Cost Centre Description in Multiple Language

Hi,
Can we able to maintain Cost Center Discription in Multiple Language like GL Description ( in FS00-- Keyword/Translation).
If can, can you guide how we can do same.
Regard,
Venkat

Hi,
I understand...
As far as I'm aware, there is no such a possibility. In order to maintain the description in different languages, you will have to simply logon in different language and create a description. The other way, is to update directly the CSKT table.
Regards,
Eli

Similar Messages

  • Project def. description & WBS description in multiple language

    Hi Guru's,
    In my current project client want to maintain Project def. description & WBS description in English and Arabic simultaneously( but not as long text).
    Is it possible to maintain two description together( 1st in English and other 2nd in Arabic)  for a Project def. and WBS Element at the time of creating project hierarchical structure in CJ20N. 
    So when the client will login to SAP as Language English/Arabic they can view the description as per the login language selected.
    I am looking forward for your reply.
    Regards,
    Amlan Neogi

    Hi Amlan
    you need to activate OPS_PS_CL_1
    Multi language support has to be activated  for object ML(IMG-->project systems-->Activate Multi language support)
    When you create a new PS object a new tab Short text appears in which you can maintain the language and the description.
    so when ever the user logs on with the language then the description o the object  in that language will be displayed
    regards
    Vijay

  • Maintain Storage Location Description in Multiple Languages

    Dear Experts,
    I need to maintain Storage Location Description in both EN and DE (Denmark) Languages.
    Kindly suggest me whether this is possible?
    If yes, please let me know how can we do this.
    I have tried doing this but I could maintain in only one language (either EN of DE)
    Regards
    Shashidhar

    Hi Jurgen,
    That was really helpful.
    My issue is, when I login with DE Language, I want to see the German Description for both Storage Location and Plants
    When I login with EN, need the descriptions to be in English.
    Is this possible?
    Regards
    Shashidhar

  • Add cost centre name field or description in line item reports

    Dear all,
    How can the cost centre name or description be added in a report's lines (i.e. FBL1N). These fields (columns) are not included in the reports and need to add them. I have tried through special fields to include them but the table CSKSZ and fields KTEXT (Cost Centre name) and LTEXT (Cost centre description) are not included.
    Regards,
    George

    Hello,
    You must use business transaction event 1650 for adding special field to FBL*N reports.
    Please refer OSS note below.
    Note 984305 - Line item: Definition of special fields (T021S)
    I hope it helps to you.
    Regards,
    Burak

  • OM - Multiple Cost Centres link with Org Unit/Position not to employee

    Hello gurus,
    In OM there can only be one relationship at a time between an organizational unit and cost centre (A011). For those areas where there is a requirement for the position to have control over more than one cost centre, there are multiple options.
    Option 1 - If only one of the cost centres is used for employee cost incurrence, this should be the main cost centre, and the others controlled through authorizations.
    Option 2 - If more than one cost centre is used for employee cost incurrence, a subordinate organizational unit is created into which those positions are placed.  In this scenario, the  subordinate  organizational units would not have a chief, and the reporting structure would go up to the more senior organizational units.
    Option 3 - Use Cost centre distribution infotype 1018 (A014)
    My question: is there a standard way through which we can show multiple cost centres attached to a position/org unit such that cost incurred by employees goes to master cost centre attached to org unit or positon and other cost centres are just attached to position/orgunit (just to show the org unit/position is managing these other cost centres as well).
    Any thoughts? Anybody has used Enterprise Organization in CO to achieve this?
    Regards,
    Ahmad

    To capture more than 1 cost center, you have to specify them in IT-1018  but employee's cost will be split based on this.
    For data maintanance alone cost distribution is not possible (based on my knowledge).
    May be equivalent custom infotype similar to 1018  @ Postiion / Org Unit level may work.
    along with Master Cost center.

  • Dimension Design - Cost Centre

    Hi All,
    I'm midst of designing a Cost  Centre, dimension which will need to have Entity, Profit Centre ID, Profit Centre Description, Cost Centre Group, Cost Centre, Cost Centre DEesription and Process, I see some of the will be Hiearachy rolling up. Starting from Entity to Profit Centre ID & Description and to Cost Centre Group, Cost Centre and Cost Centre Description and finally to Process
    My query, is what is the element should be in Dimension and its memeber and properties ? I guess currency, owner ...
    do I need to have a column of Profit Cetre from and to side by side, what about Business Unit, and how does EVDESCRIPTION fits into this scenario ? does it carry Profit Centre Description or Cost Centre Description ?
    Please advise
    Thanks
    Zan

    Hi,
    You can maintain Entity, Profit Centre ID, Cost Centre Group, Cost Centre as IDs and all their descriptions in the evdescription. The entity type of dimension must have currency, owner and / or reviewer property. The rest of the properties will depend on the actual requirements.

  • Account Assignment Text in multiple languages

    Hi,
    I copied a new Account Assignment Category "Y" and need to maintain "Short Description" in multiple languages (EN, DE etc.)
    Can anybody suggest how it can be maintained?
    Thanks in advance.
    Umakanth R

    I got the solution. In the Acc Assnt Screen, choose"Goto"-- Translations. Here we can maintain the text in different languages.
    Closing this issue.
    Umakanth R

  • Storage Location Descripion in Multiple Languages

    All,
    We have a current requirement where we want maintain the storage locations description in both English and French languages and display them based on the user's login language.
    SAP ERP as a standard does not provide an option to create description in multiple languages for Storage locations.
    Any suggestions would be highly appreciated.
    Thanks!

    Hi,
    You need to upgrade in unicode to get this.
    Thanks

  • How to Capture Multiple Cost centres and Business Unit information in a project?

    Dear Experts,
    With the help of UDA functionality in project super responsibility, I have captured Cost centre and Business unit information and this info will be used/reflected in CC and BU segments of all transactions gets recorded against that project.
    Now, our user wish to have multiple cost centres and business units to be tracked in the same one project. How is this feasible? Below example describes my requirement in a summary, please advise.
    An Indirect project is created when a defect on a machine reported from client's customer and all subsequent activities (purchases, travel to customer site to analyse and troubleshoot, purchases for any in-house analysis etc..involves costs spending internally) in resolving that defect/project involves 6 to 7 different departments (Sales, Tech Support, Quality team etc.,who actually work/travel and spend costs against project until defect resolution). And, each of the above departments will have 1 dedicated owner (project owners) to manage that project and each of these 6 or 7 owners owners will have their own cost centres (eg: 2345 - Sales team) against which they wish to see their transactions (travel, purchases during defect resolution) globally.
    So, all I want to know is how can I make one single project to accommodate multiple cost centresand business unit information to be assigned using UDA? Please let me know if I am not clear.
    Regards
    Venkat

    I think you should use the expenditure organization on the transaction itself to derive the CC/BU. Have AA lookups and define AA rules where you look at a Exp Org to BU or Cost Center to derive accounting.

  • Can we import multiple language descriptions in Hierarchy tables of MDM

    Hello Experts,
    I am using MDM 7.1 SPS4 and working on the Vendor Repository standard content.
    My source file of Regions table contains data in multiple languages for each region record. All the required destination language fields have been mapped properly in the standard map. Import action is set to 'Create' for new records and 'Update Mapped only fileds' for existing records. Matching criteria has Name<English> filed defined in it.
    However, after importing these hierarchy records, in data manager only the Name description of English is populated while all other language descriptions for the same record is shown in Red (i.e not populated with the expected data).
    Is this a limitation of MDM itself or am I missing some setting?
    Thanks in advance,
    Elizabeth.

    Hi Elizabeth,
    steps for importing  into hierarchy tables
    To add new multilingual records:
    1 If necessary, create the hierarchy from the current language layer Name field that contains the hierarchy information (e.g. using the Split Hierarchy command).
    2Map the current language layer Name field and then Map/Add the entire set of hierarchy values.
    3 Map the other language layer Name field(s). No value mapping is necessary.
    4 Map the [Remote Key] field.
    5 Record match using: (a) the Name field; (b) the [Remote Key] field (if the Name field was not value mapped); or (c) the combination of both.
    To update the language layer of existing records:
    Map the other language layer Name field(s). No value mapping is necessary.
    Map the [Remote Key] field.
    Record match using the [Remote Key] field and set the import action to Update (All Mapped Fields).
    Just try and if you need any other info then please get back to me.
    Thanks,
    Sudhanshu

  • Cost Centre and GL account description must be displayed

    Hi,
    Would anybody know what must be done in order to have the description for the GL Account (Field SAKTO) and the Cost Centre (Field KOSTL) displayed when a Purchase Requisition and Purchase Order is created, changed or displayed?
    Transaction codes ME51N/ ME52N / ME53N / ME21N/ME22N/ME23N
    Your assistance would be appreciated and points will be awarded for answers.

    HI,
    Go to FS00 and give the name of the G/L Account that u wish to give against the same and save, The name shall be picked up automatically in all the Purchasing documents.
    Similarly when u form the cost centre in KA01 give the name of the cost centre that u wish u adn save.
    This shall be taken care off then in all the transactions.
    Hpe this helps.
    Regards,
    Prasanna
    Award pls if helpful

  • How to post depreciation to multiple cost centre?

    Hi
    In the asset master there is only one cost centre for each asset. This cost centre determines the cost centre to post to for depreciation expense. Is there a way to post to multiple cost centre?
    Hope someone can advise.
    Thank you.

    Hi,
    1) Substitution rules would help you. 
    2) Through distribution or assessment allocate the depreciation expenses to multiple cost centers.
    Thanks,
    Murali

  • Description field iis required in version plan of a cost centre

    Hi,
    In KP06 , planning cost elementwise for cost centres : do we have a provision for writing down remarks for revision in cost element planning. ex : my repairs for X cost centre was 2 Lakhs and later changed to 3 Lakhs. Now I want to record remarks for increase in planing amount of this cost elementin version 1.
    Pls. suggest.
    Thanks & Regds,
    Kasi.

    Hi
    You can change the business area in cost center by changing the Analysis period. If there's any data exsist it is not allow you to change the business area. If else block or eleate the cost center and create a new one ( even though this might not permitted if  data exsist in related to cost center.
    Regards
    Kesharika

  • Multiple currencies? Multiple languages?

    hi,
        Does SAP handle multiple currencies? Multiple languages? What is a currency factoring technique?
    Thank you
    Ashok kumar

    HI,
    Yes.
    SAP handles Multiple Currencies and Languages
    see the table TCURR, TCURC for different currencies
    Currency Factoring Technique:
    Currencies in Planning
    In Profit Center Accounting, three currencies can be stored at once:
    Transaction Currency
    The transaction currency is the currency used for a specific transaction. You can choose a different currency from the list of valid currencies for each new transaction. The transaction currency is stored in the transaction data for Profit Center Accounting as the so-called "first currency".
    Local Currency (Company Code Currency)
    The controlling area currency is stored in Profit Center Accounting as the second currency.
    Profit Center Local Currency
    You need to set a special currency for Profit Center Accounting in Customizing for each controlling area. This currency is used in the standard reports, among other things. You can find more information about this currency in Customizing. The profit center currency is the third currency updated in the transaction data.
    How Do I Plan Currencies in Profit Center Accounting?
    You first plan a profit center in USD. Then you later plan the same profit center in DEM in a second planning session. This may be necessary if:
    the planned costs for the profit center in a certain cost element consist of external invoices in the local currency and external invoices from abroad and
    the external invoice from abroad was billed and paid abroad
    The currencies which can be planned manually are defined in the Layout.
    If the corresponding key figures are defined and ready for input in the planning layout, you can plan in any permissible transaction currency, the company code currency or the profit center currency. The planned amount is then immediately and automatically translated into the other currencies. Note, however, that the system can only translate into a transaction currency if you have explicitly specified a transaction currency.
    If you want to want to plan data using different transaction currencies, you need to use a planning layout that contains the characteristic "Transaction currency".
    Note that data can only be saved in the transaction currency if a transaction currency has been specified. Otherwise the data will only be saved in the other currencies without the transaction currency.
    If you want to want to summarize data in the transaction currency, you need to use a planning layout that does not contain the characteristic "Transaction currency". You can then:
    change the summarized values, in which case the changes are not updated in the transaction currency, and
    add any combinations of objects that have not already been planned.
    If you
    enter one transaction currency, the system only displays the amounts planned in that currency. You can
    change these amounts
    plan in the currency specified
    enter a number sign (#) to represent the value " " (no value), the system only displays those values that were planned without the transaction currency. You can
    change these amounts
    plan amounts without a transaction currency
    specify more than one currency or all currencies (*), the system displays all the planned values. You can
    change these amounts
    can plan as yet unplanned combinations of your planning objects in any valid currency.
    Planned currency amounts are translated using
    the value date you entered in the planner profile for your area
    a translation factor entered in the currency table for the exchange rate type entered in the planner profile
    You will find further information about the currency table and currency translation in the documentation FI Configuration and Organization.
    Transfer Pricing Using the Conditions Technique
    The term "transfer pricing" is used to describe the calculation of prices for internal exchanges of goods between profit centers. Conditions are the individual steps carried out during price calculation. When a goods movement takes place between two plants, the price can depend on a number of factors, such as the material involved, the sender plant, the profit center, the partner profit center, and so on. The information on these variable factors is stored as master data in the form of condition records. There the transfer price can be defined as a fixed price or a percentage increase or reduction.
    This section describes the steps necessary to define transfer prices. You define these transfer prices in Customizing. There you will also find a detailed description of how to proceed.
    Define condition tables, which you use to store condition records for each condition type.
    Here you define the price dependencies for transfer prices. You can make the transfer price found dependent upon a combination of fields. For example, if you want your transfer prices to be defined for a combination of material and partner profit center, you need to define a condition table that contains these key fields. The condition records then contain the individual prices for each combination of material and profit center. You maintain the condition records when you define the individual condition types.
    Define access sequences that the system should use to search for valid condition records.
    An access sequence is a search strategy that the system uses to find valid data for certain condition tables. Each access sequence consists of one or more steps, which the system processes in the order specified. The order determines where the system should look first for a valid condition record. You can specify an access sequence for any condition type for which you create condition records.
    Define condition types for all the pricing elements (fixed amounts, markups and markdowns) that occur in your daily business operations.
    In Profit Center Accounting, a condition type represents a component of a transfer price. You can define condition types for every type of fixed price, markup or markdown that occurs in your internal goods movements. If you define a percentage markup or markdown as a condition type, you also need to define another condition type to serve as the basis for this percentage. This can be a price stored in the material ledger. The relationship between these two condition types is then defined in the pricing procedure.
    In some condition types you need to specify an access sequence. In this way you determine which fields the system should use to search for a valid condition record.
    Define condition records that determine the amount or percentage to be applied for each set of values in the condition table (such as "fixed price of USD 100.00 for material 01, profit center ABC, and plant 0001").
    You can maintain condition records directly from within the definition of the condition type. Or you can define them from the application menu by choosing Master data ® Transfer prices ® Conditions. It is also possible to copy existing condition records to create new ones. This is especially useful if you want to change the currency of the condition record. You can maintain condition records either in Customizing or in the application menu, under Master data ® Transfer prices.
    Define a pricing procedure to group together condition types and determine how they relate to one another.
    In addition to the selection and order of condition types, a pricing procedure determines
    – which subtotals should be calculated
    – what base value the system should use for calculating percentage markups or markdowns
    – what conditions must be met in order for a certain condition type to be calculated
    The base value for markups and markdowns can be either a fixed price or a value from the material ledger. Using a routine supplied in the standard R/3 System, you can have the system read the legal, group, or profit center price from the material ledger and calculate the markup or markdown on this basis.
    Define condition exclusions, which let you determine which condition type should be used in a given situation.
    In transfer pricing for goods movements, it often happens that a number of different condition records are valid. Using condition exclusions, you can compare conditions with one another and use, for example, the most favorable price for the partner profit center.
    For different condition exclusion methods are available:
    · The most favorable condition in an exclusion group
    · The most favorable condition record for a condition type
    · The most favorable condition among different exclusion groups
    · Exclusion of those conditions in an exclusion group when a condition type that belongs to another exclusion group appears
    Define transfer price variants, which let you specify which pricing procedures are relevant for actual data and which for plan data.
    To valuate different datasets, such as plan and actual data, using different conditions, you can define variants with an assignment to a specific pricing procedure. The system processes the specified procedures in order until it finds a valid transfer price.
    In transfer pricing for goods movements, only actual data is valuated (variant 000). However, you can also create additional variants if you want to calculate plan prices on the basis of pricing data.
    Define pricing reports, which determine the structure of lists of conditions.
    A pricing report lets you analyze condition records according to certain criteria and define the structure of these lists. You can define pricing reports either in Customizing for Profit Center Accounting or in the application menu, under Master data ® Transfer prices ® Pricing reports.
    Regards,
    Padmam.

  • Translation of cost centre (se63)

    Hi everybody,
    Is there a possibility to translate Cost Center without logging in into another language? We need to translate short and long description from English to Chinese.
    I heard that SE63 could be used for that purpose.
    I tried to use SE63. I selected Translation > ABAP objects > Short text > TABL and then  choose table CSKT
    I wonder if I select a range of cost centres, how would I know which cost centre I am translating? On the result page, I do not retrieve the cost centre but a specific coding(e.g. 0000010006KTEXT, 0000010008MCTXT,...)
    How does it work? How do I retrieve the cost centre I need to translate... I do not want to translate them one at a time.
    Thank you for your answers in advance!
    Sabine

    Hi,
    Regarding the BAPI with the struture CSKT, could you plase give me the name of the BAPI you are thinking about? I couldn't find any BAPI that could answer my request. I need to change the field "Name "and "Description" in the cost centre master data.
    Thanks
    Sabine
    Edited by: Sabine Janssen on Aug 31, 2010 3:50 PM

Maybe you are looking for

  • Backup fail with VSSwriter error

    Hello, we currently are using Symantec Backup on tape and Windows Server Backup to make two differents backups on a SBS 2008. We are getting failed backup randomly during the week for both. Sometimes one is succeed and not the others. We have found s

  • Merging data with LiveCycle questions

    I have LiveCycle Designer 8.0 and I didn't find a forum for it so just point me in the right direction if this is not the place. I have a couple of questions with merging data with Livecycle PDFS 1. XDP is the file format for merging data with LiveCy

  • Pooledc Connection

    ok. the following code does not work. I've broken it where it starts to go wrong......it's a context error.....imports are incloded below. i think they don't matter, but you may not, so i've included them. thanks? private String driver; private Conte

  • WSUS 2012 Installing Report Viewer

    Hello, Setting up my first WSUS on a Server 2012 machine.  To view a computer status and it through an error stating that I needed to install Microsoft Report Viewer 2008 Redistributable.  I downloaded Report viewer then tried to install it and the i

  • Enhancements to 2LIS_04_P_MATNR DatSource

    Dear Friend, pls tell me how to do the enhancement to 2LIS_04_P_MATNR datsource?. 1.I want to add batch, that is there in communication structure with name MCAFPO  CHARG  Batch and I'm trying to add from Right to Left it is adding but giving error: E