Scheduled Planned Order

Dear gurus,
Any one can explain what is meant by Scheduled Planned Orders and not scheduled planned orders.
I observe this in T.Code MF51.
Srini

Hi,
Here is the extract from the help.sap.com.
==========================================================================
Select Only firmed orders if you only want the system to display firmed planned orders and production orders in the list.
Select Only assigned orders if you only want the system to display planned orders and production orders that have been assigned to a production line.
Select Only dispatched orders if you only want the system to display planned orders and production orders that have been dispatched in the capacity planning table.
Select Only scheduled orders if you want the system to display planned orders and production orders that have been scheduled.
==========================================================================
Refer below link for further details.
http://help.sap.com/saphelp_erp60_sp/helpdata/en/8a/a5a7c24adc11d189740000e8322d00/content.htm
Hope this helps..
Regards,
Siva

Similar Messages

  • Problem with scheduling planned orders in MRP

    There is a problem with scheduling planned orders in MRP. SFG is assigned to the BOM of FG. No inhouse production time maintained in the material master of SFG & FG. routing maintained for both . In OPU5 scheduling & capacity reuiremnts tickmarked for detailed scheduling. Scheduling level - via detaied scheduling. Scheduling type - backward. Adjust basic dates , adjust dep. req. to order start set. In MD02 , scheduling is via ' lead time scheduling'.
    My problem is the start date & time & finish date & time is same for planned orders of FG & SFG in the detailed scheduling tab of the planned orders. (Duration is same because of same capacity requirements on the same work centre. But how is the finish date same for both SFG & FG?)
    (Capacity requirements are being generated.)
    What could be the problem ?

    Dear,
    By scheduling the routing and maintain lot size dependent time in material is best practice and result of scheduling will be consistent.
    If you want SFG before FG you need to define lead time offset in BOM or need to maintain the floats before production.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Scheduled planned orders

    Hi,
    My MRP run gives me 10 planned orders for a material because of lot size. But all these orders are coming on the same day. Can I get these orders on different dates based on the capacity available?
    I have about 1000 finished materials. Can MRP run give scheduled planned orders for these materials i.e starting on different dates? I do not have any floats.
    Thanks and regards,
    Raghu

    Hi Raghu,
    I think you should use Lead Time Scheduling - Backward scheduling to plan those finished product. Use Capacity Planning functionlity so that Lead time scheduling would create capacity requirements.
    Once these are in place, convert those planned orders into production orders Now, these orders would be made on different dates as according to capacity situation.
    So, please check and revert..
    Regards,
    Thomas

  • BAPI for Scheduling Planned Order

    Hi,
    Please tell me if there are any BAPIs for Scheduling a Pllaned Order and for Deleting a Planned Oredr.
    Thankes & Regards,
    Rahul

    BAPI_PLANNEDORDER_CHANGE       Change planned order
    BAPI_PLANNEDORDER_CREATE       Create planned order
    BAPI_PLANNEDORDER_DELETE       Delete planned order
    BAPI_PLANNEDORDER_EXIST_CHECK  Planned order existence check
    BAPI_PLANNEDORDER_GET_DETAIL   Get details for planned order
    BAPI_PLANNEDORDER_GET_DET_LIST Get detailed planned order list
    All bapi's related to planned order processing
    BR
    Manthan.

  • Scheduling planned order of semi finished

    Dear all,
    I have the following scenario finished product A is made of semi finished product B , when making a plan for A to be delivered say 1\6\2010 the system schedules a planned order for A to be delivered on 1\6\2010 at 7:00 AM and start on 25\6\2010 at 14:00 PM therefore for semi finished B a planned order should be scheduled to be delivered on 25\6\2010 at 14:00 PM .
    the problem os that B is scheduled to be delivered on 25\6\2010 7:00 AM not 14:00 PM . known that no schedule margin key is used and the start time of the plant is 7:00 AM. is it configuration or SAP standard?
    Regards,
    Ahmed Sobhi

    Dear  Mr.Ahamed ,
    Basically , if you have Capacity Requirement Profile active , when you dipsatch the operation system will ask you to review  the Work centre  ,  Operation  , Timing  before depatch based on the capacity load  .I am not sure wether u are utilising that functionalty or not
    However , Convert the Planned Order to Production Order for B .Goto Operation Over view .How many operations are there in  B? .You can change the time , if you dispacth( Select the line itme - operation AT HEADER -DISPATCH )  , select the line Operartion line item and double click , goto Date , here you can change the Date , Time (Set up, Processing , Teardown , Move Time , Wait Time ) .Basically u should deal with Operation Execution time (Set up , Process , Teardown ) .
    We generally  change the timeing like this in our shop floor  in our business process.
    Secondly , at configuration level , you can goto -OPJN-Select the Scheduling Type -Mark the option With Time  so that you can enter the timing also when to start and end  at planned order as well production order .
    Try and revert back
    Regards
    JH

  • Planned order scheduling mass update

    Hello all,
    Is there a way I can change the scheduling dates for the planned orders collectively. (not MD16) ?
    Thankyou

    Hi,
    check the following
    Mass Changes of Planned Orders (Action Control)
    Use
    You can use this function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
    Features
    SAP supplies the function module MD_SET_ACTION_PLAF for action control.
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Confirm planned order (in repetitive manufacturing)
    Firm planned order data
    Firm planned order components
    Print component overview
    In connection with an action, you can always change planned order data, for example; order quantity, dates or production version.
    The function module also enables you to program further customer-specific actions.
    You can execute the actions for several planned orders simultaneously.
    You can create action chains, that means, have the system execute several actions in a single operation.
    Activities
    Define your own actions and program a report that includes these actions. As an example of this, the transaction MDAC Execute action for planned order (MRP ® Planned order ® Execute action) is available.
    In this example action, you can use actions only for individual planned orders. Nor can you form action chains, only simple action transitions are possible.
    Determine an action key and action controls in Customizing for MRP in the IMG activities Define action key and Define action control. An action key describes the actions that can be executed for a planned order. Action controls determine which actions are allowed and in which sequence they are to be executed.
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Regards,
    nandha

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • Mass T-code Of Planned  Order Deletion

    Dear All
    Is there any mass T-code  For Deletion of bulk planned order. An PIR.
    Rgds
    Pankaj Agarwal

    Hi,
    You can use function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
    Features
    SAP supplies the function module MD_SET_ACTION_PLAF for action control.
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    <b>Delete planned order</b>
    Confirm planned order (in repetitive manufacturing)
    Firm planned order data
    Firm planned order components
    Print component overview
    This is in the foll link...
    http://help.sap.com/saphelp_470/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    Use T.code md75 to delete PIR.
    Regards,
    Senthilkumar SD

  • BAPI or FM for scheduling a planned order (like MD11 or MD12)

    Hi guys.
    We are working with a group of materials and planned orders, in order to modify and create new planned orders depending on the stock per each material. So we use MD12 to 1) modify the quantity in the order, and MD11 to create new planned orders for the rest of stock for this material.
    For process of creation we don't have problems (BAPI_PLANNEDORDER_CREATE makes its work well ), but when we want to schedule the new planned order created before via FM or BAPI, we cannot see any results in MD12.
    I mean, when a planned order is scheduled via menu button, a new tabstrip appears in the transaction with dates. So this similar action we've tried using CX_PLANNED_ORDER_SCHEDULE or CX_CRP_PLANNED_ORDER_SCHEDULE but there was no change.  If we execute the Schedule button action, in table PLAF (master of planned orders) apears a new number in field PLAF-BEDID related to MRP.
    So guys, could you please help us how to get this issue? As last option is BDC, but BDC's and me are not good friends because its performance. So please, any suggestions?
    Thanks in advance!
    Raul Romero

    Hi guys...
    Sorry for the long time without an answer, which I'm sharing you now:
    1. In order to perform the proccess of scheduling, you have to record the steps from menu bar in your batch input. I mean: (1) set values into fields CRHARBPL-LOW () and CRHWERKS-LOW
      PERFORM set_batch USING: 'X' 'RCCRY000' '1000',
                                      space 'BDC_CURSOR' 'CRHARBPL-LOW',
                                      space 'BDC_OKCODE' '=PLNG',
                                      space 'CRHARBPL-LOW' p_arbpl,
                                      space 'CRHWERKS-LOW' 'PR01'.
    (2) After you ordered your list of planned orders or production orders, loop your internal table and per each order record these commands (these simulates the popup option to select the order you want for scheduling and mark it in the dynpro you are processing):
      LOOP AT gtd_tabofplan INTO gvc_tabofplan.
        PERFORM completa_bi_campos USING: 'X' 'SAPLPLAT' '4000',
                                        space 'BDC_OKCODE' '=Z021'.
        PERFORM completa_bi_campos USING: 'X' 'SAPLCY19' '0120',
                                space 'BDC_CURSOR' 'CYMARK-VALUE(02)',
                                space 'BDC_OKCODE' '=BACK',
                                space 'CYMARK-VALUE(02)' gvc_tabofplan,
                                space 'CYMARK-MARK(01)' space,
                                space 'CYMARK-MARK(02)' 'X'.
        PERFORM completa_bi_campos USING: 'X' 'SAPLPLAT' '4000',
                                space 'BDC_OKCODE' '=SL25'.
      ENDLOOP.
    (3) Set the SAVE operation.
      PERFORM completa_bi_campos USING: 'X' 'SAPLPLAT' '4000',
                              space 'BDC_OKCODE' '=SAVE'.
    Hope you' ve succeeded in this task, let me know if you've another questions.

  • Dedicated scheduling of a planned order having a fixed activity

    Hi Gurus,
    We're using PP/DS Optimizer with Total Delay Costs objective function, following a Backwards Scheduling strategy in order to Reduce Premature Scheduling. Order activities are then scheduled as close as possible from the requirement dates. However we would wish to apply a forward scheduling strategy to the orders having a fixed activity, but starting from the existing order planned start date instead from the system date, i.e:
    Requirement X due on 18.01.2012
    Output firmed planned order Y with 3 activities (A1, A2, A3), A2 beeing fixed
    Optimization result with a Backward scheduling strategy:
    A1 09.11.2011
    A2 18.11.2011
    A3 17.01.2012
    Optimization result when Backward scheduling setting is unchecked
    A1 NOW
    A2 18.11.2011
    A3 17.01.2012
    The business requirement we d'like to achieve
    A1 09.11.2011
    A2 18.11.2011
    A3 19.12.2011
    It is not foreseen to fix A1 to bypass the problem, above example is only a basic example whereas there're multiple activities in between A1 & A2 in our real material PDS. Is there any way (even with another optimization run, or using in combination a Production Planning Run...) to achieve such a scheduling strategy?
    BR,
    Pascal.

    Hi,
    To add further and to more precise, the issue is:
    In CM01[or in any capacity evaluation tcode], In a particular maonths load[Period] the opeartion from different month is showing up.
    For example: if Period[month] 06 is veiwed of a Workcenter load, a line[load appears], whose earliest date is in 7th month[01.07.2014].
    I expected to see, only Workcenters scheduled in 6th month to show up in the load evaluation.
    Please look at the screen shot.
    Regards,
    Avinash

  • Not scheduling on manual creation of planned order

    Creating planned order through MD11 and noticed there scheduling not done and capacity planning not done and on doing scheduling manually dates altered and capacity planned which are appearing in CM01 for the respective week
    Planned order created through MRP are fine with scheduling an capacity planning .
    Please let us know what could be a reason for not updating on manual creation.

    Hi
    This is standard behavior of SAP as when you create the planned order through MD11 manually , you need to do the detailed scheduling manually by executing schedule in Edit>Schedule.
    Check this thread:
    Need Automatic Lead-time scheduling in Planned Order using MD11
    Regards,
    Anupam Sharma

  • Collective Planned orders Scheduling for lower level orders with reference to the Superior order

    Hi All,
    Collective planned order scheduling.
    I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
    My problem is
    when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
    For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
    Could some one tell me why this is not happenning at planned order level.
    As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
    Please give your thoughts on this asap.
    Mahee.

    Hello Mahee
    Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
    * No scheduling of overall networks is executed although a directly manufactured component is assigned.
    Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
    BR
    Caetano

  • Scheduling problem in planned order.

    Hi all,
    I have a problem in scheduling of planned orders.
    I had mentioned the following parameters.
    1. Available capacity in the work center as 06:00:00 to 12:00:00
    2.Set up time is 10mins in the routing.
    3. The planned order qty is 100 nos.
    While doing manual scheduling in planned order, the system proposes the start time as 11:50am and finish time as 12:00am. But as per calculation, for 100nos x 10 mins = 1000 min = 17 hrs.
    But the system calculated 10 mins for 100 nos.
    Is there anything i am missing , due to which the system is doing wrong scheduling.
    With regards,
    Afzal

    dear afzal ,
    system is taking setup time only for first piece you are machining and for rest other 99 piece its not considering the setup time.
    Check in the formula you are using if its defined as only to consider one time the setup activity or its taking piece wise/quantity  wise.
    Check and change it , it will solve your problem.
    Hope it helps you.
    regards
    Ritesh

  • Scheduling in Planned order

    Dear All,
    When I am creating a planned order thro MD11 and scheduling it, it is picking only one operation from the routing of the material for which the plnd order is created. What could be the reason for this?
    Manisha

    Hi,
    Please check the below ...
    Proper relationship is maintained in the routing or not.
    Check that the other operation are alternate operations are not.
    Check the control key of the operation it is copying in the planned order.
    Hope thi can help.
    regards,
    kaushik

  • Planned order scheduling in mrp

    hi
    iam trying to run MRP at my client place
    facing problem in planned order dates
    i choosen  tequirement type BSF and strategy group as 11
      in md 61 pir was given in a month of june2008(monthly)
    after mrp run at modo4 iam getting planned order with
    execption message 64 called order date in past
    means iam getting planned order START DATE AND END DATE IN THE MONTH OF JUNE
    where as i need to  my planned order satar date in MAY MONTH and
    end date must be 1st of june
    means i given PIR which is my start of my june month
    checked scheduling parameters which  says backword scheduling, and i choosed planning mode 3 and leddtime scheduling
    plz suggest which setting effects the planned order start and end dates??
    regards
    sasikanth

    hi
    i selected schedule margine key with 0 flots (key000)
    and chossed *LEED TIME SCHEDULING (in mrp controll parameters :-scheduling 2 at MD02 )
    how the reduction strategy helps in this case ,casue i am doing lead time scheduling system has to consider only routing time ??? right ??
    plz suggest how to  arrest message 64
    regards
    sasikanth 
    message 64 diagnosis enclosed
    64: Production finish after order finish                                                                  (P4)
    Message no. MD427
    Diagnosis
    The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.
    As the system uses the order finish date in the planning run, this situation may lead to material shortages if production is not finished until the production finish date calculated by the system.
    System Response
    This exception is displayed in the MRP list and in the current stock/requirements list.
    Procedure
    Check the times in the material master record and in the routing.
    Check whether the order has to be rescheduled in.

Maybe you are looking for

  • Please help! dvd studio pro 3/ m2v issues

    hi, i have been attempting to burn a simple dvd for 9 hours now. i'm using dvd studio pro 3 on a macbook pro (OS X Tiger); the video assets comprising my dvd studio pro project are mpeg2 files. everything looks beautiful when i simulate the menu with

  • Wireless radio turns off every 2 minutes

    I have a Thinkpad Z60t, running Windows XP. I have the physical wireless switch on the side panel set to the on position (i.e. to the right). Initially, I am able to connect to any wireless network without a problem. However, after about 2 minutes of

  • Dynamic internal table, programming problem

    Hello, i have following problem,to bash some hardcoding. so i created a table 1, with the form: A      B A1     B1 A2     B2 A3     B3 A4     B4 now i need some working field, my new internal table should be in the form like: A      B       AA      

  • I am getting error while running OBANT command in SOA Suite

    D:\product\10.1.3.1\OracleAS_1\bpel\samples\tutorials\150.AppsAdapter\OrderImpor tConcurrentProgram>obant D:\product\10.1.3.1\OracleAS_1\bpel\samples\tutorials\150.AppsAdapter\OrderImpor tConcurrentProgram>SETLOCAL ** OBANT is now deprecated. This wi

  • Can`t manage my custom workspaces in CS5 Ai after importing CS4 workspaces

    Here is the folder I pasted my workspaces in from CS4 on XP to Ai CS5 on WIN7 then a screenshot of what my CS5 Ai workspace drop down list looks like... and last a screen shot of the manage workspace dialogue box... When  I choose manage workspaces f