BAPI for Scheduling Planned Order

Hi,
Please tell me if there are any BAPIs for Scheduling a Pllaned Order and for Deleting a Planned Oredr.
Thankes & Regards,
Rahul

BAPI_PLANNEDORDER_CHANGE       Change planned order
BAPI_PLANNEDORDER_CREATE       Create planned order
BAPI_PLANNEDORDER_DELETE       Delete planned order
BAPI_PLANNEDORDER_EXIST_CHECK  Planned order existence check
BAPI_PLANNEDORDER_GET_DETAIL   Get details for planned order
BAPI_PLANNEDORDER_GET_DET_LIST Get detailed planned order list
All bapi's related to planned order processing
BR
Manthan.

Similar Messages

  • BAPI for converting planned order to Production Order(in PP)?

    Hi all,
            Is there any standard BAPI for converting Planned order to Production Order?
    Thanks in advance,
    anjaly

    hi,
    check this..
    BAPI_PRODORD_CREATE_FROM_PLORD BAPI: Convert Planned Order into Production Order
    for more details check this link..
    Create a production order
    <b>reward points if it is helpful..</b>

  • BAPI for AFS  Planned Order Change

    Dear All,
    Can anybody help me out to find the BAPI for PLANNED ORDER
    CHANGE in AFS. i m aware that there is a BAPI_PLANNEDORDER_CHANGE for standard SAP, but im not sure of using for the AFS , since the grid value is not handled in this BAPI.Pls give your suggestion too.
    Reward points are assured.

    Hi Raja ,
    Sorry for replying too late ..... But I guess it may be useful for other guys..
    Recently I also came accross same problem . But finally I got the solution.
    BAPI  'BAPI_PLANNEDORDER_CHANGE'  does support AFS Data .. like Grid Value and Grid Quanity.
    Just pass AFS Header Data to Import Parameter AFS_HEADER  & AFS Grid Value along with changed quantity
    to AFS_SKU table.  You will get this data from PLAF and J_3ABSSI Table.
    ( Note : You also need to pass Planned Order Data & Quantity which will be total of all quantities at SKU level. )
    Regards ,
    Vishal Bhalsing.

  • BAPI to change planned orders details

    Hi Experts,
    I need BAPI to change Planned order details,which are created through SNP PPM's.I searched for Bapi and got one 'BAPI_MOSRVAPS_SAVEMULTI3'  but this BAPI will change order details if created for PP/DS PPM's.
    Kindly suggest will this BAPI only work or someother.
    I want to keep the PPM name blank and save the order details through BAPI.
    Pls reply asap.
    Thanks
    surbhi

    Hi Surbhi,
    You may please search on google, there are lots of tutorial on BDC, you will surely get the solution... in short BDC is to record a transaction & then use same recording to generate ABAP program & you can play with screen navigations & update the fields you required...
    Regards,
    Adarsh

  • Problem with scheduling planned orders in MRP

    There is a problem with scheduling planned orders in MRP. SFG is assigned to the BOM of FG. No inhouse production time maintained in the material master of SFG & FG. routing maintained for both . In OPU5 scheduling & capacity reuiremnts tickmarked for detailed scheduling. Scheduling level - via detaied scheduling. Scheduling type - backward. Adjust basic dates , adjust dep. req. to order start set. In MD02 , scheduling is via ' lead time scheduling'.
    My problem is the start date & time & finish date & time is same for planned orders of FG & SFG in the detailed scheduling tab of the planned orders. (Duration is same because of same capacity requirements on the same work centre. But how is the finish date same for both SFG & FG?)
    (Capacity requirements are being generated.)
    What could be the problem ?

    Dear,
    By scheduling the routing and maintain lot size dependent time in material is best practice and result of scheduling will be consistent.
    If you want SFG before FG you need to define lead time offset in BOM or need to maintain the floats before production.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • MRP setting for Purchase (Planned Order ) Requirement date

    Dear Sir,
    During the MRP run , we desire that the genertaed Planned Orders for the Purchase related items , should have requirement date as either the current date or the current date plus procurement lead time defined in the Material Master against the item .
    To achive the abobe requirement , we request you to pl guide us as what setting / parameters are required to be set in the MRP setup .  Or if there is some other alternate approach , pl suggest the same .
    With Thanks and Rgds
    Sonia Agarwal

    Dear
    Generally , during MRP run , system will genarted Planned order for Purcahsed item if it is opening period .
    The opening period for the planned order represents the number of workdays that are subtracted from the order start date in order to determine the order opening date. This period serves as a time float, which is available for the MRP controller when converting a planned order into a purchase requisition.
    You define the opening period for the planned order in Customizing for MRP in the IMG activity Define floats (scheduling margin key) and assign it to the material in the Scheduling margin key field (MRP 2 view) in the material master
    Now if you want to have Planned order for purchased item with requirement date as current date , then maintain Demand date like Sales Order requirement date as curent date in VA01 or PIR date as current date.
    Where as MRP will consider the Planned Order based on planned opening date , lead time , GR processing time from MRP2 view .So for current date requirement , u should keep Lead time and GR processing time as 0.
    Regards
    JH

  • Capacity Reservation Table for a planned order

    Dear experts,
    When I look at MD13, I can see the capacity requirement for a planned order.  I can also see the requirements build up in my CM01 screen.  We would like to pull the data into our BW system, but we are having issues finding where the capacity reservation information resides.  When I look at table KBEZ, I can only find values that correspond to production orders.  Is there a similar table for planned orders?  Does SAP save the detailed scheduling infromation for planned orders in a table somewhere, or is this calculated at the time MD13 or CM01 is run?
    Thanks,
    Matthew Bruckner

    Have you tried with KBED? I can see with SE16 that you have a field for selection with the planned order number....

  • Scheduled planned orders

    Hi,
    My MRP run gives me 10 planned orders for a material because of lot size. But all these orders are coming on the same day. Can I get these orders on different dates based on the capacity available?
    I have about 1000 finished materials. Can MRP run give scheduled planned orders for these materials i.e starting on different dates? I do not have any floats.
    Thanks and regards,
    Raghu

    Hi Raghu,
    I think you should use Lead Time Scheduling - Backward scheduling to plan those finished product. Use Capacity Planning functionlity so that Lead time scheduling would create capacity requirements.
    Once these are in place, convert those planned orders into production orders Now, these orders would be made on different dates as according to capacity situation.
    So, please check and revert..
    Regards,
    Thomas

  • Scheduled Planned Order

    Dear gurus,
    Any one can explain what is meant by Scheduled Planned Orders and not scheduled planned orders.
    I observe this in T.Code MF51.
    Srini

    Hi,
    Here is the extract from the help.sap.com.
    ==========================================================================
    Select Only firmed orders if you only want the system to display firmed planned orders and production orders in the list.
    Select Only assigned orders if you only want the system to display planned orders and production orders that have been assigned to a production line.
    Select Only dispatched orders if you only want the system to display planned orders and production orders that have been dispatched in the capacity planning table.
    Select Only scheduled orders if you want the system to display planned orders and production orders that have been scheduled.
    ==========================================================================
    Refer below link for further details.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/8a/a5a7c24adc11d189740000e8322d00/content.htm
    Hope this helps..
    Regards,
    Siva

  • BAPI for Open production orders

    Hi All,
    Any BAPI for open production orders?.... Using BAPI i want to upload open production orders informatiomations.... Please help
    Thanks & Regards
    Santhosh

    Hi,
       Please check the following BAPI,
    Goto BAPI tcode, select hierarchical tab
      Production orders,ProductionOrder ,ProdOrdConfirmation , RCVPRORDCF and check the BAPIs

  • Function modules or BAPI for posting plan costs for WBS Element

    Hi all,
    Does anyone know, whether there exists a function module or BAPI for posting plan costs to a WBS Element? K_COSTS_PLAN_PS does not work, because RKP1 is not allowed.
    Greetings

    check
    BAPI_COSTACTPLN_POSTACTINPUT   Activity Input Planning: Posting                
    BAPI_COSTACTPLN_POSTACTOUTPUT  Activity/Price Planning: Posting                
    BAPI_COSTACTPLN_POSTKEYFIGURE  Stat. Key Figure Planning: Postings             
    BAPI_COSTACTPLN_POSTPRIMCOST   Primary Cost Planning: Postings                 
    BAPI_PDTRANSCO_POSTPRIMCOST    Transfer of Planning Data: Post Primary Costs   
    K40C                           CO Actual Postings, Manual                      
    BAPI_ACC_PRIMARY_COSTS_POST    Accounting: Post Primary Costs                  
    BAPI_COPAACTUALS_POSTCOSTDATA  BAPI Operating Concern: Post Costing-Based Actua
    BAPI_PRIM_COST_CHECK_AND_POST  Primary Costs: Formal Parameter Check           
    S@meer

  • BAPI for Scheduling a background job

    Hi all,
    is there any bapi for scheduling a background job?
    i mean can we do background job using bapi
    If not how can we create a bapi for scheduling a background job.
    Thanks & Regards,
    Azhar

    Hi,
    Use following BAPIs for scheduling a job in background
    BAPI_XBP_JOB_OPEN - This BAPI solves the first step in scheduling a job in the R/3 background processing system. You can create the job with this method.
    Using additional BAPI calls BAPI_XBP_JOB_ADD_ABAP_STEP and BAPI_XBP_JOB_ADD_EXT_STEP, you can add job steps to the job.
    With the BAPI call BAPI_XBP_JOB_CLOSE, you can finish defining the job and transfer it to the background processing system with the status Scheduled without start date.
    You have execute the job with the BAPI calls BAPI_XBP_JOB_START_IMMEDIATELY or BAPI_XBP_JOB_START_ASAP.
    I hope it would help you.
    Regards,
    Venkatram

  • Bapi for scheduling agr release

    hi could someone help me to findout bapi for scheduling aggrement releases
    transaction me84.

    Hi Alok,
    I am not sure about BAPI for this function.I suggest you try this kind of function with user exit like COOPA002 using appropriate program logic.
    Regards,
    Ashok

  • Bapi for Scheduling material changes

    hi,
    is there a bapi for schedule changing of materials. the transaction for same is mm12.
    please let me know if there is one.
    regards
    swanand

    Hi there Swanand,
    Did you find a BAPI for the update through MM12.  Pleae let me know if you did as I am in need for that also.
    Thanks.

  • BAPI for Mass Purchase Order Confirmation

    Dear All,
    In standard SAP,it is possible to confirm for single line item only by using confirmation tab.
    We want to confirm Mass PO Confirmation.
    Is there any BAPI for Mass Purchase Order Confirmation?
    Regards,
    Ramesh

    Hi Sumant,
    I have tried with TC:MASS.
    By using this TC we can update quantity but not  delivery date & Confirmation Control (Fields available in the confirmation tab of ME22n for Vendor Confirmation).
    Is there any way to updates all these fields which are available in the Confirmation Tab?
    Is there any BAPI which is tranferring confirmation tab details into EKES table?
    Expecting your valuable inputs in this regard.
    Regards,
    Ramesh

Maybe you are looking for

  • Sending XML file from SAP to Windows Based file server with FTP function

    Hi Gurus, We are using SAP BW 3.0B version. I need to convert data in ODS to XML format and send this XML file to remote server which  is not a SAP application server, it is just a Window Based file server with FTP function.. By writing some ABAP cod

  • RAM Upgrade : Pavilion dv6-2170ee

    My Pavilion dv6-2170ee has the stock RAM - a 2048MB x 2. I'm thinking of fitting in a 4096MB x 2 in it. It's a aData 1333Mhz. Would I get any problems with the upgrading, and is it compatible with my laptop? The RAM Card can be found here:  http://on

  • Quorum Query

    Environment 2 Node RAC Cluster with each containing: Oracle Linux 6 Update 5 (x86-64) Oracle Grid Infrastructure 12R1 (12.1.0.2.0) Oracle Database 12R1 (12.1.0.2.0) I am not understanding the role of the quorum in the quorum failure group for Voting

  • Having Problems in Graphs

    Hi I am tryiing to create to a graph one line would show different colours based on their individual contribution as for ex. one project has total cost as Rs. 300 and the individual cost of the testing and the development is Rs 100 and Rs. 200 so tha

  • I've recently had problem with a popular internet radio site. Once the player opens and the music plays, all Firefox windows become frozen with no possibility of recovery.

    When I load up the internet radio channel on http://www.cheriefm.fr, a new window opens with the player, the music starts playing, but all browser windows become frozen. When I force the closier of the player window, Firefox crashes. I thought Firefo