Hi,
We have below requirement in Spare part Kitting process
1)
Client  makes compressors, which obviously have a lot of components, where one of the prime part is valve.
2)
Valve Kit is a finished product having components which are used in regular unit production also, where MRP Type can be VV or PD.
3)
This valve kit sold as a spare part.Customers buy these kits and typical assembly time is 1 day.
4)
This kit is not kept in stock and is assembled after receiving an order.
5)
To be ready for customer orders, client forecasts these kits (about 10000) and drives the demand for lower level components.
6)
When customer places an order, legacy system promises the dates based on availability of components. Date is promised to the customer based on the availability of the components. Also the requirement is passed on to the floor to assemble and shipped the same day.
7)
To meet above requirement, we proposed to use Forecast based planning, where system will create planned order for Kit assembly & component can be planned.Knowing there is a back drop i.e. planned order created thru forecast can be converted into production order.
8)
Then demonstrated “ATO – Assemble to Order” functionality in SAP. This uses strategy group 81 for the kit material XX-XXXX-XX. When a sales order is created for a material with strategy group 81, system immediately creates a planned order and as per component availability, proposes the next available date of the assembly.
9)
Since ATO is an MTO process, Planned order is tied to Sales Order and when production order goods receipt is done, stock is received into Sales Order stock. Hence Sales Orders do not consume the forecast.
10)
Question here is how to consume the forecast? When sales order is shipped system is not updating consumption data? This is important as today they use the consumption values to execute the forecast.
If any one has come across similar requirement, please give other options keeping below points in view
1. We should be able to plan valve kits may be thru forecasting or PIR's. This to start procuring components.
2. When sales order is created, system should do availability check at component level.
3. Consumption data should be updated if we use forecasting to plan kit or if we use PIR's, sales order should consume the demand. Consumption of forecasting requirement is also required.
Thanks in advance.
Hari

Hi ,
Looks like problem is due to
- Need to do ATP at componnent level  which is only possible with Planning  strategy 81,82. You cannot use planning strategy 40( 40 considers forecast , sales order & consumption)
- 81 ,82 planning strategy doesn't consume forecast for End item(Sales order entry material)
You could use Sales order BOM function. It is provided for selling Kits. BOM is exploded in sales order & kit items are put as seperate sales order items ( 20... 30... 40 ) Here are steps.
-  Create BOM with usage 5- Sales order relevancy of bom components is Ticked
- Create Sales order with item which is BOM header. System will explode BOM & all items will be part of sales order as item.
- You can configure Sale Price at End FG level, Inventory management( DO issue) at item /components level .
- Forecast will be consumed at end item level.Need configuration
- ATP check can be performed at componenet level
Only thing is you will not have Plan order for doing assembly & there is no cost captured for assembly . Kitting donot involve much labor time.
Hope it helps
Jatin

Similar Messages

  • Spare parts Demand Planning and Forecasting SCM

    Hi ,
    I am APO DP consultant can any body help me on questions on AS-IS and To-Be analysis Of Spare Parts Demand Planning and forecasting in SAP SCM.
    If You have any Documents or links or nay information on these please give replay.
    Ram

    Dear Ram..
    SPP is purely base on BOD (Bill of Distribution)..
    following are the points u can cover in AS is TOBE..
    1. On what Level (Chs) the Client performing Spare Parts Planning?nd how u want to disagreegate on lowest level ie.Hierarchy Level?
    Ex. from Region..to Branch..to ..Customer..
    2. Have u configured Spare Parts in R/3?
    3. What is the Pattern of Sales History?Seasonal/Trend/Constant  etc?
    4. u can ask questions on Deployment...Inventory?
    5. What is the Lead Time for Procurement?Distribution?Transportation?
    for more details...
    http://help.sap.com/saphelp_scm50/helpdata/en/a3/7ed240caeb752ae10000000a155106/frameset.htm
    Rajesh Patil
    SPINNOVATION

  • HP 15 Series Keyboard Spare Parts Kit

    The Service Guide for the 15 Series mentioned a Keyboard Spare Parts Kit. Anyone know where to get one?

    Hi
    Please find the link given below might help you check page 36 Chapter 6 Removal and replacement procedures for Authorized Service Provider for parts number.
    Manual Link
    Let us know how it goes!
    "I work for HP."
    ****Click the (purple thumbs up icon in the lower right corner of a post) to say thanks****
    ****Please mark Accept As Solution if it solves your problem****
    Regards
    Manjunath

  • How to change spare part item price in sap

    Dear All,
    Can you tell me how to change spare  part item price in sap ,
    like in our company hike new price of spare part item so how can update a new price in bluk order
    thankx and Regards
    Pritpal

    Hi,
    Try MR21 & MR22.
    First assign the appropriate G/L account against the account key for the same.
    Regards,
    Sourabh

  • How I can map "Sales Target Planning" in SAP?

    Hi All,
    I am working in Sales & Marketing in a Logistic Service Provider Company.
    Our Product is Container (in which RMG & other commodities are transported
    via ship from/to all over the world). Our Sales Target is planned in yearly
    basis on Quantity of Containers, Number of Buyers, Different Corridors,
    Different Commodities etc etc. How we can map our Sales Target Planning in SAP?
    Regards,
    Syed Waseem Reza

    Sir,
    Can you please let us know the high level process flow you have already mapped? I am facing the same problem.... I am here delivering my existing process flow.
    We didnu2019t go for any other special module of SAP
    The General modules of SAP including
    u2022     SD(Sales & Distribution),
    u2022     MM(Material Management),
    u2022     WM(Warehouse Management),
    u2022     LE (Logistic Execution),
    u2022     FI(Finance), CO(Controlling),
    u2022     FA(Fixed Asset)
    Basic Process Mapping:
    u2022     SO(Sales Order) may create directly or against Qut(Quotation)
    u2022     All SO line item will create the PR (Purchase Requisition)
    u2022     Warehouse does the GR (Goods Receive) against PR indirectly SO.
    u2022     Empty and Laden Container enters to Warehouse as a material received.
    u2022     TO (Transfer Order) of Goods to the Bin Location
    u2022     Creates the Outbound Delivery against GR.
    u2022     Picking of Goods from WH Bin to Deliver Place
    u2022     Packing of Goods to the Container as per Shipment.
    u2022     Outgoing Invoice for collection against Outbound Delivery
    u2022     Incoming Invoice for payment against Shipment Cost.
    Management wants to give one sales target such as...
    Year -SO-----Material Group---Material Group
    --(20' Container)-----(40' Container)
    2009-----10,0004,000--
    2,000
    and in the end of the year, Management wants to see the see the following report.
    Year      Targeted      Achieved     Target(20') Achieved(20')  Target(40')  Achieved(40')
    --SOSO-----
    2009-----10,0008,0004,0002,0002,000--
    1,500
    For this I have to store my sales target in any of SAP document, because i have already all the Achieved information in my existing system, because material groups are keeping in the Shipment/Packing phase of the process, So i can easily make the report, but i cant get the Target as I don't have any place to store the same.
    Can anybody help me to proceed?
    Rgds
    Farhad
    Edited by: Farhad Islam on Jan 31, 2009 6:49 AM
    Edited by: Farhad Islam on Jan 31, 2009 6:49 AM

  • Dealer Management System,Dealer Communication System,Spare Part System SAP?

    Hi,
    Can anybody explain me "what are the oppurtunities for Dealer Management System(DMS), Dealer Communication System(DCS) and Spare Part System(SPS) on SAP ? All are for Auto and Track Dealers ?
    Thanks and best regards,
    Behcet Ahmet Aksoz.

    Hi Behcet Ahmet Aksoz.,
    Please check the subject of the forum. This forum is only for SAP Business One user. Please close your thread.
    Thanks
    Gordon

  • Warranty for Spare parts (MRO)

    Hello Experts
    I would like to know how does warrantly for spare parts (MRO) works in SAP. I am new to it and keen to know what is needed to set up from Master data set up perspective and what benefit it gives in terms . How does the process works.
    Many Thanks
    Guarav

    Hi,
    As far as my knowledge warranty is not for spare parts, it is for technical objects, like equipment.
    To run warranty chech you have to define
    warranty types
    Warranty categories
    Define number ranges
    Warranty counters
    Then you have to create master warranty records in t-code BGM1 after saving it will give warranty number
    This warranty number you have to speciefy in equipment master
    Kapil

  • Spare part -- Fixed asset ???

    Experts
    We have spare parts as inventory in our plant.  If we want to capitalize the spare part,
    1. Can SAP handle this process?
    2. If so, what is the steps need to be taken?
    Thanks

    Use Asset Accounting Module
    Create Asset class/Account determination and assign GL accounts and create new depreciation key.
    Create assets for ispare parts and assgn life and depreciation key.
    Contacting your FI consultant helps you a lot
    Srinivas

  • SAP PM-MM Linkage for spare parts planning

    Hi
    I need to know the linkages between SAP PM-MM for the spare material... do any one came across this concept ?
    - Pithan

    1.If you create PR for spare part from Maintenance order , when goods receipt comes to stores automatically notification gets created ,this setting is done in Material Master record.
    2.You create Equipment BOM & attach it to equipment , for easy way of putting this into order during planning.
    3.You can check Material Availability in Maintenance Order.
    4.You can define the scope of Check in "Availability Check for Material" , in Spro Customize , you define check should include Material in PR , PO or Quality inspection & other.
    5.From Task list which you have planned , you can check how much quantity is currently available or when to procure.
    6.You can define default external profile settings for external mat in SPRO settings
    regards

  • Deletion OF schedule LInes from APO SPP(Spare Parts Planning) through ABAP.

    Dear All,
    I need to delete the schedule Lines from APO SPP(spare parts planning ) system.I am looking for any available BAPI provided by SAP for this purpose.Please provide me help if any of you folks previously in your project went through this requirement.
    If any other way is there other than BAPI please suggest.
    Regards
    Mukesh Pandey

    Hi Siddartha,
    That option is not working.
    Thanks

  • Spare part Planning for Breakdown maintenance

    Hi... Gurus ,
    how we maintain the minimum or maximum spare inventory in stores Dept. for Maintenance Purpose in SAP ?
    so the breakdown will not be delay due to spare not available in the stores.
    or i need one other storage location for kept that critical spares in it.
    Please suggest the correct way to do ....

    In Spare Parts Material Master, under MRP view, you can maintain the planning details like Safety Stock, Reorder Point, MRP type (Manual Reorder Point Planning), etc.,
    By running MRP on some periodical basis, system will create PR for the required items for which stock goes below the Reorder Point.
    By this, spare parts stock can be maintained properly without affecting Breakdown Maintenance.

  • "Manual Planning in SAP Retail w/o MAP

    Hi
    Can we create "Planning Scenario in SAP Retail w/o MAP " ?
    Can we do manual plannings in SAP Retail w/o BI , MAP? if so whats the limitation?
    Which are possible  for the following scenrios in SAP Retail w/o MAP /BI
    1. Planning Scenario ( Budget Plan )
    2. OAPC
    3.OTB Plan
    Simply, Whats the limitations of SAP Retail in Planning?
    Can anyone explain me clearly and if any documents for the above will be greatful
    Regards
    Anis

    Hi Anis,
    Sorry it is not possible to do manual plannings in SAP Retail w/o BI , MAP.
    It need integration with BI.
    Regards
    jiten

  • Unable to view Spare Part Components in SAP CRM Service Order

    Hello All,
    We are implementing CRM 7.0 Ehp 2.0
    As per the following video it is now possible to integrate the spare part components in the CRM Service Order, using the BOM replication and Product Proposal functionality in SAP CRM
    SAP CRM 7.0 - Integration of ERP BOM Information in the CRM Product Proposal
    However in our case we are not able to achieve the desired results.
    Following configurations are done
    1) The BOM is replicated from ECC to CRM the same can be viewed in commpr01
        Material 4561 is the main product and 4562 is the component
    2) The item category for the main product is YRVS where the customization for structure scope is done
    3) For the Product Proposal customization's, I have created a new method schema
    4) The transaction type and the sales org are assigned to the method schema
    5) However now when I am creating the service order, I enter the sold to party, the product id
    6) Next  I go to the line item to click on product proposal.
    7) The system issues the below message
    Please advice if I am missing on any configurations.
    Kind Regards
    Atul

    Hi Raghavendra,
    Thanks for your reply, appreciate the same, I have now added the relationship objects as per your post above in comm_hierarchy for the particular category
    Now  in the product master , I am now able to view the tabs(screen shot attached)
    Next I create my BOM in ECC with BOM Usage 5 and save the same
    Next I run the initial download for the adaptor object  BOM in SAP CRM
    When I check in commpr01 for the material 4561 the component and the main material have not come.
    Can you please advice further.
    Kind Regards
    Atul

  • Spare Parts Reservation in SAP DBM

    Hi all,
    Greetings..!
    In SAP DBM, if i create the spare parts reservation for service order, i am not able to see who has created the reservation in MB24.
    The column(User Name) is always empty.But if i create the normal reservation through Tcode MB21, the User name is getting appeared
    Any idea to resolve this?
    Regards,
    Rangakarthick

    Hi,
    The username who created the reservation is in field RKPF-USNAM.
    In standard DBM this field is not filled during execution of action RESERV_UPDATE
    when DBM order is saved and reservation is created.
    Therefore in MB24 you cannot select reservations with selection of User name.
    You can try to create customer BADI implementation of BADI /DBM/BADI_OE_ACTION_EXECUTE which should be executed after DBM standard implementation /DBM/ORD_AX_RESERV_UPDATE.
    Find details in configuration book of order engine.
    The username is pouplated e.g. in MS_VBAK_COM-ERNAM of object DBM-order.
    So, if reservation is created with standard implementation you can try to change RKPF-USNAM with the user who is creating the DBM-order.
    Hope this helps.
    Regards
    Joachim

  • SAP MAP - Best Choices for Planning Technical Basis

    Hello, experts!
    For today there are 3 variants of MAP planning scenaries implementation:
    1.Planning and reporting via MAP Business content for BI Integrated planning
    2.Planning and reporting via MAP Business content for BPS
    3.Planning in ECC based MAP functionality and reporting in BI
    Whether there are recommendations which alternative is more suitable, pro/cons?
    It is possible to use standard MAP workflow scenaries with planning in BPS or BI Integrated planning ?
    Regards,
    Dmitry.

    1.     BW Integrated Planning is the new SAP MAP Planning Solution. There is a also BI Content with predefined templates on BI Content 7.04. The next BI Content 7.05 will include many more out-of-the-box Templates.
    a.     7.04 includes predefined templates for Strategic-, Store- and Merchandise Plan for RMA and CMA. Additionally there is a basic template to do seasonal Assortment Planning on Assortment/Style/Color/Size level in MAP and send it to the Operational Assortment Planning and Control in ECC. But no templates for non-seasonal Assortment Planning.
    i.     http://help.sap.com/SCENARIOS_BUS2007/helpdata/EN/b4/982c4142aef623e10000000a155106/frameset.htm
    ii.     http://help.sap.com/SCENARIOS_BUS2008/helpdata/EN/72/164a4135fff66fe10000000a1550b0/frameset.htm
    b.     7.05 is the enhancement of 7.04 by non-seasonal Assortment Planning and size-curves and images for seasonal Assortment Planning.
    c.     http://wiki.sdn.sap.com/wiki/display/Retail/SAP%20Merchandising%20and%20Assortment%20Planning%20%28SAP%20MAP%29
    d.     https://wiki.sdn.sap.com/wiki/display/CK/Implementation%20Guide%20Merchandise%20and%20Assortment%20Planning%20Integration
    e.     RampUp Knowledge Transfer for internal use https://websmp105.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700003584172005E
    2.     BW BPS is our old Planning Platform. Don´t use it anymore. There's also no migration option to BW Integrated Planning.
    3.     The (very!) old ERP-based MAP functionality is not supported anymore, thus don't use it. All development goes into the above mentioned (1.) SAP MAP solution based on BW Integrated Planning.
    In connection with Integrated Planning, Operational Assortment Planning and Control (OAPC) is the ECC application to plan your seasonal Assortment. The OAPC will get input from SAP MAP either on level Assortment or on level Assortment/Style/Color/Size. Depends on the customer requirements.
    a.     http://help.sap.com/saphelp_erp60/helpdata/en/7f/2d6241bb688047e10000000a1550b0/frameset.htm
    Hope this helps!

Maybe you are looking for

  • Macbook crash on sleep after disconnection from cinema display

    Hello, I bought a black macbook core 2 duo a few months back as a replacement for a 1.5 GHz 12" powerbook G4, and I'm beginning to wonder if I made a terrible mistake as the Macbook frequently crashes on sleep which has caused a major disruption to t

  • Parse XML in a java stored proc

    I am trying to parse an xml document in a java stored procedure. Just following my nose, I have developed a stored proc that works fine in development (outside the database using JRE 1.4.1) using the Xerces 2.5 parser. But, after having transferred t

  • I am not seeing export to Excel option in SharePoint 2013 survey (even in the overview view mode)

    Hi If anyone could point me in the right direction as to what steps to take to enable the export to excel option in a sharePoint survey list. all other surveys are showing up that export to excel option. I am not seeing the view dropdown as well whic

  • Archiving Jobs

    Hi Friends, I have archived the data from ODS. After completed the process there are 3 finished jobs in sm37 with different time duration. As my knowledge one is for dleting the records and another one is for writing the records. But what about the 3

  • Error 3194 on windows on itunes updating ipod touch 5g

    i have ipod touch 5g 32gb running 7.0.1 then update it to 8.0 then update to 8. something i cant remember then after screen has a connect to itunes logo forever!. i connect to itunes then click recover then and after an update it says error 3194.