TWO CURRENCIES IN ONE Purchase Orders Release Procedure.

TWO CURRENCIES IN ONE Purchase Orders Release Procedure.
Please provide a solution if a release strategy is maintained for two currencies like USD and SGD for more clarification please Read the below Requirement.
Requirement for Singapore:
u2022          COMPANY Asia (Singapore) wants its own Purchase order release strategy is based on their local currency (SGD)
u2022          Whereas COMPANY is using only USD as currency in Purchase order release strategy.
u2022          Standard SAP works based on Character currency which is defining in Class of Purchase release strategy and converts with Local currency to compare with Character Currency.
Required analysis:
u2022          The value assigned in classification is based on Conversion from SGD to USD, Due to Exchange rate fluctuations the assigned value is differ by large amounts and hence system is either determining the higher release strategy or Lower release strategy
u2022          But during Release Strategy Configuration the Net order Value is assigned as 3600 USD considering the Exchange as 1.388889.
u2022          As per the exchange rate in the purchase order 1.3799 the system is calculation the PO Net order Value but the Strategy is Determined based on the value maintained according to exchange Rate 1.388889
In the Purchase Order the system is 
Ex:  Total Purchase Order Value is 4765.21 SGD and 3453.30 in USD
      For Level 1 the value limit is 5000 SGD if it exceeds 5000 SGD it has to go to his manager (Level 2) Exchange rate on 01.04.2008 is 1.3799.
System Considerations:
Possible Solution:
1.        Create a new Class with Characteristic with Currency Value SGD System should determine the class based on the combination of Plant 6000 and Document Category F Purchase Order.
2.        By using Enhancement spot with Function Module ME_RELEASE_STRATEGIE/ ME_RELEASE_STRATEGIE_EKKO
Logic:
1.        System will determine the class PUR_RELEASE from table T16FG if the system finds Plant as 6000 and Document Category as F Then replace PUR_RELEASE with New class as ZPUR _6000.
2.        Maintain Z table for the combination of Plant and Class for future requirement
Edited by: Mohammad Irfan on Jun 8, 2009 10:41 AM

Hi Mohamed,
  You can create separate characteristics far all check points and assign those to class.
Regards,
Prasath

Similar Messages

  • Purchase Order release procedure

    Hi All,
    My client is having following requirement for Purchase Order release procedure.
    Plant 1                    -    1 Release code (Manager)
    Plant 2             -    2 Release Codes (Manager, Sr Manager)      
    Plant 3             -    3 Release Codes (Purchase Officer, Manager, Sr Manager)     
    All plants are assigned to one company code. Please advise me how I can map above requirement in sap.
    Thanks & Regards,
    Nagi

    Hi Nagi,
    In PO Realease startegy configuration, you need to decide and select the Release objects for which the system should trigger release for the document. you should work with Characteristics for each object (Your requirement is for 3plants) so in one of your characteristic WERKS should be your field along with other characteristics based on your requirements such as Total Net Value, Doc type etc.
    Create Characteristics in CT04 for the class type 032 and proceed maintaining the release Group and Release codes as per your requirement.
    Refer the following thread and revert if any confusions...
    http://**********************/2008/11/release-procedure-release-strategy-main.html
    Regards
    Shiva

  • Two currency in one sale order

    Hi guru,
            We are made one sale order in EURO currency,Now our customer wants some quantity in USD.
    Can i put  the two currency in one sale order?What i do?
    Regards,
    T.Murugu

    Dear Friend,
    You can create Sales Order with two different Currency Based on the Customizing :
    But at the time of billing the Currency conversion will take place to the sales organization default currency.
    View the Statistical Currency of Sales Organization: OVX5
    Check the table: EWUCURRS
    See Notes: 91481 and 135661
    regards,
    A S

  • Purchase order release workflow - urgent

    Hi friends
    When iam creating purchase order it trigger the workflow WS20000075 for releasing purchase order in that purpose what can i do..
    How can i set the Agents
    How can i trigger the events - i think in that purpose using pftc we trigger the workflow.. so i need clear steps from beginning onwards..
    my exact requirement
    once i create purchase order, the workflow will be triggered..
    after that the mail goes to the approver.. if he/she click that mail purchase order release statement want to be open.. after that he/she release purchase order it will goes to the next level..anyone give the step by step procedure..for that
    Thanks
    Gowrishankar

    yes prabakar.. but iam confused..
    You can get step by step workflow for PO using standard workflow
    Release of Purchase Order :WS20000075
    And for two levels of approvals you have to configure in SPRO the path is
    Purchase Order:
    SPRO> Material Management->Purchasing->/Purchase order-->Release procedure ---> Procedure with classification ---> set up procedure with classification ---> double click on Release strategies and Workflow.
    If you don't know about this configuration, you have to confirm with your MM consultant.
    after finish this iam triggering events using pftc
    in that pftc iam choosing business object bus 2012 for po release..
    i think thats enuf..
    After that it is possible to trigger workflow.. when iam create purchase order..
    Thanks
    Gowrishankar

  • Want to restrict the Purchase order release at lower level...

    Dear Friends,
    The Problem i am facing is that the release strategy defined in Purchase order is such that it will be released by four authorities,
    & When 4th One, The Highest authority releases the order it should not get unreleased by lower level authorities.I want to configure this.
    Partially it is completed, as if Tcode me29n is used for cancel release then it is restricted by Going into
    SPRO-MM-Purchasing-Purchase Order-Release Procedure for Purchase Order- Define Release Procedure for Purchase Order
    & suggesting it there.into Release Indicator
    But still it can get unreleased by Tcode me28.
    Kindly Suggest,
    Gaurav Chopra

    Hi,
    This is the standard like release srtetegy will not have the restriction only the release do the release . He can also should de release the document.
    this can't control.
    SAM

  • Creating  workflow for purchase order release.

    Hi friends
    I want step by step detail about creation of workflow for purchase order release..
    After release purchase order it will goes to the two level of approval..
    after that the workflow should be completed...
    how can i develope the workflow for that scenario..
    Thanks
    Gowrishankar

    Hi Gowrishankar,
    You can get step by step workflow for PO using standard workflow
    <b>Release of Purchase Order :WS20000075</b>
    And for two levels of approvals you have to configure in SPRO the path is
    Purchase Order:
    SPRO> Material Management->Purchasing->/Purchase order-->Release procedure ---> Procedure with classification ---> set up procedure with classification ---> double click on Release strategies and Workflow.
    If you don't know about this configuration, you have to confirm with your MM consultant.
    Thanks and Regards,
    Prabhakar Dharmala

  • Email Alert for Purchase Order Release

    Hi,
    When a PO is subject to release I would like an external email to be sent to the relevant user as per assignments in config.
    I have used standard workflow for PO release and this is working with no problems, alerts successfully going to the workflow inbox.
    But does anyone know the steps to configure the standard workflow so that an external email is sent?
    Thanks

    hi
    WORKFLOW FOR PO RELEASE PROCEDURE
    Steps involved are :
    1) SPRO > MM > Purchasing > Purchase Order > Release Procedure for Purchase Orders > Define Release Procedure for Purchase Orders > Release Codes > here assign Workflow indicator as "1" against each Release Code
    2) SPRO > MM > Purchasing > Purchase Order > Release Procedure for Purchase Orders > Define Release Procedure for Purchase Orders > Workflow > Here against each release code assign OT as US and respective User ID's for Release Codes.
    3) Go to OOCU > here under MM, go to MM-PUR,
    4) Click on "activate event linking"
    5) Go for "WS 20000075" and for BUS2012 RELEASESTEPCREATED, click on Detailed view button. Activate "Event linkage activated" and also activate "Enable usage of event queue"
    and Save.
    6) Click on "Assign agents" and proceed all above steps.
    BUS2012 is the relevant business object and Releasestep created is the event for the same.
    7) Check SWETYPV transaction for the WF you have activated for BUS2012 and confirm.
    Test the same by creating a PO and check the SBWP for SAP Mail of respective Users
    regards
    KI

  • Purchase Order Release Strategy didn't trigger

    Hi Gurus and SAP People!
    Good Day!
    I currently have a problem regarding one purchase order which didn't trigger a release strategy. I checked the classification/conditions/classes and it's all satisfied. I tried replicating the scenario in our Development server and I always end up triggering a release strategy.
    Moreover, as far as i know, the release procedure is not locked as it is one of the most commonly used release group and code. Can anyone have any ideas why that certain PO didn't trigger any release procedure upon saving?
    More details that might help.
    1. PO was initially on hold status then saved. (tried to replicate this as well and yet a release strategy was triggered)
    2. Upon saving, PO triggered an IDoc successfully. (my replication results always stayed "yellow" as it is still waiting to be released/approved before the actual Idoc generation (green)).
    3. Line item details had been changed between the PO being on hold and the actual saving. (but yet it still satisfies the release classifications)
    4. Line items came from PRs, Contracts, RFQs.
    Will greatly appreciate your help.
    Thank you very much!
    Regards,
    JV

    Hi Suzy!
    Thanks for the answer.
    I already checked the classification and searched our documentation repository if there were changes made and did not find any. Development and Production environment customization are the same.
    I forgot to include that after a few days the PO was created, they deleted one line item. That deletion made the PO trigger a release strategy.
    Nevertheless, the question still remains - why the PO didn't trigger any release procedure upon the initial saving.
    Regards,
    JV

  • Purchase Order Release Strategy Approval

    HI All,
    I have an issue with the Purchase Order Release Strategy, I need to set the Release strategy at 2 levels.
    Level one will have 1 approver
    Level two must have two approvers.
    The scene is:
    Level one will approve all purchase orders betwee 400 to 5000 euros.  1 approver only
    Level two will approve all purchase orders above 5000 euros.  2 approvers.
    The problem is that the level two approvers must have the same Purchasing Group, Release strategy and Code, that is.
    Pur. group G70, Release Group GC and release strategy DF.
    I have completed the customising and the Release simulation is working correctly but when the PO is created the is no release strategy proposed.
    CL20N is completed for both levels and works correctly for level one approval but not for level two
    Can any please help
    Leslie

    Hi,
    May be in your case the values are not properly designed in release strategy for PO Value (ZPO_GNETW) release characteristic.Now go for creation of following release characteristics
    1. PO Order Type (ZPO_BSART),
    2. Company Code (ZPO_ BUKRS),
    3. Purchasing Organization (ZPO_EKORG),
    4.Plant (ZPO_WERKS)
    5. Purchasing Group (ZPO_ EKGRP) and
    6. Total net PO Value (ZPO_GNETW)
    Create one release class ZPO_CLASS & then add all above release characteristics
    And then design your release strategies as required.
    AND under release characteristic for PO Value (ZPO_GNETW) keep following values
    A. <= 400 EUR
    B. 400.01- 5000 EUR
    C. >5000 EUR
    As you already created Release Group GC & release strategy DF (1st level), now create another release strategy DS (2nd level).
    NOTE: As you needed one releaser at 1st level and then two releasers in 2nd level. So create three release codes C1 for 1st level and C2 & C3 for 2nd level.
    In designing release strategies for PO , you can keep value 400.01- 5000 EUR with release codes C1 under DF release strategy and Keep value >5000 EUR with release codes C2 & C3 under DS release strategy.
    Regards,
    Bijju K

  • Purchase order release startegy

    Dear Experts,
    We have got release startegy for five release codes i.e L1,L2,L3,L4 and L5 for purchase orders
    Release startegy is based on Pur order category,doctype, Net order value and Pur group.
    For L1-L5 authorisation(all authorisations) is given for General managers.
    Currently when emergency is there general Manager has to release L1 to L5 all release codes.
    Requirement is that instead of releasing all can it be possible to release only L5 so that all can be released.( This authorisation is for only for L5)
    Once the authorisation is there for all any customisation possible for releasing code L5 so that remaining all release codes can be released.
    Please suggest.
    Regards,
    Dayanand

    Hi Mr.Shawn,
    I have removed ticks for L1,L2,L3,L4 in Release prerequisites then release startegy L1 L2 L3 L4 kept as Released.
    Then Even if release one all releasing.
    But Requirement is that when only L5 is released only All shall be removed, other wise remaining Releases shall be based on the old procedure only. L1 to L4 shall be L1 is released then only L2 can be released principle. But in case of L5 releases all shall be released.
    Is it possible, what needs to be done ,please suggest.
    Regards,
    Dayanand

  • Problem in Purchase Order Release Workflow

    Hello Experts,
       I am working in a workflow for releasing PO.In this workflow I have created just one activity step type to release a purchase order.Here I have taken PO(BUS2012) object as input parameter.In the activity step type I am using a custom task(TS99900011).In this task I have used BUS2012 as Business Object and SINGLERELEASE as method.Here I have used 3 terminating events of BUS2012 object.They are Released, Reset and significantly changed. I have just copied the standard task (TS20000166).
      Now my activity step has four outcomes.We can see them in Outcomes tab.
    1.Purchase Order Released(Cgy:External Events)
    2.Not Used(Cgy:External Events)
    3.Purchase Order Changed Significantly(Cgy:External Events)
    4.Processing obsolete(Cgy:Internal Events).
    I have set agent assignment as user Manas.
    Now, when I am testing the workflow with a valid PO number as input the work item goes to my inbox for release the PO as expected.There I can release or reject the PO.But while saving after releasing or rejecting the PO the work item still remains in Workspace Inbox.Any of the four outcomes is not appropriate for the activity.
      Can anybody suggest any solution to overcome the situation.
    Are the external events are really helpful in developing workflow activity?Please suggest.

    Hi Manas,
    There is one option, where you can stop the workitem and even entire workflow.
    Use Fork for parllel processing
    Have a Wait step with BUS2105-Significantlychanged event and outcome to the end of workflow.
    Thanks,
    Sudhir.

  • No of levels in purchase order release more than 8

    Dear All,
    We have a situation where some of our purchase orders need to be approved by more than 8 people.Can any one help me in telling-> whether we can create release strategies having more than 8 levels of approvals.If yes how to do it since I could see only max of 8 levels of approvals in the release strategy configuration for purchase order(release strategy with classification).
    Regards,
    Feroz Choudhury

    Hello,
    As mentioned by Uttkarsh, It is not possible to go beyond 8 levels in release strategy.
    More than 8 levels of approval is not a best practice, if your requirement still demands this explore the options of using Workflow functionalities in ECC or if approval is complex suggest SRM where you can handle n-level approval.
    Hope this helps.
    Thanks
    Ashu

  • Problem with purchase order release strategy

    Hi Guru's
        i am dealing with problem of  service purchase order release strategy , when i making the service  po ,  i am not giving any over fulfillment tolerance  ,  after release & making Service entry sheet of PO ,   when i go to the change mode and change
      over fulfillment tolerance say 90%  , system allow me to make , and not applying release  strategy again  ,  so  there can be a miss use of this Scenario ,  so is there any possibility that release strategy , will appear again when change the tolerance ,
    0r  any other idea from your side , to avoid this ,
      your suggestions are really always helpful to me ,  please guide me for this also
    Thanks & regards
    Neha

    Hi Neha,
    A reset of the release strategy only takes place if
    -  the changeability of the release indicator is set to '4' in
       case of a purchase requisition and '4' or '6' in case of
       another purchasing document (purchase order, request for
       quotation, contract, scheduling agreement),
    -  the document is still subject to the previous release
       strategy,
    -  the new TOTAL NET ORDER VALUE is higher than the old one.
    The total net order value is linked to CEKKO-GNETW for a purchase order,
    CEBAN-GSWRT for a purchase requisition item-wise release and CEBAN-GFWRT
    for a purchase requisition overall release.
    If you have maintained a Tolerance for value changes during release
    (V_161S-TLFAE), the release strategy is reset when the value of the
    document is higher than the percentage you have specified and if the
    document is still subject to the previous release strategy.
    Review the SAP note 365604 and 493900 for more
    information about Release strategy.
    Regards,
    Ashwini.

  • Purchase order release as per project

    I want to send notification to approve purchase orders. I can do this by configuring purchase order release strategy. But I want to identify the approver as per project.
    Purchase order has project number in account assignment tab.
    Can I relate this in workflow so that notification will be sent to project manager as per assignment in purchase order ?

    Release standard workflow is defined based on release groups and codes, so first, in this case you need to setup a release procedure for each structure/manager, having a relationship 1 to 1 between release codes and Releaser/Manager.
    For procedure determination, take into consideration that project is not defined in the standard communication structure, since as you might know, you may have multiple account assignment. In that case which is the cost center/project that should be taken into consideration to determine the release procedure.
    Therefore, to add this logic and include the project as a characteristic, I would recommend to include a custom exit.

  • Purchase Order Release Strategy with Dependency Condition

    Hi
    We have a scenario where we have to set up Purchase Order Release based on a combination of the following
    Vendor + Purch Org + Dollar Value.
    We have successfully set up the release strategy for which we have done the following
    1) Create Characterstics for Vendor, Purch Org and Net Order Value
    2) Assign the above characterstics to a Class
    3) Assign Class to the Release Strategy in SPRO.
    So far everything is good.
    Now we try to define a Condition. With a Fourth Characterstic (TRIG_RELEASE ) attached to the same class.
    And attached a Dependency condition to it.
    $SELF.TRIG_RELEASE = 'Y' IF VENDOR = '1000' and PURC_ORG ='8500' and NET_VALUE > 1000.
    When this dependency is set, the release doesnt trigger.
    but modifying the condition to
    $SELF.TRIG_RELEASE = 'Y' IF VENDOR = '1000' and PURC_ORG ='8500' .
    Trigger the Release for that condition.
    How can we base the dependency on Net Value also ? What are we doing wrong or missing ?
    Regards
    Aju Paul

    Hi Paul,
    I'm not sure why you really need that fourth characteristics. In my opinion, the three characteristics are good enough to achieve the desired release strategy. Why don't you just create a strategy that has those specifc characteristics value in your classification.
    You can do that from SPRO or CL24N.
    Define a new strategy in SPRO e.g "Vendor 1000 Porg 8500 > 1000"
    In CL24N, enter the class name; e.g Z_PO_RELEASE.
    class type 032
    Hit the enter key for existing release strategies to be displayed. Select the one you one just created above. Then click on detail and your characteristics/Value is displayed below.
    Then maintain the different values for the charateristics and then test with PO creation
    Xtic                  Value
    Vendor                1000
    P.Org                  8500
    Value                  > 1000

Maybe you are looking for

  • A78M-E35

    Why MSI A78M-E35 with ASUS EAH6670/DIS/1GD5 after restart in BIOS turn off  "Windows 8 Configuration - Windows 8 Feature" ? After PC start on display show - "System BIOS detected a non-Windows 8 Logo graphic card. There in no GOP (Graphics Output Pro

  • Getting problems with one book

    Hi everyone. I have never experienced this before and its really holding me up. When trying to output this one book its failing every time with a hang. But completly randomly, sometimes it gets to page 100 sometimes 125. If I watch where it hangs, I

  • What r problems came related ABAP/4 work, when upgration from lower version

    Hi Experts, can i know information about upgration. what are problems came in ABAP/4 realated development,when upgration from lower version to higher version. Best Regards jai

  • Installed too many fonts into font book, HELP!!!

    Hello community! A friend of mine gave me a folder with nearly 3000 fonts. I mistakenly opened my font book, dropped folder onto the app, and voila I thought my new mac had 3000 cool new fonts! Little did i know it seemed to slow down every program a

  • Trouble opening Apps,Documents etc ,,

    The only way I can open up any items to right click on then with the mouse. The problem is pretty much system wide. Any suggestions on what I can do to correct the problem will be greatly appreciated.