Estimation in Projects with reference to materials and expenses

Dear Experts,
Currently am undergoing a project implementation for a manufacturing industry also a construction firm. The client has a specific requirement from project system. They get a various constructions projects inquiry (they also deal with this scenario) based on that they want to calculate the material's cost, processing time for that project as well as the project general expenses. Based on this they want to trigger the estimation for the client. Also they want to calculate analytical estimation of the project.
Could anyone explain me how to encounter this scenario in PS. As this is a challenging task i would require your expertise.
Can we do estimation from PS with reference to materials, resource as well as expenses.
Is this something to do with cProjects?
Kindly do the needful
Thanks and Regards
Praveen B M

use Sales Pricing and quotation creation functionality....you can read it here http://help.sap.com/saphelp_erp60_sp/helpdata/en/aa/96853478616434e10000009b38f83b/frameset.htm

Similar Messages

  • Sales order with reference to Contract and another sales order

    Hi Gurus,
    I would like your suggestions on one of the business requirement i have.
    We are creating a new EDI interface with few of our customers to create sales orders. While creating sales orders, it should validate if there are any open contracts available and if yes, then the sales order should be created with reference to it. so far good but there are chances that sold to party on the contract could be different from sold to party on the EDI order sent by customer (customer can have more than one sold to party on their system). IDOC's are failing in this scenario and not able to create a sales order since sold to partys are not matching. I need your help.
    Can we do some thing in customer master to handle this scenario?
    or
    Create a new sales doc type (YEDI or some thing) and create sales order from IDOC without reference to contract. Business will look into all YEDI order and create the actual sales order out of it but the challenge here is i cannot refer contract to the actual sales order or YEDI order.
    Is it possible to create sales order with ref to a contract and another sales order?
    Please help
    Thanks
    Venkat

    Hello Venkat
    What is the linkage between sold to party of contract and sold to party of order..If customer has more than one sold to party.
    Why don't you use customer hierarchy....link all sold to party of a customer to hierarchy node.for example...you create a hierarchy  node 1000 and assigned customers 2000 and 3000 to it.you have contract for 2000..so when you create a sales order for 3000 check in knvh table it's customer hierarchy 1000 and get all sold tos assigned to hierarchy...which is 2000....check if contract exist for sold to's..If yes then create order with reference.
    Let us know if it works for you.
    Thanks
    Amit Gupta

  • IMovie project with 06 (please read and help..)

    I just upgraded to iLife 08. I had 06 before 08 and had a iMovie project with 06 and can't view in iMovie, why is this.

    I don't know the answer to that but you can download and reinstall iMovie HD to complete your project. You'll find that the new iMovie has simplified some aspects which many do not like so Apple has provided an iMovie HD download for those with iLife 08 installed. That way you can use the older version for those features that have been dumbed down in iPhoto 8. Both have their pluses and minuses. I like the older version for how it handles added multiple audio tracks.
    Do you Twango?

  • Delivery from Project with reference to sales order

    Dear All,
    I am facing problem in delivery. In my case scenario is-
    1. There are 10 materials with 20 quantities.
    2. I create a sales order only for two material with 5 quantities and enter wbs element number.
    Now when i use CNS0, enter sales order number and wbs elelment number system shows all 10 materials that I dont want means I want the materials that are included in sales order. Please help me how to control this.

    Please read SAP Help for a better under standing...
    I mentioned below a line from SAP help for your info.
    ...... it selects material components, the system takes components into account that have been assigned to either a network or ...... ...
    Please follow the below path to access the help..
    SAP Help Portal >>> Logistics >>>> Project System >>> Material >>>> Delivery from Projects......

  • IMovie´09 Project with synced photo clips and workflow

    Hi,
    as I am new to Imovie, I have some difficulties to start with, no real Manual available and so on. Maybe someone can help me out a bit.
    I want to sync Pictures to a given music piece which has 120 bpm. I want to change the pictures every four seconds, but I did not figure out, how to adjust the timing of my pictures.
    I want to add overblendings for two seconds. These values are added to the duration of the importet picture. I want to have them embedded in the duration of my 4 seconds and so on. If I enter a value in the inspector it does not accept these nor the yellow editing borders really keep the desired value. If there is any good documentation out there it would be fine to have that. It is not a good idea to have those short pieces of online information. Workflow should be explained and so on...
    Thanks for your help
    Best regards
    Tim
    Do I have to prepare the matereial in a certain way to edit it and son...
    Thx for your answer
    Message was edited by: TB11188

    Mac OS X 10.6.8
    imovie 09
    76 GB free
    all software up to date
    Yes I have had the same problem. Exactly. Not the amount of music or sound or effects I think. I have produced many 2+ hour films loaded with $hit in Imovie 09 with no problems. Until now.
    Other projects work fine. I tried creating a duplicate project, it also crashes imovie.
    I opened and restarted 10 times, finally looks like I am able to 'share' and export the corrupted project as a .mov or mp4 file.
    Hope it works I have many hours invested.

  • How do you setup a remote project with Netbeans 6.1 and IDM 8?

    I have been using Netbeans with IDM 7.1 fine, but have now upgraded to IDM 8 and want to use the new Netbeans plugin. However there is no ide-bundle.zip with IDM 8. If you try to connect to IDM 8 using the previous bundle from 7.1 you get a compatability error. Anyone able to give help on this?

    I have setup a remote project using the other setting of configuring the repository yourself. I couldn't use the remote method as it requires this file from your localhost file store and as I am using a different machine to run netbeans this wouldn't work. The other method allows you to put in connection information.
    I am not sure of the point of the remote method as it doesn't allow what the name suggests.

  • Want to procure material  with reference to WBS and sales order

    Dear all
    If i have assigned account assignment in PO means then while GR my material value is going to consumption. I dont want to book consumption at GR level i want to do consumption at delivery level. Also i want to procure material for particular WBS and Sales order.
    How to process the same. Kindly give some idea.

    Hi
    If you wanna toprocure the material wrt to WBS element or sales order the you have to make use of the Account assignment category P- projects ( That can be WBS elements /network ) And sales order C or any specific account assignment category created by you.
    Example :
    Sceneraio- When you are creating a slea order in SAP by T.code VA01 then at time of saving the SO the system is creation the WBS automatically ( that has to be mapped in SAP) .The Sales order number and the WBS element are  same .When you are cretating PO for  the Material wrt to  this WBS element then the system at time of the GR will be posting the consumption account which is booked to WBS element that in turn against the particular sales order.
    In SPRO - customizing i for the account assingment category P  in the Consumption Value is V
    Which is posted to consumption at time GR. Please  try create new account assignment category
    Consumption Value is E i.e accounting by sales order .
    Regards

  • How to create a vi project with two ao channel and multi ai channel by customer/producer mode

    I'm a ni elvis ii user.
    i want to create one vi which include 2 AO channel output FGEN and multi AI channel acquisition signal,
    and i wish use cunstomer/producer mode to realize this vi。
    here is the vi,run this vi seveal secends,then pop-up with “完成该操作内存不足”
    anyone can help me?
    thx
    Attachments:
    demo.vi ‏191 KB

    Hi steve ,
    Sorry to say that you cannot configure and acquire from AI channels on a   Device simultaineously from 2 seperate VI's.
    regards
    Dev

  • Report of projects with reference to particular customer

    Hi All
    Is there any report which can show me all the projects of a particular customer?
    Thanks

    Use txn Cn46--> Shift +4 (For the slection of dynamic line items ) -->in new window select  Master Data sales Doc. --> drilldown --> double click on sold to party --> enter your customer no. in right side sold to party field --> give * in the network header --> Execute.
    The report will disply you the netowrks assigned to perticular customer / in the same report you get the Project / WBS no. to which that network is assigned.
    Regards
    Nitin

  • VS 2013 template with references not working properly

    I'm trying to create a set of templates that contain references to dlls. When I create a project with references and then export it the references are saved into the template but the files aren't copied.
    I have created a class that implements iWizard and copies the remaining file types (.dll, .xml etc.) in the correct folder when you create a new template. This is also working.
    Now the problem was that I needed the project to know that it should use the dlls that are copied into the project folder. So I edited the .vbproj file and inserted the path manually, i.e. I found the reference tags and removed the path information so they
    only referred to the file itself. Like this:
      <Reference Include="MyDll"><HintPath>MyDll.dll</HintPath></Reference>
    This workaround is almost working. VS finds the dlls and lets me use them, but only if I go to project -> properties and then clock on the reference tab. The classes are not recognized until I do this. I get the usual  type or class not defined error
    until I simply click on the reference tab in project properties.
    It seems to me that I have missed a step when I was doing my workaround and Visual Studio completes it when I click on references. I just don't know what that is or what a good alternative to my solution would be.

    Hi Mongan,
    I have been researching this issue these days. You can check whether there are some differences in MyTemplate file and the project file before and after you click the references tab in project properties? Maybe you will get some information.
    In addition, I doubt maybe you missed something in your iWizard extension. the following link introduced detailed ways and code to create project template using IWizard interface, you can reference it to check whether it can help you.
    http://www.codeproject.com/Articles/391989/Working-with-Project-Template-and-Wizard-Extension
    The following threads suggested adding the project reference in the ProjectFinishedGenerating() method to add a reference to project template:
    https://social.msdn.microsoft.com/Forums/vstudio/en-US/f57d8eed-ba7a-4e82-bed4-1dd4b8a3a288/custom-wizard-adding-references-dlls-to-a-project?forum=vsx
    https://social.msdn.microsoft.com/Forums/vstudio/en-US/b4d4f816-70b6-4042-bb34-324a7da1a3e2/custom-wizard-is-it-possible-to-add-a-dll-reference-to-a-project-on-creation-from-a-custom-wizard?forum=vsx
    If the suggestions above does not help you, I find that
    Visual Studio Integrate forum:
    https://social.msdn.microsoft.com/Forums/vstudio/en-US/home?forum=vsx is a better forum because you are using iWizard to create project template. You can open a new thread about
    your current issue and post some code about iWizard  there, Visual Studio Extension experts will provide you better support.
    Thank you for your understanding.
    Have a nice day:)
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Create a Sales Order with Reference to Contract using IDoc / LSMW  ( AFS )

    Hi Gurus,
    I need to crate a Sales Order with reference to a Contract. I need to upload Sales Orders with reference to contract via LSMW.
    So far, I've been able to create the Sales Order with ref to contract. But, the Sales Order Quantity is not getting deducted from the Original Qty in Referred Contract ( When try to create another Sales Order referring to the same Contract.) When a Sales Order is created manually, this is working fine.
    Please tell me if I've missed some parameter which stopping it create the link to exact schedule line ( Sizes level )
    The Details of the IDoc which is been created via LSMW are as follows;
    Message Type: ORDERS
    Basic Type     : /AFS/ORDERS05
    Process Code : ORDE / DELO
    ( Tried with both process codes.  But the Identification is the same for both: IDOC_INPUT_ORDERS )
    *_In Header;_
    Segment : E1EDK02  - IDoc: Document header reference data *
    Qualifier : '043' - Vendor Contract Number ( Tried with ' 005' - Customer Contract, but it's not working )
    Contract Order is mapped for field BELNR
    *_In Item;_
    Segment : E1EDP02  - IDoc: Document Item Reference Data *
    Qualifier : '043' - Vendor Contract Number ( Tried with ' 005' - Customer Contract, but it's not working )
    Contract Order is mapped to field BELNR
    Line Item of the Contract is mapped to field ZEILE
    I also tried passing the Schedule line of Contract in Segment :  E1J3P01 AFS IDoc: Doc.item general data
    to following fields;
    J_3AETENV
    J_3AVGETE
    /AFS/UETENR
    Still its not getting updated in the VBEP also..
    Please help me with regard to this. Points will be awarded for your valuable contribution.
    Thanks.

    Hi,
    This issue is been resolved.
    One of my friend helped me with resolving this issue..
    Once the below mentioned configurations were done on SPRO, the Sales Order was created with reference to Contract and the Qty was reflected when tried to create a new Order referring the same contract.;
    u2022     SPRO --> SD  -->Sales  --> Sales Documents  --> Sales Document Header  --> Define Sales Document Types  --> Field : Outline agreement message; from blank to u201CBu201D.
    u2022     SPRO  -->SD  -->Sales  --> Sales Documents  --> Sales Document Header  --> Maintain Sales Document Types for AFS  --> Field : Outline agreement message; from blank to u201CAu201D

  • Is it possible to link data across different/multiple PWA sites leveraging Master Project with the Subprojects feature?

    A couple different questions /similar scenarios
    1) Is it possible with Project Server 2010 to have several sites (http://server/pwa1 and
    http://server/pwa2 for example) communicate and build a Master Project at a third (or X) site (http://server/pwa3)
    2) Is it possible with Project Server 2010 to have several sites (http://server/pwa1 and
    http://server/pwa2 for example) communicate and build a Master Project at one of the original sites (http://server/pwa1 (for example))
    OR is there a better way to do this/more preferred way to do this. 
    We found this (http://social.technet.microsoft.com/Forums/projectserver/en-US/2379c3f2-6c80-46d7-8eac-3bc2ccb2d908/master-projectsubproject-with-sites-in-pwa-2010?forum=projectserver2010general)
    but its not what we're looking for
    3a) Issue/Example -
    We want to set up a site (http://server/pwa100) for just the president of the company - all the schedules of the subsites (/pwa99 + /pwa98) create a feed into an integrated master schedule/master project with subprojects(located
    in /pwa100). 
    3b-1) We also want to set up sub sites (http://server/pwa99 and
    http://server/pwa98) for each division VPs (and specific other people). These two sites would only allow specific user's project files to be viewed by each other...
    Can their project files have linkages between the two project sites (/pwa99 and /pwa98)? Meaning if user1 logs in to /pwa99 can he see a project file (given that they have permission) from /pwa98 in the same instance?
    3b-2) Can they see the project file in ProjPro and/or PWA ???
    3c) is it possible to have:
    + /pwa100 (pres)
    ++/pwa99 & /pwa98 (two vps)
    +++/pwa97 & /pwa96 & /pwa95 & /pwa-etc (minions)
    each rolling up to the next level (level 3 rolls up to level 2 which can roll up to level 1)

    kbwrecker,
    I agree with Dale. Having multiple sites will make this difficult to set up. 
    Not knowing how your Custom Groups/Categories have been set up, have you looked into using the "Project Permissions" feature to share projects. These permissions are 'additive' to the category permissions, so you could start out with people looking at the
    projects they are authorized to via categories, and then let them share/add people as needed basis. This will also satisfy the requirement of not-loading the projects with resources..
    And finally, the department and categories need not align, except that when projects from one dept are shared t another dept resource, the visibility of custom fieds will be affected.
    Hope I did not go off on a tangent there :)
    Prasanna Adavi,PMP,MCTS,MCITP,MCT TWitter: @prasannaadavi Blog: http://www.prasannaadavi.com
    Meant to get back to this earlier - your answer is close (because its what we currently do..sort-of)
    From my understanding of this issue the users are separated by department and can only see specific projects; however, when they try to share departments between users (so they can see their projects (dept a sees dept b projects)) this works - but there
    is a bigger issue/main issue.  
    main issue: when dept B adds a new project dept. A cannot see the new project in dept B.
    This can be eliviated by removing the user/s and re-adding them to the permission structure of the deptment but overall doing this several times based on user/s and projects being added it gets to be cumbersome and just plain annoying.
    Any help/additional thoughts would be great

  • Sales order with reference to quotations.

    Hello Experts ,
    I want to know how can a sales order be created with reference to more than one quotation??
    Is there a transaction to do this ?? or else its a process?? Please guide. points will be rewarded to the answers.
    Thanks,
    Arathi

    Hi Arathi Rajan,  ALL ARE GIVEN WRONG ANSWERS TO YOU : SORRY TO SAY THAT ....
    YES YOU CAN CREATE ONE SALES ORDER WITHR EFERENCE TO MULTIPLE QUOTATIONS:
    FOLLOW ME:
    1). GO TO VA01 SCREEN ENTER ORDER TYPE : OR
    ENTER SALES AREA
    2). SELECT THE ICON " WITH REFERENCE TO QUOTATION"
    AND THEN COPY THE 1 QUOTATION DETAILS, THEN IT WILL TAKE YOU TO SALES ORDER SCREEN, THERE U WILL FIND ONE LINE ITEM . OK
    3). THEN, IF U WANT TO ENTER MULTIPLE QUOTATIONS:
    SALES DOCUMENT- SELECT CREATE WITH REFERENCE AND SELECT THE MULTIPLE QUOTATIONS LIKE THIS:
    4). NOW U CAN ABLE TO CREATE THE SALES ORDER WITH REFERENCE TO MULTIPLE QUOTATIONS.
    HOPE IT HELPS YOU ,
    Thanks&Regards
    Venkat.Dhanemkula

  • Sales order with reference to contract using IDOC_INPUT_ORDERS

    Hi all,
    I had the requirement to create sales order with reference to contract based on some validations of idoc values and then passing the modified idoc data table to IDOC_INPUT_ORDERS. I have completed the coding till the modification of data in a new function module ('Z') and then calling the IDOC_INPUT_ORDERS FM inside that. Now my problem is while creating the sales order, the bdc for Txn VA01 is not populating those values to screen fields which I want to populate. I could find out that some modifs needs to be done in some user exit for reference to contract case.But finding difficulty in getting the exact place to make the modifications. Any pointer to this problem would be highly appreciated.
    Regards,
    Divya

    Hi,
    This issue is been resolved.
    One of my friend helped me with resolving this issue..
    Once the below mentioned configurations were done on SPRO, the Sales Order was created with reference to Contract and the Qty was reflected when tried to create a new Order referring the same contract.;
    u2022     SPRO --> SD  -->Sales  --> Sales Documents  --> Sales Document Header  --> Define Sales Document Types  --> Field : Outline agreement message; from blank to u201CBu201D.
    u2022     SPRO  -->SD  -->Sales  --> Sales Documents  --> Sales Document Header  --> Maintain Sales Document Types for AFS  --> Field : Outline agreement message; from blank to u201CAu201D

  • Book expenses against Internal Order with reference to PO which is created against Cost Center.

    Dear Users,
    We have an issue, we created PO against Cost Center and now we want to book its expenses(MIR7) against internal order. So if possible suggest me any solution for this.
    Thanks,
    Manoj.

    Hi
    The only other way is to post a manual JV for such a PO where in you debit the expense account with reference to IO and credit the cost center with expense account. Now do the GRN against the PO with reference to Cost Center.
    If you cannot modify the PO, unfortunately, this can be the only way out.
    Regards
    Sanil Bhandari

Maybe you are looking for

  • Problem in creating the data source in r3.

    hello gurus, i have created a view in r3 for transaction table but i am not being able to create the data source for the same. i have two fields in my table called amount n currency. when i remove those two fields then i am able to create the datasou

  • One of a kind problem with the zen micro(which i love)......... PLEASE HELP me bring it back to l

    [color="#ff6600" size="4" face="Verdana">I have a creative zen micro and when i try to turn it on?i get?the blue glow but it only goes to the screen that says creative with the copyright info?then it'sfreezes?there and i have to take the battery out

  • Existent components disabled for maintenance, EPM 11.1.2.2 11.1.2.3

    I'm trying to do a maintenance release installation of EPM 11.1.2.3 on top of 11.1.2.2 and am getting "ERROR: There are existent components that are disabled for maintenance install.  Please, review the reasons why the components are disabled, resolv

  • Best Wireless router for Macbook?

    I currently have a linksys wireless router, which I'm beginning to find out will not support my Macbook in using the wireless airport network I have. Has anyone used another wireless router (other than Airport/Airbase) that works well and is easy to

  • APD creates CSV file as soon as it is executed altough the CSV is last step

    Hi, I have an APD with three steps: 1. read a query 2. remove records with figures = 0 3. generate a CSV file As soon as the APD is executed the CSV file is generated. However it needs 5 minutes at least to really execute the query (step1 & 2) and fi