Updating project issues in 10.1

I have numerour projects on 3 different internal drives and am having trouble getting them to open/update or whetever.  I was attempting to "update projects and events" and yest when I slect the drive with those projects I get this:
This drive has BOTH Final Cut Projects and Events but those folders are always greyed out!  How in the heck do I get these things to update so I can work on them???!!!!!!!!

Yes there is AN event in the FC Events folder and many in the "Hidden" folder:
I was under the impression that if I "update all" then all of the projects would be in one big library, therefore I have only moved one to the "Final Cut Events" in order to try to get this to work.
I am selecting File > Update Projects and Events > Locate... and am then trying to update just the Final Cut Events folder as the window on the screen indicates that I ought to be able to do.
I am unfamiliar with the unmounting procedure.  I am working on a Mac Pro tower with all internal drives.  You don't mean to literally disconnect them do you?  Not connected to a SAN.

Similar Messages

  • Problems updating projects to new versions of Premiere (CS5 to CC and CC to CC 2014) Memory consumption during re-index and Offline MPEG Clips in CC 2014

    I have 24GB of RAM in my 64 bit Windows 7 system running on RAID 5 with an i7 CPU.
    A while ago I updated from Premiere CS5 to CC and then from Premiere CC to CC 2014. I updated all my then current projects to the new version as well.
    Most of the projects contained 1080i 25fps (1080x1440 anamorphic) MPEG clips originally imported (captured from HDV tape) from a Sony HDV camera using Premiere CS5 or CC.
    Memory consumption during re-indexing.
    When updating projects I experienced frequent crashes going from CS5 to CC and later going from CC to CC 2014. Updating projects caused all clips in the project to be re-indexed. The crashes were due to the re-indexing process causing excessive RAM consumption and I had to re-open each project several times before the re-index would eventually complete successfully. This is despite using the setting to limit the RAM consumed by Premiere to much less than the 24GB RAM in my system.
    I checked that clips played; there were no errors generated; no clips showed as Offline.
    Some Clips now Offline:Importer  CC 2014
    Now, after some months editing one project I found some of the MPEG clips have been flagged as "Offline: Importer" and will not relink. The error reported is "An error occurred decompressing video or audio".
    The same clips play perfectly well in, for example, Windows Media Player.
    I still have the earlier Premiere CC and the project file and the clips that CC 2014 importer rejects are still OK in the Premiere CC version of the project.
    It seems that the importer in CC 2014 has a bug that causes it to reject MPEG clips with which earlier versions of Premiere had no problem.
    It's not the sort of problem expected with a premium product.
    After this experience, I will not be updating premiere mid-project ever again.
    How can I get these clips into CC 2014? I can't go back to the version of the project in Premiere CC without losing hours of work/edits in Premiere CC 2014.
    Any help appreciated. Thanks.

    To answer my own question: I could find no answer to this myself and, with there being no replies in this forum, I have resorted to re-capturing the affected HDV tapes from scratch.
    Luckily, I still had my HDV camera and the source tapes and had not already used any of the clips that became Offline in Premiere Pro CC 2014.
    It seems clear that the MPEG importer in Premiere Pro CC 2014 rejects clips that Premiere Pro CC once accepted. It's a pretty horrible bug that ought to be fixed. Whether Adobe have a workaround or at least know about this issue and are working on it is unknown.
    It also seems clear that the clip re-indexing process that occurs when upgrading a project (from CS5 to CC and also from CC to CC 2014) has a bug which causes memory consumption to grow continuously while it runs. I have 24GB RAM in my system and regardless of the amount RAM I allocated to Premiere Pro, it would eventually crash. Fortunately on restarting Premiere Pro and re-loading the project, re-indexing would resume where it left off, and, depending on the size of the project (number of clips to be indexed), after many repeated crashes and restarts re-indexing would eventually complete and the project would be OK after that.
    It also seems clear that Adobe support isn't the greatest at recognising and responding when there are technical issues, publishing "known issues" (I could find no Adobe reference to either of these issues) or publishing workarounds. I logged the re-index issue as a bug and had zero response. Surely I am not the only one who has experienced these particular issues?
    This is very poor support for what is supposed to be a premium product.
    Lesson learned: I won't be upgrading Premiere again mid project after these experiences.

  • I am attempting to update from iMovie 9 to iMovie 10. I have many movies with iMovie 9. Yet, on iMovie 10, when I press "update projects and events", it states "iMovie could not find any projects or events to update". What do I do?

    I am attempting to update from iMovie 9 to iMovie 10. I have many movies with iMovie 9. Yet, on iMovie 10, when I press "update projects and events", it states "iMovie could not find any projects or events to update". Somehow it doesnt' see all the movies I have on iMovie 9 library.  What do I do?

    I'm dealing with this same issue. At one point, it did recognize the Update function but then said it could not import the cache.mov and plist files which apparently means that imovie 10 can't see any of these past events. I can't figure it out.

  • How to update project library list from an extension

    Hello,
    I'm writing an extension that needs to update project library list. I want to add a jar file in the library. How can I do this? Is there a sample code that does similar logic?
    Thanks.

    Hi José,
    2 considerations: 
    The first one is that (as you experienced) one should not delete or rename any of the predefined columns in the risk/issue list. What you did is the right way, meaning keeping the native column as is and creating new ones based on the business needs. Finally
    you just need to create view with the appropriate fields.
    Then for importing risks from an Excel list, I can't test it right now, but you should have a datagrid view (MS Access type) allowing you pasting data from Excel.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • IMovie 10 crashes when attempt to update projects and events of external HDs.

    No way to update projects and events. Crash every time after few minutes of processing. Without external HD, works fine. To access older projects and work on it,  the only way seems to be uninstal iMovie 10 and return to 9.

    I do not have exactly the same issue, but iMovie 10 seems buggy as all get out and the alledged bugs cause the system to hang something fierce. There are a number of ways to trigger a crash, apparently, but it always proceeds the same way.
    The screen - the display - goes all big pixelly and wonky. The computer becomes partially unresponsive. Controls in the apple menu at left end of menu bar work, so I can try some things. Relaunching finder does not help. Logging out does not help. Only shutdown and reboot clears the screen.
    But after a few minutes of trying things in iMovie 10, it crashes again. The crash goes the same way each time, but it seems to be triggered by different things.
    I have added screen shot - (hope I added a screen shot, anyway. ) Too bad.  I think I like iMovie 10.
    Message was edited by: quaoar
    Message was edited by: quaoar

  • Imovie crashes when updating projects and events

    I have updated to iMovie 2013, but when I try to bring all my media and project s into the new version, it crashes during the process. Has anyone else had this issue? Any

    I update to 10.0.1 and it crashed updating projects/events. I follewed the instructions in the link "if updating is interrupted.." and the same thing. I get a "problem report" that starts with
    Process:         iMovie [1772]
    Path:            /Applications/iMovie.app/Contents/MacOS/iMovie
    Identifier:      com.apple.iMovieApp
    Version:         10.0.1 (239055)
    Build Info:      iMovieX-23905005031000000~1
    App Item ID:     408981434
    App External ID: 141822634
    Code Type:       X86-64 (Native)
    Parent Process:  launchd [274]
    Responsible:     iMovie [1772]
    User ID:         501
    Date/Time:       2013-11-20 23:18:26.710 -0800
    OS Version:      Mac OS X 10.9 (13A603)
    Report Version:  11
    Anonymous UUID:  86B3DBF6-7B78-20C6-BFEF-087178DA0796
    Crashed Thread:  0  Dispatch queue: com.apple.main-thread
    Exception Type:  EXC_BAD_ACCESS (SIGSEGV)
    Exception Codes: KERN_INVALID_ADDRESS at 0x00000001164aa006
    VM Regions Near 0x1164aa006:
        MALLOC_LARGE           0000000116486000-00000001164aa000 [  144K] rw-/rwx SM=PRV 
    -->
        mapped file            00000001164e5000-00000001164ef000 [   40K] r--/rwx SM=COW  /System/Library/Caches/com.apple.IntlDataCache.le.kbdx
    Thread 0 Crashed:: Dispatch queue: com.apple.main-thread
    0   com.apple.Flexo                         0x000000010be6dc3e DVFormatReaderCreateFromStream + 1134
    1   com.apple.Flexo                         0x000000010be6a85
    Any ideas?
    -Phil

  • Billing plan is not updating project plan revenue

    Hi,
    My client has scenario like he creates projects manually and when he creates any sales order, he assign this sales order to the project though account assignment tab.
    The plan revenue for the project comes from sales order billing plan.
    The issue is the billing plan is not updating project plan revenue. Even if there is a billing plan, project report S_ALR_87013543 shows there is no revenue.
    Please tell me if there is any link between sales order billing plan and project plan revenue.
    How can I resolve this issue?

    Hi,
    I think you have not maintained planning profile in project definition.
    Goto project and  check planning profile in control data.
    We can create planning profile in OPSB t.code.  Select the fields Quotation and sales order in +Automatic revenue planning segment+ and assign revenue element.
    Now create a sales order with billing plan and check S_ALR_87013543 report.
    Regards,
    Chandra

  • Cannot See 'Updated' projects in iMovie Library

    Recently updated to iMovie 10.01 and then 10.02.  Originally had the Updated Projects event and the Finalized Movies Event showing in the iMovie Library, but they are no longer there.  I can 'see' them in the finder, looking at the iMovie and the show package contents....
    Is there way to get iMovie to 'see' these events again?
    PS: more info,  this orginated while I was cleaning up some of my events and clips, putting them in the trash.  I mistakenly put these in the trash, but hit the undo button and they seemed to reappear. Next opening of iMovie they were gone (but still in the finder as above).

    Try to find them in your medialibrary. iMovie folder, your library, right mouse click - "open a contents package"

  • IPad mini now terrible to use, apple support no help because warranty is up.  All cause by new ios8 update, wifi issues, many apps no longer work, apps that do work now crash regularly and sometimes take several instances and reboots to even open.

    IPad mini now terrible to use, apple support no help because warranty is up.  All cause by new ios8 update, wifi issues, many apps no longer work, apps that do work now crash regularly and sometimes take several instances and reboots to even open.

    need help uninstalling ios8 and going back to 7 where things worked please.

  • FSCM via WS-RM (without PI ) - Update termination issue

    Hello experts .
    We are trying to integrate SD with FSCM ( credit management) using WS-RM (without PI).
    Details of the issue and steps followed so far.
    Ideal Scenario :
    Once we create / change a sales order ( in SD ) , the interface Creditworthinessquery_out (WS Consumer ) gets triggered (in SD) and the subsequent response CREDITWORTHINESSQUERY_IN(Provider) is triggered from FSCM (with the details of creditworthiness).Once the query response in received an notification is triggered from SD to FSCM (asynchronous service).
    After receiving the query response the functionality of credit check happens while creating / changing the sales order .
    Configuration steps followed in SOAMANAGER
    We have created end points for all the relevant service interfaces (Providers) , and also created logical ports for the respective consumers.
    During the creation of logical ports - for the consumers we used the WSDL (of the providers) as the inbound message action.
    (This has been done to all the services query , notification that are relevant in our integration).
    Current behavior / issue .
    While creating sales order the sales order is not getting saved (getting updated in the database).System allows us to complete the sales order creation process and also we get a message as sales order saved successfully. But then there is a update terminated express document that pops up. Sales order is not getting updated in the database.
    When I see the logs/traces in SOAMANAGER I see that the query out is successful , query in has the right response (in warning state though) . But no notification is being triggered ?? 
    How to overcome this update termination issue ?
    When we see the SM13 log , it points to SLD issue (LCR 010: Internal error in SLD API). why do we need a SLD without PI

    Hi  ,
    Finally we are able to solve the update termination issue . But again we are using a work around .
    Situation :
    Once we executed the VA01 transaction we were getting update termination issue . After lots of debuggung we found that system was trying to get the Business system details ( Own business system data ) . The table lcrt_clntcache had no values.
    Solution
    We inserted appropriate values in the Table LCRT_CLNTCACH (business system data ) and now it works .This is a work around we got as of now.Credit checks are happening successfully and also integration is good .
    (typically if we define business system in SLD (PI) , and run SLD_CHECK , this table gets populated , but in our case we are not using PI instead we are using WS-RM)
    But now few questions arise .
    a) Why do we need a business system in case we are not using PI ( typically we define business system and technical system in PI )  and instead using WS-RM ?
    b) Is it a good practice to update the table ( as did in workaround above )?
    c) Is this any bug and needs to be consulted with SAP ?
    Please let me know your views .
    Edited by: Vedula Adeep on Jan 16, 2012 8:42 AM

  • Need HELP (Project Issue) : Having 3 individual VIs, datalogger.vi, start vi, amksms.vi done. (How to run the VIs in sequence order - datalogger start amksms combine into 1 VIs? )

    Need HELP (Project Issue) : Having 3 individual VIs, datalogger.vi, start vi, amksms.vi done.
    (How to run the VIs in sequence order - datalogger > start > amksms combine into 1 VIs? )

    VIs in icon.
    how would it able to run in the sequence order:
    data first, follow by start and lastly amk sms.
    Attachments:
    dsa.jpg ‏10 KB

  • Can I use a project/issue management software with LabVIEW?

    There are project/issue management softwares.
    I only know Redmine.
    Can I use LabVIEW with such softwares?

    I am not aware, that you can hook LabVIEW to tools like bug tracing databases in a native way.
    What you can do is performing that link in a context of requirements management. Use NI Requirements Gateway for this functionality. 
    Norbert 
    CEO: What exactly is stopping us from doing this?
    Expert: Geometry
    Marketing Manager: Just ignore it.

  • Bug in 10.1: Updating projects from a folder tree

    There's a bug when updating projects that are organized in a tree of folders under Final Cut Projects.
    I had a bunch of projects organized under a subfolder under Final Cut Projects. After the update to a library, each project appeared under the subfolder under Updated Projects as expected. However, a duplicate of each project also appeared directly in the Updated Projects folder. When I tried to delete either of the duplicated projects, it erased its duplicated partner, leaving no trace of the project.
    The only workaround is to make sure that all projects are situated on the same level under Final Cut Projects.

    Hi !
    I found out where the problem is. On startup Default setting is checked in this is problem. When you uncheck this option, encoding list is not repopulated. So you have force it (by closing Preferences window down and opening it again) and then it works. Coworker of mine disovered this quite accidentally. This should be fixed, by either populating list always, or repopulating list after option is checked. I suppose first option would be better.
    Andy

  • In imovie 10.0.1 while trying to update projects and events in get a box telling me iMovie could not find any projects or events to update

    in imovie 10.0.1 while trying to update projects and events i get a box telling me that imovie could not find any projects or events to update. Help, please.

    Do you have Projects and Events form an earlier version of iMovie?
    Matt

  • What is the 'Updated Projects' folder in iMovie 10?

    I installed iMovie 13 and I'm totally confused by the new layout. Specifically, it's not clear to me what happened to my projects and events.
    I see three top levels in the sidebar:
    *All Events: This seems to show all my imported events.
    *All Projects: This seems to show all my improved projects. So far so good.
    *iMovie Library: This seems to contain all my imported events (how is this different from the All Events?). It also contains a folder called 'Updated Projects', an event which contains all my imported projects (why are my projects in an event?? And how is this different from the 'All Projects' view?)
    The old layout was so simple - Events and Projects. The new layout is utterly confusing. Any help would be appreciated.

    I really find what they've done to be very confusing.  Even if you don't compare it to how things used to be in the last version.  Why is a movie Project inside an Event?  I have 6 Events from a recent vacation.  Each location that I visited is logically an Event.  It was something that happened in a point in time.  I believe that's a reasonable definition of an Event.  Now I want to make a "vacation movie" and it wants me to pick which event it's associated with.  Well, 6 of them... now what?  So I have to create a container Event just to put the movie inside it?  That makes no sense to me.  I rate this new approach a D-. 

Maybe you are looking for