Yosemite scheduled start up not really starting up

I updated to Yosemite and it seems that schedules start up (via System Preferences > Energy Saver > Programmed....) is not really booting the system up.
I Mavericks and before, the computer started, booted, loaded everything that it was supposed to, and the screen remained in the user log-in mode, until I entered my password and find everything already working.
Now in Yosemite, the iMac starts up, but remains in the log-in screen, without really booting the system.
So 5 minutes later, if no one logs-in into a user account, the computer turns itself back off.
As you can figure, this feature is useless functioning this way.
Any help will be appreciated.

Found the answer.
If you have FileVault active, meaning your hard drive is encrypted, the system does not allow for startup and automatic log-in.

Similar Messages

  • Lightroom mobile one way street & not really mobile from the start ?

    Great news and was waiting some time for it ; But it looks the workflow starts always with the Photos already in the PC . Mobile is second ... Not really a fully mobile workflow like I am using today with :
    1) importing JPEG with EyeWifi on IPAD while shooting RAW + JPEG
    2) do the picks & ratings in pad using Photosmith
    3) sync to PC LR catalog with photosmith and the ratings &picks are applied to the RAW file = easy delete of raw files not picked ?
    Will LR mobile sync JPG file information & meta data  to the raw file after import the raw in PC or is there no connection between JPEG & RAW when JPEG is imported in LR mobile ?
    Do I miss anything ?
    Bjoern

    Fully understand but Raw is to big for IPAD; I would not look for getting the development settings synced at all nor do development on the JPEG .
    My interesst is rather importing the JPEG direct from the camera, do the picks in the field on a long travel incl adding keywords for location  ... .and sync this to the RAW at home so I do not need to re-start all picks & keywords at home .

  • BI Scheduler Service is not getting started

    BI scheduler service is not getting started and showing this error
    Could not start the oracle BI Scheduler Service on local computer.
    Error 1064:An Exception occured in the service when handling the control request

    Refer to Oracle Business Intelligence Infrastructure Installation and Configuration Guide.
    Chapter 10 discussed configuring Oracle BI Scheduler.
    The steps include:
    Create a scheduler schema.
    Create tables in the scheduler schema using scripts.
    Updating configuration options in Job Manager.
    Updating the config files: instanceconfig.xml & credentialstore.xml.
    Start the Oracle BI Scheduler.
    If all goes well, the BI Scheduler should start.

  • Personalization Scheduling Engine does not start -- Bug?

    Hi there. I don't know if it's the correct forum to post my question. If I'm wrong I ask you to redirect to
    the correct one.
    I've correctly installed Oracle AS 10g release 1 according to the following topology, on the production
    environment :
    Server 1 --> Here we are three oracle homes : Identity Management , Middle Tier (Portal and Wireless) ,
    Personalization.
    Server 2 --> MetadataRepository
    My problem focuses on Personalization. I advise that in my developing environment I've not got any problem.
    So , I've installed Oracle AS Personalization without wornings. I've created RE,MOR and MTR schemas as the
    procedure dictates. Problem's that Personalization Scheduling Engine does not start. It should start
    automatically but It didn't. So I tried to start it by hand following "Oracle Application Server Hi there.
    I don't know if it's the correct forum to post my question. If I'm wrong I ask you to redirect to the
    correct one.
    I've correctly installed Oracle AS 10g release 1 according to the following topology, on the production
    environment :
    Server 1 --> Here we are three oracle homes : Identity Management , Middle Tier (Portal and Wireless) ,
    Personalization.
    Server 2 --> MetadataRepository
    My problem focuses on Personalization. I advise that in my developing environment I've not got any problem.
    So , I've installed Oracle AS Personalization without wornings. I've created RE,MOR and MTR schemas as the
    procedure dictates. Problem's that Personalization Scheduling Engine does not start. It should start
    automatically but It didn't. So I tried to start it by hand following "Oracle Application Server
    Personalization Administrator's Guide 10g(9.0.4)". Specifically , when I try to start the scheduling engine
    with the command "execute OP_START_ENGINE" in the MOR schema I obtain an error linked to DBMS_JOB.run()
    method. Digging deep into the Oracle alert log file I found this brief linked to the error executin the
    script :
    Thu Apr 14 17:57:28 2005
    Errors in file E:\MetadataRepositoryHome\admin\asdb\udump\ORA01860.TRC:
    ORA-12012: error on auto execute of job 119
    ORA-29532: Java call terminated by uncaught Java exception: java.lang.Exception: Scheduler Workflow Error:
    9756161113494248343 java.lang.NumberFormatException: 9756161113494248343
    at java.lang.Long.parseLong(Long.java)
    at java.lang.Long.parseLong(Long.java)
    at oracle.dmt.op.util.messagelog.MessageLog.getExecutionContextID(MessageLog.java:857)
    at oracle.dmt.op.workflow.SchedulerWorkflowClass.main_method(SchedulerWorkflowClass.java:101)
    at oracle.dmt.op.workflow.SchedulerWorkflowClass.SchedulerWorkflowJava(SchedulerWorkflowClass.java:91)
    ORA-06512: at "MOR_PORTALE.DMT_CLIENT_IDARWIN_WORKFLOW", line 0
    ORA-06512: at line 1
    So as the main error is "NumberFormatException" , I executed reverse engineering decompiling two Oracle
    classes , just to know the origin of the error :
    oracle.dmt.op.util.messagelog.MessageLog and
    oracle.dmt.op.workflow.SchedulerWorkflowClass
    After simple tracing I think I reached the origin and I shocked myself to see it!! The problem starts in the
    main_method of oracle.dmt.op.workflow.SchedulerWorkflowClass, i.e. :
    private void main_method()
    throws Exception
    String event_msg_args[];
    traceMsg += "Start";
    moduleID = "SchedulerWorkflowClass.main_method";
    traceMsg += "-executionContextID";
    executionContextID = MessageLog.getExecutionContextID();
    The problem resides in the getExectiongContextID() method of oracle.dmt.op.util.messagelog.MessageLog class.
    Code of this method is this :
    public static long getExecutionContextID()
    String hostIP = null;
    try
    InetAddress host = InetAddress.getLocalHost();
    hostIP = host.getHostAddress();
    catch(UnknownHostException ex) { }
    StringBuffer buf = new StringBuffer(20);
    if(hostIP != null)
    for(StringTokenizer st = new StringTokenizer(hostIP, "."); st.hasMoreTokens(); buf.append
    (st.nextToken()));
    buf.append((new Date()).getTime());
    String tmpString = buf.toString();
    String idString = tmpString.replace('?', ' ');
    idString = idString.trim();
    int len = idString.length();
    if(len > 19)
    idString = idString.substring(len - 19);
    long id = Long.parseLong(idString);
    return id;
    Simply , code obtains IP address of the Host , concats it with the current time and if the length of the
    result string is longer than 19 it obtains substring of (len -19) length!! I think , Oracle programmer
    thought to prevent NumberFormatException with the control "if(len > 19)
    idString = idString.substring(len - 19);"
    but that's strange , very strange!! In fact , in my case(with my IP Address 160.97.*.*) , method outputs
    NumberFormatExceptio 'couse long "id = Long.parseLong(idString);" is not able to convert the String
    "9756161113494248343" to java.lang.Long!!! 'couse it exceedes maximum value ( 2EXP(63)-1)!! So , I think
    it's bug but I don't know how to solve it!! Problem's in method's semantic. It should control that the
    String it creates is lower that the maximum value allowed for a long , not its length lower or equal 19!!!
    I mean , I cannot modify Oracle Java Class file.
    With kind regards,
    Nicola

    Fix in OracleAS 10.1.2.0.2 if you file a bug referencing bug 4397235 a backport of the fix can be provided on metalink.

  • Filters on CSWP not working when Scheduling Start Date sets Immediate Value

    In Sharepoint 2013, When users sets value of "Scheduling start date" to "Immediately", the filters does not work correctly.
    I have checked many forums where it is mentioned that If you set scheduling Start date to Immediately, internally the Scheduling Start Date is set to 01/01/1900.
    When i use query in content search webpart as publishing date is between "Scheduling Start Date" and "Scheduling End Date" so it fails. it  does not displays filtered data.
    Please provide some resolution for this issue.
    I have tried using calculated field wherein we can put formula to get value for Immediate value and then use it in Filter expression. but I need another approach related to "Scheduling Start Date" Column. i.e can we remove the Immediate radio button
    or can we restrict user to use specific date only?
    Thanks in Advance.

    This is a new one on me.
    It's a server program to interface with QuickTime and some other problematic services.
    If you use video or 3D in Photoshop Extended, you probably need it.
    Sounds like you are correct in that it has to do wtih Quicktime.  Do you have PS extended?

  • I have recently lost my @ start icon in the dock. Not really sure what happened to it. How do I go about acquiring a new icon

    I have recently lost my @ start icon in the dock. Not really sure what happened to it. How do I go about acquiring a new icon to place in the dock. Any all all tips are greatly appreciated. Not having icon - a real pain!!

    Open  http://www.apple.com/startpage/
    from the address bar, pull this down to the right side of your Dock for your link.
    MacBook Pro, Mac OS X (10.6.7), 2.4GHz IntelCore i5 320 HD 8GB RAM

  • Scheduling start date and end dates

    Hello Gurus,
    I am trying to understand the schedule start date and schedule end date functionality in Plant Maintenance. I do understand the basic start and end dates. Currently I set up u201C3.Do not adjust basic dates, dep rqmts to order startu201D and set the scheduling type as u201CForwardsu201D . Please note we donu2019t do any capacity planning or leveling.
    So my question is, why the scheduling start date is defaults to the basic  start date  for forwards and scheduling finish date defaults to basic finish date for backwards ? I tried adding couple of operations and save the work order. It did not change anything in schedule dates.
    Do we really need to care about scheduling dates if we donu2019t use capacity planning ?
    Please advise
    Mahee

    Hi,
    As per priority, final dates would be calculated as we will define the duration based on the priprity. Either current date or basic date only applied to Scheduling start date.
    You can change the scheduling start date so that based on priority, final date would be calculated.
    Regards,
    Maheswaran.

  • Start/Finish vs Schedule Start/Finish vs Actual Start/Finish

    Hi,
    I'm new to MSP 2013 and I'm confused on the way MSP handles Start/Finish dates. While I understand the rational of it adjusting the schedule so you see how actual dates impact the schedule, I find it confusing that there are multiple columns with different
    labels performing the same function?
    "Scheduled Start" would lead you to believe this is your initial planned start date and remains static while "Actual Start" would be, well, the Actual Start date. So one value by definition would be different than the other, yet when any
    of these dates, "Scheduled Start", "Actual Start", or "Start" are changed, they all change to the same value.
    My questions are:
    Why do the "Scheduled Start", "Actual
    Start", and "Start" dates all change to the "Actual Date" when entered?
    Is there a scheduling technique or purpose for this to work this way?
    Also, since the "Scheduled Start" date changes, how does MSP 2013 handle Earned Value?
           Since Earned Value calculations rely on your Planned Value which would be based on the Budgeted Cost of Work Scheduled          and the Earned Value which is
    the Budgeted Cost of Work Performed vs. the Actual Cost of the Work Performed at "a point          in time," how could it provide a reliable figure if the scheduled date is moving? Is it using the "Baseline Start/Finish"?
    I hope you can answer this for me or direct me to a resource that can. Thank you for your consideration.
    Marc      

    Marc,
    When Project was first released there were only two basic start field, Start and Actual Start (in addition of course to the Baseline Start field and a few others). With the release of Project 2010, a manual scheduling mode was introduced. That's when things
    got a little more confusing. Instead of leaving the Start date as is, the Start field was converted to a text field and the old Start field was renamed as Scheduled Start. When in auto-schedule mode, both Start and Scheduled Start are exactly the same.
    Now to answer your questions. To keep it simple, let's assume you are using auto-scheduling.
    1. In order to keep the schedule dynamics intact, it is necessary to update the Start field to agree with what really happened, namely with the Actual Start date. If you do not enter anything into the Actual Start field, Project automatically assumes the
    task started as scheduled, on the Start date.
    2, Yes, Project does its scheduling based on the current plan which is represented by start, finish and other data. Once the project starts, that current plan must be updated so the actual date values come into play. As noted in the lead in paragraph, Scheduled
    Start and Start are the same for auto-scheduled tasks.
    3. Earned value is based on the actual values and the saved baseline data. The "point in time" you refer to is the timescaled data as of the status date.
    Hopefully, this clear up at least some of your confusion.
    John

  • Is there a Scheduled Wake up (similar to Scheduled Start Up?

    I recently decide to let Backup run in the wee hours, so set them for 3, 3:15, and 3:30am.
    I don't shut down at night; I let the computer sleep (either via the Apple menu or automatically if I don't use it for 2 hours). While it's sleeping, of course, the backups won't run -- they wait until wake-up.
    So in the Energy Saving part of System Preferences, I set AutoStart for 2:55 am, and Auto Sleep for 3:45 am.
    AutoStart does execute, but the Mac immediately goes back to sleep. I guess AutoStart doesn't overide sleep mode, since the computer is actually running.
    Is there a way to schedule an auto-wake from sleep? I can't find an AutoWake function.
    (I did try trashing the com.apple.AutoWake.plist and com.apple.PowerManagement.plist files, then restarting, to no avail. I've also searched the forums -- if it's there, I can't find it!)
    Thanks for any advice.

    Thanks for the info, John.
    Unfortunately though, the Lacie product won't work for me, as it doesn't do backups over a network. Since I live in a hurricane-prone area, I really like the ease, simplicity, and security of the off-site backup to the dot-Mac servers. (Nawwww, I'm not paranoid! But I was within 20 miles of 3 hurricanes a couple of years ago.)
    Just for fun, I've set both the Scheduled Start and a Backup for 3:00 exactly. I'm hoping the backup will get started before the Mac goes back to sleep. Otherwise, yeah, I'll have to let it happen during the day. It's no big deal either way -- just thought I'd give it a shot!
    Jim

  • Schedule start & finish dates - Project Management

    All
    Will there be any implications on performance /status reporting etc if we personolise Schedule start & finish dates.
    The reason to personlise is to have Transaction Start & Finish date instead of Schedulate start & finish dates.
    Needs your inputs....
    Thanks in advance.
    Regards
    Ajith

    Marc,
    When Project was first released there were only two basic start field, Start and Actual Start (in addition of course to the Baseline Start field and a few others). With the release of Project 2010, a manual scheduling mode was introduced. That's when things
    got a little more confusing. Instead of leaving the Start date as is, the Start field was converted to a text field and the old Start field was renamed as Scheduled Start. When in auto-schedule mode, both Start and Scheduled Start are exactly the same.
    Now to answer your questions. To keep it simple, let's assume you are using auto-scheduling.
    1. In order to keep the schedule dynamics intact, it is necessary to update the Start field to agree with what really happened, namely with the Actual Start date. If you do not enter anything into the Actual Start field, Project automatically assumes the
    task started as scheduled, on the Start date.
    2, Yes, Project does its scheduling based on the current plan which is represented by start, finish and other data. Once the project starts, that current plan must be updated so the actual date values come into play. As noted in the lead in paragraph, Scheduled
    Start and Start are the same for auto-scheduled tasks.
    3. Earned value is based on the actual values and the saved baseline data. The "point in time" you refer to is the timescaled data as of the status date.
    Hopefully, this clear up at least some of your confusion.
    John

  • Return the scheduled start date from one task to a custom field for all tasks

    Hi all
    I am trying populate an entire custom task date field with the scheduled start date of one of the tasks. I thought the easiest way would be to:
    1) identify the date I need with a custom task flag field set to 'yes'
    2) create a formula to look for the 'yes' flag in that field and populate the custom task date field with it.
    This worked only for the task where the flag was set to yes (task #36) and the rest of the 49 tasks returned an error message. I'm unsure of how to set this up so that the date with the 'yes' flag populates in this column on
    all 50 tasks.
    This would also need to scale for situations where there were more or less than 50 tasks.
    Thanks in advance...
    Using MSP 2010 Pro   

    ShelleyBrodie,
    That's because the syntax of your formula isn't quite what you intend. The correct syntax is:
    IIf( expression, truepart, falsepart )
    For your case that converts to:
    IIf([Flag1],[Scheduled Start],{not sure what you want for the false part but I assume is is not Scheduled Start})
    Note, the "Yes" for Flag1 is implied, so the first part (i.e. Scheduled Start) is the truepart, but you don't give a value for the falsepart (i.e in both cases your formula is looking for Flag1 to be "yes". Let's say you want the Date1
    field to have the Scheduled Start date if Flag1 is "yes" and to have today's date if Flag1 is "no". Then the formula will be:
    IIf([Flag1],[Scheduled Start],[Current Date])
    However, As I indicated in my previous response, you won't be able to do what you described in your initial post by using a formula. Are you now trying to do something different?
    John

  • Task Scheduled Start Date with RAPI

    Task Scheduled Start Date with RAPI
    Is it possible to have a scheduled start date for a task in a service that is generated by RAPI, and, which does not have any authorizations/reviews? RAPI seems to throw the request into the service delivery moment without calculating the tasks even if I supply a date onload (in a field for the task start date to use). It works fine if there are authorizations or reviews, which is expected, but I can't get it to work without them. Thanks!

    Fascinating. As a workaround could you try throwing in a dummy authorization? For example, externalize it with ServiceLink dummy and autocomplete adapters, or keep it internal, but conditional with a condition that would always be false.

  • Scheduled start and Finish date .

    Hi Everyone,
    I am facing a problem in dates in creating a process order in Production .
    In the tcode COR1, when input the BASIC START DATE manually, the BASIC FINISH DATE ,scheduled start date and finished dates should get calculated automatically  as per standard SAP.
    The problem that I am facing is that , if I input the BASIC START DATE in future , the scheduled start date and finished dates are always coming as  the system date.
    whatever date I input in the BASIC START DATE  the scheduled start date and finished dates are always coming as  the system date.
    But this is not happening in quality and development server .
    Please help me if you have any solution
    Thanks
    Bijay

    Dear ,
    1.Scheduling parameter for new process order type and plant combination, to be defined at OPUZ . U can copy the settings at standard order type PI01.Here you should keep Backward Scheduling as Scheduling Type  and Keep the adjustment  Scheduling as Adjust to Basic Date , depenent requirement Date .
    Now  Order Basic finish date = Order Basic start date + float before prod + Lead Time of Operations (operation time from routing )+ float after prod.
    These floats are predefined in SMK  and assinged to material master .It comes through Planned Order after MRP run andcoped to Production Order .
    .2.Check and Define Scheduling Margine key in MRP -Carry All over all palnt paremtres (OPPQ)
    If you are MTS process , then Keep the Scheudling Type as Forward .Enter the Basic Start date and Scheduling Margine Days ( Opening periods , FBP, FAP) and then hit the Scheduling Indicator .It will calcuate all the dates based on the SMK and operation setup and propose you Basic Finish Date .
    So adjust the Flaots in SMK tab in process order , enter Basic Finish Date , Choose Bacward Scheduling to arraive Basic Start  or Go in reverse direction by choosing Forward scheduling .
    Hope its clear
    Regards
    JH

  • Basic Start Date and Schedule Start date

    Dear All,
    In a Preventive Maintenance order generated through IP30, I am getting Basic Start Date and Schedule Start date as different dates. For all other orders those date as coming same.   I am using forward Scheduling. Can any one of you please tell me what would be the problem?
    Regards,
    Babu R

    [SAP Note on Scheduling - Note 45433|https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=45433]
    Regards,
    Maheswaran.

  • PP DataSource 2LIS_04_P_ARBPL - Incorrect extraction of latest scheduled start dates (SSAVD)

    Hi experts,
    we use the SAP Business Content Standard DataSource 2LIS_04_P_ARBPL "Work Center View PP" and need the latest scheduled start date each production order operation.
    In the production order operation overview (t/code CO03) on the ERP-side we have the expected latest scheduled start (Source AFVGD-SSAVD)
    But in the DataSource 2LIS_04_P_ARBPL (PSA-Table) we become the incorrect latest scheduled start dates (DataSource field SSAVD)
    Any ideas or experiences why the latest scheduled start date not up-to-date?
    Many thanks and best regards,
    Michael

    Hi,
    I have tested the scenario again...
    At the header level of test production order 1000381 I have changed the basic dates (Start/End) from 22.04.2014 to 24.04.2014.
    As a result the start dates at operation level also changed...
    After the above changes I have extracted the Data. The Delta-Queue (RSA7) for the relevant DataSource 2LIS_04_P_ARBPL looks nearly good.
    For the both operations 20 and 30 the delta update for the field "Latest start date" (SSAV) works correct. But the delta update for the first operation "10" not processed.
    Is it possible that the delta update only works for specific system status? Or any other ideas?
    Many thanks and best regards,
    Michael

Maybe you are looking for

  • Is a gateway what I need?

    I am using CF8 in a windows environment. I have a magentic stripe reader on the network at IP xxx.xx.xxx.174:1070 When a badge is scanned, I want that information to automatically log in my SQL database. I think a Socket Gateway is what I want, so it

  • How can we lauch browser from my application?

    hello all, i tried Runtime.getRuntime().exec("cmd /c start http://www.sun.com"); to launch my default browser (IE) on NT4 system, but nothing happened... when i tried Runtime.getRuntime().exec("iexplore.exe") i got java.io.IOException: CreateProcess:

  • Hi. My iMessage is not working .....

    My iMessage is wating for activation..... since 2 days....... whats to do ? iPhone 3Gs. IOS 5.0.1 <Edited by Host>

  • ANE Java Desktop?

    I am not seeing any examples on how to build a ANE for Java on the Desktop side. I am seeing hundreds in C, C++ or for android....Is this not a recomended path in ANE development? if their are tutorials can some one point me to one?

  • Nokia 5200 won't be recognized

    Hello, I bought a Nokia 5200 and installed PC Suite 6.83.14.1. It used to work fine in all the connection modes, but recently it hasn't recognized the phone in "Nokia PC Suite Mode" - only in mass storage and imaging (like a digital camera). When I c