Cost center plannig data was deleted in production client
Hi All Please look into below problem.
2008 GP1 cost center planning data(KP06) that is entered in SAP Version 1 and 3 and assessed with planning assessment cycles has been mysteriously deleted from SAP. The data is entered and re-enterd every month. There are no line items in GP1. The data is in GB2 to prove it was in GP1 when a snapshot of GP1 was taken to refresh GB2. We need a root cause analysis. Screen shots of GP1 and GB2 are attached for one cost center as an example
Please let me know your opinions and thougts.
While i am executing KP06.in Assurance i am getting Actual and planned costs values, but the same one while i execute in production values are displaying in Actual costs not displayed in plaaned cost.
Please suggest to me tables which which is
Double-post
Hi,
"deletion" of CO plan data is possible but not "mysteriously...
Just copy an empty plan/actual version to a plan version containing plan data.
T-Codes: KP97 or KP98, the important thing is, the source version needs to be empty, copy "all data" and flag "reset and overwrite".
Pls. ensure that this T-Codes are not executed by mistake.
Best regards, Christian
Similar Messages
-
Delete Cost center master data
Hi Gurus,
I am facing issues at the time of delete the cost center master data. some cost center which are not delete & getting the following error:
Deletion not possible (usage is in table AUFK)
Deletion not possible (usage is in table ANLZ)
Deletion not possible (usage is in table COBRB)
Please help me to workout this issue?
Warm Regards,
Rahane D.hello Dhananjay
try to find entries maintained with same cost center which you want to delete using find option .
sachin
Edited by: sachin on Oct 28, 2009 7:56 AM -
Multiple Analysis Period in Cost Center Master Data
Hello Experts
My client did the mass change of cost center master data through T.Code KS12. Here, few of the cost centers analysis (validity period is different) like cost center X - analysis period was 01.01.2008 to 31.12.9999, & Cost center Y - analysis period was 01.01.2011 to 31.12.9999.
Since he did the change (through T.Code KS12) w.e.f 01.01.2011 to 31.12.9999, few of the cost centers created the mutliple analysis periods at cost center level ( i understand this is SAP standard behaviour)
Now, if he choose the display of cost center - X through KS03, he is getting two analysis periods
(a) 01.01.2008 to 31.12.2010
(b) 01.01.2011 to 31.12.9999
However my client does not want to see two analysis periods in cost center master data.
Kindly advise is there any SAP standard procedure to revert back / SAP note which can coorect the same
Regards
Anil KumarIf there are no postings during that analysis period you can delete the same if not required to avoid the message.
I will test the same if any other solution is possible.
Regards,
Divraj -
Hi, Export,
Can we change the cost center valid date from 2007.10.01 to 2007.08.01? If it can change, Pls tell me how to change it.Thanks.
best regards
Park HanWell, it's a little late to reply to the original question, but I found this thread while trying to figure out how to do the same thing myself and thought I would update it with the answer in case anyone else stumbles across this thread while searching as I did.
You can actually make a change in the valid from date by using a KS01 Create Cost Center transaction and referencing the original cost center to create the additional period you want to add.
In this case in KS01 you would fill out the fields in this manner:
Cost Center: Existing Cost Center to be changed, let's say 1000
Valid From 2007.08.01
Valid to: 2007.09.30
Reference Cost Center: 1000
Controlling Area: Whatever the controlling area is
In effect, rather than changing the cost center, you are creating the extra time period from the new from date to the original from date and referencing it to the cost center.
The end result for us was that KS03 shows the cost center with the new from date and the old to date, which was the change we wanted.
Not quite as obvious as a change, but it worked for us. -
Cost center planning data table and transaction code to view
Hi,
I want to see the cost center planning document. In which transaction code, I can see this document.
In which table, cost center planning data is stored?
Regards,
VS ramaiah
Moderator: Please, search SDNHello,
I do not think that COEP contains the plan line items*. For plan line items it is COEJ. But as suggested by Christian the better option in case you want to create a report is you use COSS/COSP and COST. The latter is for activity type planning (KP26) and the other two are for cost planning (KP06).
The transactions to view the plan document is KABP and line items is KSBP.
* Christian, do correct me if I'm wrong. I was not able to see anything with value type 01 in COEP.
Kind Regards // Shaubhik -
Field Status for cost center master data!
Hi friends,
can anyone please tell me,
Where do we define, which field is mandatory in cost center master data
regardsGood afternoon Rohan,
To do that :
IMG or transaction KM1V.
Create a variante with attributes.
You can also define time based fields in transaction OKEG
Valérie
Message was edited by: valerie secondy -
Person Responsible in cost center master data
Currently in cost center master data the field -"Person Responsible "is mandatory.
How can I delete this definition-meaning make it as not mandatory.
Also how can I hide this field.
ThanksHi,
Check the following link
KS01 , Field status Cost center master data -
Profit Center Mandatory in Cost Center Master Data
Hi guys,
Can any one suggest,where can we make settings for profit center mandatory in the cost center master data?Hi Swapvik,
I was just surfing and came across the concept for the profit centre.Have a look at it , it might help you or even resolve the issue.
Here is the Link: [Centre1|Re: Gl account is set to profit center mandatory;
There is another link for configuration problem relating to the query.
Link: [Centre2|Profit Center Column;
I am sure this will resolve your query.
Have a best day ahead. -
ALE for G/L and Cost Center Master Data
Dear Expert,
I am a fresher in ALE and want to distribute G/L and Cost Center Master Data from our production system to Development and Q/A system. Can you give some guidances? and how to configure ALE for this purpose?
Regards,
MALhi,
steps to configure ALE :
1.first u hav to create 2 logical systems for ur 2 clients in BD54.
2.then assign thm in SCC4 for both clients.
3.thn crete rfc destination in SM59.create in client from which u want to send only.
4.create port in WE21 for sender.
5.create partner profiles in We20 for both clients,outbound for sender and inbound for reciever.
6.now create distribution model in BD64.
generate partner profiles and distribute.
now ur ale configration to send data frm 1 clnt to other is ready.
u hav diff methods like master data,change pointers,idoc extensions,idoc reductions,...... to send data .
hope this helps.
reward points if helpful. -
Lsmw Uploading cost center master data fields ERFNM,ERFDT at History tab
Hi Gurus,
I done uploading of cost center master data through LSMW.everything is fine but I have one issue.
I done Uploading from 4.6 now in 4.6 the cost center was created by some one else when I am doing in ECC 6.0 system automatically taking my name as default it means I can not enter in ECC 6.o that who originally created it and what was that date. Is there any way to solve it or system will take only mine name in Fields( ERFNM,ERFDT )at cost center History Data while creating Master data.
Many Many ThanksYes, system will take the creator name from the person who actually creates the cost center in SAP.
It will be filled automatically and you can not change the creator name.
This is to ensure better audit trail and tracability.
Regards,
Gaurav -
Defination of Department to assign in Cost Center Master Data
Hi Experts,
Can you anyone please suggest me reg, "Defination of Department to assign in Cost Center Master Data".
because, My client needs Department wise Cost Centers balance.
Pls explain in detail..
Thanks in advance..
Regards,
Balaji BhonsleIn my (4.7) version there is a field for "Department". This field is nothing more than a text field. You can populate it with whatever you wish and use that field in a variety of reports. One use would be to enter the legacy department number when going live. Another would be to group several cost centers in some desired way. However, if you are looking to group cost centers, the cost center grouping as previously suggested is a far superior choice normally since you can create many different groups whereas this field is limited to just one choice. Another grouping available for reports is the Category, which is a one letter designation. Be careful with this though, because it may be used to drive functionality as well. Like P in my category implementation means "Production" and thus allows labor activities as a feature.
I hope this helps. -
Hi All
I would like to change cost center master data valied from date and to date for more than 1000 cost centers. Please let me know what is the easy way to do this.
Thanks in advance
Regards
PrasadHi,
In Standard SAP we are not able to change the valid date.
I believe you should do delete and create another cost center with the same parameters and with the new valid date.
Or....create a programm with Abaper...but I am not sure if it will fix your issue.
Thanks
Daniel -
Problem while changing Business Area in Cost Center Master Data
I am having a problem while changing the Business area in cost center master data, the system does not allow to change the business area due to the following reasons;
1. The transactional data already exists for that cost center
2. The desired date required to be changed, falls between analysis period 01.01.2000 to 31.12.2999
Can anyone help me in order to reslove this issue
Thanking in anticipation
Edited by: Arshad Iqbal on May 24, 2010 2:10 PMDear Dejan !!
Thanks a lot for resolving my problem actaully i have tested the scenario in Testing Server by changing the fiscal year and the system allowed to change the business area before any transactional data posted.
Thanks Once Again
Regards
Ch. Arshad Iqbal -
How to find out when data was deleted from table in oracle and Who deleted that
HI Experts,
Help me for below query:
how to find out when data was deleted from table in oracle and Who deleted that ?
I did that to fidn out some data from dba_tab_modifications, but I m not sure that what timestamp shows, wether it shows for update,insert or delete time ?
SQL> select TABLE_OWNER,TABLE_NAME,INSERTS,UPDATES,DELETES,TIMESTAMP,DROP_SEGMENTS,TRUNCATED from dba_tab_modifications where TABLE_NAME='F9001';
TABLE_OWNER TABLE_NAME INSERTS UPDATES DELETES TIMESTAMP DROP_SEGMENTS TRU
PRODCTL F9001 1683 46 2171 11-12-13 18:23:39 0 NO
Audit is enable in my enviroment?
customer is facing the issue and data missing in the table and I told him that yes there is a delete at 11-12-13 18:23:39 in table after seeing the DELETS column and timestamp in dba_tab_modifications, but not sure I am right or not
SQL> show parameter audit
NAME TYPE VALUE
audit_file_dest string /oracle/admin/pbowe/adump
audit_sys_operations boolean TRUE
audit_syslog_level string
audit_trail string DB, EXTENDED
please help
Thanks
SamLOGMiner --> Using LogMiner to Analyze Redo Log Files
AUDIT --> Configuring and Administering Auditing -
Retraction Cost Center Plan Data into SAP R/3
Hi All,
I am working on Integrated Planning and we have a requirement to retract the Cost Center Plan data to SAP R/3. Can anyone tell me how to do it in SAP BI-IP envirinment.
Regards
keyrunHi Keyrun:
Please refer to slide 7 of document below.
"SAP NetWeaver 7.0 Data Retraction in BI Integrated Planning"
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/30af46fb-eb4f-2a10-4899-9167af035742?quicklink=index&overridelayout=true
>Online documentation: http://help.sap.com/saphelp_sem60ep1/helpdata/en/99/97157967e3440a94d199538959cd0b/frameset.htm
>See SAP Note 525543 for additional documentation on field mapping.
Regards,
Francisco Milán.
Edited by: Francisco Milan on Jun 22, 2010 8:13 PM
Maybe you are looking for
-
Can 2 users have the same email login with different passwords for seperate itunes accounts
My daughter is currently using the home email address for her account and i have just purchased an ipad. I would like a seperate account. Is it possible to use the same email address as the login and have two accounts. Thanks Tracey (a mum who is try
-
Do you not realize that there are HUNDREDS of cookies in the Cookie Jar? I want to save SOME of them (banks, stores, Facebook, etc.) but get rid of the rest. Why have you made it so that I can't click & drag (or otherwise select) multiple cookies for
-
Additional message mapping in the operation mapping-use
Hi Friends, I could find the option for adding more than one message mappings in the operation mapping(Interface mapping). What is the actual purpose of it. when it is used. If there is any blogs regarding the same. refer any link for the same. Re
-
How to reatain advance in MIRO
Dear Gurus, There is a standard rule that i will be retaining 10% on the invoiced value,when I am doing MIRO how I can post to the Vendor spl. GL. In FB60 through Complex posting I can do. But the same is not happening in MIRO.I am in ECC 6.00 Regard
-
WRT54G Router and VOIP/Softphone
I am having trouble using X-lite (softphone) with my WRT54G. I just recently signed up for VOIP with Voip your Life and am using their X-lite software to start making phone calls. The softphone works perfectly when my computer is hooked directly up