Batch wise actual material consumption and activity cost

hi
my client is steel industry, client requirement is heat wise actual material and machine cost. Heat is a batch number, how i can check batch wise actual material consumption and machine cost.
regards
imdad

Hi Imdad
Whats the batch definition in your case?? have you designed One batch per Prod order or One batch per GR?
If its one batch per Prod order - you can directly see the prod order.. however, chances are less for this as Steel company might be using PCC i.e. repetitive mfg
If its one batch per GR - Then you will have to track using the Confirmation no because each Confirmation will trigger the Goods Issue and Activity Confirmations...
Using Table AFRU - You can track the individual Confirmation no and also the Activity Qty confirmed....COSS / COSSD will have the Activity Cost
If any goods mvt are posted during the Confirmation, you would see a Mat Doc No populated in the field "Mat Doc"
Br, Ajay M

Similar Messages

  • Material ledger and standard cost estimate

    Hi Gurus,
    When standard cost estimate is done in a scenario, where  material ledger is activated, does the entire stock get revaluated andl post a credit in my P/L? Is it possible  to keep my inventory(FG and SFG) at periodic unit price ie at the actual manufacturing price over a longer period say 3 years? Please fill this gap in my understanding.
    Best regards
    Vimal

    Hi Vimal,
    Material ledger uses the standard price as 'preliminary price' always during the current month, independent of the question if a new standard price was estimated and released.
    But: After period end, when the actual price is calculated the posting will adjust the inventory and P/L accounts to the actual price, with posting date in the recent period.
    That means if you have a material that was manufactured once and then consumed over a 3 year period, and during that period you calculate the same material in a standard cost estimate with changing results, that would mean: Looking back at any month during the 3 years the consumption and stock values will be valued at the actual price of manufacturing. But during the currently open period it will always be valuated at the price of the last released cost estimate.
    I hope I understood your scenario correct...
    Best regards,  Udo

  • Product wise raw material consumption

    Raw material consumption is not coming correctly product wise (not matched with data extracted through MB51 material consumption report).What will be the possible error?
    N.B. Material Ledger is not active but variant configuration is on.

    Hi
    MB51 contains total movements list which may include material issued to Production as well as to Cost center/Mat moved from one store to other store and so on. where as RM consumption you may be trying to match with the GL In some of the above transactions only material documents are created and FI docs may or may not be created hence the two may not match.
    Regards
    Rajneesh Saxena

  • Day wise raw material consumption report query

    Hi,
    I was wondering if there was a way to extract the day wise consumption of all the raw materials that we use at the factory. The standard report in SAP B1 only gives me the total raw material consumption within a period of time and I need to drill down a couple of levels to see the individual raw material transferred.
    I basically wanted to use this data to establish the weekly consumption of my raw materials as the goods issue team enters this on a daily basis.
    Thanks in advance.

    Sorry for not having included it earlier. The website did not let me attach an excel sheet.so I've attached a csv file for you to take a look at but basically these are the only fields I need:
    Date
    Item No.
    Item Name
    Issue Qty [Out Qty]
    01-01-2014
    CSPLPIC001
    Raw Material 1
    740
    01-01-2014
    CSPLPIC002
    Raw Material 2
    950
    01-01-2014
    CSPLPIC003
    Raw Material 3
    793
    01-01-2014
    CSPLPIC005
    Raw Material 4
    980
    01-01-2014
    CSPLPIS001
    Raw Material 5
    487
    01-01-2014
    CSPLPIS002
    Raw Material 6
    927
    07-01-2014
    CSPLPMC001
    Raw Material 7
    907
    08-01-2014
    CSPLPMC002
    Raw Material 8
    669
    09-01-2014
    CSPLPMC005
    Raw Material 9
    41
    10-01-2014
    CSPLPIC001
    Raw Material 1
    599
    10-01-2014
    CSPLPIC002
    Raw Material 2
    473
    10-01-2014
    CSPLPIC003
    Raw Material 3
    619
    10-01-2014
    CSPLPIC005
    Raw Material 4
    477
    10-01-2014
    CSPLPIS003
    Raw Material 5
    408
    Please do let me know if there is any other information that you need.

  • Subcontracting scrap, component consumption and service cost booked to vendor

    Hi,
    Our client is issuing 100 pieces of component "A" to subcontracting vendor to manufacture finished product "B". In MIGO, we are receiving finished product B and consumption is booked for 100 pieces of component A . Invoice is paid to the subcontracting vendor for the service cost. 
    Later, we realized finished product did not met the quality standards and decided to scrap out the finished product B. This is scrapped and stocked out using std. SAP using 551 mov type.  But the client want to charge scrap cost of finished product B, service cost (Job work cost) and the consumed components (A) of 100 pieces to subcontracting vendor. How to map this challenging scenario in Std. SAP.
    Regards,
    Sat

    No need to create subcontracting PO.
    Just create a standard PO, use material as FG (Material B as per your scenario)
    Enter the vendor (whom you want to charge for it)
    Let me explain the scenario:
    1. You have created a subcontracting PO for vendor X, FG material B and component A.
    Subcontracting service charge = Rs. 10.
    Price for Material B = Rs. 50
    Price for material A = 30.
    2. You have done GR.
    Now the FG material B is in your stock. (Here, you have done 551 movement type). Right ?
    Now just do not do 551 movement type. Leave the stock as it is.
    3. Then create a standard PO for material B and vendor X, give the price = (10+50+30) 90 and tick the return option in PO line item.
    4. Then do goods receipt. Movement type 161 will be automatic posted in system and stock will be consumed from your storage location.
    Then accounting entry will be
    Stock account Credit
    GR/IR account Debit.
    5. Then you can do credit memo to vendor from MIRO with the reference of this PO. Then the accounting entry will be
    GR/IR account Credit
    Vendor Account Debit.

  • Report for Material consumption quantity  & its cost in Repetitive MFG.

    Hello,
    Is there any Standard Report available in SAP to check the Quantity of raw / intermediate material consumed & their cost in Repetitive manufacturing Backflush transaction MFBF?
    Thanks

    Here I'm interesed in the MFBF Qty & against which the consumption of Raw Materials & their cost.
    The reports which you asked me to check are all structures & not much of use for individual analysis.
    My requirement: When we access the material document(MB51) of the individual MFBF we get all the Raw material Consumption Qty & from there we can go to FI Doc (A/c Document).In A/c documet  we get the cost of all Raw materials consumed alongwith the Qty.
    Is there any report or I need to develope a new report?

  • Stock Material Consumption and Costing Behaviour

    Dear All,
    I have created a Maintenance Order and issued a stock Material on it. So, MO is carrying a cost e:g 1000.
    After GRN process, the Plan cost should convert into Actual Cost but its not doing so. Can anyone guide me how can the Total Planned costs be changed into Actual Costs ??
    Best Regards
    BK

    Hi,
    Go to Tcode OIOF and check  Actual var. calc is assigned or not for ur order type and plant.
    regards
    sunil

  • Double consumption of activity costs as reflected in PCC

    Hi all
    While doing Confimation in  APO.
    we have observed that there is double consumption of activities at each stage after the first stage that is confirmed.
    This has a direct impact on cost booked against activities and depreciation.
    When one looks at PPCSHOW transaction in ECC6.0, for the order no 050000970308, it shows that  the consumption is double .
    From where the system picking the activity time double for all the stages other than 1st stages
    Please let me know the solution
    Note-We are using APO
    Thanks
    Ansuman

    Hi,
    Check whether the BOM & Receipe is maintain correctly in the PP & check from APO also the master data for the consumption of BOM & Activity,Whether the Qty is double or not.
    Regards,
    Raj

  • Batch Split for Material which are activated with serial number management

    Hello All,
    We have requirement where we want batch split to be mandatory during goods reciept with inbound delivery  for material which are serial number managed.
    Please let me know the possible solution to achive this requirement.
    Appreciate your quick response.
    BR,
    Tushar

    I have resolved this issue by myself. Check out the link where I have briefed how to resolve the issue using bapi BAPI_OUTB_DELIVERY_CHANGE.
    BAPI_OUTB_DELIVERY_CHANGE - Batch Splits don't work
    Regards,
    Senthil G.

  • Activity Costs Revaluation Using Actual Price

    Hi,
    Since we can revaluate the activity costs at actual price in the product costing module itself using t.code MFN1, why SAP has provided another option to revaluate acticvity consumption at actual price in the material ledger multi level price determination?
    What is the difference between the both? If i had used MFN1, do i still have to use the revaluation of activity costs provided in the material ledger?

    Hi,
    However don't you think if the production order activity cost has been revaluated at actuals in the production order then during settlement it will carry the activity actual costs which will be shown in material ledger receipts category with the same actuals value for the activity costs.
    So why should i be revaluating the activity costs again with actual activity price in material ledger once again? It sounds like a duplicate work to me under this scenario....

  • Order settlement cost ( Activity cost) can we consider for financial report

    I am in port Implemetation as per their senario financial reports based on cost center hierarchy,
    for minisrial report requirement, they submitting Operational wise nothing but cost center heirarchy wise
    for Pm order settlement Man hour cost based on kp26 computed cost converted actual at the time of confirmation. At the time of settlement to concern cost center is debited but primary cost booking for (man hour) salaries not deducting the primary cost element. Here is salaries and manhours both is apprearing in the cost center. My client requirement is based manour activity cost deducted in salary primary element, they want that process. After Order settlement based on amount we can deduct concern intial cost booking cost center to Order settle cost center.
    Please suggest and PM order cost affect in cost center in primary booking and after order settlement
    Please anyone resolve my issue
    Clarification above issue
    when we settle PM order Activtiy cost (Manhours) based on the salaried booked in primary cost element,we assume per hour man hour cost and specify in kp26 based on the activtiy cost planning system picks cost and at time of order settlement it will settle concern cost center.
    intially we booked salaries in primary cost not thing but salaries a/c and once again we are settling the same salary assumption cost to cost center ...
    when we go  for cost center report Initial salary a/c booking Administrative cost center and now production cost center with activity cost with secondary cost element ....so problem is both cost centers are debiting for the same salaries( activity cost) but my client want cost center  report all including primary and secondary cost element total balance.
    Please resolve my problem it very critical
    Edited by: msreddy08 on Sep 10, 2009 6:27 AM
    Edited by: msreddy08 on Sep 10, 2009 6:39 AM

    Dear Sudhakar,
    salaries cost booked in administrative cost center with primary cost element salary a/c
    but Activity type man hour is meant for per hour salary cost. we can specified in kp26
    so when we take cost center report, we get salary amount and activity cost in admin cost center and product cost center for the same salary amount... for financial report requirment, if we use cost center report the salay amount appeared twice.
    Please explain the activity cost against salay amount ..

  • Plan v/s actual materail consumption report for production order - urgent

    Dear all Hi,
    Is there any report or T code from which i can get the plan v/s actual material consumption for a production order or wbs element after completion of order, please suggest / help, the requirement is very urgent.
    thanks in advance

    Hi shaiz,
    You can get that in COOIS tcode
    Select components again List
    then give the plant,Order details
    execute
    You can find 2 fields reqmn qty(nothing but planned) & qty Withdrawn(Actual consumption) in the report
    Hope this hepls
    Rgds,
    SVP

  • Cost Center wise List of Material Consumption

    Dear Sir,
    Kindly guide us , as which Tcode or Report is available to see the Material wise Consumption List  during a period for a given Cost-Center .
    Full marks are assured for the suggested solution
    Regards
    B Mittal

    Hi,
    You can use T.Code: KSB1 (Display Actual cost line items) in which you can restrict the report by providing the material consumption cost elements and don't give any cost center, which displays all the cost center for the given cost element.
    Regards

  • Volatile raw material price and actual costing

    Hello,
    We are investigating the use of material ledger / actual costing in SAP. We have multiple production plants and multiple distribution warehouses that would be modeled as a plant.
    We are worried that due to the extreme volatility of our raw material prices and the fact that some of our products have low volume or slow turnover in some warehouses, our cost of goods sold in SAP using material ledger / actual costing will be difficult to explain and not reflective of actual conditions.
    For example, if a product is placed in Warehouse A in month 1, receives very little new product in months 2-4, and then we sell a lot of that product from warehouse A in month 4, the cost of those goods will be very close to the month 1 cost. We are worried about how that will affect our cost of goods sold.
    We would like to hear from other companies that have similar conditions to see if this really causes any problems using actual costing / material ledger.
    Thanks,
    Jimmy

    Hello,
    Thank you for your response. We would like to understand why other companies do not have a problem with this behavior. Our company is concerned that this will reduce visibility of raw material price fluctuations in COGS (and reports that use COGS data), and make it more difficult to explain COGS behavior. Note that we have some reports on COGS data by material.
    In our current system, COGS consumes inventory at the average price accross all warehouses.
    Thanks,
    Jimmy

  • Month wise Closing balance of Material Wise and  Batch Wise

    Hi,
    We can get period wise closing balance for Plant-Storage Location-materials in MARDH.
    But i didnt find any table which can provide Plant - S.Loc - Year - Period (or Month) - Batch wise closing Balances.
    Can any body please suggest a table on the above criteria.
    Thanks
    Pardha Saradhi Bandaru.

    Hi,
    The required batch information can be taken from the table S034
    Regards
    Merwyn

Maybe you are looking for

  • Macbook air Mini DisplayPort to VGA Adapter connectivity issues

    Hi pple, Would like to ask if anyone is facing connectivity issues with Mini DisplayPort to VGA? I am currently using the 2nd Gen Macbook Air with Intel HD Graphics 3000 384 MB. Sometimes when I connect to a montior (Viewsonic VA1918wm) it works fine

  • Ipod video no longer plays video

    my ipod video will not play video. it did a few days ago. i did the 5 R thing several times. all videos are from itunes purchases. all audio works fine. any thoughts?

  • What is the difference between Bex transportation and Normal Transportation

    Hi experts, I have doubt with Transporting queries , in this I've used the normal transport (truck icon) rather than Bex Transport. I would like to know which is the preferable one and what is the main difference between them. Suggest me if I can go

  • Wi-fi won't work in Flight mode

    Hi everyone - was wondering if anyone here could help me. I'm planning on taking my iphone overseas without roaming and just using wifi for skype and messaging (ping, whatsapp etc.). However, when I put my phone in flight mode, even though it's conne

  • Class object

    Hi, I have a question about the class Class. Assume that I have written a program containing 3 classes (say 1.java, 2.java, 3.java). Now, when the program is compiled, we get 3 classes namely 1.class, 2.class and 3.class. Are these the classes that a