.
    Resend a set of test user id's which existed in the pre-system copy QA system (and still in the QA CUA master system) to the newly copied QA system to merge with the cleaned up  QA user master.
    Re-link the new QA system with the QA CUA master system to transfer the "merged" list of QA users into the QA CUA.
    I've simulated the above on a test server but the process of sending down the sub-set of old QA test id's from the CUA master (using report RSCCUSND) does not create the users in the QA client even though the report itself appears to have transferred the users. Checking SU01 on the target CUA client shows no user has been created and there are no idocs passed from Master --> Client.
    Other than either exporting the QA users to a transport before the system copy (for re-import after the system copy to replace the copy of the production user masters with the old QA list), or using the "production" users in QA following the system copy I can't seem to find a way of merging some of the old QA users with a cleaned up list of production users in the QA system post system copy.
    If anyone knows of a way to do what I'm suggesting then please let me know.
    Brian.

    Hi Brian,
    I don't think there is an option, directly.
    However what I would do is.
    Before System Copy
    On the QA Side:
    1) Create a new client in the QA and only copy user masters in the empty client.
    2) In this new client, keep only those users I need after client copy.
    3) Take help from ABAP guys to include all usr* table entries (with MANDT field selected only for the new client) into a transport request and save it for later use.
    On the Production Side:
    1) Export user masters of the production client
    2) Create a new client in Production and re-import the user masters
    3) Work on the new client to cleanse the unwanted users.
    4) Re-export the new user master of the new client and save it for later use.
    After System Copy
    1) Import the exported user masters from the production server , thus overwriting the client with the users selectively chosen from the production user master.
    2) Import the transport request to merge the older users from the QA.
    I know this is a crude way.. anyways..
    Hope that helps,
    Siddhesh

  • SAP ECC 6.0 EHP5 with Opentext VIM 7.0 - Question on System Copy / Refresh

    Hi
    We are planning to perform a system refresh of our QA systems (platform: Windows / SQL 2005).  The ECC system has Opentext Vendor Invoice Management 7.0 on it.
    I was looking for some documentation explaining the Pre and / or Post system copy (refresh) activities specific to Opentext VIM, but could find none so far.
    I have tried on Opentext website, SAP SMP and Google.
    Are there any VIM specific tasks for system copy ?
    Is there any documentation that you can lead me to ?
    Any help / lead is appreciated.
    thanks
    Sree

    There shouldn't be any specific procedures for the system copy as there is OpenText VIM add-on installed on the system. As the add-on's are stored in the database you just need to restore the database and do the post refresh activities.
    RB

  • System relate issue

    Hi friends,
    im in guess of where to post system related issue, since this is my problem
    run --> drivers --> host file,
    i couldnt able to edit & save host file.
    Tried below steps:
    1. host --> properties --> Security --> add --> everyone --> given full control also.
    2. Not able to do that in administrator account alsoWhich is the right place to post this question.
    Regards,
    Saro
    Edited by: Saro on May 17, 2011 12:48 PM

    Hi,
    Probably in your OS provider support forum?
    Regards,
    Jari

  • Errors in TMS after system copy

    Hi Guru's
    I've just completed succesfully a client copy from PRD to QAS & reconfigured the transport routes.
    I did the post system copy activities  as shown below
    1. Logon on to client 000 of the newly COPIED system with DDIC.
    2. Execute transaction SE06
    3. Select the Database Copy or migration option
    4. Press the Post-installation Processing button.
    5. When prompted Do you want to re-install the CTS? Press the Yes button
    6. When prompted for the Source System of Database Copy?, make sure that the <SID> of the production system is selected. Press the checkmark button to continue.
    7. When prompted Change originals from PRD to QUA?, press the Yes button
    8. When prompted Delete TMS Configuration?, press the Yes button
    9. When prompted Delete old TMS configuration?, press the Yes button
    *10. When prompted Delete Old Versions of transport routes?, press the No button
    Howver my developers are getting the errors below when working in DEV system. Its worth noting I didn't make any changes to the DEV system during or after the system copy
    Object Checks
    Object messages: R3TR PROG ZMM_SHIPPERS_GLOBAL_LE
    Transport objects from package ZMMS to target QAS only
    Error In Object Editing:
    Choose a change request with target system QAS
    Kindly assist
    Thanking you
    Edited by: Andale J on Oct 18, 2010 2:52 PM

    Juan
    I deleted all the 3 systems from the transport routes & reconfigured afresh using a the standard 3 system landscape
    I succesfully tested by
    1) adding an entry into a table & transporting across the landscape
    2) creating a role & transporting across the landscape
    The two tests above worked well
    The only problem is the errors mentioned earlier that are being encountered by the developers in the DEV system
    Sunil
    I 've restored the previous versions as per your instructions. Just waiting for the develpers to give feedback
    Thanks guys
    Edited by: Andale J on Oct 18, 2010 4:24 PM

  • Source system issues post BW System Copy

    Hi Team,
    Post BW System Copy, we have observed that the RFC connection has changed.
    However the Target Host port is maintained same as the required source system...
    While checking the Connection, we are getting the following error messages:
    @5C@     Port description contains errors: Incorrect destination MR0CLNT200     RSAR     669     
    @5C@     BI unknown in source system     RSAR     8     
    @5C@     BI IDoc type ZSMA002 is not the same as source system IDoc type     RSAR     371     
    @5C@     The following errors occurred in the source system:     RSAR     374     
    @5C@     EDI: Partner profile not available     E0     332     
    @5C@     Entry in inbound table not found     E0     414     
    @5C@     Entry in outbound table not found     E0     400     
    @5C@     Entry in outbound table not found     E0     400     
    @5D@     Destination MP0CLNT200 has incorrect Unicode setting; adjust it to destination     RSAR     673     
    Please advice.
    Thanks & Regards
    Sneha
    Edited by: Sneha Santhanakrishnan on Mar 23, 2011 2:12 PM
    Edited by: Sneha Santhanakrishnan on Mar 23, 2011 3:04 PM

    Hi Arun,
    Thanks..
    Your solution worked for all the datasources except one wherin I am getting a error message while activating the Transformation as "System setting does not allow changes to be made to the object XXXXXXX"
    Please note the Transformation is in the ACTIVE but NOT EXECUTABLE state.
    Find below the details description on the issue.
    Message no. TO128
    Diagnosis
    The system and namespace change option set for this SAP System does not allow any changes to be made to object RSFO 4L8RD1B5MKEQI3WSPE5S8MR2O.
    System Response
    Editing is terminated, the object can only be displayed.
    Procedure
    If you want to edit the object RSFO 4L8RD1B5MKEQI3WSPE5S8MR2O in this SAP System, have your system administator set the SAP System to "modifiable" for this object.
    This can affect the modifiability of the namespace &1 or the namespaces that correspond to the pattern &1, as well as the global setting of the system change option.
    The system change option is set using the Transport Organizer tools (Transaction SE03). Expand the Administration node and execute the program Set system change option. The options are described there.

Maybe you are looking for