XStep- creation of two control recipes

Hi,
I am using the Ecc 6.0 Enp 3.0
I have created a Xtsep structure with parameters and checked. so errors found.
XStep is copied into Routing. Production Order is created. during Control recipe generation, there are 2 control recipes are generated. first control recipe do not have Production Order header material and status.
The second control recipe has the all details which are captured from XStep.
Why First control recipe getting created.. am I doing something wroing in setup..
Thanks,
JK

Why don't you just create a custom view object? There's even an example or 2 in the docs:
http://docs.oracle.com/cd/E16162_01/web.1112/e16182/intro_tour.htm#CHDGDIEC (check out "View object on refcursor" example)
Edit: you are aware that you can create a View Object based on more than one table?
John

Similar Messages

  • How to avoide the control recipe creation step and control recipe complete

    Hi
    in process order procedure has configured in our syayrm ...like
    orde creation,release,control recipe created at time orede release, then order conformation ,order inal conformation, control recipe comlete , order TECH., ...Like ths our order process configured..
    here we not useing any control recipe functions ... and control recipr complte ...so how to remove this step from order process...pls could any one guide inthis issue.
    Rgards
    HGVD

    Dear HGVD,
    Assuming there is only one order type(process order type) is used in both the manufacturing plants,then create plant specific
    production scheduling profile in CORY,for the plant 2000,assign the prod.schd.profile with the default order type and
    do not include the check box for generate control recipe and save the data,but in the same CORY,assign the same order
    type,with including the check box for generate control recipe.
    Check by this way and revert back.
    Regards
    Mangalraj.S

  • Assigning XSteps to control recipe destination

    Hello Experts,
    I have a question related to XSteps. I have used XSteps in ECC5.0. One of the deficiency we faced compared to process instructions is, process instruction categories can be assigned to control recipe destinations and can be generated without directly assigning to phases of recipe. This immensely reduces the maintenance effort. This is not possible in XSteps.
    Even if the XStep references should be defined to destination while its definition, it should be assigned to each phase of the recipe. Any change is there in this design in ECC6.0?
    Also what is the use of context in XStep reference definition?. When I try to create new context, its asking me to select a node and not letting me create.
    The last question is, is there any mass assignment tool developed by SAP to assign XStep references to recipes?
    Thanks
    Prathib

    Even if the XStep references should be defined to destination while its definition, it should be assigned to each phase of the recipe. Any change is there in this design in ECC6.0?
    Ans: -
    Nope. it is your chioce if you wiosh to assign it to individual phase of or single reference to all phase. It purely defpends on how efficient your design it.
    We has 28 Phase (Ave) in each reciepe and we still have managed to keep Xsteps reference to minimum. Thanks to efficient XSTEPS master data designing.
    Also what is the use of context in XStep reference definition?. When I try to create new context, its asking me to select a node and not letting me create.
    Ans: -
    Reference can be used in Reciepe and it helps in easing your reciepe creation. Context can used in reciepe or process order. Context is used to assign individual operation or phase. This is used is general all phase in generation tab could not be used.
    The last question is, is there any mass assignment tool developed by SAP to assign XStep references to recipes?
    Ans: -
    There is one. I will find out and let you know. U can try yourself as well.
    I have a question related to XSteps. I have used XSteps in ECC5.0. One of the deficiency we faced compared to process instructions is, process instruction categories can be assigned to control recipe destinations and can be generated without directly assigning to phases of recipe. This immensely reduces the maintenance effort. This is not possible in XSteps
    Ans: -
    You can do this in XSTEPS as well. But of what use will it be if simulation does not show data and the way you wish to see the data.
    Simulation can be done for each XSTPS tree you define in XSTEPS master data.

  • Control recipe and PI sheet creation creation

    HI frnds,
    Please explain me the configuration and  path of creating control recipe and PI sheet.
    thanks in advance
    Daniel

    HI,
    plz respond as earliest
    Daniel

  • Process instruction sheet and control recipe

    dear,
           can u let me know how the process instruction sheet is created or maintained and how the control recipe and destination works.
    if I want to start with PI sheet and control recipe in my organisation , how do I go ahead with configuration as well as process.
    thnx-rgds
    Amitabh

    Hi,
    In control recipe destination the destination type must be browser based.Another is Abap based generally it is using.
    So select that recipe destination, select phase & go in deatil u will find INSTR.READ1, READ2,SIGN which can used as a instruction.
    There are two types 1:process sheet 2: remote fuction call (RFC)
    Process sheet is used for giving instructions to line operator & also entering data during reaction etc per period.
    For INSTR- select it give instruction for that particular phase.
    READ1 - In which we are one column is available where we can enter 1 value by line opearator
    READ2- Here 4 columns are available u can use it as date,time,temp,total etc. as per your requirement.
    SIGN- Here u can use it as a to identify who entered the value.Systen will ask for pass word after entering ID
    After creation & releasing  process order  create contriol recipe.
    Thern go for T code- CO 53 - send control recipe(control recipe monitor)
    http://help.sap.com/saphelp_46c/helpdata/en/f3/6ee4117aed11d2a5fe0060087d1a6b/content.htm
    CO60 - Operator will enter the values
    CO54 - send process messages
    http://help.sap.com/saphelp_46c/helpdata/en/ac/6a101268ce11d2a67600104b57eaa3/content.htm
    CO55- Check the report.
    Check the above & reward if useful.
    Regards,
    Suhas

  • Control Recipe Status

    Hi Everyone...
    Need your help urgently.
    When creating a process order; after i have only released the order and not saved it; a control recipe is created. Can anyone tell me what is the status of the control recipe at this juncture and how exactly is this getting this status.. technically any idea where this status is being assigned in the code? I checked with transaction CO53 for seeing this control recipe but it isn't here.. only once the process order is saved is it coming up here with Status displayed on the report as Created. So only after this does the status become created or when i release itself this control recipe gets created but since the process order is not saved it doesn't appear in CO53. Please help. Awaiting your replies on this.
    Thank you,Regards

    You can set this in customization for process order type that during release the control recipe is to be created or during the creation of the process order.
    Once the Control recipe is created until unless it is released it will not be visible in CO53, You have to go to the change mode of the process order and go to the list of control recipes and release it.
    When a Control recipe is created it gets the status of CRTD as of a process order and when it is released it will be with status released, when Completed it will be with Completed, during processing with status of In process.
    When you release the Control recipe it will be available in CO53 then you can process the PI sheet.
    Hope this may help you.

  • Control Recipe not created

    Hi PP Gurus,
              I have issue of Control recipe not created while creating the process order. So that log on PI generation/ ctrl recipe creation is empty. It is not possible to enter data for PI sheet as it is not generated while creating process order.
             Could you please suggest, what are the probable reasons which are leading to this issue?
    Thanks,
    Reddy

    Hi Pankaj,
            Thanks for your response. I have tested control recipe creation from the process order, before posting the issue. It seems few issues related to process instructions.
    I have got a solution for creating Control recipe and PI sheet by spending some time on this issue.
    I am closing this issue.
    Thanks,
    Reddy

  • Control Recipe and PI sheet

    Hi, All,
    Can I know what's the difference between master recipe and PI sheet? And what's difference between master recipe and control recipe?
    I know control recipe is generated from process order. What's the output of master receipe? But how to generate PI sheet? what's the PI sheet output?
    Thanks

    Hi,
    Master recipe will contain the Resources to be used and the duration of the process.
    Process order will generate control recipe. Control contains process Instructions.While creating / Releasing the process order control recipe will be created. It can be created automatically or manually. We shall discuss the manual creation.
    PI Sheet:
    process Instructions can be attached to the Master Recipe. Process Instructions assigned in master recipe will generate control recipe.
    Regards,
    Mohan

  • Control recipe generation from process order

    Hi,
    Iam using XSteps to generate control recipes for external destination ie destination type 02. But I find no control on the number of control recipes that can be generated.Whenever I click on the generate control recipe botton,  a new control recipe is getting generated,
    I need to have a control on this similiar to the case of destination type 04. ie system will not generate a control recipe if already a control recipe is there for a destination.
    Can anybody know how to bring this control?
    Thnaks in advance
    Regards
    Prathib

    Hi
    If you want to restrict quality inspection based on production order type, Its possible. Use exit QAAT0001. Take help from ABAPer, dont forget to set E_NO_INSPECTION based on the order type field there. VERY IMPORTANT: Put  E_TQ32 = I_TQ32 in the program, otherwise you will get error "Post stock in QM only"
    SDG

  • How can i distinguish two controls with the same name?

    I'm recording automated tests with VS 2012 Coded Ui Test for testing a web application.
    In that web application it is possible to enter data in something looking like a list.
    There is - per example - an Edit control sitting on a ColumnHeader with the name/text "Description".
    Below that header is another Edit control for data input - containing the text "Description" too and which lies on a Cell control.
    When i playback my recording, Coded UI Test looks for a control with the name "Description" and gets the one, it finds at first.
    In that case the Edit on the ColumnHeader, which causes an exception, when the Text will be setted with the data input from the recording.
    Unfortunately the controls have no ID.
    Is there a way to distinguish controls with the same name?
    Thanks in advance!

    Hi Patrick Pirzer,
    >>Is there a way to distinguish controls with the same name?
    Based on the blog "How does “Coded UI test” finds a control ??", we know that to really find a control, it would be related to the unique properties as the search properties,
    so if two controls have the same property, please use other unique property as the search property would be better.
    Best Regards,
    Jack
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Error in CO54 Control recipe.

    Dear Experts,
    I am not able to do TECO for process order as auto control recipe is being created,this is the status of my process order.
    I have created massage through T-Code CO57 with massage category PI_CRST, Process order number,but I don't know which control recipe I have to select so that the when I am doing massage posting through T-Code CO54, it is giving error massage that it can not be posted. I have tried some of the control recipe number from F4, in CO57, but again the system gives the error massage while proceeding with CO54.
    This is very critical as my client plant is nearly down as far as SAP is concerned.
    Please do the needful by giving the detail steps to over come this error as TECO for this process order is a must.
    Regards,
    Rajesh.

    Dear,
    The error given is as follows.
    2.Destination PI04 COCI_CONFIRM_MATERIAL_CONSUMPTION cannot process the message
    3.Message is not sent to and destination.
    This error is because of CO57 where I don't know to select which Control recipe along with process order number in CO57. I tried selecting some of the control recipe from F4, but was of no use.
    I just want to do TECO for the process order where status is control recipe created (which is being created automatically), so I am selecting Massage Category PI_CRST. But I don't know which control recipe to be selected along with Process order number for field Contol Recipe in CO57.
    Regards,
    Rajesh Prasad.

  • Control recipe resending.

    Hi!!
    Control recipe can be sent to xMII or other systems through CO53.
    How can we resend the control recipe to xMII?
    Please Guide.
    Best Regards,
    Ajit Dubal.

    Hi Pasobh,
    Previously, I have sent the control recipe correctly.
    However, due to some reason, i need to resend it to xMII. So, is it possible to resend it?
    rgds,
    Ajit Dubal.

  • Control recipe resending to xMII.

    Hi!!
    Control recipe can be sent to xMII through CO53 transaction.
    How can we resend the control recipe to xMII?
    Please Guide.
    Best Regards,
    Ajit Dubal.

    Hi Vijaya,
    I am able to send the control recipe but need to know how to resend the control recipe.
    Rgds,
    Ajit

  • Control recipe destination not available in Process order

    Hi PP-PI Gurus,
    When i am sending the process maessages to destinations,i am getting the error"No control receipe destination available in process order".
    When we create master recipe using X-steps, there is no option to enter comtrol recipe destination. Infact we asssign the destination in X-step tree.
    When the control recipe is created for a process order using x-steps, the operations overview will not have the control recipe destination.
    When the status of the control recipe is sent to destination(PI02),the system throws the above error.
    Any help on  how to resolve this error.
    Thanks in advance.
    Mani

    Hi Dhavel,
    Whether it is PI_CRST or PI_CRST2 i am getting the same error message.
    When i am working with Conventional Characterestics based process instructions in my recipe, everything is working fine.
    When i use X-steps instead of process instructions in master recipe to create the control recipe, i am facing this error.
    So it is clear that , when we are using Execution steps(X-steps) to create PI sheet,there needs some extra settings.
    Any body working with X-steps in process order ,request your help please to resolve this issue.
    Mani.

  • Control Recipe and PI sheet assignment in Master Recipe

    Hi,
      Can anyone guide me in detail about the Assignment of PI sheets in detail and also guide me the generation of Control recipe during Process order release.
    Also explain hoe to generate PI sheet automatically. brief me in Step by step.
    Regards,
    Muthamil

    Closed

Maybe you are looking for

  • I can't update my iPod 4th generation to ios 6

    I can't update my iPod 4th generation to ios 6... I've updated my iTunes to 10.7 checked my security software tried restoring my iPod and then downloading on my device and my laptop. When I connect it to the computer I try downloading & updating and

  • Case statement in a multiple query

    Hi everyone, This is my first time to use case statement in a multiple query. I have tried to implement it but i got no luck.. Please see below set define off SELECT g.GROUP_NAME as Market ,t.NAME as "Template Name" ,t.TEMPLATE_ID as "Template ID" ,(

  • Table where system id is stored in CRM

    Hi everybody, I'm currently implementing a solution and got the id of the source and target system. I need to know which ID belongs to which system. The id is an 32 long and alphanumerical. I know there is a table in CRM where the logical system are

  • Regarding dbms_jobs

    Hello All, I want to know when generally we schedule a job using dmbs_jobs and when using crontab ? If we schedule job using dbms_jobs,then is it possible to run the job regularly in intervals ? or is the job run only once using dbms_job package? Tha

  • Added Noiseware plug-in to Photoshop - Can Lightroom do the same?

    I just bought a new Canon 7D camera which gives the option for high ISO up to 64000. Even at 800 ISO, this camera seems to be giving me plenty of visible noise as I zoom in to the image in Lightroom. I've purchased the plug-in for Photoshop called No