Subcontracting scrap, component consumption and service cost booked to vendor

Hi,
Our client is issuing 100 pieces of component "A" to subcontracting vendor to manufacture finished product "B". In MIGO, we are receiving finished product B and consumption is booked for 100 pieces of component A . Invoice is paid to the subcontracting vendor for the service cost. 
Later, we realized finished product did not met the quality standards and decided to scrap out the finished product B. This is scrapped and stocked out using std. SAP using 551 mov type.  But the client want to charge scrap cost of finished product B, service cost (Job work cost) and the consumed components (A) of 100 pieces to subcontracting vendor. How to map this challenging scenario in Std. SAP.
Regards,
Sat

No need to create subcontracting PO.
Just create a standard PO, use material as FG (Material B as per your scenario)
Enter the vendor (whom you want to charge for it)
Let me explain the scenario:
1. You have created a subcontracting PO for vendor X, FG material B and component A.
Subcontracting service charge = Rs. 10.
Price for Material B = Rs. 50
Price for material A = 30.
2. You have done GR.
Now the FG material B is in your stock. (Here, you have done 551 movement type). Right ?
Now just do not do 551 movement type. Leave the stock as it is.
3. Then create a standard PO for material B and vendor X, give the price = (10+50+30) 90 and tick the return option in PO line item.
4. Then do goods receipt. Movement type 161 will be automatic posted in system and stock will be consumed from your storage location.
Then accounting entry will be
Stock account Credit
GR/IR account Debit.
5. Then you can do credit memo to vendor from MIRO with the reference of this PO. Then the accounting entry will be
GR/IR account Credit
Vendor Account Debit.

Similar Messages

  • Maintenance Activity Type and Service cost

    Hello friends,
    Is there any relationship between Maintenance Activity Type[MAT] and Service Cost ?
    Actually all the PM02 - Preventive Maintenance Order with MAT as Cost collector are actually accounted under service cost unlike other MATs.
    Please let me know more information regarding the above.
    Rgds
    Prasad

    Scenario in our company is something like below:-
    1.All the maintenance activity is done internally and no Serivces involved in the order
    2.Some of the Non-codified materials for order consumption are Purchased.
    With above, When I do the Cost Analysis MCI8 for all PM02 - Preventive Maintenance Orders for last year I could make the below observations:-
    1. Till Jun08 there is no service cost [which is normal]
    2. From Jul08 there is Service Cost involved , which am not able to understand.
    Could you please help me out?

  • Batch wise actual material consumption and activity cost

    hi
    my client is steel industry, client requirement is heat wise actual material and machine cost. Heat is a batch number, how i can check batch wise actual material consumption and machine cost.
    regards
    imdad

    Hi Imdad
    Whats the batch definition in your case?? have you designed One batch per Prod order or One batch per GR?
    If its one batch per Prod order - you can directly see the prod order.. however, chances are less for this as Steel company might be using PCC i.e. repetitive mfg
    If its one batch per GR - Then you will have to track using the Confirmation no because each Confirmation will trigger the Goods Issue and Activity Confirmations...
    Using Table AFRU - You can track the individual Confirmation no and also the Activity Qty confirmed....COSS / COSSD will have the Activity Cost
    If any goods mvt are posted during the Confirmation, you would see a Mat Doc No populated in the field "Mat Doc"
    Br, Ajay M

  • Inter Company Billing and automatic booking to Vendor master.

    Hi,
    Wish you a Happy New year,,,,,,,
    We have done all the necessary configuration for generating Inter Company billing including the Cost booking to vendor Automatically.
    There are certain points where I need some help,
    1) During Idoc genration we are getting error related to Payment terms of Internal Customer.
    If the payment terms is immidiate then only an Idoc is getting generated,,,,,,,,, else it is throwing an error message " status 51", but according to our business requirements it may be for any days and this may also impact our aging analysis and cash flows.
    2) We have configured upto Third level of product hierarchy but while creating a contract if user maintains only upto first level, then release to account is not happening for inter company billing. Where as if user maintain upto third level there is no issue in the whole process of inter comapny billing.
    Kindly suggest us how to restrict user to maintain product hierarchy pto third level during the creation of contract.
    3) during the Inter company billing generation, if the internal customer is eligible for Tax exemption or tax booking, that is how to book the tax details to internal customer and also to vendor while booking the cost.Please let us know the logic for tax processign in Inter company billing and Idoc generation.
    Awaiting for a favourable reply and thanks in Advance.
    Regards,
    Upendra.

    Hello,
    Did you assign the internal customer to the ordering sales organisation? If not, then create a customer in Delivering Sales org + DC+ Div + Plant and assign the same in the ordering sales organisation.
    You can maintian the same in SPRO --> Enterprise structure --> Defenition --> Sales organisation (Enter internal customer).
    Or
    SPRO--> Sales and  Distribution --> Billing ---> Intercompany billing --> Define internal customer
    Prase

  • Function Module to find Planned Costs and Actual Costs against WBS element

    Dear All,
    We have a requirement where we need to find out the Planned Costs and Actual Costs booked against a WBS element, in a year. The costs can be against all the plan versions or on individual plan version.
    Are there any function modules to retrieve this value?
    Thanks for the help.
    Warm Regards,
    Judith

    Hi,
    The easiest way would be to get the OBJNR for all WBS elements from PRPS and look up RPSCO and summarize for Value type (RPSCO-WRTTP) 1 for planned cost and 4 for Actual cost.
    Please let me know if this helps.
    jibat

  • Report for extracting the actual and planned cost from service orders

    HI all
    we are creating a report in BI for Module - Customer service . LIke , the report is all about how many complaints created in the system and how many completed technically and what is the cost involved for each complaint .
    Like we want the comparision between the planned cost and the actual cost .
    Now to give the logic to the BI Team for planned cost and actual cost , please suggest the flow of logic or table flow to arrive the planned and actual cost
    thanks in advance

    Hi Marthand,
    I am not sure which datasource your are using. In this case, you can use the 0VALUETYPE to differencitae between th eplan and actuals. Normally Plan which is budget will have value 050 and for actuals will have 010. For costs, you will have one key figure and at the reporting level, you will have the costs restricted by the value type for plan and actual to make comparisons.
    Hope this helps.
    Regards,
    Srinivas

  • Operation cost and time sheet booking

    Hi,
    In my current project we have SAP PP and SAP HR too.
    My production order is against WBS, I am issuing materials and confirming operations in CO11N to capture material cost and operation cost. then i am doing GR of finished goods and then order settlement and then goods issue ( of finished goods) to project to post the cost to project. Also in HR, time sheet booking is done in CAT2. This will lead to double cost posting to project i.e. once thru PP and then thru HR.
    How to avoid this??
    Regards.

    I am not sure how you have defined your std value parameters in the Routing.
    in the Production order we are trying to capture the cost incurred to the order, these hours are for Product costing purpose need not  be used for Salaries.
    in CAT2 we are trying to post only the manual labour hrs for the Project. thses hrs for Salary wage settlement purpose.
    Regards
    Ratan

  • Fixed and variable cost component break up in PCA

    Hi,
    Is it possible to get fixed and variable cost component break up and contribution report in PCA at each product group level and lower level of node. I think this requires development. As my client requires the report to have cost break up into fixed and variable in PCA at each line item level. Can anyone solve this

    Hello
    You can get the report by using the  report painter, no development will be required.
    Regards
    Madhav

  • Service Cost and Material Reservation

    Dear Experts,
    We have came up with a requirement that maintenance service costs and material requirements for the same to be captured through PM orders.
    - A budget will be used to paid maintenance service costs
    - Service costs are to be paid for external parties(framework PR will be raised through PM Order)
    - Material requirements for the maintenance to be mentioned in the same order but it should NOT consume the budget.
    - Only cost of service should consume the budget.
    However when i tried, using control key PM03, budget get consumed when materials are requested.
    How do i cater the requirement.
    Thanks in Advance...

    Sank N.
    whn u reserve a material in maintenance order. Material will have cost element assigned to it (via. valuation class) this cost element will be mapped with a cost center. That cost center should be mentioned in your work order settlement rule. so then your material cost will be effecting cost center.
    For service you are having WBS so that WBS you will maintain in same work order settlement rule. Your service cost will effect that WBS element.
    Both are different process.
    For this purpose only i had requested you to ask your FI team and confirm for cost element and cost center mapping.
    Refer below eg so your problem will be clear.
    Cost Element -1 (service) is mapped to WBS and Cost Center
    Cost Element -2 (material) is mapped to WBS and Cost Center.
    Or
    Cost Element -1 (service) with WBS
    Cost Element -2 (material) with Cost Center
    If first case then you will have budge mix up problem
    If second case then no budget mix up problem

  • How can I book services in ical and have that booking generate an editable invoice in numbers

    I would like to book an appointment with billable services in ical and have that booking generate an invoice which I can edit in numbers. Possible? working on an ipad 4th generation.

    I would think with an Applescript  you could create duplicate of an invoice template which is saved in a specific file (and location) and a calendar entry with a shortcut to that new file.
    This would be something you, or someone else, would have to write, test and deploy.  It is not built into Numbers.
    You could do this manually by creating a template for your document.
    Each time you book an event you open the tamplate and save as the invoice number, then create a calendar event where you include the new invoice document as an attachment:
    Since you have posted in the forum for Numbers on Mac OS X you are getting people who mostly work in Numbers on a Mac (I am one of them).
    I will request your post be moved to the Numbers for iOS forum

  • Costing for Maintenance- and Service Orders

    hi
    Can any one tell me the Configuration steps for Costing for Maintenance- and Service Orders.
    Kindly please guide me.
    regards,
    R.Ramakrishnaraj

    Hi,
    Please go through below mentioned threads.
    Re: Activity Costing
    Re: PM order costing.
    Re: Planned cost not getting displayed in Maintenance Order
    Re: Costs not appearing in service order
    There are many threads available for Costing. Please search in the threads.
    Regards,
    Maheswaran.

  • Different service costs in work order and purchase order

    When I add a service in a works order and later on add the vendor I get an incorrect planned cost in the order. A recalculation is not performed based on vendor price. A manual recalculation is possible but it should be done automatically on order save. Anybody familiair with his problem, and more importantly: Anybody got a solution for this?

    The service master / activity 123 has a specific price of 25,- For vendor XYZ the service master /activity has a price of 20,- When I create a work order and add service master / activity 123 first the price of 25,- appears. When I add the vendor XYZ in the work order and create a purchase requisition I presume the price of the vendor xyz (20,-) will appear in the PR. When I create a purchase order from the PR the price is still 25,- instead of 20,-. I get the same result when I manually change the price of the service master / activity. The price in the PR stays the same (20,-).

  • My iphone 5 is eligible for battery replacement program but I have bought it from a mobile operator in Thailand (my place) since Dec 2012. Please advice whether I have to contact my operator or Apple Authorized Service Center. And any cost or free?

    My iphone 5 is eligible for battery replacement program but I have bought it from a mobile operator in Thailand (my place) since Dec 2012.
    Please advice whether I have to contact my operator or Apple Authorized Service Center. And any cost or free?

    bsaelao wrote:
    My iphone 5 is eligible for battery replacement program
    How do you know?
    Please advice whether I have to contact my operator or Apple Authorized Service Center. And any cost or free?
    Follow the instructions here -> https://ssl.apple.com/support/iphone5-battery/
    (which is where you should have found out your iPhone is eligible)

  • Difference between cost component structure and cost component split

    can anyone explain me the difference between cost component structure and cost component split with simple example
    thanks
    santosh

    Hi ,
    cost component structure
    Definition
    Number that identifies the structure.
    Use
    In Product Cost Controlling, the cost component structure determines how the results of material costing are updated. The cost component structure groups the costs for each material according to cost component (such as material costs, internal activities, external activities, and overhead). If the material is used in the production of another material, the cost component split (which breaks down the costs according to material costs, internal activities, external activities, overhead, and so forth) remains in the system when the costs are rolled up.
    In the cost component split, you also define the following for material costing:
    Which part of the costs are fixed costs
    Which costs are
    cost of goods manufactured and what are sales and administration costs
    Which costs are relevant for stock valuation, commercial inventory valuation and tax inventory valuation
    When the cost component structure is assigned to the organizational units, you can specify that two cost component splits are created:
    Main cost component split
    This is the principal cost component split, meaning that it is used in the standard cost estimate, which can be used to update the material master. The main cost component split can be a cost component split for cost of goods manufactured or a primary cost component split.
    Auxiliary cost component split
    This can exist in addition to the main cost component split, and is not used in the standard cost estimate. It can be used for analysis purposes, in that it can be displayed with the cost estimate and passed on to Profitability Analysis.
    In Cost Center Accounting, the cost component structure determines how the results of the activity price calculation are updated. The cost component structure groups the costs for each activity type of the cost center according to components (such as material costs and labor costs). If an internal activity allocation is carried out, the cost component split (which breaks down the costs according to material, labor costs, and so forth) is retained at cost rollup.
    If the cost component split is not to be retained, you can create a switching structure for the cost component structure for Cost Center Accounting. In the switching structure, you specify which sender cost component goes into which receiver cost component.
    <b>require a cost component structure to calculate prices using cost component split.</b>
    For each cost component structure you define a component such as energy, personnel, or raw materials. The components combine all costs occuring for a particular cost element area. In this way, you ensure greater cost transparency in activity price calculation when putting together the activity type prices - for example, it becomes easier to find how much of the activity price is taken up by the material costs.
    In activity allocation, the cost component structure remains constant, meaning that the receiver takes on the sender cost elements and that the allocated costs are posted in the same cost components in the receiver as in the sender.
    A cost component structure can have a maximum of 40 defined cost components.
    Cost components are assigned to cost elements. You thereby determine which cost elements go to which rows in the structure, and how these components are updated in price calculation.
    Hope ths helps
    Please rewad points
    Sunil

  • Subcontracting PO u0096 BOM and component setup

    Currently a finished good is setup to receive at a DC from a Vendor as follows;
    We procure all of the components.
    The finished good is setup in making Vendor plant 0006 and the DC.
    Components of the finished good are setup in Vendor 0006 and receiving DC 07.
    BOM exists in making plant 0006 and BOM exist in DC 07.
    BOM in the DC has a special procurement field (ITSOB) set as 76 – procure from 0006.
    A PO is created with ME21N to receive the finished good in DC 07 that Vendor 0006 makes.  This is set as a subcontracting item category “L”  The BOM explodes the correct components.
    The PO is received via MIGO or RF and stock is backflushed from Vendor 0006 stock to receive the finished good in DC 07.
    This works OK.
    From a business practice standpoint, is it necessarily a good idea to create all these components of the finished good in the DC’s?  It’s kind of silly because we could receive this finished good from the Vendor in up to 4 or 5 DC’s.  Why can you not just create a BOM in the vendor 0006 plant only?  Having to create all these materials in the DC has caused problems.  It is time consuming and purchasing has trouble keeping up with the components that are not necessarily active in a DC but have to exist for the BOM.  Is the system capable of exploding the Vendor 0006 BOM components for a subcontracting PO that is created to receive at DC 07?

    the dc <b>0007</b> is a wm managed plant
    the vendor plant <b>0006</b> is where the finished good is made with various components.
    i agree that it is unnecessary.  very unnecessary.  that's why i was in disbelief that the current setup of bom's in all the dc's was being done.  it is redundant.
    i have tried on QA to create a PO in ME23N with a subcontracting line item to dc/plant 0007, supplying plant is the vendor of course.  i do not understand why the po will not relate the components in the vendor plant 0006 BOM.  you can manually punch them in of course but that defeats the purpose.
    and plant 0006 should receive 30 - subcontracting setting in mrp, right?

Maybe you are looking for

  • How can i remove the empty sting from IList collection?

    How can i remove the empty sting from IList collection. If i use the code i got  System.NotSupportedException was unhandled exception. How can i achive this? IList record = (IList)records; int count = record.Count; for (int i = 0; i < count;i++) bool

  • Boot camp and Windowa 7 (64 bit)

    Happy New Year to every one! My mac is a 2.66 GHz Quad-Core with 8 GB RAM, a nvidia GeForce GT 120 video card and 3 1 GB super ata HDs. Traditionally, one of the hard disks is dedicated to windows os and its applications. Since I got this mac I insta

  • Word 2008 was not work at Yosemite

    Yesterday, I upgraded my OS to Yosemite. Though the OS upgrading seemed to be succeeded, I noticed the microsoft word files could not be opened on the new OS. Word App immediately shut down, soon after I tied to open the file, which using the functio

  • Database in archivelog

    my database is in archivelog mode and i have a two database one is db01 which has alok1 tablespace and second is oemrep and i have a tablespace name alok1 and it has 3 tables in it i want to know that if i want to recover alok1 tablespace in second d

  • Can't repair Imac hard drive

    tried repairing my hard drive using the disk doctor utility.  It said I needed to insert the OS disk and restart and run the Disk repair utility.  I inserted the disc but cant seem to get to the repair utility.  What am i missing?