Message with IDOC number, created by LSMW, missing in job log in SM37
Hi gurus,
We have a temporary interface which uses LSMW to create IDOCs and update in SAP. It's used for materials, BOMs and document info records. In LSMW we have defined standard message types MATMAS_BAPI, BOMMAT and DOCUMENT_LOAD for the IDOCs. All these have the same problem.
A background job runs and starts LSMW. In the job log in SM37 I want to see which IDOCs were created. For some reason this is different in my development system and my test system, and as far as I know all settings should be the same. In the test system LSMW creates more message lines in the job log, than it does in the dev system. Message number E0-097 is "IDOC XXXX added", and this is missing in the dev system.
This is what it looks like in the dev system:
Data transfer started for object 'MATMAS' (project 'X', subobject 'Y') /SAPDMC/LSMW 501 I
Import program executed successfully /SAPDMC/LSMW 509 I
File 'XXX.lsmw.read' exists /SAPDMC/LSMW 502 I
Conversion program executed successfully /SAPDMC/LSMW 513 I
Data transfer terminated for object 'MATMAS' (project 'X', subproject 'Y') /SAPDMC/LSMW 516 I
And this is what it looks like in the test system. More information, which is exactly what I want in dev system too:
Data transfer started for object 'MATMAS' (project 'X', subobject 'Y') /SAPDMC/LSMW 501 I
Import program executed successfully /SAPDMC/LSMW 509 I
File 'XXX.lsmw.read' exists /SAPDMC/LSMW 502 I
Conversion program executed successfully /SAPDMC/LSMW 513 I
File 'XXX.lsmw.conv' exists /SAPDMC/LSMW 502 I
IDoc '0000000002489289' added E0 097 S
File 'XXX.lsmw.conv' transferred for IDoc generation /SAPDMC/LSMW 812 I
Data transfer terminated for object 'MATMAS' (project 'X', subproject 'Y') /SAPDMC/LSMW 516 I
In both cases the IDOC is created and update works fine.
My only issue is that I can't see the IDOC number in the dev system. I know I can get the IDOC number in WE02, but in this case we have program logic which reads the job log to be able to check IDOC status before sending OK message back to the other side of the interface.
I hope any of you can have an idea how I can update somewhere to get message E0-097 with IDOC number into the log.
Regards,
Lisbeth
Hi Arun,
If you want to show your messages in the job log you have to use the MESSAGE statement. In case you use WRITE statements an output list be created which can be found in the spool (there is an icon to go to the spool directly).
Regards,
John.
Similar Messages
-
How can i get a copy of my ipone messages with the number, date and time stamp?
How can I get a copy of my iphone messages with the number it was sent from and the date and time stamp? Needed for court purposes.
Try the computer apps PhoneView (Mac) or TouchCopy (Mac & PC):
http://www.ecamm.com/mac/phoneview/
http://www.wideanglesoftware.com/touchcopy/index.php
You should probably consult your attorney to see if either of these will be acceptable. -
Whenever I try to buy a song on iTunes it gives me an error message with this number:0x800B0101. Help!
Drrhythm2 wrote:
What's the best solution for this? I
Copy the entire /Music/iTunes/ folder from her old compouter to /Music/ in her account on this new computer. -
F110 " Error in creating the payment document; read job log"
Hi all,
when i execute payment in Tcode F110, getting message " Error in creating the payment document; read job log".
Log for payment run for payment on 30.07.2009, identification TEST1
Error in the recovery of constants
Information re. vendor 1000040256 / paying company code BG10 ...
... payment not possible because of reported error
Because of it, the payment file is also not generated.
The status says " Payment run has been carried out".
But when the open items are cleared.
What could be the reason for this error message?
Regards,
VidyaHi,
As the document is in the cleared status, you can try finding out with which run date and run id the documents got cleared. Go to Transaction code SE12 and give the following details - Company code, vendor code and the payment documents (clearing document for the invoice) or you can also give the invoice document numbers and fiscal year.
The output will tell you which payment run id and run date was used to process the payment.
Hope this will help you understand what has happened.
Thanks and Regards,
Anit
Edited by: Anit Mangat on Jul 30, 2009 4:38 PM -
Error in creating the payment document; read job log
Hi All,
Recently we are upgraded to EHP4 pack. While running the payment proposal for the vendor I am getting the error 007 "Error in creating the payment document;read job log" Details of job log is as follows
> Due date determination additional log
> Document 1100001518 line item 001 via ILS 694.00-
> Terms of payment: 05/23/2011 60 0.000 % 0 0.000 % 0
> 01 days grace period is being considered
> Maximum cash discount should always be taken
> Payment must take place before 07/23/2011; next payment on 07/27/2011
> Item is due with 0.000 % cash discount
Internal error: doc.balance not zero / comp.code SNXL vendor 1009530510 customer
Balances: 2,052.00- ILS / 2,052.00- ILS
>
> Posting documents additional log
> Currencies in line 1: ILS / ILS Currencies in line 2: USD / ___
> Document company code SNXL currency ILS payment method T
> LIt PK Acct RA Amount Tax
>
> 001 38 2001520500 3,420.00 0.00
> 1,002.02 0.00
> 002 50 0032118400 1,026.00 0.00
> 297.21 0.00
> 003 25 2001520500 72,645.00 0.00
> 20,879.23 0.00
> 004 50 0032118400 21,793.50 0.00
> 6,312.93 0.00
> 005 50 0010009101 48,457.50 0.00
> 14,036.70 0.00
> 006 40 0096100000 0.00 0.00
> 769.63 0.00
>
Information re. vendor 1009530510 / paying company code SNXL ...
I have checked the configuration of FBZP The configuration settings is correct. Can you please help to solve this problem
Regards
GirishHi Girish,
You should be having error FZ326.
Please kindly refer to the following link in order to solve the issue:
http://wiki.sdn.sap.com/wiki/display/ERPFI/PaymentProgram-ErrorMessageFZ326
or
http://wiki.sdn.sap.com/wiki/x/jY3YCw
Apply all notes that are relevant to your support packaged.
Kind Regards,
Fernando Evangelista -
LSMW with Idocs directly created
Hello,
I'm using the LSMW with Idocs for the migration of business partners in CRM.
During the step "convert data" I have the choise to create the Idocs directly (without creating the file first).
Some days ago everything was well working. But without knowing what I've changed in LSMW, this is no longer possible.
I get the same screen as when I want to create a file ".conv", but the name of "converted file" is not named. Instead there is a message "no directly creation of Idoc"
What do I do wrong? What do I have to change?
Thanks in advance!
Nicoleyou have to always convert the data after reading the data.
please check in the specify files section you have given the file name for the converted data in the application server.
you will not get the option to create idocs directly in the convert data step.
please let me know if you any more details.
regards
vivek
reward points for all the useful answers -
Question on linkage of idoc with document number created in SAP R/3
Hi all,
I have a query related to IDOC.
When inbound IDOC is posted into SAP R/3 it creates Material document number or billing document number is generated in SAP R/3.
Question: <b>Do we have interface monitor in SAP R/3 Where I can see the linkage of Idoc number with the document number created in SAP R/3.</b>
Need your help on this any suggestion will be greatly appreciated.
Thanks & Regards
PrabhatI'm not sure if this is what you are asking for, but you can look at the IDOC in WE02/WE05 and look at the header segments to get the document number.
-
Finding message in SAP Business Connector with IDoc number
Hi Experts,
Since there is no separate forum for Business Connector, posing my question here.
Does anyone have idea how we can find a message in SAP Business Connector if we know the source IDoc number, the same way we use IDX5 in PI.
Thanks,
DhawalAFAIK there is no simple way. What I usually do is compare timestamps. The Idoc is usually processed on the B.C. within the same minute.
We only have up to 10 Idocs within one minute and I do not have to search every day. So it works for me. -
Get Idoc Number created through BD14
Hi,
I want to send some vendor details from SAP side to other system.And for that I am submitting BD14 using some vendor numberand message type cremas.
Now whenever we execute BD14 transaction with a vendor it will create one idoc number.
Now please let me know can we get this idoc number?
If i go to we02 i can see that but i want the table from where i can get this idoc number as i want show it in my final report output.
Edited by: Julius Bussche on Sep 12, 2008 4:45 PMHi
Its very simple.
Use function module SREL_GET_NEXT_RELATIONS
where :
GWA_OBJECT-OBJKEY = VENDOR_NUMBER.
GWA_OBJECT-OBJTYPE = 'LFA1'.
CALL FUNCTION 'SREL_GET_NEXT_RELATIONS'
EXPORTING
OBJECT = GWA_OBJECT
TABLES
ROLES = GT_ROLES .
DELETE GT_ROLES WHERE OBJKEY EQ VENDOR_NUMBER AND OBJTYPE EQ 'LFA1'.
After that, you will get IDOC number in the OBJKEY field where OBJTYPE = 'IDOC' -
RC1_IDOC_SET_STATUS Program - Message Type & Idoc Number
Hi All,
Good Morning.
We use the SAP Standard Program RC1_IDOC_SET_STATUS to convert the status of Idocs. Recently, we had encountered a behavior which we havent come across before.
The selection screen has the IDOC number, the message type, the current status and the new status. There is an additional trial run checkbox as well.
(1) If the IDOC number alone is given then the status of that idoc alone will be changed. (And that works successfully)
(2) If the message type alone is given then the status of the Idocs for that message type are converted (And that works successfully)
(3) If the message type and the Idoc number is given, then the program converts the status of the all the idocs associated with the message type irrespective of the specification of IDOC numbers in the selection screen. (Now, this is where we faced the problem, the system converted all the Idocs with the mentioned message type ignoring the list of Idocs to be changed).
This resulted in change of the status of all Idocs of a particular message type.
Is there a way, we could track the Idocs which got changed and reverse them back to the old status? Is there an SAP note which addresses this issue?
Your Inputs on this would be highly appreciated.
SpandanaHi,
With this report , specifying range won't work because the program loops at the select option and only takes the LOW variable of each record. So it is necessary that you pass all the idoc numbers for which you want to change the status for.
The solution is to give exact idoc numbers in the single values or copy this program to a 'Z' program and tweak it as per your requirement.
Br,
Advait -
Sales order number with idoc number
experts
the idoc is generated and posted the sales order and given the idoc number.
how to get the sales order data for this idoc .i have seen the table edidd,edid4etc but no use.
If atleast i get the sales order number with this idoc then i can get the sales order details ie kunnr, matnr,menge etc in vbak table.
please tell me where to get the data of the idoc.thanks Alexander you are always a great help.
in the status table EDIDS four records are created for each idoc.
in this the one with status 53 has the document number and the field name is STAPA2.
is there any function module to get the order number if we give the idoc number?
or any other table or function module which fetches all the data of the order if we give the idoc number. -
Standard Report with IDOC Number and PR number
Hi
My client need the Standard report with the combination fields of " Purchasing Number , Requirements tracking number in PR,
IDOC number , IDOC Processing status. "
(Our PR will generates through IDOC from other system via XI interface)Hi Nagendra,
for Purchasing Number , Requirements tracking number in PR you can use -ME5A
Purchasing Number-EBAN-BANFN
Tracking number goto- MELB.
table name-EKPO
for IDOC number , IDOC Processing status -we09
For IDOC number -EDID4-DOCNUM
IDOC Processing status-EDIDC-STATUS
Regards,
Krishna.
Edited by: kris_hna on Sep 8, 2011 1:14 PM
Edited by: kris_hna on Sep 8, 2011 1:19 PM -
F110 Error 007 - Error in creating the payment document; read job log
We have created a new SAP instance (vers 4.7) and testing if its working.
The above error occurs at the payment proposal stage for payment methed C (Cheque), but is OK for E (BACS).
I have been back through the config a couple of times checking FBZP and OBA7, and I can see anything obviously wrong.
The job log says........
10.03.2010 16:27:24 Job started -
00 516 S
10.03.2010 16:27:24 Step 001 started (program SAPF110S, variant &0000000000007, user ID BPGB) -
00 550 S
10.03.2010 16:27:24 Log for proposal run for payment on 10.03.2010, identification GB4 -
FZ 402 S
10.03.2010 16:27:25 -
ZT 004 S
10.03.2010 16:27:25 Information re. vendor 500007 / paying company code PS10 ... -
FZ 305 S
10.03.2010 16:27:25 ... payment not possible because of reported error -
FZ 311 S
10.03.2010 16:27:25 End of log -
FZ 398 S
10.03.2010 16:27:25 Job finished -
00 517 S
What appears to be the offending line in the log (Error ZT004) is blank, so gives me no clues as to the problem. I'm at a loss what to check net, and I'm hoping somebody can help me.
Any advise welcome.
Thanks
GrahamThanks Ji, that gives me a much better log to look through.
I've been doing a lot more testing as a result, but ultimately still come up blank. Heres why I am....
1. I have 2 payment methods...
C-Cheque
E=BACS
2. I pay 2 types of vendors...
Eternal (i.e. Invoices)
Internal (i.e. Employees expenses)
3. The payment proposal step is working fine for external suppliers on both payment methods, but fails for internal on both methods.
4. I am using the same payment terms on everything (Immediate payment no discount)
5.The only difference in the logs is (i.e. the line below does not appear on the external supplier logs).....
Cash discount base amount not set! FZ 753
6. The accounting documents look as I expect (External have an amount in the Cash Discount base, internal do not), this is how our current system behaves where we do not have any issues, and I cannot see any differences in the vendor document between the 2 systems
7. Incase I have missed something that is the real cause of the problem, here is the full log.
If you have any ideas what the problem still is, advice would be gratefully received, as I am pulling what little hair I have left out.
Full log......
Job started 00 516
Step 001 started (program SAPF110S, variant &0000000000018, user ID BPGB) 00 550
Log for proposal run for payment on 10.03.2010, identification GB6 FZ 402
> FZ 693
> Additional log for vendor 500008 company code PS10 FZ 691
> FZ 693
> Due date determination additional log FZ 799
> Document 2100000002 line item 001 via GBP 53.04- FZ 700
> Terms of payment: 10.03.2010 0 0.000 % 0 0.000 % 0 FZ 701
> 00 days grace period is being considered FZ 726
> Cash discount base amount not set! FZ 753
> Payment must take place before 10.03.2010; next payment on 12.03.2010 FZ 728
> Item is due with 0.000 % cash discount FZ 721
> FZ 693
> Payment method selection additional log FZ 699
> Payment method selection for items due now to the amount of GBP 53.04- FZ 601
> Payment method "E" is being checked FZ 603
> Bank details are being checked FZ 640
> Customer/vendor bank details are being read FZ 644
> Country GB / Bank number 404731 / Account 12457852 ... FZ 645
> Customer/vendor bank details are being checked FZ 665
> System reads house banks and checks if they are allowed FZ 668
> Our bank 1000 is being checked FZ 648
> For currency GBP and 001 days 9999,999,999.00 are planned FZ 658
> Available amount is enough, 9999,999,999.00 GBP still available, 53.04 necessary FZ 657
> House bank is selected ... FZ 673
> Our bank details 1000 GBBK1 are being used FZ 641
> Bank details of the partner with ctry GB bk no. 404731 acct 12457852 are being used FZ 642
> Payment method "E" is permitted FZ 609
ZT 004
Information re. vendor 500008 / paying company code PS10 ... FZ 305
... payment not possible because of reported error FZ 311
End of log FZ 398
Job finished 00 517
Edited by: gbrandreth on Mar 11, 2010 11:35 AM -
Issue with Idoc for creating purchasing contracts
Hello everyone,
I'm trying to create purchasing contracts using Idoc BLAORD3 through LSMW.
But i have a problem : all informations concerning account assignement are missing on this Idoc.
Does anyone know how to solve this problem? Maybe is there a BAPI which could replace my Idoc? Or is there another Idoc which could create account assignement seperatly?
Thanks in advance for your help.
CédricHi,
Try using E1EDK18 segment. Put "Number of days" ,Qualifier and check if this achievs the desired result or not? If yes then you have to use an user exit to put the number of days in the IDOC.
Cheers, -
Pop up message with Contract Number if Contract exists in ME21N in MM
Hi Experts ,
We have ECC6.04 system.We are NOT usning Pur. Requisition.
While creating PO by ME21N transaction code ,w.r.t. Contract if Contract is exist, then we need to find out the contract Number manually for each material in the req Pur. Org., which is very tedious task.
We can craete PO from Contract as a follow on document in ME33, but still 1st we need to find out the contrcat and then go to display of it and then craete Release Order (PO)...but it is not necessary that we will use single contract of same Vendor.
Currently , if contract is exist and we are craeting the PO w/o contract , then system gives Warning Message that '"... but does not gives me Contract Number & item No.
I'm exploring some enhancement, which will give me pop screen with the Contract Number & item No or system will directly insert the Contract Number and item in the item overview with all the detials picked up from it 9from source list)...while creating the PO in ME21N code.
Can anyone suggest, whether it is possible to achive the above by doing any custom devolopment or user exit..etc
Thanks
NAPYou can maintain the contract in source list. On creating purchase order you can go to environment-source list---there you will see the contract number, item number and validity. If the requirement is to see the contract number and item number can be done in this way without any enhancement.
REgards
Sangeeta
Maybe you are looking for
-
InDesign CS6 8.0.1 Fixes PDF, EPUB, Other Issues
Adobe updated InDesign CS6 to version 8.0.1, fixing many problems with EPUB and PDF export, as well as other problems. Recent postings in the user forums the past few months have complained about failure of some buttons to work when PDF was exported,
-
Jco Destinations not available in GRC AC 5.3
Hello, We have installed GRC AC 5.3 with latest patch and configured SLD configuration. It is working fine but the standard virsa Jco destinations are not visible. Is there any additional settings required to get that Jco destinations? Regards, Kumar
-
Program to create Datasources in BW
Hi All, do we have any BAPI/ Program available to create FlatFile Datasources in Bulk ? we need to create almost 200 flatfile datasources ..
-
How can I setText in a JTextField which is a char? I do text.setText("" + character); but it doesn't print right. However if i do System.out.println(character); it prints it just as i want to. How can i make JTextField work with chars?
-
when i am confirming the order i am getting error as follows No prices could be determined for object Activity type GXXX/ANK023/ANK-MH. now inthis order i am having the quantity of 15 tons now while confirming i am confirming it to 16ton with th echa