WIP quantites in SAP

Hello friends
I have a question regarding WIP quantities in SAP, is it possible through some development or BADI to get WIP quanties for make-to-order or make-to-stock environment (manufacturing through production orders).
As far as i know SAP associates WIP to dollar amount and not to quantities.And just wondering why they didnt provide the option for WIP quantities. Any way they are calcuating the actual labor confirmed,actual goods issued to cost object, why no report which display these WIP quantities?
Is it possible through implementation of Material ledger, i checked some OSS notes and i got infrmation about WIP revaluation through ML
Any one worked on project related to WIP quantities? Points will be assignend
regards
sap-admirer

Hi,
Let me try to understand your requirement better. As you are aware that WIP is not being quantified anywhere in the system. The products are in various stages of completion. Some are 50% complete and some are 90 % complete and so on. Even if it is quanitified, we need to the weightage of completion. If that is the case, without any input in to the system how, the system shall be able to quantify. I do not think that any BADI or by implementing ML, this requirement can be fulfilled. Let us know what business demands in this case.
Trust this helps much!
Cheers!

Similar Messages

  • WIP Calculation in SAP

    Hello All,
    When we are Calculating WIP in SAP i found two things
    it is taking all the materail cost from the order for which the raw material has been issued but the stock from the orders were not delivered. I think that is correct since the Stock is still lying in the shop floor and SAP is calculating the WIP from that stock.
    But i have a problem in Understanding that WIP calculated for a Specifical Month is not getting reversed on the first day of the next month, but it is getting reversed on the settlement of the Order after complete delivery only.
    For Example:
    One Production Order ZYX is Created In March 20th for getting the output Material 123
    for that we issued raw material A, B,C with total value of 200 EUR  on 31st of may we calculated the WIP  and it showed the value of 200 EUR in WIP but on 1st of April it is not getting reversed.
    next month i.e. April we issued raw material to Order say D,E,F with Total Value of 800 EUR this time WIP is calculated on 30th April for 800 EUR and showing in the GL  without any reversal in May 1st.
    On 15th of may the Production Order ZYX Had the GR of Material 123 and now at the settlement of Order on the 31st May it is showing the settlement Entry and the addition entry of WIP Reversal for 1000 EUR.
    Now i want to know why is SAP not Reversing the entry for every month and why is it getting reversed at the Order Closing Time.
    Is it the SAP Standard Process or Is it some thing that can be changed by Customization.
    Best Regards.
    Krishna Chandra

    Hi Christian,
    In that case what happens if there is a partial GR for the order for EUR300 on 5th Of May, now the FG stock accounts will get an update of EUR300 and the final standing of the balance sheet on 5th of May will be as follows :-
    Balance sheet
    FG stock accounts : EUR300
    WIP Total       : EUR1000
    Total BS stock value = EUR1300
    This is actually wrong because the total stock cannot be EUR1300 where EUR300 more than total WIP of EUR1000
    The right way is when a GR of 300 is happening the system should reverse a WIP value of 300 from the WIP total instead of waiting till the order changes status to DLV or TECO. Only then the BS stock total can be correct as follows :-
    Balance sheet
    FG stock accounts : EUR300
    WIP Total       : EUR700
    So my question is why SAP is not reversing the value of the GR from the WIP total computed earlier?

  • Inventory Management MultiProvider 0IC_MC03 - Where does the WIP Come From

    Hi,
    I have installed the primary InfoCube 0IC_C03 for Material Movements and noticed that there is a MultiProvider 0IC_MC03 (Material Range of Coverage WIP )  and I'm curious how this would project WIP?  The Documentation doesn't mention any details about what really makes up this provider other than the primary cube 0IC_C03.
    Where does this MultiProvider get Work in Process Values (WIP)?

    Hi,
    Check this:
    [Material Range of Coverage WIP |http://help.sap.com/saphelp_nw70/helpdata/en/41/34c9b85c2531fbe10000000a114e5d/frameset.htm]
    Hope this helps....
    Rgs,
    Ravikanth

  • Material Ledger -- WIP values

    Hi,
      We have material ledger functionality active and want to extract the WIP values based on the Production Order. Currently we are executing transaction Code CKMLWIPDISP for viewing the WIP details and the values in object currency and controlling area currency are appearing. We want to know the table which provides the above details
    Can anybody suggest the table which will provide us the WIP values based on the Production corder incase if the material ledger active.
    Regards,
    Shree.
    Edited by: Shree Ja on Nov 18, 2010 10:19 AM

    Hello Shree,
    Some more tables
    CKMLCRWIP                      Material Ledger: WIP Period Records (Values)
    CKMLLACRWIP                    ML Activity Types: Period/ Currency Records WIP
    CKMLLAPPWIP                    Ml Activity Types: Period Records WIP (Quantitie
    CKMLMV004WIP                   Process Model: Deductions WIP
    CKMLPPWIP                      Material-Ledger: Period Records WIP (Quantities)
    CKMLWIPCUST                    Customizing: WIP To Actual
    As told earlier I'm not in a position to verify since there are no records in the current system.
    Kind Regards // Shaubhik

  • Activate WIP at Actual Costs

    Dear friends,
    Our SAP system is going to upgrade to ECC 6.0. We did not activate WIP revaluation functionality in original ECC 5.0. Are there any impacts or notes if i directly activate WIP revaluation function via Tcode OMXW? Thanks in advance for your input.
    Best regards,
    Jessie

    Hi ADI ,
    So , its confirmed that its a ML issue only ..
    Hence , You have to contact SAP for the same .Refer OSS Note : Note 1497118 - Helpdesk for WIP inconsistencies
    Contact SAP helpdesk directly..
    Regards
    Sarada

  • Special stock indicator in production order

    Hi,
    We have a new business scenario from sales department.
    For example, A is a MTO item, it has component B & C. Now there is a sales order for A come in, and system create a production order, but there is no enough stock for B. They want to:
    1, Allocate C to the production order and other production order or sales order can not take it away via V_V2 or MRP run.
    2. Create another seperate purchase order for B and want this purchase order also allocate to this production order.
    3. They do not want to use WIP stock because it is difficult to display WIP stock in SAP you know.
    I trying to use the special stock indicator "E" for components in production order, and I move C to custom stock via 412 E with no issue.
    But when I create a purchase order for B with account assignment "F",  it goes to normal stock in MD04. After I post GR for the purchase order, the quantity goes to production order directly, does not show in MD04 and did not reduce the requirement quantity.
    If I create a purchase order for B with account assignment "E", it gives an error message "Sales document item is not defined for the transaction. I tried to change the requirement type from "KMFA" to "KE" in the sales order for A, and the production order disappeared, it is not accepted.
    How should I define and configure the process?
    Thank you so much.
    Albert

    Hi Albert
    I suggest you to take a look on the setting "individuall/collective" on the tab MRP4 of the material master.
    For both components, you should set the value 1 and system will always plan the components under the sales order special stock.
    BR
    Caetano

  • Need Information Related to Finance

    Hi Everyone,
    Can anyone explain me about WBS ,WIP, AP ,AR, GL & related things..
    With Regards
    Pavan

    Hi,
    WBS
    Go through the below link
    http://www.sap-img.com/project/what-is-wbs-element.htm
    WIP
    http://help.sap.com/saphelp_470/helpdata/EN/90/ba6609446711d189420000e829fbbd/content.htm
    AP
    http://www.sap-basis-abap.com/sapfiar.htm
    AR
    http://www.sap-basis-abap.com/sapfiar.htm
    GL
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/FigL/FigL.pdf
    Regards,
    Marasa.

  • Result Recording Error

    Dear Gurus,
    I am geting the following ERROR
    Value can't be interp. as floating-point number or longer than 22 charac.
    Message no. BF020
    I have maintain an MICs in the systam as BlankDie,and asigned in the Inspection Plan as my client wants to enter the die size in the Result-Recording.
    But when i enter the die size for example: 60/33
    I get above error.
    Regards
    Ram

    Ram
    Correct me if I am wrong
    You always want to enter something like that 60/30 (means your die size or fixed like 60/30 , 29/15 like that)
    If your MIC is Quantitative - then SAP will allow to enter either 60 or 30 and it will not allow you to enter 60/30 or 60by30 because these are all consider as Alphanumeric this is not allowed for MIC's.
    for this you need to create catalogs1 and code group and codes
    Create MIC as Qualitative and select catalog in QS21.
    In Qe51N you can select your predifined codes (means your die sizes like 60/30) if you feel 500 - 600 die sizes it is very difficult to select.then ask your business is't it realy neccesarry for single material inspeciton they want to all size or depends material it may wary. if it is vary better to create more MIC based on that you can split catalog code group and code.
    otherwise As i said create one code group and code.
    or  if possible if 1 is equal to 30/60 and 2 equal to 70/50 -- something like that is ok then you can use quantitative MIC --- but I don't think your client will accept this?
    this is the only solution
    Try this and let me know if you have problem
    Thanks
    Sami
    Edited by: sami sami on Mar 7, 2009 6:43 PM

  • Production Order Confirm/Label Printing problems

    I am currently having issues printing out labels for production orders.  Whenever I confirm an order, our printer will print out a different quantity or no label at all.  
    Here is a brief history of production order confirmations today....
    Entered                Printed
    80                           40 (2 labels of 20)
    20                           No Print
    20                           No Print
    40                           No Print
    ALL confirmations were accepted by SAP
    SAP WILL often drag during a normal confirmation when correct labels are printed
    SAP will NOT drag when a confirmation is entered and no labels are printed
    Yesterday I had a confirmation for 10 print out a label for 19.  All of the quantities in SAP are correct, it's only the printer that is creating labels for different quantities.  If all the lot sizes in SAP are correct, what do you think the issue might be?

    Hi,
    Based on what i understand of your query, would suggest to work with your technical person to have a look at the print program. The delay you notice or the incorrect data being printed might have to do with the program.
    Regards,
    Vivek

  • Results Analysis for Projects

    Hi Guys,
    We use Results analysis for projects and also we use RA in Product Costing.
    Can anyone let me know what exactly does this Results Analysis mean ( not in SAP terms ).
    I am trying to look for this over help.sap.com and google but could not find information on what exactly this term means.
    Also how is this related to WIP?
    Please clarify.
    Thanks,
    Srikanth.

    Dear srikusap,
    Calculation WIP through the SAP, RA key will play important role.  Work in process calculation is diferent from industry to industry. 
    In SAP RA key will shows the WIP amount while u running KKAX Transaciton Code.  After when ever u do the settlement then ti will be settled to Financial Account.  At that time A Accounting Document was generaged.  when ever the Order Status is Teco then the provious period WIP will be reversed.
    Revert back if u any calrification.
    Raj

  • Doubt in Result Analysis

    Hi Experts,
    Result

    Hi,
    Result Analysis:
    Overview:
    The objective for calculating Work in Process (WIP) is to determine the value of manufacturing activity in process at the end of a fiscal period, during a fiscal period and to properly reflect this value on the financial statements. WIP calculation is a facet of Results Analysis (RA). RA is a specialized tool within the controlling module that computes and analyzes the value of WIP. The terms WIP calculation and RA are generally interchangeable.
    Results analysis is used to:
    a. Calculate the inventory value of finished and unfinished products in a non-valuated project stock or non-valuated sales stock environment or
    b. You are using a valuated sales order stock or valuated project stock and want to capitalize goods that have been delivered but not yet invoiced.
    The difference between SAP and other systems is in the treatment of material consumption for manufacturing. Component issues to production orders, run schedules, WBSs, etc is immediately treated as an expense to the P&L statement. The issue is not treated as a reclassification from raw or semi-finished inventory to WIP inventory. SAP considers WIP to be a snapshot of values that can be computed on demand and passed to the general ledger as required to re-class the values to the balance sheet. This process demands a specific, methodical approach to be used for period-end and mid-period processing. Rules used to calculate the value of WIP and settle WIP to the G/L are defined in multiple RA tables depending upon the requirements of the company. RA is designed to support a variety of calculation techniques and there may and are alternate settings depending on the demands of the company. To support the configuration, scenarios and unit testing need to be thorough. RA needs to be configured towards the middle of the of the implementation with subsequent testing. This will allow for configuration of the data needed to support WIP and RA (chart of accounts, production orders, projects, cost centers, cost elements, etc.)
    Configuration Transactions:
    OKG1 u2014 Create Results Analysis Key
    OKG2 u2014 Results Analysis Version
    OKG9 u2014 Results Analysis Version
    OKGC u2013 OKGD u2014 Valuation Methods
    IMG SPRO u2014 Define Line IDs
    OKGB u2014 Define Assignment Mapping by incoming charges by cost element to line IDs
    OKG5 u2014 Define Assignment Mapping by incoming charges by cost element to line IDs
    OKG4 u2014 Define Update
    OKG6 u2014 Define Number Ranges
    Thanks,
    Rau

  • Capitalizesd cost

    hi
    in the CK11N,we make plan cost esimate and released, in the CO01 plan and actual cost calculate , these difference take as a variance and difference between delivered and undelivered take as WIP. this WIP amount through posting rule send to FI
    IS NOT IT
    SO, why we are assigning cost element/ group to LINE ID's , these line id's take ' required to capitalized ' what is mean of CAPITALIZED , for this line ids RA cost element assigning .
    what is the result of doing this
    which cost has to take as capitalized,which one has to take as prohibition to capitalize
    any link LINE IDs to WIP
    THNK U
    SOWMYA

    Hi,
    WIP or RA:
    The objective for calculating Work in Process (WIP) is to determine the value of manufacturing activity in process at the end of a fiscal period, during a fiscal period and to properly reflect this value on the financial statements. WIP calculation is a facet of Results Analysis (RA). RA is a specialized tool within the controlling module that computes and analyzes the value of WIP. The terms WIP calculation and RA are generally interchangeable.
    The difference between SAP and other systems is in the treatment of material consumption for manufacturing. Component issues to production orders, run schedules, WBSs, etc is immediately treated as an expense to the P&L statement. The issue is not treated as a reclassification from raw or semi-finished inventory to WIP inventory. SAP considers WIP to be a snapshot of values that can be computed on demand and passed to the general ledger as required to re-class the values to the balance sheet. This process demands a specific, methodical approach to be used for period-end and mid-period processing. Rules used to calculate the value of WIP and settle WIP to the G/L are defined in multiple RA tables depending upon the requirements of the company. RA is designed to support a variety of calculation techniques and there may and are alternate settings depending on the demands of the company. To support the configuration, scenarios and unit testing need to be thorough. RA needs to be configured towards the middle of the of the implementation with subsequent testing. This will allow for configuration of the data needed to support WIP and RA (chart of accounts, production orders, projects, cost centers, cost elements, etc.)
    Configuration Transactions:
    OKG1 u2014 Create Results Analysis Key
    OKG2 u2014 Results Analysis Version
    OKG9 u2014 Results Analysis Version
    OKGC u2013 OKGD u2014 Valuation Methods
    IMG SPRO u2014 Define Line IDs
    OKGB u2014 Define Assignment Mapping by incoming charges by cost element to line IDs
    OKG5 u2014 Define Assignment Mapping by incoming charges by cost element to line IDs
    OKG4 u2014 Define Update
    OKG6 u2014 Define Number Ranges
    hope this helps you.
    Thanks,
    Rau

  • HOW TO IMPROVE THE PERFORMANCEOF THE ABAP PROG

    HI ... CAN I IMPROVE OF THE PROG
                                          WHAT ARE STEPS CAN I TAKE.
                                          HOW CAN I CHECK THE PERFORMANCE

    Hi Srinu
    Some of my favs at SDN,
    SAP Network Blog: Welcome to the Performance Forum!
    /people/joerg.nalik/blog/2005/08/04/welcome-to-the-performance-forum
    SAP Network Blog: Analyzing performance problems on a production system
    /people/markus.kohler/blog/2006/09/14/analyzing-performance-problems-on-a-production-system
    SAP Network Blog: Performance improvement hints: date, time, timestamps
    /people/harry.dietz/blog/2005/10/11/performance-improvement-hints-date-time-timestamps
    SAP Network Blog: Performance of Nested Loops
    /people/rob.burbank/blog/2006/02/07/performance-of-nested-loops
    SAP Network Blog: Performance improvement hints 4: loop at itab where...
    /people/harry.dietz/blog/2005/11/03/performance-improvement-hints-4-loop-at-itab-where
    SAP Network Blog: Query Performance, Pareto, Goldratt's TOC & Me
    /people/vikash.agrawal/blog/2006/11/15/query-performance-pareto-goldratt146s-toc-me
    SAP Network Blog: Query Performance – Is "Aggregates" the way out for me?
    /people/vikash.agrawal/blog/2006/04/17/query-performance-150-is-aggregates-the-way-out-for-me
    SAP Network Blog: Performance Tuning - an overlooked activity
    /people/hema.rao/blog/2006/09/25/performance-tuning--an-overlooked-activity
    SAP Network Blog: Performance improvement hints 3: internal table - fill and read
    /people/harry.dietz/blog/2005/10/28/performance-improvement-hints-3-internal-table--fill-and-read
    SAP Network Blog: When Old Data Affects Performance. And When Not.
    /people/helmut.stefani/blog/2006/02/13/when-old-data-affects-performance-and-when-not
    SAP Network Blog: Getting Through the Maze of Query Performance Improvement–a Quantitative Approach
    /people/vikash.agrawal/blog/2006/10/19/getting-through-the-maze-of-query-performance-improvement150a-quantitative-approach
    SAP Network Blog: Using Field Symbols in Loop Statements - Performance Boost?
    /people/rich.heilman2/blog/2006/03/07/using-field-symbols-in-loop-statements--performance-boost
    SAP Network Blog: Query Optimization
    /people/prakash.darji/blog/2006/01/26/query-optimization
    SAP Network Blog: Internal table - fill and read: how to measure
    /people/harry.dietz/blog/2005/12/12/internal-table--fill-and-read-how-to-measure
    SAP Network Blog: Query Creation Checklist
    /people/prakash.darji/blog/2006/01/27/query-creation-checklist
    SAP Network Blog: Simple ABAP Benchmark
    /people/sergio.ferrari2/blog/2006/01/18/simple-abap-benchmark
    SAP Network Blog: The power of the "Code Inspector"
    /people/community.user/blog/2006/11/30/the-power-of-the-147code-inspector148
    SAP Network Blog: Parallel Processing in ABAP
    /people/naresh.pai/blog/2005/06/16/parallel-processing-in-abap
    SAP Network Blog:
    /people/nitzan.levi/blog/2004/10/03/code-review-150-it146s-a-kind-of-magic
    SAP Network Blog: Writing Optimized query-Basic
    /people/puru.govind/blog/2006/09/21/writing-optimized-query-basic
    SDN WIKI
    https://wiki.sdn.sap.com/wiki/display/HOME/ABAPPerformanceand+Tuning
    Regards
    Kathirvel

  • Revenue recognition through RA

    Hi CO and RA Gurus
    Does any one know how to do Revenue Recognition using Result Analysis Keys.
    thanks
    KT

    Hi,
    Result Analysis:
    Overview:
    The objective for calculating Work in Process (WIP) is to determine the value of manufacturing activity in process at the end of a fiscal period, during a fiscal period and to properly reflect this value on the financial statements. WIP calculation is a facet of Results Analysis (RA). RA is a specialized tool within the controlling module that computes and analyzes the value of WIP. The terms WIP calculation and RA are generally interchangeable.
    Results analysis is used to:
    a. Calculate the inventory value of finished and unfinished products in a non-valuated project stock or non-valuated sales stock environment or
    b. You are using a valuated sales order stock or valuated project stock and want to capitalize goods that have been delivered but not yet invoiced.
    The difference between SAP and other systems is in the treatment of material consumption for manufacturing. Component issues to production orders, run schedules, WBSs, etc is immediately treated as an expense to the P&L statement. The issue is not treated as a reclassification from raw or semi-finished inventory to WIP inventory. SAP considers WIP to be a snapshot of values that can be computed on demand and passed to the general ledger as required to re-class the values to the balance sheet. This process demands a specific, methodical approach to be used for period-end and mid-period processing. Rules used to calculate the value of WIP and settle WIP to the G/L are defined in multiple RA tables depending upon the requirements of the company. RA is designed to support a variety of calculation techniques and there may and are alternate settings depending on the demands of the company. To support the configuration, scenarios and unit testing need to be thorough. RA needs to be configured towards the middle of the of the implementation with subsequent testing. This will allow for configuration of the data needed to support WIP and RA (chart of accounts, production orders, projects, cost centers, cost elements, etc.)
    Configuration Transactions:
    OKG1 u2014 Create Results Analysis Key
    OKG2 u2014 Results Analysis Version
    OKG9 u2014 Results Analysis Version
    OKGC u2013 OKGD u2014 Valuation Methods
    IMG SPRO u2014 Define Line IDs
    OKGB u2014 Define Assignment Mapping by incoming charges by cost element to line IDs
    OKG5 u2014 Define Assignment Mapping by incoming charges by cost element to line IDs
    OKG4 u2014 Define Update
    OKG6 u2014 Define Number Ranges
    If your done with RA configuration and posted actual cost,plan cost and plan revenue.
    you can calculate revenue recognistion using KKA2 T.code for projects.
    Hope this helps you.
    Thanks,
    Rau

  • WIP Variance Calulation in SAP B1

    Hi Experts
    I need help in WIP variance calculation in SAP B1.
    How system calculate FG cost in SAP B1?
    As per my knowledge component cost is FG cost if we have not loaded any overheads.
    But we are getting WIP variance in production orders.
    Pls. help me out from this.
    Regards
    Kamlesh

    Hello Kamlesh,
    You can also refer to Note 1089549. I have copied the text here:
    "In SAP Business One, a pre-defined standard is summarised in the form of a 'Bill of Materials' (BOM). The BOM holds all the raw materials, labour, and processes required for producing the finished product. The production variance is calculated as the difference between the quantities defined in the BOM and the actual quantities issued for production. The quantity difference is multiplied by the current item
    cost to arrive at the total variance cost.
    Once completion of the final product is posted, the variance is stored in the 'Total Variance', 'Variance Per Product', and 'Variance %' fields of the Production Order -> Summary tab.
    This variance cost is posted to the corresponding 'WIP Stock Variance Account' when closing the Production Order. The 'WIP Stock Variance Account' is set up in the Item Group, Item Warehouse, or Item Level,
    whichever is applicable."
    I hope the above helps.
    Regards,
    Lorna Real

Maybe you are looking for

  • USB-6009 pulse train generation with digital output....

    Hello! I've bought a new USB NI-Card (USB-6009) and now I'm trying to adopt an old vi that uses traditional DAQ drivers. I wrote that vi for a PCI NI-Card (PCI-6024E), which has two counters to generate two pulse trains simultaneously. Now I've only

  • DNS & routing on a new Solaris 10 installation

    Hello all. This will be my first time posting, so let me know if I breach ettiquette or something. I just installed my Ultra 10 with Solaris 10, and I love the look of the OS. However, I can't ping or connect to anything on the network with the serve

  • Agents in Content DB

    In CM SDK it was possible to write custom agents, either timer-based or event-based (or both). I don't see anything about writing agents in Content DB though, although there are agents. Will there be any documentation on writing agents in Content DB?

  • WSUS - Clients stopped reporting on downstream replicas

    Just looking for some advice on what could be wrong here. Some of our downstream WSUS replicas have stopped 'receiving' updates from machines on the network.  Below is an example of one group affected.  In this case WSUS is on a 2003 server but there

  • How to load/import/extract Axon Instrument .abf file 2.0.4 version?

    Hi all, We recently set up a low current measuring system using Axon Instrument's devices, and the data recorded are in .abf format 2.0.4 version. I know there's an example VI about abf file format here: http://www.ni.com/example/30979/en/, but it on