This is a good place to start:
<http://help.sap.com/saphelp_scm50/helpdata/en/78/bca554465f11d3983a0000e8a49608/frameset.htm>
If you have some practical experience with demand planning in general, a lot of the info at that link will seem like common sense and you'll likely be able to fill in the blanks.  However, if you are starting from scratch then it may be too general to orient you sufficiently.
At any rate, I hope it helps.
Dan

Similar Messages

  • Business Objects and Demand Planning Book

    Has anyone combined the functionality of Business Objects and Demand Planning into a single view?   The requirement is to provide enhanced analytics (near real-time) within DP.  We are on version 5.0.  Ideally, it will a single view (table and graph -similar to standard layout) where both DP and BO are called with the same selection.  I have a method to access the data near real time.  What are the options to acheive this?  Any ideas will be helpful.
    Regards,
    James

    Thanks Dave.  I created a virtual cube in APO to connect BO.  I can retrieve the data fine.  I was wondering if there is a way to integrate BO and the planning book so that I will have one view to see both applications.  For example, I called /zsapapo/sdp94 and get the planning book and BO analytics.  Essentially, I want the BO to replace the standard graphics in the planning book.  So, I would have a table at the top and BO dashboard at the bottom of the planning view.  Any ideas how to achieve this?
    The other question is around using a function module or BAPI to connect a virtual cube to LC to retrieve real time information.  Are you aware of any drawbacks to using a function module or BAPI to retrieve data instead of the DataSource?

  • Business Process: Final Demand Plan Key Figure in the past for APO DP

    Hello APO process experts,
    I have a BPX question for APO DP process owners, consultants or gurus:
    1.- Have you ever seen in any SAP APO customer, that in their APO DP planning books, they chose or designed to update the Final Demand Plan key Figure in the past closed historical buckets with the Actual Sales?
    Meaning that that in the Past closed historical Buckets, Actual Sales and Final Demand Plan, look exactily the same.
    Meaning that they create a dynamic Final Demand Plan key figure so to speak, yet they did not choose to create a key figure that also keeps the Final Demand Plan as originally entered.
    2.- Would you think that doing the above, without keeping any keyfigure in the planning book that actually shows what the Final Demand Plan was in the Past, is a good practice?
         The Demand Planner could still retreive the Final Demand Plan from BI reports, yet, dynamically they could never really see it in the planning book.
    3.- Do you think the above dynamic key figure would bias the Demand Planner's behaviour to manipulate the future open Final Demand Plan buckets to enter volumes in order sum to a monthly total, independently of what were the over and underachievements in the past (since they are not really visible to him) ?
    I would really like your feedback,
    thanks in advance!
    JD Loera

    Hello Thanks for your feedback.
    I agree with your point, and I hope that i still get more feedback from other Business Process Experts.
    I am trying to build a case for my client, to challenge the decision of their initial design as this practice is going to hurt the Demand Management process, if what they intend to achieve is a true "unconstrained demand plan"
    Much appreciated
    JD Loera

  • What is the best practice for APO - Demand planning implementation

    Hi,
    M client wants to implement demand planning.
    Cient has come up with one scenario like a New Customer is created in ECC, and if I use BI and then APO flow for Demand planning, user will have to wait for another day. (AS BI is always having one day delay).
    For this scenarios user is insisting on ECC and APO-DP interface.
    Will anybody suggest what should be the best practice for Demand planning.
    ECC -> Standalone BI -> Planning area (Planning is done in APO) -> Stand alone BI
    Or ECC -> APO-DP (Planning is done in APO) -> Standalone BI system
    I hope I am able to explain my scenario.
    Regards,
    Saurabh

    Any suggestions !!

  • Demand Planning Implementation Questionaire to the Business

    Hi All:
    We are about to implement Demand Planning SCM 5.0 for one of our businesses.  As a part of requirements gathering, I am supposed to prepare a questionaire that business would fill in.  Does anyone have any document on this that you would not mind sharing with me?  What sort of questions do I ask?  I am kind of new to DP and any help would be greatly appreciated.
    Thanks
    Ryan

    Hi Nar,
    Few questions for yor intial start up, you can go ahead with the similar questions how they want it after APO -DP.
    1.     Which vertical of business you are belong to? Specify the same.
    Ex: Manufacturing industry u2013 Pharmaceuticals.
    2.     What are the automated tools currently used for the planning purpose?
    3.     What is an objective of going to SAP APO-DP?
    4.     What are the challenges faced with the current tool?
    5.     How long the business users are using the current tools?
    6.     What are the advantages of the current tools?
    7.     Is there any Manual planning method is used for division of business or any business geographical location?
    8.     What are current data taken in to consideration for the demand planning?
    9.     Which are the departments providing an input for the planning now?
    10.     What are the base characteristics used for the current planning? Ex: Product, Location.
    11.     What is a detailed level of data are stored or reported?
    12.     What are the forecast methods used?
    13.      What are the factors considered in the planning? Ex: Seasonal, Climate, economical ect.,
    14.     How the new product introductions are handled now?
    15.     Does the planning carried out on geographical based or product line or division based?
    16.     What is an aquiracy of statistical forecast?
    17.     Is there any promotional planning and life cycle planning are done now?
    18.     What is a frequency of planning? How it is expected to be in future ?
    19.     Does that a calendar weeks or months are followed in the planning or any customized calendars are followed? If customized what is that and Why it is used?
    20.     Is there any regular back up is taken after the planning run? If so how is it carried out?
    21.     Any reporting tool is linked with the Demand Planning?
    22.     How demand planning results are analyzed and how the decisions are made?
    23.     What are the kinds of decisions are made after every planning run?
    24.     Who are all taking the decisions?
    25.     How many locations manufacturing is carried out and how many distribution centers are there?
    Regards
    Jegan

  • Mm business flow

    Hello
    MM Experts,
    Plz give me details for the following t codes.i.e.tell me the mm business flow for the following.......
    IH09 - Display Material
    MM01 - Create Material
    MM02 - Change Material
    MM03 - Display Material
    MM50 - List Extendable Materials
    MMBE - Stock Overview
    MMI1 - Create Operating Supplies
    MMN1 - Create Non-Stock Material
    MMS1 - Create Service
    MMU1 - Create Non-Valuated Material
    Regards,
    Raj.

    Dear,
    The transactions description itself explanatory.
    IH09 - Display Material
    MM01 - Create Material
    MM02 - Change Material
    MM03 - Display Material
    MM50 - List Extendable Materials
    MMBE - Stock Overview
    MMI1 - Create Operating Supplies
    MMN1 - Create Non-Stock Material
    MMS1 - Create Service
    MMU1 - Create Non-Valuated Material
    For any tranasction help - you can click on help button or by selection HELP - Application help.
    Regarding Simple MM Business flow, please have a look (you can find the info from earlier posts in SDN by searching or from first thread)
    The typical procurement cycle for a service or material consists of the following phases:
    1. Determination of Requirements
    Materials requirements are identified either in the user departments or via materials planning and control. (This can cover both MRP proper and the demand-based approach to inventory control. The regular checking of stock levels of materials defined by master records, use of the order-point method, and forecasting on the basis of past usage are important aspects of the latter.) You can enter purchase requisitions yourself, or they can be generated automatically by the materials planning and control system.
    2. Source Determination
    The Purchasing component helps you identify potential sources of supply based on past orders and existing longer-term purchase agreements. This speeds the process of creating requests for quotation (RFQs), which can be sent to vendors electronically via SAP EDI, if desired.
    3. Vendor Selection and Comparison of Quotations
    The system is capable of simulating pricing scenarios, allowing you to compare a number of different quotations. Rejection letters can be sent automatically.
    4. Purchase Order Processing
    The Purchasing system adopts information from the requisition and the quotation to help you create a purchase order. As with purchase requisitions, you can generate Pos yourself or have the system generate them automatically. Vendor scheduling agreements and contracts (in the SAP System, types of longer-term purchase agreement) are also supported.
    5. Purchase Order Follow-Up
    The system checks the reminder periods you have specified and - if necessary - automatically prints reminders or expediters at the predefined intervals. It also provides you with an up-to-date status of all purchase requisitions, quotations, and purchase orders.
    6. Goods Receiving and Inventory Management
    Goods Receiving personnel can confirm the receipt of goods simply by entering the Po number. By specifying permissible tolerances, buyers can limit over- and under deliveries of ordered goods.
    7. Invoice Verification
    The system supports the checking and matching of invoices. The accounts payable clerk is notified of quantity and price variances because the system has access to PO and goods receipt data. This speeds the process of auditing and clearing invoices for payment.
    Regards,
    Syed Hussain.

  • What is best practice to do APO Demand planning

    Hi,
    My client wants to implement demand planning.
    Client has come up with one scenario like a New Customer is created in ECC, and if I use BI and then APO flow  ( ECC -> BI -> APO-BI) for Demand planning, user will have to wait for another day. (AS BI is always having one day delay).
    For this scenarios user is insisting on ECC and APO-DP interface.
    Will anybody suggest what should be the best practice for Demand planning.
    ECC -> Standalone BI -> Planning area (Planning is done in APO) -> Stand alone BI
    Or ECC -> APO-DP (Planning is done in APO) -> Standalone BI system
    I hope I am able to explain my scenario.
    Regards,
    ST

    Hi Sujoy,
    Thanks for reply.
    (1) I have to get Sales Order data from ECC into BI standalone system Cube.
    (2) Then from this cube same data is sent to SCM APO - BI Cube.
    (3) Planning will be done in SCM APO.
    (4) Planned data is again sent to BI standalone system, Using datamart on Planned area.
    (5) In BI we will have reporting on cube, which has ECC sales order data and APO Planned data.
    But in this case, there is always delay between data loads (firstly ECC -> BI, then BI -> APO, then APO -> BI).
    In this case, if a new customer is created, Client wants to see demand planning in  latest data.
    How do we do APO DP generally?
    Do we follow the route from BI, or directly between ECC and APO..
    Hope I am able to explain the scenario..

  • Business Flow for Down payment

    Dear All,
    1. when and where Down payment will appear in FI business flow
    2. what are the process will happend in down payment.
    3. What is the end stage of down payment.(Vendor & Customer)
    Can i have Business Flow digram for Down payment to vendor and Down payment from customer (Visio or Aris)
    My mail id : [email protected]
    Thanks

    Hi Down payment is handled in the following manner
    Plz assign points as a way of thanking
    Down payment 3000
    Final Invoice 10,000
    Transaction:
    Invoice to Customer for Down payment: F-37.  This is a noted item and there is only one line item in the document.  If you want to handle this thru SD, then you should ask SD consultant to configure a billing plan in the sales order.
    Noted item  3000
    When you receive the check from the customer F-29 and you can clear the open down payment request.
    Dr. Bank 3000
    Cr. Customer  (special gl indicator A)  3000
    When you finally bill the customer for full invoice,
    Dr. Customer 10000
    Cr  Revenue 10000
    Clear Down payment:
    F-32, clears the 3000 against 10000 and makes the open item 7000.
    Final payment form customer 7000
    Dr. Bank   7000
    Cr. Customer   7000

  • How to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM

    Hello Guru's,
    Request for information on smart documentation on the integration between Trade Promotion Management and SCM-Demand Planning from an architecture perspective how to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM and from TPM promotions values can be considered in to APO demand planning: can anybody give me some insight on it.
    Thanks in advance.
    Kumar

    Hi Praveen
    There are several ways you can connect a DP system to a TPM. How are your interfaces and systems setup?
    Option1:
    Extract the baseline from APO to a BW cube, extract the data out of BW, may be using infospokes/open hub and pass it on to TPM.
    2. Have a custom program written in APO-DP to extract the selected keyfigure data at the aggregation level into an interface or a .txt file into APO directory and use some data transfer service such as EDI to take this data and send to TPM.
    In my experience it is simple to define an integration process. The much larger and complicated aspects are the date adjustments and the aggregation levels.
    Date adjustments:
    Understand the basis of the data in APO and TPM. APO is usually at the requested delivery date or material availability date ( when the customer like a store wants the product). However TPMs are usually at the consumption date ( when an end customer like you and me but from store shelf). Depending on the product and business style this can mean several days difference. Let's say it is 25 days on average, you need to add 25 days to APO base line date to get the TPM consumption date.
    Aggregation level:
    This can be product or customer. If the planning in DP is at product sku level and the TPM is at packs or brand level, you need to aggregate the data up before loading to TPM. The same with customer.
    To me the most complex part of the integration is to understand and transform the data in a meaningful way and a strategy to sustain this integration by keeping both DP and TPM in sync in terms of master data. Also important to have a process for identifying exceptions and failures. you send baseline from DP to TPM and if it fails, how do you know? how do you trouble shoot?
    Hope these help.

  • What are the disadvantages of implementing APO- Demand Planning without improvements or cleaning up the MRP. in other words is DP implementation dependant on MRP process. Gurus please advise

    HI All. What are the disadvantages of implementing APO- Demand Planning without improvements or cleaning up the MRP. in other words is DP implementation dependant on MRP process. Gurus please advise

    Hi Amol,
    DP is the demand planning machine, here you estimate your forecast (future sales).
    The MRP is a supply planning machine, here you use estimate the replenishment.
    Both machines in a technical perspective are independent one each other. Now in a business perspective they are not: The problem that you will have if you don´t clean your MRP elements is not a problem in DP itself. I mean, you can have a very success implementation in DP, your forecast accuracy will be very good.. and you will get a very good forecast, but when the MRP run and estimate the replenishment, the effort that you made in DP will not be translated in good results and your planning situation will be still not good.
    Kind Regards,
    Mariano

  • Macros in Demand Planning SCM 7.o

    Dear Friend,
    Please give me the link where I can learn about Macros of Demand Planning in SCM 7.o.
    Please brief me about the Macros.
    My intention is to learn about Macros.
    With regards,
    Balu

    Balu,
    Macros are used for performing complex calculations easily. They are basically used to manipulate the Key Figure values. They are also used for genertaing alerts. You can execute macros either interactivekly or by a background job. Go terough the following link:
    http://help.sap.com/saphelp_scm50/helpdata/en/17/a5216532a111d398260000e8a49608/frameset.htm
    I believe the best way to learn about macros is to create them and test them. You have the standard 9AEXAMPLES macro workbook which contains examples of all the macro functions available. Very handy tool!
    Try and go through the macros in standard SAP books and refer to the link above and 9AEXAMPLES to understand the flow. I am sure you will learn in no time.
    Happy Learning!
    Cheers!
    Abhi

  • APO DP - Collaborative Demand Planning

    Hi Gurus,
                  Can anyone help me to activate and configure collaborative planning in DP?
    I have my forecast running but business wanted to have consensus forecast by using Collaborative plenning . Please let me know to active the process and Steps to configure the collaborative demand planning.
    Thanks & Regards,
    Raj

    Hi,
            It's a big list of things to follow. You need to have portal or ITS setup.
    Go through the sap help [Collaborative Supply and Demand Planning|http://help.sap.com/saphelp_scm50/helpdata/en/4a/2e8e3919fbdb34e10000000a114084/frameset.htm]

  • Aggregates in demand planning

    HI guru's
    Do we use aggregates on MPO's in demand planning, is there any difference which used in bw,
    thanks in advance
    regards
    ravi

    Hi,
    The aggregates in APO are not the same as those in the Business Information Warehouse (BW), but they have the same purpose: to speed up data access and therefore increase performance.  SAP recommends that you use aggregates in Demand Planning.
    An APO aggregate contains a subset of the characteristics in the master planning object structure. The creation and use of aggregates is optional. The data is always saved on the lowest level of detail. If aggregates exist, the system saves the planning data on the defined aggregate levels as well as on the lowest level of detail. The data is saved twice, but consistently; that is, the sum of the details equals the aggregate value.
    SAP recommends that the aggregates you build in APO for planning data also exist in BW for actual data.
    If you want to save fixed values at aggregate level ; that is not at detail level of the master planning object structure, in a planning book, you must create aggregates for this level. Otherwise the data is only saved at detail level.
    You cannot form aggregates for navigational attributes
    Hope this will help you...
    Regards
    Sujay

  • Quick sizing for Demand Planning system

    Hi All
    Our team is required to do quick sizing for a SCM 5.0 Demand Planning system with Livecache. The DEV and QAS is already available but not being used at all but now we need the quick sizing for the production box. I have never done any quick sizing, detailed help is appreciated. I have gone through the service.sap.com/quicksizing for demand planning it shows 3 input tables only for Throughput sizing - Time Series, DP Run, DP Users. The APO functional guys entered some numbers but not sure what to do next as the Calculate Result shows information Iam not able to understand.
    What I need from sizing is CPU processor, disk size, memory size, etc in clear detail. Please suggest, Thanks in advance.
    Regards
    Ali

    Hello Ali,
    First of all I am not a BASIS consultant and hence it would not be prudent for me to comment on hardware configuration reuqired in your case.
    Secondly I do not understand what you mean by Quicksizer has been shut down. It is available online at <a href="http://service.sap.com/quicksizer">Quicksizer Tool</a> in Service Marketplace.
    There is good amount of documentation available in the website giving details on the basis of computation of different parameters. Again SCM Hardware Configuration is not just dependent on the number of users but the functional requirements as well.
    Thirdly - I cannot explain how SAPS concept is related to SCM Quicksizing. Per my understanding the SAPS concept is an hardware-independent benchmark of throughput which is an indicator of the processing capabilities required at peak loads. SAPS will determines the number and processor speed on your Application Server depending on the processor capabilities. Most hardware vendors provide datasheets with SAPS capabilities.
    Suggest you go through the document "Background: Sizing mySAP Business Suite" under Sizing Guidelines >> General Sizing Procedures.
    Thanks,
    somnath

  • Forecasting Models in Demand Planning.

    Hi experts,
    want to know in details and also to practice various forecasting models in Demand Planning, from beginning.
    please suggest.
    Regards
    Bhupendra

    Hi Bhupendra,
    There are various forecasting models to use in business like automatic model and manual model as a broad category. 
    In detailed, there are models like constant model, trend model, season models, trend seasonal etc.,
    Forecasting models are very simple and mostly based on STATISTICAL TECHNIQUES.  If you have sound knowledge in various statistical methodologies, it will be very easy to followup all the models.
    Moreover, while selecting the best model for an organisation, one needs to study and identify the key performance indicators for improvement and accordingly the forecast model needs to be aligned.
    The method to find this kind of model is the BEST FIT METHOD (it could be one or more or combo of it).
    In demo systems or sandbox system, you can populate various data with various models and try to analyse the one which satisfies business requirements. You can also take the help of BUSINESS PLANNING ANALYSER to build the customised forecasting model which can be part of business side or from consulting side.
    Regards
    R. Senthil Mareeswaran.

Maybe you are looking for

  • ABAP class or function for retrieving BEx query properties at runtime

    Hello Experts, I'm working on BADI RSR_OLAP_BADI and for a special calculation I need to know which characteristics are in the drill-down of the BEX query, sol later on I can aggregate some key figures using only these characteristics. Problem is tha

  • Where did 3.12G HD space go?

    Yesterday i still have 3.12G free space in my startup drive, but i dont know what happened. Only 207M free space left. How can I know what changes made to the HD? Any way to get back to yesterday status? iBook G4   Mac OS X (10.4.8)  

  • Acl on ldap

    does tuxedo 7.1 can use LDAP for ACL ?

  • Old accounts disappeared after adding google account

    I have similar problem, after adding new Google account on BB, old account disappeared and all infos are taken from Google and not anymore from Outlook. Then re-created previous account and deleted Google one: no solution, re-installed BB-DTop Mng: m

  • Is there a timeline creator on my iMac?

    is there a timeline creator on my iMac?