ACE- From one real server to another VIP

Hi,
I have a problem with ACE;
We have multiple serverfarms configured in the ACE module based on the application and different VIPs related to it. We are running the ACE in bridging mode. Now the requirement is from one serverfarm real server wants communicate to the VIP of the second serverfarm...Is this possible..???? Wil some NATing help in this situation. Below is the configuration.
======================
/* Style Definitions */
table.MsoNormalTable
{mso-style-name:"Table Normal";
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-qformat:yes;
mso-style-parent:"";
mso-padding-alt:0in 5.4pt 0in 5.4pt;
mso-para-margin:0in;
mso-para-margin-bottom:.0001pt;
mso-pagination:widow-orphan;
font-size:11.0pt;
font-family:"Calibri","sans-serif";
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-fareast-font-family:"Times New Roman";
mso-fareast-theme-font:minor-fareast;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-bidi-font-family:"Times New Roman";
mso-bidi-theme-font:minor-bidi;}
access-list LAN_Traffic remark For all IP Traffic
access-list LAN_Traffic line 10 extended permit ip any any
access-list LAN_Traffic line 20 extended permit icmp any any
probe http PORTAL_HTTP
  passdetect interval 20
  passdetect count 2
  request method get url http://portal
  expect status 0 600
probe http RMS_HTTP
  request method get url /_wmcs
  expect status 0 600
rserver host PORTAL1
  ip address 172.22.11.241
  inservice
rserver host PORTAL2
  ip address 172.22.11.243
rserver host QGLRSPW1
  inservice
rserver host RMS01
  ip address 172.22.10.12
  inservice
rserver host RMS02
  ip address 172.22.10.8
  inservice
serverfarm host PORTAL
  failaction purge
  probe PORTAL_HTTP
  rserver PORTAL1
    inservice
  rserver PORTAL2
    inservice
serverfarm host RMS
  failaction purge
  probe RMS_HTTP
  rserver RMS01
    inservice
  rserver RMS02
    inservice
class-map match-any PORTAL
  2 match virtual-address 172.22.10.166 tcp any
class-map match-any RMS
  2 match virtual-address 172.22.10.52 tcp eq www
  3 match virtual-address 172.22.10.52 tcp eq https
policy-map type loadbalance first-match RMS-POLICY
  class class-default
    serverfarm RMS
policy-map type loadbalance first-match PORTAL-POLICY
  class class-default
    serverfarm PORTAL
policy-map multi-match SFARM-LB-POLICY
  class RMS
    loadbalance vip inservice
    loadbalance policy RMS-POLICY
    loadbalance vip icmp-reply active
class PORTAL
    loadbalance vip inservice
    loadbalance policy PORTAL-POLICY
    loadbalance vip icmp-reply active
interface vlan 800
  description ACE Client Interface
  bridge-group 1
  mac-sticky enable
  service-policy input SFARM-LB-POLICY
  no shutdown
interface vlan 898
  description ACE Server Interface
  bridge-group 1
  mac-sticky enable
  no shutdown
interface bvi 1
  ip address 172.22.11.151 255.255.252.0
  alias 172.22.11.153 255.255.252.0
  peer ip address 172.22.11.152 255.255.252.0
  description Bridge Group for 800 and 898 Interfaces
  no shutdown
ip route 0.0.0.0 0.0.0.0 172.22.8.17
===================================
Pleae help..Thanks in advance

Hello!
Well yes it would work. BUT...you have to change your config a bit. First you need to apply your accesslist to both interfaces, or the ACE will reject it, because it is acting as a firewall by default. And second you have to apply the policymap to both interfaces as well or you put the policymap globally on the ACE.

Similar Messages

  • How to move phones from one CUCM server to another?

    How easy is it to migrate IP phones from one CUCM server to another?
    The situation is this:
    A vessel currently sitting in dry dock has 14 IP phones onboard which currently register with a CUCM server half way round the world (literally). As you can imagine there is quite a fair amount of delay for the signal processing, not to mention the connectivity being over a VSAT link. This being a temporary solution.
    A CUCM server has been configured and installed on the vessel with all the relevant partitions, route patterns, trunks etc. The phones have also been added to the new server ready for migration. The only real thing that will be different when the phones are migrated is the Directory Number on each phone. Both CUCM servers are running software version 7.1.3
    The phones currently pick up their local IP addresses via a local DHCP server which assigns 150 TFTP Server IP Address for the remote CUCM server. Is changing the the TFTP Server IP address to the local CUCM server enough to have the phones register with the local server.
    This is not something I've tried before so would appreciate feedback or any comments that may indicate anything I missed along the way.
    Thanks,
    Ric

    Hi Ricardo,
    On the DHCP scope created for the voice vlan change the Option 150(TFTP Server IP address) to the new CUCM and remove/delete the remote CUCM IP address just to ensure that phones once after registering to the new CUCM will not fetch any config from the remote CUCM as the DN's of the phones are changed on the new CUCM please ensure this.
    Apart from this i dont see any challenges as the firmware of the IP Phones will also remain same as CUCM version is same.
    Hope that helps.
    Regards
    Najaf

  • Fetching data from one BI server to another

    Hi All,
    We have BCS environment on top of BI. We have a request from Client to refresh the BCS data in our quality box (copy of BCS production data). Data wasn't refreshed to our Quality system regularly from SAP Quality and hence we thought of complete BI Production copy to our Quality box.
    Since the above strategy is time consuming,we have been contemplating on other options and have stumbled upon SAP blog http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/21489. [original link is broken] [original link is broken] [original link is broken]
    The blog talks about pulling data from one BI server to another. As BCS is such a fragile environment, wanted to take an opinion on whether you all see any concerns with the approach.
    Regards,
    Vivek Das Gupta

    Hi,
    W have done the system copy from production to QA system and only faced authorization issues  and also we follwed the same blog and as mentioned in the blog dont forget below points before going ahead for the system copy.
    switch the source Real Time Infocube (in MBP) if you want to copy all latest productive data, that is to say including those which were contained in the open request.
    For data consistency reasons and to avoid any risk of error, the loading process is executed in Full.
    If you planning to copy only a part of the source data records,  set filters in the infopackages.
    Hope it going help you
    Thanks

  • How to copy a Module Pool Program from one SAP server to another SAP server

    Hi Experts,
    My requirement is to copy some Module pool programs from one SAP server to another SAP server which do not have any link.
    Please advise on this.
    Regards
    Dipak

    put all relevant objects inside a transport request and release it. this will generate two files, a control file in /usr/sap/trans/cofiles/ and a data file in /usr/sap/trans/data/
    you can take these two files, zip'em up and e.g. email them to your destination. There they have to be put into the same directories of that other server and can then be added to the import queue and finally imported.
    These last steps would usually be done by an administrator.
    Both systems should be on the same release, as far as I know.
    Cheers
    Thomas

  • Moving LCM Jobs from one LCM server to another

    I have just built a new proof of concept LCM server (3.1 SP3 FP3.7).  My aim is to migrate the content from our current production LCM server (3.1 SP2 FP2.5) to the POC LCM server.  I have been able to migrate the subversion repository.  I have been able to migrate custom access levels and users etc.
    I want to migrate the actual LCM jobs stored within LCM itself from production LCM to POC LCM server.  Should be able to do this with LCM itself or Import Wizard but neither work.
    Import Wizard produces and error against each LCM Job as follows, "Failed to create a new CrystalEnterprise.LCMJob. reason: Item SI_NEWOBJECT was not found in the collection"
    LCM itself does not show the LCM jobs when adding objects to a job.  It will show the Sub Folders under the main LCM folder (which contain the specific jobs I'm looking to migrate) but not the jobs themselves.  Selecting one of the sub LCM folders and clicking the "Add & Close" button results in this error;
    Sorry, LCM application is unable to process your request.
    The error from the server is: Failed to get dependencies of the job.com.crystaldecisions.sdk.exception.SDKServerException: CMS operation timed out after 9 minutes. cause:com.crystaldecisions.enterprise.ocaframework.idl.OCA.oca_abuse: IDL:img.seagatesoftware.com/OCA/oca_abuse:3.2 detail:CMS operation timed out after 9 minutes. The server supplied the following details: OCA_Abuse exception 7710 at [.\exceptionmapper.cpp : 79] 48022 ...CMS operation timed out after 9 minutes. Thread timeout has expired. at com.crystaldecisions.sdk.exception.SDKServerException.map(SDKServerException.java:107) at com.crystaldecisions.sdk.exception.SDKException.map(SDKException.java:196) at com.crystaldecisions.sdk.occa.infostore.internal.InternalInfoStore.queryHelper(InternalInfoStore.java:736) at com.crystaldecisions.sdk.occa.infostore.internal.InternalInfoStore.query(InternalInfoStore.java:566) at com.crystaldecisions.sdk.occa.infostore.internal.InfoStore.query(InfoStore.java:167) at com.businessobjects.lcm.core.CMSLocal.query(CMSLocal.java:4083) at com.businessobjects.lcm.core.CMSLocal.queryInfoObjects(CMSLocal.java:1457) at com.businessobjects.lcm.dependencies.ParentChildDI.computeDependees(ParentChildDI.java:68) at com.businessobjects.lcm.dependencies.DependencyManager.computeDependees(DependencyManager.java:543) at com.businessobjects.lcm.dependencies.DependencyManager.computeDependees(DependencyManager.java:477) at com.businessobjects.lcm.core.LCMEngine.computeDependees(LCMEngine.java:1397) at com.businessobjects.lcm.job.Job.computeDependencies(Job.java:1006) at com.businessobjects.lcm.job.Job.addPrimaryResources(Job.java:389) at com.businessobjects.lcm.job.Job.addPrimaryResources(Job.java:244) at com.businessobjects.lcm.actionHelper.JobActionHelper.addResourceToJob(JobActionHelper.java:2313) at com.businessobjects.lcm.actionHelper.JobActionHelper.performAction(JobActionHelper.java:172) at com.businessobjects.lcm.actions.JobActions.execute(JobActions.java:37) at org.apache.struts.action.RequestProcessor.processActionPerform(RequestProcessor.java:419) at org.apache.struts.action.RequestProcessor.process(RequestProcessor.java:224) at org.apache.struts.action.ActionServlet.process(ActionServlet.java:1194) at org.apache.struts.action.ActionServlet.doPost(ActionServlet.java:432) at javax.servlet.http.HttpServlet.service(HttpServlet.java:709) at javax.servlet.http.HttpServlet.service(HttpServlet.java:802) at org.apache.catalina.core.ApplicationFilterChain.internalDoFilter(ApplicationFilterChain.java:252) at org.apache.catalina.core.ApplicationFilterChain.doFilter(ApplicationFilterChain.java:173) at com.businessobjects.lcm.LCMCacheControleFilter.doFilter(LCMCacheControleFilter.java:27) at org.apache.catalina.core.ApplicationFilterChain.internalDoFilter(ApplicationFilterChain.java:202) at org.apache.catalina.core.ApplicationFilterChain.doFilter(ApplicationFilterChain.java:173) at org.apache.catalina.core.StandardWrapperValve.invoke(StandardWrapperValve.java:213) at org.apache.catalina.core.StandardContextValve.invoke(StandardContextValve.java:178) at org.apache.catalina.core.StandardHostValve.invoke(StandardHostValve.java:126) at org.apache.catalina.valves.ErrorReportValve.invoke(ErrorReportValve.java:105) at org.apache.catalina.core.StandardEngineValve.invoke(StandardEngineValve.java:107) at org.apache.catalina.connector.CoyoteAdapter.service(CoyoteAdapter.java:148) at org.apache.coyote.http11.Http11Processor.process(Http11Processor.java:869) at org.apache.coyote.http11.Http11BaseProtocol$Http11ConnectionHandler.processConnection(Http11BaseProtocol.java:664) at org.apache.tomcat.util.net.PoolTcpEndpoint.processSocket(PoolTcpEndpoint.java:527) at org.apache.tomcat.util.net.LeaderFollowerWorkerThread.runIt(LeaderFollowerWorkerThread.java:80) at org.apache.tomcat.util.threads.ThreadPool$ControlRunnable.run(ThreadPool.java:684) at java.lang.Thread.run(Thread.java:595) Caused by: com.crystaldecisions.enterprise.ocaframework.idl.OCA.oca_abuse: IDL:img.seagatesoftware.com/OCA/oca_abuse:3.2 at com.crystaldecisions.enterprise.ocaframework.idl.OCA.oca_abuseHelper.read(oca_abuseHelper.java:106) at com.crystaldecisions.enterprise.ocaframework.idl.OCA.OCAi._InfoStoreEx4Stub.queryEx3(_InfoStoreEx4Stub.java:209) at sun.reflect.GeneratedMethodAccessor201.invoke(Unknown Source) at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:25) at java.lang.reflect.Method.invoke(Method.java:585) at com.crystaldecisions.enterprise.ocaframework.ManagedService.invoke(ManagedService.java:425) at com.crystaldecisions.sdk.occa.infostore.internal._InfoStoreEx4Proxy.queryEx3(_InfoStoreEx4Proxy.java:364) at com.crystaldecisions.sdk.occa.infostore.internal.InternalInfoStore.queryHelper(InternalInfoStore.java:708) ... 37 more com.crystaldecisions.sdk.exception.SDKServerException: CMS operation timed out after 9 minutes. cause:com.crystaldecisions.enterprise.ocaframework.idl.OCA.oca_abuse: IDL:img.seagatesoftware.com/OCA/oca_abuse:3.2 detail:CMS operation timed out after 9 minutes. The server supplied the following details: OCA_Abuse exception 7710 at [.\exceptionmapper.cpp : 79] 48022 ...CMS operation timed out after 9 minutes. Thread timeout has expired.
    Has anyone actually suceeded in moving an LCM job from one LCM server to another?

    Apologies for the formatting, IE6 and company policy means none of the formatting seems to work. :o(

  • Move Protection Group from One DPM server to another DPM server

    Hi Mike,
    Can we move Protection Group from one DPM 2012 SP1 to another DPM 2012 R2 version? If yes then what is the steps to perform that. Also i am running DPM servers with co-located and non-colocated configuration. What would be best as per best practice? Because
    my 95% backup are SQL backups.

    Hi,
    There are no provisions in DPM to move protection groups or protected data sources to a new DPM server and maintain the recovery points.  The best you can do is to stop protection on DPM1 and retain the replica, then run the setdpmserver.exe on the
    protected server and point it the DPM2 server. On DPM2, run the attach-productionserver.ps1 script to establish agent communications, then make new protection groups and re-protect the same data sources.  After the retention goals are met, delete
    the replica from under inactive protection group on DPM1.
    Please remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually answer your question. This can be beneficial to other community members reading the thread. Regards, Mike J. [MSFT]
    This posting is provided "AS IS" with no warranties, and confers no rights.

  • Data transfer from one sql server to another sql server in 2005

    Hi,
    Im trying to transfer only one table data from one server database  to another server   database table.both are in 2005 .Can anyone help?

    Hi,
    Im trying to transfer only one table data from one server database  to another server   database table.both are in 2005 .Can anyone help?
    If you are not using express you can use Import export wizard to mode data its very easy below link will help.In link destination is excel but you can select destination as your SQL Server
    http://www.mssqltips.com/sqlservertutorial/202/simple-way-to-export-data-from-sql-server/
    Please mark this reply as the answer or vote as helpful, as appropriate, to make it useful for other readers

  • Moving the mailbox database copy from one exchange server to another exchange server 2010 DAG

    Hello Team
    is it possible to the move the passive copy of database and logs from one server to another exchange server in the same DAG with out removing  and deleting the mailbox database copies in exchange 2010
    normaly procedure is
    Remove the mailbox database copies and manually delete the .edb files and logs from the physical location and re-add the mailbox database copy to the new server in the DAG.
    is that any way to achieve to move the passive database copy to another exchange 2010 server in the same DAG ?

    From your note, you appear to have a two-member DAG (with a server hosting your active database, and a second hosting the passive copy), and you want to move your passive database copy from the current passive server to another.  Your note
    about what "the normal procedure is" isn't 100% correct - there are many ways to handle this task, and all can be considered "normal". Why not just add the third server to the DAG and
    add a database copy on that third server?  Once it is fully seeded, you can remove the current passive copy.  This way, you never lose your redundancy.
    Yes i can add the third and fourth  serve in DAG , but i cannot add the mailbox database copies to the 3rd and 4th mailbox server in DAG as am using RTM version of exchange 2010 which is allowing to have only 5 database inclding mailbox datbase copies
    and also currently my lab setup is  two member dag (with a server hosting your active database,
    and a second hosting the passive copy) in the same site named SITE A
    and recently i have created new SITE B and included the 3rd and 4th DAG members in the same DAG
    i want the  mailbox database copies from the mailbox server  database  in SITE A  to
    Mailbox server database in  SITE B as  passive copy
    That is why i want to move the mailbox database without deleting / removing it manually
    Hope you understand my situation!

  • Moving OEM grid control(10.1.0.5) from one linux server to another RHEL4

    Hi ,
    I'm trying to move grid control from one server to another as part of data centre move-OEM GC version is 10.1.0.5 running on RHEL 4.The IP's will get changed too ,What configuration files needs to be changed on Tthe hots server for OMS/repository as they are on same box,and also on the various hots/targets managed by agents.Please let me know iwhat all steps needs to done for this move(Any documents/links)
    Thanks

    user9097501 wrote:
    Binaries will be copied over (O/S imaging) and data will be replicated using SRDF(SAN Replication) from source A and the database containing OMS/repository will be brought up on the target destination B in a new subnet.So my question is as what configuration files do i need to change once its on target server. Please any input will be appreciated.Hi ,
    I hope your hostname will remain same... If it is like that then you dont have to make any changed anywhere...
    You you need to make changes only on hosts files with new ip address on all target servers..
    And if hostname is changed, then you will have to reinstall OMS..
    Please read
    How To Re-configure the OMS After Hostname/IP Address Change on the Remote Repository Database Machine [ID 736061.1]
    Is it possible to Modify the EM 10g Grid Control OMS Hostname After the Installation? [ID 371865.1]
    Also GRID 10.1.0.5 is unsupported and it contains lot of BUGS so i would suggest you to upgrade it to 10.2.0.5*
    Regards
    Rajesh

  • Moving bpel instances from one application server to another

    Is it possible to move bpel instances from one server to another?
    We use SOA Suite 10.1.3. The idea is:
    1. shutdown the appserver
    2. make a dump of the dehydration store (bpel schema, ...)
    3. import the dump in the new environment
    4. startup the the "new" SOA Suite
    The question is: Are there any hard coded references (e.g. OAS url) within the
    SOA database schema?
    Thanks,
    Marcus

    Apologies for the formatting, IE6 and company policy means none of the formatting seems to work. :o(

  • How to export a table from one oracle server to another oracle server?

    Hi experts,
    Scenario : Copying table T1 from Server1 to Server2.
    Can I follow any of the following two options. Please advise if these options would be feasible under the current scenario.
    1) Create the same table T1 in Server2. Export the values of T1 in Server1 to an Excel sheet. Make the Excel sheet as source and import the values of the excel sheet to table T1 in Server2.
    2) Use an ETL tool like Oracle Warehouse builder to extract and load the values in T1 in Server1 to T1 in Server2.
    Can we schedule both option1 & 2 as a job in Oracle Warehouse Builder? The job will have 2 steps :-
    a) Delete all rows in T1 (Server2).
    b) Insert the values from T1(Server1) to T1(Server2).
    Please advise.
    Thanks,
    Debashish

    Can you exactly explain a little bit more what is the actual requirement.
    Just to kick off the things..
    In case:
    1) you just need to create a table based on another table in same schema. Its as simple as : create table table2 as (select * from table1)
    2) table1 is on remote db then
    create table table2 as (select * from table1@yourdblink)
    3) Need to export and import table1 refer this link :
    http://wiki.oracle.com/page/Oracle+export+and+import+?t=anon
    4) Need to refresh table periodically either schedule a job or create materialized view refer to this link :
    http://download.oracle.com/docs/cd/B10501_01/server.920/a96567/repmview.htm
    Choose an approach. Then try it and see what errors you get, In case you get errors search on internet for that error code and how to resolve that and in case need any help post it here. But key is understanding first what exactly your requirement is and which approach you need/want to follow.

  • Crystal Reports Moved from one file server to another - very slow opening

    Hello,
    I am new here, and I am in need of a solution. If I am not in the correct forum, please advise.
    Our crystal reports were moved from an old file server to a new file server.  Once the old file server was shut down the reports opened very slow in Designer and in our 3rd party application.  Our server team determined that the reports are still attempting to connect to the old file server.  If the old file server is brought online or dns is changed to reflect another machine that it can make a connection to, it opens with no delay. 
    For some reason, not every report is affected.  Most of the reports are Crystal 8.5, but I have some Crystal XI reports that do the same thing.  I can't find any reference in the reports to any file server/location....
    I need to resolve this issue on the Crystal 8.5 version due to the application that we are running.
    Is there a way to fix this other than to recreate the reports (I have over 400 of them)?
    Any assistance or advice is appreciated!
    Thanks,
    Nancy

    Hi Nancy,
    The server info still needs to be updated. Are you setting location for each subreport also?
    Possibly this registry key will help, I only have CR 2008 installed so you'll have adjust for what ever you are using:
    HKEY_CURRENT_USER\Software\Business Objects\Suite 12.0\Crystal Reports\DatabaseOptions - VerifyStoredProceduresOnFirstRefresh = No
    and
    VerifyStoredProceduresOnSetLocation = No
    And
    VerifyWhenDBDriverUpgraded = No
    And
    ViewOutOfPlaceSubreports = No
    Close CR designer before making any changes. And the usual warning about modifying the registry.
    Thank you
    Don

  • MS Project 2010 Server - How to move a single MS Project plan and SharePoint Project site from a PWA server to another PWA server (one at a time)

    MS Project 2010 Server
    How to move a single MS Project plan and it's SharePoint project site from a PWA server to another PWA server (one at a time)
    I have 2 Project PWA servers, i know how to copy all the databases (Publishing, Draft, Reporting, archive, content) from one SQL server and copy it to the other PWA server so both server can be identical.
    I need to only move a single project from a PWA server to another, 
    Moving the Project plan, actual time data, SharePoint site with all it's content
    Is there a 3rd party tool that can be added on to the server to help me move single project plans? to different PWA servers?
    -Isaack

    Visit my friends at FluentPro and try FluentBooks
    http://www.fluentpro.com/productsfluentbooks2013.html
    they have a 2010 version also.
    Hope that helps,
    Thanks, Eric S. Pcubed

  • Not able to copying files/folders from one Document Library to another Document Library using Open with Browser functionality

    Hi All, 
    We have SharePoint Production server 2013 where users are complaining that they are not able to copy or move files from one document library to another document library using “Open with Explorer” functionality.
    We tried to activate publishing features on production server but it did not work. We users reported following errors:  
    Copying files from one document library to another document library:
    Tried to map the document libraries and still not get the error to copy files: 
    In our UAT environment we are able to copy and move folders from using “Open with Explorer” though.
    We have tried to simulate in the UAT environment but could not reproduce the production environment.  
    Any pointers about this issue would be highly appertained.
    Thanks in advance
    Regards,
    Aroh  
    Aroh Shukla

    Hi John and all,
    One the newly created web applications that we created few days back and navigated to document library, clicked on “Open with Explorer”, we get this error.
    We're having a problem opening this location in file explorer. Add this website to your trusted and try again.
    We added to the trusted site in Internet Explorer for this web application, cleared the cache and open the site with same document library but still get the same above error.
    However, another existing web application (In same the Farm) that we are troubleshooting at the moment, we are able click on “Open with Explorer”,  login in credentials opens and we entered the details we are able to open the document
    library and tried to follow these steps:
    From Windows Explorer (using with Open with Explorer), tried to copy or move a files to
    source document library.
    From Windows Explorer moved this file to another destination document library and we got this error.
    What we have to achieve is users should be able to copy files and folders using
    Open with Explorer functionality. We don’t know why Open with Explorer
    functionality not work working for our environment.  
    Are we doing something wrong? 
    We have referred to following websites.
    we hope concepts of copying / Moving files are similar as SharePoint 2010. Our production environment is SharePoint 2013.   
    http://www.mcstech.net/blog/index.cfm/2012/1/4/SharePoint-2010-Moving-Documents-Between-Libraries https://andreakalli.wordpress.com/2014/01/28/moving-or-copying-files-and-folders-in-sharepoint/
    Please advise us. Thank you.
    Regards,
    Aroh
    Aroh Shukla

  • How can i upload files from one ip address to another  ip address machine ?

    how can i upload files from one ip address to another ip address machine ?

    i need to copy files from one client m/c to server m/c like sftp
    please suggest solution on this

Maybe you are looking for

  • How to find out the user from the Jobs queue in Report server

    Hello All! I have a doubt about finding out the user from the scheduled jobs queue. Say I go ahead and schedule a report on Reports Server how can I find out the user name. When I view the jobs using showjobs I could see that the DBMS_JOBS table has

  • Errors ORA-01034, ORA-27101 and ORA-01033

    Hi! I have Oracle 9i DB and DevSuite 10g installed on my laptop. There are three databases on my machine. Recently, I tried to install Oracle Discoverer 10g and that's where the problem started. I could no longer connect to the databse using either S

  • Help required on Asynchronous Logon in Background

    Hi All, We have a requirement in which we have to input characters into a web form (for e.g. Vendor master data) in Russian character set. After this is submitted, it is set for approval by some Western European codepage (English)/login. So the appro

  • Error installing jdk-1_5_0-windows-i586.exe

    During second phase of the install process, I get this error message: "Error 1311.Source file not found: C:\Program Files\Common Files \Java\Update\Base Images\jdk1.5.0.b64\patch-jdk1.5.0b64\jo150000.cab. Verify that the files exists and that you can

  • Impact of a new record on primary on Materiaslised view on replicate

    Hi, We are just refreshing completely the MV on replicate based on primary table at source It is a large table with 54GB of data to be synched. There are more indexes on replicated (used for reporting) thast the source. Data has completed on MV sync