How to get JIT scehdule lines for delivery creation?

Guys,
I have created a JIT scheduling agreement using order type LZJ and i have both forecast and JIT delivery schedules. Now when i am going into VL10E i am not able to see any schedule lines for that scheduling agreement, so if you guys have any ideas please reply..
I have MRP for DS type is D - Requirements by validity and deliveries by JIT.
thanks
Aman

Make sure you have:
  Sold-to Customer
  Ship-to Customer
  Purchase Order Number (doesn't have to be entered in the system)
  P.O. Date
  Valid From Date
  Valid To Date
  Enough Material in stock to fill the Delivery
  Open Quantity in the JIT tab.

Similar Messages

  • Validation in Accounting-how to get it to work for PO creation?

    Hi!
    I created a validation rule from GGb0 to limit cost center assignment to some G/L expence accounts.
    It works great for all the transactions that get posted to BSEG: Journal Entries, IR, GR.
    How can i get it to work (to validation if it is a correct cost center with G/L expense account) during creating a PO type K (for expense PO's) from ME21N?
    I know that it is a complete set of tables and PO is not triggering the validation because it is not creating a FI document, but i still need it to work!
    Any ideas?
    Points will be assigned!

    Hi,
    Can you please list out the coding done with this validation rule in Controlling via tcode OKC7 and/or GBB0.
    I am using R/3, V 4.7 and not ECC.
    While creating a Purchase Order or Purchase Requisition, Project expense account should only generate a validation error when an Account Assignment Category K (Cost Center) is selected but should not generate any validation error when the same project expense account is selected with an account assignment category A (Asset). Please note that this project expense account is commonly used expense ccount in PR/PO for thel fixed asset purchases and would like to have a validation rule so that it cannot be used with any cost center. Figured out there are two options 1. BAdI User Exit and 2. CO Validation Rule.
    I would appreciate if anyone has the detailed coding part of the complex CO validation rule via OKC7 and commitment management part?
    Regards,
    Srinivas Puppala
    Edited by: Srinivas Puppala on Aug 10, 2009 8:13 PM
    Edited by: Srinivas Puppala on Aug 13, 2009 5:30 PM

  • How to get the baselinegrid position for a line?

    Hi All,
    How to get the baselinegrid position for a line in a paragraph?

    Hi,
    2nd line baseline grid for yourPara paragraph is:
    yourPara.lines[1].baseline;
    last line baseline is:
    yourPara.endBaseline;
    Jarek

  • No Schedule Lines for Delivery upto selected date

    Hi,
    I have a scenario for Repairs order. Following are the steps of my scenario:
    1. Create a Repair Order.
    2. Create return delivery to recieve the faulty item.
    3. Create Outbound Delivery to send a loaner item to customer (This item would be returned once the returned item is repaired and sent to customer)
    4. Send the item after repairing.
    5. Receive the loaner item.
    When I am trying to create outbound delivery for Loaner item, i am getting an error "No Schedule Lines for Delivery upto selected date".
    I have checked and verified the schedule line date.
    I have checked for Confirmed Quantity.
    Below are the screenshots. Please let me know how can this issue be resolved.

    Hi,
    With reference of your screens,I can see there is no qty in the field loner hence you are getting issue.
    1.May I know ,why you have checked indicator -Repair?
    because ,you are not going to repair the goods.You are just sending loner items to customer.In this case what is the use of to indicate repair ?.
    Thanks,
    Naren

  • How to get balance sheet report for profit centers

    hi
    how to get balance sheet report for profit centers, is there any transcation code to get that report or i need to create a report painter report for this

    Hi,
    You can use T. code KE5Z for actual line items.
    More to this you can use program RFBILA10 (Use T. code SE38 and program RFBILA10) for complete blance sheet.
    The transaction is for special purpose ledger but this program RFBILA10 can be used for profit center balance also.
    In selection, you can give ledger name which is generally 8A for profit center ledger.
    Reg

  • In VL10C,Unselected Line items are copied for delivery creation in VL01N

    Hello,
    I am trying to create outbound deliveries for an sales order using t.code VL10C. when I execute VL10C,it takes me to next screen with all sales order line items where i am selecting some line items & select Dialog button for delivery creation. In this case all line items of the sales order get copied into VL01N screen instead of copying only the selected line items.
    What may be the issue? Is this standard functionality of VL10C transaction? my requirement is  to create delivery for selected line items using VL10C transaction.
    Regards
    Goutham

    hi All,
    It's a standard SAP process... See OSS note 453947...
    For me it's a bug, not for SAP....
    But create deliveries for only selected item work in backgroung process ! According to user role parameter "selected items"
    Source code :
        SET PARAMETER ID 'VST' FIELD <cs_postab>-vstel.
        SET PARAMETER ID 'AUF' FIELD <cs_postab>-vbelv.                       -
    > only order number (not item)
        SET PARAMETER ID 'ALT' FIELD SPACE.                       "n_810897
        EXPORT lv50c-datbi FROM lf_datbi TO MEMORY ID 'LEDAT'.
        EXPORT d_tcode     FROM sy-tcode
               enque       FROM cx_list_profil-enque              "n_602290
               TO MEMORY ID 'CALLING_TCODE'.
        CALL TRANSACTION 'VL01N'  AND SKIP FIRST SCREEN.
    regards.

  • How to create a dashed line for cell border

    Hi,
    Is anyone know How to apply the style for cell border to get the dotted line in WinRT 
    In WPF i will get the dotted line for cell border using this way.
    <DrawingBrush Viewport="0,0,20,20" ViewportUnits="Absolute" TileMode="Tile">
    <DrawingBrush.Drawing>
    <DrawingGroup>
    <GeometryDrawing Brush="Black">
    <GeometryDrawing.Geometry>
    <GeometryGroup>
    <RectangleGeometry Rect="0,0,50,50" />
    <RectangleGeometry Rect="50,50,50,50" />
    </GeometryGroup>
    </GeometryDrawing.Geometry>
    </GeometryDrawing>
    </DrawingGroup>
    </DrawingBrush.Drawing>
    </DrawingBrush>
    Thanks in Advance,

    check this thread: 
    http://stackoverflow.com/questions/14673643/windows-store-apps-how-to-draw-a-dashed-line
    Fouad Roumieh

  • How to get automatically batch no in delivery level?

    Dear Expert
    How to get automatically batch no in delivery level?
    Thanks for Advance

    hi,
    answering to your question.
    please go IN SPRO - LOGISTICS GENERAL - BATCH MANAGEMENT - BATCH DETERMINATION AND BATCH CHECK &  you need to CONFIGURE what ever comes in the name of SD.
    hope this clears your issue
    balajia

  • How to get rid of lines on photo prints???

    PSE12 win7 64 bit; HP OJ 7680; HP OJPro 8630;
    all photo prints have horizontal lines (like grid lines);
    same for psd and jpg;
    same on different computer;
    same photo printed using Photo Gallery has no lines; 
    How to get rid of lines in PSE12???

    If you have layout showing you will see the borders of text boxes. Go to the View menu & choose Hide Layout & see if they disappear.

  • How to get the last error for while loop?

    How to get the last error for while loop? I just want transfer the last error for while loop, but the program use the shift register shift all error every cycle.

    What do you mean by "get" and "transfer"?
    If the shift register is not what you want, use a plan tunnel instead.
    Typically, programmers are interested in the first, not last, error.
    Can you show us your code so we have a better idea what you are trying to?
    LabVIEW Champion . Do more with less code and in less time .

  • How to get title templates library for CC?

    How to get title templates library for CC?  Do you have to download and install PP 6 to get them?

    Try here Library, title templates, template projects missing: Premiere Pro, After Effects, Encore

  • I went to add my iPod to another computer and when I did it re-bought all of my music and I would like to know how to get my money back for it?

    I went to add my iPod to another computer and when I did it re-bought all of my music and I would like to know how to get my money back for it?
    anyonr know how I can get my money back????????

    Go to Settings>General>Reset>Erase all content and setting. Then re-setup the iPod with your account/media. To redownload iTunes purchases see:
    Downloading past purchases from the App Store, iBookstore, and iTunes Store

  • How to get 64 bit version for premiere elements 12

    How to get  64-bit version for Premier Elements 12 ? 
    I download from ADMISY site.
    Click on win 64 bit and download it.
    When I try to install ther is a error  this download version is not for 64 bit I have try many times but same result

    Hello
    I have been away some days
    ADMISY is a software partners for Adobe
    I running Win 7 Home Edition
    I have received a card with a code when I bought the program and the I
    download from ADMISY
    Sending serial and installation warning
    PhotoshopElements_12_WWEFDJ.7z
    PhotoshopElements_12_WWEFDJ
    PremiereElements_12_WWEFDJ_win32.7z
    PremiereElements_12_WWEFDJ_win32
    I can not find a 64 bit version of 32-bit or 64-bit version of downloads
    This is information I have
    Best regards
    Erling Magnusson
    2015-02-04 22:33 GMT+01:00 Adobe Forums <[email protected]>:
        How to get 64 bit version for premiere elements 12  created by A.T.
    Romano <https://forums.adobe.com/people/A.T.+Romano> in *Premiere
    Elements* - View the full discussion
    <https://forums.adobe.com/message/7162950#7162950>

  • How to get the depreciation areas for an asset in particular period

    Hi frndz,
      how to get the depreciation areas for an asset in a particular period for writeup or manual depreciation method.
    Thanks and regards.
    Harisumanth.Ch

    Try table ANLB, then read ANLC.
    Regards.

  • How to get the version no. for service po?

    Hi,
    How to get the version no. for service po?For material po we are getting the version from EKKO-REVNO but for service po Ekko-revno is blank.
    Regards,
    Rachel.

    Hiee,
    It is not like service PO does not have revision.
    REVNO will only exists for any document if amendment is made after releasing it. If in EKKO for all service PO revision number is blank then test if version management is active for document type
    MM->Purchasing->Version management -> External documents
    Here check for your doc type and purchase org version management is active.
    Regs,
    Appie

Maybe you are looking for

  • Import statement question

    what's the difference between import java.util.Vector; and import java.util.*; is there any difference in bytecode generated? or time takes to compile? what's the best practice?

  • Error -Adding HL Item (LIPS-UEPOS)  when changing outbound delivery(VL02N)

    Dear SDN members, I have a requirement of adding new sub item (LIPS-UEPOS) for a main item  during changing of outbound delivery VL02N .I am using idoc type WHSCON/DELVRY05. I am passing LIPS-UEPOS(say 10) in segment E1EDL24-HIPOS and also matnr , po

  • Check Printing in french language

    Hi, After upgrade from 4.6C to ECC 6.0, when we tried to print check in French language, the amount in words( in the check ) are still getting displayed in english. Please advise us how to convert the text into French instead of English. The output w

  • Pass Finder reference between Automator and Applescript

    Hi - This is doing my head in ! I have an Automator script that encrypts a PDF and then runs an AppleScript within the Automator workflow that does a rename on the resultant encrypted PDF. The result of this workflow is a filename I need within anoth

  • Row chaining problem

    hi as far as i know row chainig is the process in which when a rows is unable to fit in one datablock.... it just strips into more than one block using formation of chunks. i just want to know that whether this allocation is always done in contigous