Node functions in real time scenario

can any one tell me  where node functions used in realtime explain with examples?
thanx&regards
naren

Hey,
1. remove context:
You use removeContexts () to delete all the top contexts for an element. This removes all top hierarchy levels, so that all elements of the target queue are assigned to a root element of the source queue.
Advanced user-defined functions can import either just one context into the input arrays, or complete queues. Make your selection by selecting or deselecting the Save Entire Queue in Cache checkbox in the function editor.
2. split by value:
The SplitByValue() function is the counterpart to removeContexts(): Instead of deleting a context, you can insert a context change in the source value queue. You then receive this element for each inserted context change instead of a top node element. However, for this to be possible, the top node source field must be assigned a top node target field and minOccurs must be >0. You can insert a context change in the queue after each value, after each change to the value, or after each tag without a value.
3. collapse context:
Using collapseContexts() puts the first values of all contexts into a context. Empty contexts are replaced with an empty string:
This can be useful if an upper-level node is to be created each time a lower-level node exists, for example. The function is useful in combination with the SplitByValue function.
4. Use one as many
You require the function useOneAsMany() if a field that only occurs once needs to be replicated as often as another field occurs in the outbound message so that the fields can be written to the target structure in pairs as a record.
http://help.sap.com/saphelp_nw04/helpdata/en/2c/2d8c4024d26e1de10000000a1550b0/frameset.htm
5. Map with default
6.copyValue
You use CopyValue() for a frequently occurring element to copy the value of a position in the source structure and assign it to a target field. The value is copied each time the target field occurs in the target structure. However, it is copied a maximum of maxOccurs times
7.createIf
You use createIf() to create a tag in the target structure depending on a condition.
8.exists
You use this function to determine whether a particular source field exists in the XML instance to be processed. If it does, exists() returns the value true, otherwise it returns the value false.
9.Use
You use this function if you need to synchronize two queues of equal length with reference to their context change. The mapping runtime takes the values from the first queue, and the context change from the second queue. If the two inbound queues do not have the same number of values, the mapping runtime triggers an exception.
Link for Node function.
/people/claus.wallacher/blog/2006/04/17/replication-of-nodes-using-the-graphical-mapping-tool
Example:
removeContext:
We use remove context to remove the context of a queue
A ->removeContext-> A
B B
C C
here each line under an alphabet denotes context change.
One thing about context change is it will not show you null values coming in input.
A ->removeContext-> A
C
C
in above example -- represents only context change no value in this place(null).
Collapscontext :
It works very much same way of removecontext but it also considers null values and gives [] for null values (if Context of Field is on its Preceeding parent otherwice it will work as remove context)
A ->CollapsContext-> A
[] (Blank value)
C C
One more chane is if there are multiple values in a context then it will only select first value from that queue
A ->CollapsContext-> A
D B
B C
C
As you can see in above example A & D falls under one context hence D is Removed
Split ByValue :
Used to Change the Context of Input
it has three options in it
1)each value
2)value change
3)emptyValue
The link given by Rohit is Self Explanatry for this .
FormateByExample :
it changes the Context of input1 as per the Context of Second input but the number of values in both the input must be same .
eg.
Input1 Input2 ->FormateByExample-> Out
A P A
B Q B
C R C
As you can see Context of input1 is Changed as per input 2
Sorry Guest Seems To Be Some Problem With Formating
Give me you Email ID Will Send You in Proper Formate
reward points if useful.
regards,
      Milan

Similar Messages

  • When we use SQLScript/CE Functions or procedures in real time scenario

    Hi,
    Can anyone explain me, when we use Scripted Calculation view or procedure using SQL/CE functions in real time project implementations.
    Let me know some business requirement why we choose these instead of graphical view.

    Hi Kumar,
    <i>So in real time if you want to develop some interface whether we use existing components or we will create own user defined products and components ??</i>
    We can do both.
    If the pre-delivered content actually solves ur purpose by providing the exact format of data, then u should go for the <b>existing components</b>
    If there is any change from the content provided, then u should change it and<b> create own user defined products and components</b>
    <i> What is the criteria behind choosing either of them ??</i>
    Thus the criteria is purely based upon the type of data formats u have to use. Existing component always saves lot of development time
    Regards,
    Prateek

  • How to implement the Transfer Function in Real Time VIs?

    Hi all,
    I'm relatively new to Labview Real Time modoule and want to implement one Controller(not PID one) in Deterministic Loop! I have already designed discrete Transfer Function and searching for the way to build one Controller with it! Is it right to use the Simulation Loop instead of Timed Loop (in this case Deterministic loop) and implement the controller in it?! If it's correct so, should I use the same clock and Priod as Timed Loop?!
    It would be very helpful, if there is an Example about using transfer function in Real Time Loops!
    thanks for your help,
    Mohsen 

    Hello mhmdi,
    Sorry I can't open your VI (looks like it is a new version of LV than I have installed).
    You're right - you don't need to convert to a difference equation if you have the CD&SIM Module which can take discrete time transfer functions directly. You don't need shift registers with this function, as it is effectively done internally. If you don't have CD&SIM discrete TF's can be implemented easily just in a timed (or while) loop with feedback nodes or shift registers to replicate each z-1 you need.
    Some more ideas:
    There are many configuration parameters and options with the Discrete TF VI - which you need to understand for your application and make sure are correct. Sometimes implementing in a basic form (timed loop and shift registers) allows you to see what is happening without any confusing options you might not need.
    Are you using the Discrete TF VI in a Simulation Loop ? You might need to think if the loop being used is appropriate for a Real Time application. Maybe the timing of the TF, the loop and the DAQmx data are not all suitable for each other.
     I'm not familar with DAQmx, so not sure about any specific real-time aspetcs of that.
    "if the sample frequency of the discrete transfer function in the timed-loop is at multiple integers of the sampling rate (e.g. 12000 Hz for tranfer function and 4000 Hz for sampling rate, 12000=3*4000), would it somehow improve the resolution of the controller command?"
    This could actually make things worse - but depends on your transfer function if it is a problem. Think about it this way - in the scenario you state the input signal going into the Discrete TF will only change once in every three samples, that means if your transfer function includes a 1-z^(-1) factor (i.e. a derivative) - that will be zero for two samples then jump up for the next sample. You'll observe a very jittery/noisy signal, but the noise is due to samples not being correct. This will also occur if the sample times are very similar but go in and out of sync where you may get the occassional sample that is the same and hence the occassional zero in the TF.
    In an application I had we had problems trying to get the data coming into a timed loop and the timed loop itself synchronise, and before it was fixed the control signal was very jittery.
    Consultant Control Engineer
    www-isc-ltd.com

  • Real time scenarios...

    hello ther ....i am simi .. iam new to sdn...i have my interview in sem bps..in a couple of days time..iam through with the theoritical bit ...my concerns are related to the questions that may arise about project scenarios....would be much obliged if someone could help me thru by providing some real time planning scenarios ....or may be some help with the tech specs,,.....thanx....favour will be returned....
    regards,
    simi..

    I have mentioned couple of real time scenario I know.
    [1] Down payment :
    When PO gets created and vendor asks for some portion of PO as an advance payment, accounts payable department creates down payment request for the purchase order using F-47 and enters PO number in it.automatic payment program pays for the down payment request made.
    <b>When automatic payment program makes payment, PO gets updated with Down payment amount, and purchasing department gets visibility against that PO and knows that certain amopunt has been paid as an advance payment.</b>
    When Goods is received and invoice is entered using MIRO for that PO accounts payable department gets notification that down payment exists towards  PO.
    and they clear down payment made for the PO againt the invoice.
    [2] AR/AP netting :
    Some times in business some customers are also vendors.
    SAP has given the functionality to set the Customer as a vendor scenario.
    it requires two settings in customer-vendor master record.
    For customer who is also vendor, cendor master record is created , in control tab customer number is entered in vendor master, same time in customer master record in control tab vendor number is entered for that customer.
    Check clear agaist customer-vendor in both master record.
    when payment is made to this vendor/customer another master record gets updated automatically.
    Assign points if helpful

  • Documentation of SAP HR- Real time scenario

    Hi,
    Please can anyone give me some documentation on how the functioning happens in SAP HR real time scenario.
    The real time implementation for Organizational management, Payroll, time Management and personal administration.
    It would be great if the document be sent to .
    Thank you !

    This is a Crystal Reports forum. Please close the existing thread an post your question here:
    SAP ERP Human Capital Management (SAP ERP HCM)
    I would recommend to explain in more detail the business need behind your quesiton in the new posting.
    Regards,
    Stratos

  • Regarding PSA real time scenarios and things

    Hai
    I knew abour PSA therotically . But i want in detail real time scenarios concering about PSA . Like , if data laoding is failed then how to look at PSA and after identifying how to update to corresponding datatarget like this ......
    So please tell in detail some real time scenarios about PSA and also send some documents or weblogd or old forums to [email protected] now
    I ll assign the points for thanks
    bye
    mohammed

    hi chakri, go through this.
    1.The Persistent Staging Area (PSA) is the inbound storage area for data from the source systems in the SAP Business Information Warehouse. The requested data is saved, unchanged from the source system. Request data is stored in the transfer structure format in transparent, relational database tables in the Business Information Warehouse. The data format remains unchanged, meaning that no summarization or transformations take place, as is the case with Info Cubes.
    2. The data records in BW are transferred to the transfer structure when you load data with the transfer method PSA. One TRFC is carried out per data package. Data is written to the PSA table from the transfer structure, and stored there. A transparent PSA table is created for every transfer structure that is activated. The PSA tables each have the same structure as their respective transfer structures.
    3. The number of fields is limited to a maximum of 255 when using TRFCs to transfer data. The length of the data record is limited to 1962 bytes when you use TRFCs.
    4. Four types of updates a) psa and data targets parallel b)psa and data targets serially c) only psa with subsequent updates to data targets d) only data targets
    5.Since the data is stored in transparent tables in database we can edit the data in psa using  ABAP routines using PSA-API’s.
    6. u can delete the requests from the PSA  for the incorrect data provided that the concerned request data is not populated into data targets.
    7. table for PSA:There is only one table for all psa requests.One way to know the psa table name is by right click the psa node and 'maintain export datasource', you will see the table name is /BIC/B0000xxxx (System generated psa table name ) ('ExtractStru.') with se16 you can see the contents, each request no. displayed in field REQUEST.
    8. reporting:  We can not report directly on psa  as the  same data is coming form the source system we can see a report from the source sytem. How ever technically speaking we can have a report on that. You are creating an export datasource on it and report using a Remotecube. you could even create an ODS with the same structure of the PSA and push the PSA data into it with no data transformation and then report. When u create an export data soruce on psa it will start with 7 followed by ur  PSA name. The below link gives the reporting on psa document.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/968dab90-0201-0010-c093-9d2a326969f1
    Re: Reporting on PSA
    Reporting on PSA
    9.Changelog and PSA: If we delete data in changelog the data in psa will not be deleted. You have to delete the data in the PSA exclusively.The change log acts as the PSA for the data target if the ODS acts as a datasource. What I mean is if the ODS supplies to another cube/ODS then the source ODS's Changelog is the PSA for the target ODS/Cube.
    10.PSA as a data source:   create an export data source. The export data source starts with 7 followed by psa name.  Go to data marts in the info sources tab and replicate that data source.  Create an info source and assign this data source.  Activate transfer rules and communication structure Then create a data package  and schedule the load to the data target.
    11.PSA deletion:
      Re: PSA Deletion
    12. PSA data in EP:
    Re: urgent: PSA Data in EP?
    13.Deleting PSA data source:
    To delete the export data source
    Just go to RSA6 and find the your datasource in the node 'DM', click once (highlight it) and there is a delete icon on the standard icon bar, click on that you should be able to delete the datasource.
    Delete PSA datasource
      14.Debug load inpsa:
    Re: How to Debug a Load into PSA    
    to load data manually from psa to the data targets.
    1. go to rsal .ie administrator work bench
    2. under modelling tab choose psa option
    3.select your application component
    4. choose ur info soruce and expand the tree to see the requests
    5. double click on the psa icon
    6. a new screen will appear which asks for the no of records to enter give the number and press enter u can see the data in the psa
    7. to update psa data manually go to the context menu  of that request and select the optio "update date immeditatley" it will be  loaded to the data target/
    cheers
    ravi
    dont forget to assign points that is the way of saying thanks in sdn

  • Please provide real time scenario for when we use object type in PL/SQL.

    Hi Experts,
    When we use this kind of code in PL/SQL block.
    CREATE OR REPLACE TYPE sample_object IS OBJECT
    (id       NUMBER
    ,name     VARCHAR2(30));
    CREATE OR REPLACE TYPE sample_table IS TABLE OF sample_object;I have read some docs ,but I didn't get any information where exactly we use this.
    Please provide one real time scenario with an example.
    How this is different from record.
    Thanks in advance.

    Hi,
    For an example please have a look at this....
    CREATE OR REPLACE TYPE FML_DAT_ITEMS_OBJ AS OBJECT
                      (F_NAME VARCHAR2 (20), L_NAME VARCHAR2 (20));
    CREATE OR REPLACE TYPE FML_DAT_ITEMS_FTAB AS TABLE OF FML_DAT_ITEMS_OBJ;
    CREATE OR REPLACE FUNCTION GET_FML_ITEMS_DAT (PFML_NR IN NUMBER)
       RETURN FML_DAT_ITEMS_FTAB
       PIPELINED
    AS
       OUT_REC   FML_DAT_ITEMS_OBJ;
    BEGIN
       SELECT FML_DAT_ITEMS_OBJ ('peter', 'zwan') INTO OUT_REC FROM DUAL;
       FOR I IN 1 .. PFML_NR
       LOOP
          PIPE ROW (OUT_REC);
       END LOOP;
    END GET_FML_ITEMS_DAT;To view the o/p:
    SELECT * FROM TABLE (get_fml_items_dat (5));
    F_NAME, L_NAME
    peter,zwan
    peter,zwan
    peter,zwan
    peter,zwan
    peter,zwan Refer these links to know more about the topic...
    http://www.oracle-developer.net/display.php?id=207
    http://www.oracle-base.com/articles/misc/pipelined-table-functions.php

  • BAdI........How are they used in the real time scenario.

    Im a rookie in ABAP development and i was wondering that how we use the BAdI enhancement technique in the real time scenarios. Like do we get create them or we have few already built BAdI's which we work on? Can any body please explain how this works.

    Hi Ramana,
    Business add-ins are enhancements to the standard version of the system.
    Business Add-In is a new SAP enhancement technique based on ABAP Objects.
    They can be inserted into the SAP system based on specific user requirements.
    Each Business Add-In has:
    • at least one Business Add-In definition
    • a Business Add-In interface
    • a Business Add-In class that implements the interface
    In order to enhance a program, a Business Add-In must first be defined
    Subsequently two classes are automatically generated:
    • An interface with ‘IF_EX_’ inserted between the first and second characters of the BADI name.
    • An adapter class with ‘CL_EX_’ inserted between the first and second characters of the BADI name.
    The Application developer creates an interface for this Add-In.
    There are multiple ways of searching for BADI.
    • Finding BADI Using CL_EXITHANDLER=>GET_INSTANCE
    • Finding BADI Using SQL Trace (TCODE-ST05).
    • Finding BADI Using Repository Information System (TCODE- SE84).
    1. Go to the Transaction, for which we want to find the BADI, take the example of Transaction VD02. Click on System->Status. Double click on the program name. Once inside the program search for ‘CL_EXITHANDLER=>GET_INSTANCE’.
    Make sure the radio button “In main program” is checked. A list of all the programs with call to the BADI’s will be listed.
    The export parameter ‘EXIT_NAME’ for the method GET_INSTANCE of class CL_EXITHANDLER will have the user exit assigned to it. The changing parameter ‘INSTANCE’ will have the interface assigned to it. Double click on the method to enter the source code.Definition of Instance would give you the Interface name.
    2. Start transaction ST05 (Performance Analysis).
    Set flag field "Buffer trace"
    Remark: We need to trace also the buffer calls, because BADI database tables are buffered. (Especially view V_EXT_IMP and V_EXT_ACT)
    Push the button "Activate Trace". Start transaction VA02 in a new GUI session. Go back to the Performance trace session.
    Push the button "Deactivate Trace".
    Push the button "Display Trace".
    The popup screen "Set Restrictions for Displaying Trace" appears.
    Now, filter the trace on Objects:
    • V_EXT_IMP
    • V_EXT_ACT
    Push button "Multiple selections" button behind field Objects
    Fill: V_EXT_IMP and V_EXT_ACT
    All the interface class names of view V_EXT_IMP start with IF_EX_. This is the standard SAP prefix for BADI class interfaces. The BADI name is after the IF_EX_.
    So the BADI name of IF_EX_CUSTOMER_ADD_DATA is CUSTOMER_ADD_DATA
    3. Go to “Maintain Transaction” (TCODE- SE93).
    Enter the Transaction VD02 for which you want to find BADI.
    Click on the Display push buttons.
    Get the Package Name. (Package VS in this case)
    Go to TCode: SE84->Enhancements->Business Add-inns->Definition
    Enter the Package Name and Execute.
    Here you get a list of all the Enhancement BADI’s for the given package MB.
    Have a look at http://help.sap.com/saphelp_nw04/helpdata/en/04/f3683c05ea4464e10000000a114084/content.htm
    http://help.sap.com/saphelp_erp2005/helpdata/en/73/7e7941601b1d09e10000000a155106/frameset.htm
    http://support.sas.com/rnd/papers/sugi30/SAP.ppt
    http://www.sts.tu-harburg.de/teaching/sap_r3/ABAP4/abapindx.htm
    http://members.aol.com/_ht_a/skarkada/sap/
    http://www.ct-software.com/reportpool_frame.htm
    http://www.saphelp.com/SAP_Technical.htm
    http://www.kabai.com/abaps/q.htm
    http://www.guidancetech.com/people/holland/sap/abap/
    http://www.planetsap.com/download_abap_programs.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/c8/1975cc43b111d1896f0000e8322d00/content.htm
    /people/thomas.weiss/blog/2006/04/03/how-to-define-a-new-badi-within-the-enhancement-framework--part-3-of-the-series
    /people/thomas.weiss/blog/2006/04/18/how-to-implement-a-badi-and-how-to-use-a-filter--part-4-of-the-series-on-the-new-enhancement-framework
    How to develop BADI
    Reward if useful.
    Thanks
    Aneesh.

  • Real time scenario for AXIS framework in SOAP adapter

    Hello,
    Can anybody please suggest some real time scenario where AXIS framework can be used
    and what are the advanteges and disadvantages of using AXIS framework
    regards,
    Loveena

    Hi !
    have a look on these links
    Using the Axis Framework in the SOAP Adapter
    http://help.sap.com/saphelp_NW04/helpdata/en/45/a4f8bbdfdc0d36e10000000a114a6b/content.htm
    http://help.sap.com/saphelp_nwpi71/helpdata/en/69/a6fb3fea9df028e10000000a1550b0/frameset.htm
    Have a look at this Pdf
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b092777b-ee47-2a10-17b3-c5f59380957f
    Thanks !
    Abhishek

  • Need SD,MM  real time scenarios

    hi everyone, Plz help me with SD real time scenarios with examples..
    regards,
    prashanth

    Business scenario that has to be mapped by you (SD consultant) -
    Company / client is a TV manufacturing company which sells TVs and provides TV repair sevices.
    1.  Sales orders for both (TV selling & services) must be done in one sales document type
    2. Delivery type must be set up ONLY for TV selling (as services do not need any delivery of goods!)
    3. For easy identification - bills should have different number ranges. For selling TV bill # must range from 1 to 1000, and for TV services from 90001 to 90099
    4. TV selling must be delivery related bill, TV service must be order related bill
    How shall you configure this in SAP SD? What are the important questions you will ask the client, for more information?
    Once you have attempted this we can go a step further (in to more functionalities)
    Edited by: Typewriter on Aug 14, 2011 2:35 PM

  • SAP HR Real time Scenarios

    Hi,
    Can somebody give me a few examples of real time scenarios/challenging issues in SAP HR implementation? Can be anything in Personnel Administration, Org.Management, Time management, Benefits. Any help will be appreciated.
    Thanks,
    Prapar

    This is a Crystal Reports forum. Please close the existing thread an post your question here:
    SAP ERP Human Capital Management (SAP ERP HCM)
    I would recommend to explain in more detail the business need behind your quesiton in the new posting.
    Regards,
    Stratos

  • XI real time scenarios practice

    Hello XI gurus,
    Are there any XI exercises available to prepare myself for real time scenarios?
    I understand that SAP training material includes exercises. But other that material (for people who do not have that material), are any other options available?
    If I can get XI system access, what are the basic topics/areas that I need to practice to survive the first few months as XI developer?
    Thank you very much.
    Manu

    Hey
    Following are the links to weblogs which will help to develop the <b>basic scenarios</b>.
    /people/prateek.shah/blog/2005/06/08/introduction-to-idoc-xi-file-scenario-and-complete-walk-through-for-starters - IDoc to File
    /people/ravikumar.allampallam/blog/2005/03/14/abap-proxies-in-xiclient-proxy - ABAP Proxy to File
    /people/sap.user72/blog/2005/06/01/file-to-jdbc-adapter-using-sap-xi-30 - File to JDBC
    /people/prateek.shah/blog/2005/06/14/file-to-r3-via-abap-proxy - File to ABAP Proxy
    /people/venkat.donela/blog/2005/03/02/introduction-to-simplefile-xi-filescenario-and-complete-walk-through-for-starterspart1 - File to File Part 1
    /people/venkat.donela/blog/2005/03/03/introduction-to-simple-file-xi-filescenario-and-complete-walk-through-for-starterspart2 - File to File Part 2
    /people/ravikumar.allampallam/blog/2005/06/24/convert-any-flat-file-to-any-idoc-java-mapping - Any flat file to any Idoc
    /people/arpit.seth/blog/2005/06/27/rfc-scenario-using-bpm--starter-kit - File to RFC
    https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1685 [original link is broken] [original link is broken] [original link is broken] [original link is broken] - File to Mail
    /people/jayakrishnan.nair/blog/2005/06/20/dynamic-file-name-using-xi-30-sp12-part--i - Dynamic File Name Part 1
    /people/jayakrishnan.nair/blog/2005/06/28/dynamic-file-namexslt-mapping-with-java-enhancement-using-xi-30-sp12-part-ii - Dynamic File Name Part 2
    /people/michal.krawczyk2/blog/2005/03/07/mail-adapter-xi--how-to-implement-dynamic-mail-address - Dynamic Mail Address
    /people/siva.maranani/blog/2005/05/25/understanding-message-flow-in-xi - Message Flow in XI
    /people/krishna.moorthyp/blog/2005/06/09/walkthrough-with-bpm - Walk through BPM
    /people/siva.maranani/blog/2005/05/22/schedule-your-bpm - Schedule BPM
    /people/sriram.vasudevan3/blog/2005/01/11/demonstrating-use-of-synchronous-asynchronous-bridge-to-integrate-synchronous-and-asynchronous-systems-using-ccbpm-in-sap-xi - Use of Synch - Asynch bridge in ccBPM
    https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] [original link is broken] - Use of Synch - Asynch bridge in ccBPM
    /people/michal.krawczyk2/blog/2005/08/22/xi-maintain-rfc-destinations-centrally - Maintain RFC destination centrally
    /people/sravya.talanki2/blog/2005/08/18/triggering-e-mails-to-shared-folders-of-sap-is-u - Triggering Email from folder
    /people/sravya.talanki2/blog/2005/08/17/outbound-idocs--work-around-using-party - Handling different partners for IDoc
    /people/siva.maranani/blog/2005/08/27/modeling-integration-scenario146s-in-xi - Modeling Integration Scenario in XI
    /people/michal.krawczyk2/blog/2005/08/25/xi-sending-a-message-without-the-use-of-an-adapter-not-possible - Testing of integration process
    /people/michal.krawczyk2/blog/2005/05/25/xi-how-to-add-authorizations-to-repository-objects - Authorization in XI
    http://help.sap.com/saphelp_nw04/helpdata/en/58/d22940cbf2195de10000000a1550b0/content.htm - Authorization in XI
    /people/michal.krawczyk2/blog/2005/09/09/xi-alerts--step-by-step - Alert Configuration
    /people/michal.krawczyk2/blog/2005/09/09/xi-alerts--troubleshooting-guide - Trouble shoot alert config
    /people/sameer.shadab/blog/2005/09/21/executing-unix-shell-script-using-operating-system-command-in-xi - Call UNIX Shell Script
    /people/sravya.talanki2/blog/2005/11/02/overview-of-transition-from-dev-to-qa-in-xi - Transport in XI
    /people/r.eijpe/blog/2005/11/04/using-abap-xslt-extensions-for-xi-mapping - Using ABAP XSLT Extensions for XI Mapping
    /people/prasad.ulagappan2/blog/2005/06/07/mail-adapter-scenarios-150-sap-exchange-infrastructure - Mail Adaptor options
    /people/pooja.pandey/blog/2005/07/27/idocs-multiple-types-collection-in-bpm - Collection of IDoc to Single File
    /people/sap.user72/blog/2005/11/17/xi-controlling-access-to-sensitive-interfaces - Controlling access to Sensitive Interfaces
    /people/michal.krawczyk2/blog/2005/11/10/xi-the-same-filename-from-a-sender-to-a-receiver-file-adapter--sp14 - The same filename from a sender to a receiver file adapter - SP14
    /people/prasad.illapani/blog/2005/11/14/payload-based-message-search-in-xi30-using-trex-engine - Payload Based Message Search in XI30 using Trex Engine /people/sap.user72/blog/2005/11/24/xi-configuring-ccms-monitoring-for-xi-part-i - XI : Configuring CCMS Monitoring for XI- Part I
    /people/michal.krawczyk2/blog/2005/11/23/xi-html-e-mails-from-the-receiver-mail-adapter - XI: HTML e-mails from the receiver mail adapter
    /people/sap.user72/blog/2005/11/22/xi-faqs-provided-by-sap-updated - XI : FAQ's Provided by SAP
    Regards,
    Sushil Hadge

  • ALE IDOC's Real Time Scenarios

    Hi Friends,
    Can anyone get me some real time scenarios in ALE IDoc's.
    Please help me out .
    Thank You.
    Patil

    HI Patil
       You can try out any of the following
    Transfering Master Data like
    1.  Material Master
    2.  Customer Master
    3.  Vendor Master
                   etc..
    For this You need to Activate the Change Pointer through IMG SALE...for the repective MESSAGE TYPE say Material Master MATMAS
    After That creat Material (MM01)
    After that go to SE38 Run the Report programm <b>RBDCPMIG</b> to created Master IDOC and Communication IDOC...And if All Your ALE Settings are correct .. it will transfer the IDOC to Other Client....or R/3
    YOu can also try
    Creation of purchase Order what has been explained in above reply..
    You can also try out this scenario instructed in this Quick refrance Guide.....
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CABFAALEQS/CABFAALEQS.pdf
    You can also check out this very useful link for newbie
    <b>http://www.allsaplinks.com/idoc_sample.html</b>
    Note:Do Reward Points if found useful...
    Cheers:)
    Mithlesh

  • How to Login to Web Dynpro developer studio in real time scenario.

    Hi,
    1. How to Login to Web Dynpro developer studio in real time scenario.
    Do we have login pad and User id to enter developer studio.
    Is the user id for login maintained in UME of J2EE engine.
    2. How to stop and start j2ee engine in real time. Is it same SAP Management console is used like in Demo version.
    3. If I use central server, Do I have to install GUI like SAP R/3 GUI to Develop, test and deploy my application.
    Cheers,
    Sam

    Hi,
    What do you mean with real time scenario? Do you talk about runtime?
    NetWeaver Developer Studio (NWDS) is only for design time and you install it on the local PC/laptop of the developer. The 'connection' between NWDS and engine is specified in the preferences (Window->Preferences->SAP J2EE engine) of NWDS. The development track is in 'real life' (e.g. if the engine is a remote one) connected with support from SLD (System Landscape Directory) which is a tool for managing the NWDI (NetWeaver Development Infrastructure). In normal case, there are so-called 'development configurations' that can be imported into NWDS (Window->Preferences->Java Development Infrastructure).
    For starting and stopping the engine, there are several possibilities: SAP MMC, view in NWDS or console.
    If you've a central server, you connect your NWDS to this central server and then you can deploy to this central server.
    Regards,
      Jan

  • How to Logon to Web Dynpro developer studio in real time scenario.

    Hi,
         1. How to Login to Web Dynpro developer studio in real time scenario.
             Do we have login pad and User id to enter developer studio.
             Is the user id for login maintained in UME of J2EE engine.
         2.  How to stop and start j2ee engine in real time. Is it same SAP Management console  is used like in Demo version.
         3. If I use central server, Do I have to install GUI like SAP R/3 GUI to test and deploy my application.
    Cheers,
    Sam

    Hi,
    What do you mean with real time scenario? Do you talk about runtime?
    NetWeaver Developer Studio (NWDS) is only for design time and you install it on the local PC/laptop of the developer. The 'connection' between NWDS and engine is specified in the preferences (Window->Preferences->SAP J2EE engine) of NWDS. The development track is in 'real life' (e.g. if the engine is a remote one) connected with support from SLD (System Landscape Directory) which is a tool for managing the NWDI (NetWeaver Development Infrastructure). In normal case, there are so-called 'development configurations' that can be imported into NWDS (Window->Preferences->Java Development Infrastructure).
    For starting and stopping the engine, there are several possibilities: SAP MMC, view in NWDS or console.
    If you've a central server, you connect your NWDS to this central server and then you can deploy to this central server.
    Regards,
      Jan