Project management and multiple master images

Anyone here making use of 2 or more projects with the same master image in each project?
scenario is:
project 1 "blah shoot" <-- contains all images from shoot
project 2 "portfolio" <-- will contain some of the images from the shoot
The problem im having at the moment is when i drag any master image from project 1 into project 2, it removes the master file from project 1
Surely i can have multiple images in multiple projects?

You can copy the master image to your portfolio by
clicking and dragging with the option key held down.
I don't know of a way to link these images so that
changes in one are carried over to the other though.
If someone does know, please let me know, it'd make
my life easier...
If you drag an image from one project into an album under another project, it will not move the master - it puts only that version in the album, linked back to changes made in the original project.
if you export that project, the master that version is based on will be copied at that time and pushed out into the exported project. So if you export a project and then re-import you will no longer have a link but a copied master. To get around that you can manually copy the project with the album holding links out of the Aperture library to elsewhere to make backups or move a set of projects together,

Similar Messages

  • Project Management and Resource Management Reporting Views

    I am wondering if anyone would have and is willing to share some documentation they may have put together around reporting views related to Project Management and Resource Management modules. We are installing the projects suite and I have never done custom reporting out of these modules and would be interested in feedback or documentation anyone may have related to these or any offer of assistance or direction in designing the reporting views.
    Thank you in advance!
    Matt

    hello Tony,
    What I can say. Maybe you should use SAP PPM as a operational Project Management tool and integrate it with WBS elements and projects in SAP PS. Probably it will be the best solution for you.
    The second way is to use a second project structure for project management as you wrote, with different number of this project. So you will have 2 structures one for actual posting of costs and the second for rest management needs and statistical posting of costs. Probably you will need CO substitution for posting of costs to post costs on these 2 structures.
    There will be many other conditions to get right solution but I think this 2 ways are possible.
    Adam

  • Where to maintain project manager and Project details.

    Hi Guys,
                 Whats the transaction or table to maintain project manager and project details.
    Cheers
    S Kumar

    T Code OPS6 (table TCJ04). You maintain person responsible over here and then these values can be referred in project definition or WBS element.
    Regards
    Sreenivas

  • Compare Oracle Project Management and Primavera

    Hi All,
    We are using Primavera today and it is not integrated to Oracle.
    We are also currently implementing Oracle Projects Management (R12.1.3) and trying to evaluate if Primavera can be replaced by Projects Management. Based upon my little experience with Primavera - I see some advantages of Primavera over Projects Management e.g.
    a. Primavera is more user friendly than Oracle Projects Management.
    Primavera: easy to create workplan; configurable views; generate reports with gantt charts
    b. Primavera has scheduling engine to derive schedules based upon dates/duration/logic while Project Managment does not have it.
    c. Gantt charts are better in Primavera than Oracle Projects Management.
    Has anyone also done similar kind of analysis and evaluated the need of Primavera integration with Oracle Projects Management? I would appreciate if you can share your inputs.
    Thanks,
    Nitin

    Hi,
    I have used both the product. For project management i would suggest to use primavera for the same reason u mentioned.
    the only disadvanage in primavera is it is not integrated with ERP.
    Now oracle provide a AIA PIP integration package to integrate Primavera with oracle Projects(Limited integration). Use primaver for Project managment and oracle for Project Costing and Billing
    Govind

  • Incident management and Critical Master data table change management.

    Dears,
    I need to configure Incident management and Critical Master data table change management on our solman 7.0 server.
    I want to know how many days should be required for this activity and please share documents.
    Shivam

    Hi,
    I faced a similar situation,
    I tried all the possible ways like activating InfoObject manually, Through an activation program of aggregates,
    Also ran RSRV check which was showing no negative results.
    I raised an OSS note for the same but after that when SAP returned back the process chian ran again as it is a daily load which activated the record in 'M'.
    I ask you to wait till the next process chian run, and try all possible ways to activate.
    If it is not corrected then raise an oss to SAP.
    Thanks & Regards,
    Vishnu

  • Delete multiple master images: hangs

    When I choose multiple images for delete I get the infinite spinning beach ball. I searched for similar posts and did not find anyone with the same problem.
    Deleting one image at a time works ok.
    I have to force quit and restart. When the project is opened again I see that the images were in fact deleted. This is very repeatable.
    This is a reasonably serious bug for me since doing the pruning of images outside of aperture will require a raw-enabled viewer.
    It would also be nice to have a hot-key for deleting a master image, and a way to get rid of the "do you really want to do this" dialog.
    nmurray

    Hi nmurray,
    a number of posts here which concern hangs, spinning beachballs, performance and the like point to a single conclusion:
    Rebuild your library.
    In order to do that, quit Aperture, and restart it while pressing the Alt key. (You can let go of the Alt key after the startup screen has appeared.) After having started, Aperture will then ask you whether you really want to rebuild the library as that may take some time (and if you have a large library, you might want to do this before preparing and having dinner with friends. Spend a nice evening while Aperture is keeping your Mac busy. Have some wine. Maybe a walk).
    The hot key combination is Command-Backspace. The confirmation dialog is there for a reason - after all, you're telling Aperture to delete a master. However, to dismiss it, just hit the Return key on your keyboard.
    The best way to get rid of several masters is to select them, press Command-Backspace, hit Return, and then sit back and wait while Aperture is throwing your masters into the trash. Don't ask me why a simple delete takes so long; I have the impression that the way Aperture works with its libary has significant room for improvement.
    Cheers,
    Karl

  • Project Manager and Reverse problems.

    Hey there,
    I am working on a timeline and when I media manage it I am getting the zebra stripes for some clips that reversed speed. The clip will be freeze framed for a while depending on length. I don't believe it's for every one, but we have had issues with this for multiple projects.
    Info:
    1080P ProRes 422 timeline.
    All footage transcoded to 422.
    I don't think it happens on clips which are nested.
    I believe it's only reversed clips.
    At this point I'm pursuing workarounds, and will post them if I find them, but can someone explain why this is coming up?
    Edit on,
    -AKChannel

    Hey you know what that might be the case. Our current solution is just to bake the file through AME, as I'm not sure if render and replace would bake in the speed change. I just spoke to a coworker of mine and she had a couple of clips do the same when using project manager.
    For the record, here is a couple more notes which may help.
    We used to get the same danger stripes issue when media managing Atomos Samurai footage. Transcoded clips through AME worked fine, but interviews done on Samurai footage which was not-transcoded would pick the wrong in-out points for trimming a project through project manager.
    Also, the clips I'm using may or may not be transcoded through AME. In my coworkers instance, she was using 7Q footage 4k-HD ProRes (transcoded in the recorder). In my case it was a 240fps 2kRAW clip which was transcoded to Pro Res via Resolve.
    I hope that helps and doesn't make things more confusing.
    I'm going to mark this question as answered for now, but will try to contact this forum again if something else comes up.

  • Project Management and Financial Management

    Hello,
    Our Federal client uses WBS for Inter-Agency Agreements, They use a simple structure to collect costs and define budget availability at the WBS level.  They also have a need for a Project Management tool, with milestones, resource tracking, etc.  However, this would not easily integrate into the way that they use WBS for financial purposes due to the structure that the business needs have for a higher level Project Management approach.  The WBS currently represent individual agreements, whereas the Project Management function would span many agreements.  The agency would not like to move away from the current financial structure.
    What I'm wondering is if there is a way to either forward or somehow statistically shadow the WBS that are used for financial purposes into a parallel Projects setup.  Is that possible?  I know that you can have a cost center and statistical WBS, but don't know if there's a way to do it with two Projects structures.  Please let me know your thoughts / suggestions.
    Best regards,
    Tony

    hello Tony,
    What I can say. Maybe you should use SAP PPM as a operational Project Management tool and integrate it with WBS elements and projects in SAP PS. Probably it will be the best solution for you.
    The second way is to use a second project structure for project management as you wrote, with different number of this project. So you will have 2 structures one for actual posting of costs and the second for rest management needs and statistical posting of costs. Probably you will need CO substitution for posting of costs to post costs on these 2 structures.
    There will be many other conditions to get right solution but I think this 2 ways are possible.
    Adam

  • Project Manager and Impulse responses

    I just bought some new IR's from Spirit Canyon audio.
    2 CD's worth. You can download Space Designer presets from their website but the presets dont know where the IR's are.
    So I have to locate every file manually.
    I wish the project manager could re-connect the IR's to the presets like it can with the EXS-24.
    Thank you for reading my rant. I will now get back to the mind numbing repetitive work that is now before me.

    You may want to read the customer success stories on
    the Primavera website. For example, here is one that
    mentions using both P5 and Contract Manager:
    http://www.primavera.com/files/customers/LVVWD.pdf

  • Oracle Project Management and Oracle HCM integration????

    Is there any benefits of Oracle Project Management for users of Oracle HCM?? Can they be integrated and how?

    ERP systems were built because you could use various products like Fin, HCM, CRM, Project accounting etc seamlessly as all are built by the same provider and you will have less interface headache.
    So, based on what your company's requirements, you can choose to implement one or more of the products.

  • Project Manager and Contract Manager

    Dear Sirs,
    We have Primavera 5.0
    and we are looking for a document control program. I know
    that Primavera use Contract Manager to organize the
    documents and be able to share information with the
    Project Manager. I would like to know the experience that
    you have to respect.
    Thanks.<br
    />Mauricio

    You may want to read the customer success stories on
    the Primavera website. For example, here is one that
    mentions using both P5 and Contract Manager:
    http://www.primavera.com/files/customers/LVVWD.pdf

  • Organizer applications (project management and to do's)

    I'm looking for an application that will let me organize and edit my "important, to do's, passwords, financial" etc, etc documents (now in pages or word). Ideally I need these on my iPhone and my laptop. I'm really hoping for something that I can /import/ existing documents into so I don't have to retype these. I also need something that can accommodate multiple pages.
    Any ideas? Is there a better place to get advice on this?
    Also, is there a good place to get recommendations on applications such as Pages, FileManager, Bento and the like? I need something to organize project information for architecture and construction.
    Thanks,
    Jon

    Search in:
    http://www.macupdate.com/
    The cross links and user feedback are invaluable.
    Peter

  • Vision Builder AI and multiple cameras/image files

    Hi,
    We are trying to develop an inspection using Vision Builder for AI with 3 1394 cameras.
    We have setup the image output to save all images from the inspection, however it only saves the last image acquired during the inspection.
    Is it possible to have Vision Builder save the images from the other 2 cameras?

    VBAI only has the ability to save the last image. If you would like to save the other images you will need to port the inspection to LabVIEW, and use Vision to save the other images. The other option is to create inspection scripts for each of the cameras.

  • Project Size and Multiple CHMs

    I'm looking for some information on the affects/dangers of large projects and the feasability of breaking up a large project into several smaller ones and linking them together.
    From time to time, we experience significant speed issues when loading and editing topics.  How much does project size affect this? At what point does a project's size become "dangerous"? Can a project get so big that is damages itself (i.e., corrupts files, etc), or does it just reach a point where it won't compile anymore?
    We use RoboHelp 7 HTML, but are considering upgrading to Robo 9 and also to Windows 7 (64-bit, I believe). We use Sourcesafe. Certainly moving the project to a faster machine would speed things up, but I'm wondering if we'd still want to break up the project into smaller projects to improve speed and ensure the project does not get too big.
    Our project has 1767 topics. We have begun to add more graphics to topics, although the overall number of graphics is small.  We generate CHM and webhelp. The CHM is 13.8 megs. The folder for the compiled webhelp is 61 megs.

    I would not have thought that size of project should cause performance issues. I have some projects with over twice that number of topics and a fair number of graphics.
    I would start investigating by taking a copy of the project out of source control and trying it on a different machine with reasonable performance. I think this is more an environment issue rather than one of project size.
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

  • Trac (project management) and apache

    I'm having some problems setting up Trac as explained in this wiki article:
    http://wiki.archlinux.org/index.php/SCM_Example_Trac
    The problem is with Apache and its configuration.
    Im getting a 403 Forbidden when trying to access the trac web.
    Here is the error:
    Forbidden
    You don't have permission to access / on this server.
    Additionally, a 401 Authorization Required error was encountered while trying to use an ErrorDocument to handle the request.
    Apache/2.2.9 (Unix) mod_ssl/2.2.9 OpenSSL/0.9.8h DAV/2 mod_python/3.3.1 Python/2.5.2 SVN/1.4.6 Server at 192.168.1.69 Port 80
    I know trac is working ok because I can access using the tracd webserver.
    Here is my httpd-vhosts.conf section of trac:
    <VirtualHost *:80>
    ServerAdmin [email protected]
    DocumentRoot "/var/empty"
    ServerName scm.cracker.lan
    <Location />
    Require valid-user
    AuthType Digest
    AuthName "svnrepos"
    AuthDigestDomain http://192.168.1.69/
    AuthDigestProvider file
    AuthUserFile /home/repo/conf/scm-user
    </Location>
    <Location /svn>
    DAV svn
    SVNParentPath /home/repo/svn
    SVNPathAuthz off
    </Location>
    <Location /trac>
    SetHandler mod_python
    PythonHandler trac.web.modpython_frontend
    PythonOption TracEnvParentDir /home/repo/trac
    PythonOption TracUriRoot /trac
    </Location>
    </VirtualHost>
    All the folders and files named here exist.
    Since Arch changed the paths and the way Apache worked, I have been a bit lost on its configuration.
    On the discussion tab of the wiki article, there is someone who couldn't get trac to work with this settings and used ScriptAlias instead, I dont know how to do that.
    Regards,
    Last edited by sud_crow (2008-09-08 14:58:01)

    I solved this issue, will be updating the documentation in the wiki soon.
    Regards.