Best practice regarding work flow (cutting, applying effects, exporting etc)

Hi!
I've been asked to shoot and edit a music video for a friend of mine, and I'm trying to figure out the best way to manage this project in PrE (in what order to do things and so on). I have a picture in my head which make sence, but I'd like to have it confirmed. If you've been following the "Very disappointed with Premiere Elements" thread, you know I'm not a fan of how the applying of effects works, when having a lot of cuts between scenes and clips etc. A few of the steps below is meant to make that process more effective.
So, here's my idea, from the begining and in detail:
1. Download the appropriate clips from the camera (in this case 1280x720, H.264 mov's from an EOS 500D).
2. Create a PrE-project for each clip and maybe trim the in and outs a bit, if needed.
3. Export each clip to uncompressed avi's.
4. Create the main project file and import all the uncompressed avi's.
5. Insert the clips in on appropriate tracks in the timeline.
6. Do all the cutting, triming and sync as complete as possible, without thinking about effects.
7. When finished, open up each of the smaller clip projects and add the desired effects. This will mainly include contrasts, color corrections, noise etc, in order to get the right look and feel to each clip/scene.
8. Again, export the clips to uncompressed avi's and overwrite the previous versions.
9. Open up the main project, which now should contain the clips with look-and-feel effects visible.
10. Add some additional effects if needed.
11. Export/share, and you're done.
Of course I will end up going back and forth through these steps anyway, but as a basic plan it seems reasonable. I see three main positive aspects:
1. The look-and-feel effects will be applied on the raw material, before the converting process. This should result in a slightly better quality. Perhaps not noticeable, but anyway.
2. The main project will be more CPU friendly and easier to work with.
3. If I want to tweek the look-and-feel effect to a clip/scene, I don't have to do it on every split (I will have a lot of splits, so applying and changing the effect parameters will be time consuming and ineffective). Of course, opening up the clip's specific project, changing the effect and then export to avi, will also take time, but point 1 and 2 makes up for that.
Have in mind that it is a music video project, to put things in the right context. We'll probably have a few parallel stories/scenes, with lots of cutting in and out between them. The timeline will probably look insane.
So, am I thinking in the right direction here? Any traps I might fall into along the way?
Regards
Fredrik

Fredrik,
Though similar to your workflow, here is how I would do it.
Import those "raw" Clips into a Project, and do my Trimming in that Project, relying on the Source Monitor to establish the In & Out Points for each, and also using different Instances of any longer "master Clip.". I would also do my CC (Color Correction), and all density (Levels, etc.) Effects here. Do not Trim too closely, as you will want to make sure that you have adequate Handles to work with later on.
Use the WAB (Work Area Bar) to Export the material that I needed in "chunks," using either Lagarith Lossless CODEC, or UT Lossless CODEC *
Import my music into a new Project and listen over and over, making notes on what visuals (those Exported/Shared Clips from above) I have at my disposal. At this point, I would also be making notes as to some of the Effects that I felt went with the music, based on my knowledge of the available visuals.
Import my Exported/Shared, color graded Clips.
Assemble those Clips, and Trim even more.
Watch and listen carefully, going back to my notes.
Apply any additional Effects now.
Watch and listen carefully.
Tighten any edits, adjust any applied Effects, and perhaps add (or remove existing) more Effects.
Watch and listen carefully.
Output an "approval" AV for the band/client.
Tweak, as is necessary.
Output "final approval" AV.
Tweak, as is necessary.
Export/Share, to desired delivery formats.
Invoice the client.
Cash check.
Declare "wine-thirty."
This is very similar to your proposed workflow.
Good luck,
Hunt
* I have used Lagarith Lossless CODEC with my PrE 4.0, but have not tried UT. Both work fine in PrPro, so I assume that UT Lossless will work in PrE too. These CODEC's are fairly quick in processing/Exporting, and offer the benefit of smaller files, than Uncompressed AVI. They are visually lossless. The resultant files will NOT be tiny, so one would still need a good amount of HDD space. Neither CODEC introduces any artifacts, or color degredation.

Similar Messages

  • Best Practice For Working on Composite In Team

    Hello,
    I would like to know what is the best practice for working on a single composite by mutiple members in a team.
    We have a core services module wherein a single composite contains many services. So, to complete in time, we would like many members to work on it simultaneously.
    In such scenarios, if some one adds a new adapter or some other services, composite.xml changes.
    Saving it would override other member's changes. Also, it is not possible to apply lock simultaneously on the same file through some version control mechanism.
    Please let us know what should be the best practice in such scenarios.
    Thanks-
    Ashish

    You can very well use a version control software with JDev. You may refer -
    http://www.oracle.com/technetwork/articles/soa/jimerson-config-soa-355383.html
    I think without version control mechanism (like subversion) it won't be easy to work in a multi-developer environment. If you really don't have a source and version control mechanism then manual merging will be required which may be error prone and time & effort consuming.
    Regards,
    Anuj

  • Regarding work flow

    hi,
    can you please  tell me wht is work flow .
    thanks & regards,
    ramnaresh

    Hi
    Workflow automates the steps and activities in a business process according to predefined procedures and rules.
    Workflow presents information and documents to the appropriate knowledge worker or agent (another entity such as a program) to make a decision or perform an activity.
    Workflow tracks each and every step in the process flow and maintains an ongoing status.
    Workflow also collects and reports all of the metrics associated with the execution and completion of the process.
    Check the below links u will get lot of info..
    http://www.sap-press.com/product.cfm?account=&product=H950
    Workflow
    http://www.sap-img.com/workflow/sap-workflow.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/172437130e0d09e10000009b38f839/frameset.htm
    For examples on WorkFlow...check the below link..
    http://help.sap.com/saphelp_47x200/helpdata/en/3d/6a9b3c874da309e10000000a114027/frameset.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    http://help.sap.com/saphelp_47x200/helpdata/en/4a/dac507002f11d295340000e82dec10/frameset.htm
    http://www.workflowing.com/id18.htm
    http://www.e-workflow.org/
    http://web.mit.edu/sapr3/dev/newdevstand.html
    Go through the following links on FORK :
    http://help.sap.com/saphelp_nw04/helpdata/en/24/e2283f2bbad036e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/8d/25f1e7454311d189430000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/c5/e4a930453d11d189430000e829fbbd/content.htm
    http://www.insightcp.com/res_23.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMSTART/BCBMTWFMSTART.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMDEMO/BCBMTWFMDEMO.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMPM/BCBMTWFMPM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    For more reference on workflow: http://****************/Tutorials/Workflow/Workflow.htm
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/04/9277a346f311d189470000e829fbbd/frameset.htm
    Check these links.
    http://www.sapgenie.com/workflow/index.htm
    /people/ginger.gatling/blog/2005/12/01/link-workflow-business-objects-to-your-collaboration-tasks
    http://help.sap.com/saphelp_nw04/helpdata/en/92/bc26a6ec2b11d2b4b5006094b9ea0d/content.htm
    http://help.sap.com/saphelp_bw33/helpdata/en/92/bc26a6ec2b11d2b4b5006094b9ea0d/content.htm
    http://help.sap.com/saphelp_bw31/helpdata/en/8d/25f94b454311d189430000e829fbbd/content.htm
    http://www.sap-press.com/product.cfm?account=&product=H950
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    http://www.workflowing.com/id18.htm
    http://www.e-workflow.org/
    Workflow
    http://www.sap-img.com/workflow/sap-workflow.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/172437130e0d09e10000009b38f839/frameset.htm
    For examples on WorkFlow...check the below link..
    http://help.sap.com/saphelp_47x200/helpdata/en/3d/6a9b3c874da309e10000000a114027/frameset.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    http://help.sap.com/saphelp_47x200/helpdata/en/4a/dac507002f11d295340000e82dec10/frameset.htm
    http://www.workflowing.com/id18.htm
    http://www.e-workflow.org/
    http://web.mit.edu/sapr3/dev/newdevstand.html
    http://www.sap-img.com/workflow/sap-workflow.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/172437130e0d09e10000009b38f839/frameset.htm
    For examples on WorkFlow...check the below link..
    http://help.sap.com/saphelp_47x200/helpdata/en/3d/6a9b3c874da309e10000000a114027/frameset.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    http://help.sap.com/saphelp_47x200/helpdata/en/4a/dac507002f11d295340000e82dec10/frameset.htm
    http://www.workflowing.com/id18.htm
    http://www.e-workflow.org/
    http://web.mit.edu/sapr3/dev/newdevstand.html
    Workflow tutorials with step-by-step and with screenshots are available at http://www.****************/Tutorials/Workflow/Workflow.htm
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/42/c14a9b55103116e10000000a1553f7/frameset.htm
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/c5/e4a930453d11d189430000e829fbbd/frameset.htm
    http://www.sapgenie.com/workflow/
    http://www.sap-img.com/workflow/sap-workflow.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/3d/6a9b3c874da309e10000000a114027/frameset.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    http://help.sap.com/saphelp_47x200/helpdata/en/4a/dac507002f11d295340000e82dec10/frameset.htm
    http://www.sap-basis-abap.com/wf/sap-business-workflow.htm
    https://forums.sdn.sap.com/click.jspa?searchID=791580&messageID=2857887
    https://forums.sdn.sap.com/click.jspa?searchID=791580&messageID=2855919
    https://forums.sdn.sap.com/click.jspa?searchID=791580&messageID=2735228
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMSTART/BCBMTWFMSTART.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMDEMO/BCBMTWFMDEMO.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMPM/BCBMTWFMPM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    Debug a workflow.
    This has a step by step procedure :
    http://fuller.mit.edu/workflow/debugging.pdf
    www.erpgenie.com/sap/workflow/debugging.htm
    http://www.erpgenie.com/workflow/debugging.htm?2b5de440
    Workflow tutorials with step-by-step and with screenshots are available at
    http://www.****************/Tutorials/Workflow/Workflow.htm
    http://www.sapgenie.com/workflow/
    http://www.sap-img.com/workflow/sap-workflow.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/3d/6a9b3c874da309e10000000a114027/frameset.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    http://help.sap.com/saphelp_47x200/helpdata/en/4a/dac507002f11d295340000e82dec10/frameset.htm
    http://www.workflowing.com/id18.htm
    http://www.e-workflow.org/
    http://web.mit.edu/sapr3/dev/newdevstand.html
    http://www.sap-basis-abap.com/wf/sap-business-workflow.htm
    https://forums.sdn.sap.com/click.jspa?searchID=791580&messageID=2857887
    https://forums.sdn.sap.com/click.jspa?searchID=791580&messageID=2855919
    https://forums.sdn.sap.com/click.jspa?searchID=791580&messageID=2735228
    http://www.sapbrain.com/TUTORIALS/TECHNICAL/WORKFLOW_tutorial.html
    Regarding Work Flow   
    work flow scenarios.
    1. applying for a leave.
    2. approval process.
    3. material creation process.
    4. mainly work flow is for notification purpose.
    chk this links
    http://help.sap.com/saphelp_erp2005/helpdata/en/fb/135962457311d189440000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_erp2005/helpdata/en/c5/e4a930453d11d189430000e829fbbd/frameset.htm
    Workflow
    http://www.sap-img.com/workflow/sap-workflow.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/172437130e0d09e10000009b38f839/frameset.htm
    For examples on WorkFlow...check the below link..
    http://help.sap.com/saphelp_47x200/helpdata/en/3d/6a9b3c874da309e10000000a114027/frameset.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    http://help.sap.com/saphelp_47x200/helpdata/en/4a/dac507002f11d295340000e82dec10/frameset.htm
    http://www.workflowing.com/id18.htm
    http://www.e-workflow.org/
    http://web.mit.edu/sapr3/dev/newdevstand.html
    http://www.erpgenie.com/workflow/index.htm
    http://www.sap-basis-abap.com/wf/sap-business-workflow.htm
    http://www.insightcp.com/res_23.htm
    A good tutorial
    http://www.thespot4sap.com/articles/Invoice_Verification_Automation_Using_SAP_Workflow.asp
    http://www.sap-basis-abap.com/wf/sap-business-workflow.htm
    /people/alan.rickayzen/blog
    /people/jocelyn.dart/blog/2006/06/19/why-use-abap-oo-with-workflow
    a good book
    http://www.sap-press.com/product.cfm?account=&product=H950
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    http://help.sap.com/saphelp_47x200/helpdata/en/4a/dac507002f11d295340000e82dec10/frameset.htm
    http://www.sap-press.com/downloads/h950_preview.pdf
    Check the following PDF
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMSTART/BCBMTWFMSTART.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMDEMO/BCBMTWFMDEMO.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMPM/BCBMTWFMPM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSWFL/PSWFL.pdf
    also seach the workflow forum: SAP Business Workflow
    Regards
    Anji

  • Best Practices regarding program RCOCB004

    Dear Colleagues
    I'd like to discuss the Best Practices regarding the setup of jobs to send Process Messages
    In my company we have a batch job with two steps. Each steps contain one variant of program RCOCB004.
    The first step will send messages with Status "To be sent", "To be resubmitted" and "To be resubm. w/warng"
    The second step will send messages with Status "Destination Error", "Terminated", "Incomplete"
    However, this job sometimes fails with error "Preceding job not yet completed (plant US07)"
    I'd like to discuss what is best way to set up this job in order to avoid this error and also improve performance.
    Thanks and Regards

    Dear,
    To keep the number of message logs in the system low, proceed as follows:
          1. Check the report variants for report RCOCB004 used in your send jobs.The sending of messages in status "Destination error" or "Terminated" is only useful if the error is corrected without manual intervention;for example with messages of category PI_PHST, if the sequence of the messages or time events was swapped in the first send process.
          2. Regularly delete the logs of the messages that were not sent to the destination PI01 using report RCOCB009 (Transaction CO62).
          3. Check whether it it is actually required to send messages to the destination PI01.This is only useful if you want to evaluate the data of these messages by means of the process data evaluation, or if the message data including the logs are to be a part of the process data documentation or the batch log. Remove destination PI01 for the message categories to which the above-mentioned criteria does not apply.You can activate destination PI01 again at a later stage.
          4. If you still want to send process messages to destination PI01, carry out a regular archiving of your process orders.As a result of the archiving, the message copies and logs in the process message record are also deleted.
          5. If the described measures do not suffice, you can delete the logs using Transaction SLG2.
    Control recipe send = RCOCB006 and you need to set the job to run after event SAP_NEW_CONTROL_RECIPES
    Process message send = RCOCB002 (cross plant) and RCOCB004 (specific plant). You need to create variants for these.
    Check the IMG documentation in PPPI for control recipes and process instructions where there is more information about this. Also standard SAP help is quite good on these points.
    Finally, if you are automatically generating process instructions then you need program RCOCRPVG plus appropriate variants.
    Hope it will help you.
        Regards,
    R.Brahmankar

  • Issue regarding [Work Flow] Business Object Event Raise in ABAP Program

    Hi All,
    I have one issue regarding [Work Flow] Business Object Event Raise in ABAP Program.
    Actual TDS is as below:
    If E message type written, raise Business object BUS2005 (Production order) Event PickShortage for production order passing warehouse, transfer request
    (BUS2065 Object key) in event container. Also include table of text version of error
    messages for this set of Transfer
    Request.
    Can anybody tell me how can i write it technically in ABAP Code.
    Can anybody solve this issue!
    Thanks in advance.
    Thanks,
    Deep.

    Hi,
    Can anybody solve above posted issue!
    Thanks,
    Deep.

  • Best Practices regarding AIA and CDP extensions

    Based on the guide "AD CS Step by Step Guide: Two Tier PKI Hierarchy Deployment", I'll have both
    internal and external users (with a CDP in the DMZ) so I have a few questions regarding the configuration of AIA/CDP.
    From here: http://technet.microsoft.com/en-us/library/cc780454(v=ws.10).aspx
    A root CA certificate should have an empty CRL distribution point because the CRL distribution point is defined by the certificate issuer. Since the roots certificate issuer is the root CA, there is no value in including a CRL distribution point for
    the root CA. In addition, some applications may detect an invalid certificate chain if the root certificate has a CRL distribution point extension set.A root CA certificate should have an empty CRL distribution point because the CRL distribution point is defined
    by the certificate issuer. 
    To have an empty CDP do I have to add these lines to the CAPolicy.inf of the Offline Root CA:
    [CRLDistributionPoint]
    Empty = true
    What about the AIA? Should it be empty for the root CA?
    Using only HTTP CDPs seems to be the best practice, but what about the AIA? Should I only use HTTP?
    Since I'll be using only HTTP CDPs, should I use LDAP Publishing? What is the benefit of using it and what is the best practice regarding this?
    If I don't want to use LDAP Publishing, should I omit the commands: certutil -f -dspublish "A:\CA01_Fabrikam Root CA.crt" RootCA / certutil -f -dspublish "A:\Fabrikam Root
    CA.crl" CA01
    Thank you,

    Is there any reason why you specified a '2' for the HTTP CDP ("2:http://pki.fabrikam.com/CertEnroll/%1_%3%4.crt"
    )? This will be my only CDP/AIA extension, so isn't it supposed to be '1' in priority?
    I tested the setup of the offline Root CA but after the installation, the AIA/CDP Extensions were already pre-populated with the default URLs. I removed all of them:
    The Root Certificate and CRL were already created after ADCS installation in C:\Windows\System32\CertSrv\CertEnroll\ with the default naming convention including the server name (%1_%3%4.crt).
    I guess I could renamed it without impact? If someday I have to revoke the Root CA certificate or the certificate has expired, how will I update the Root CRL since I have no CDP?
    Based on this guide: http://social.technet.microsoft.com/wiki/contents/articles/15037.ad-cs-step-by-step-guide-two-tier-pki-hierarchy-deployment.aspx,
    the Root certificate and CRL is publish in Active Directory:
    certutil -f -dspublish "A:\CA01_Fabrikam Root CA.crt" RootCA
    certutil -f -dspublish "A:\Fabrikam Root CA.crl" CA01
    Is it really necessary to publish the Root CRL in my case?
    Instead of using dspublish, isn't it better to deploy the certificates (Root/Intermediate) through GPO, like in the Default Domain Policy?

  • Regarding [Work Flow] Business Object Event  Raise in ABAP Program

    Hi All,
    I have one issue regarding [Work Flow] Business Object Event Raise in ABAP Program.
    Actual TDS is as below:
    If E message type written, raise Business object BUS2005 (Production order) Event PickShortage for production order passing warehouse, transfer request
    (BUS2065 Object key) in event container.  Also include table of text version of error
    messages for this set of Transfer
    Request.
    Can anybody tell me how can i write it technically in ABAP Code.
    Can anybody solve this issue!
    Thanks in advance.
    Thanks,
    Deep.

    Hi,
    Can anybody solve above posted issue!
    Thanks,
    Deep.

  • Best Practice Regarding Large Mobility Groups

    I was reading the WLC Best Practices and was wondering if anyone could put a number to this statement regarding the largest number of APs, end users, and controllers which can contained in a Mobility Group.
    We would be deploying WiSMs in two geographically dispersed data centers. No voice is being used or is planned.
    "Do not create unnecessarily large mobility groups. A mobility group should only have all controllers that have access points in the area where a client can physically roam, for example all controllers with access points in a building. If you have a scenario where several buildings are separated, they should be broken into several mobility groups. This saves memory and CPU, as controllers do not need to keep large lists of valid clients, rogues and access points inside the group, which would not interact anyway.
    Keep in mind that WLC redundancy is achieved through the mobility groups. So it might be necessary in some situations to increase the mobility group size, including additional controllers for
    redundancy (N+1 topology for example)."
    I would be interested in hearing about scenarios where a Catalyst 6509 with 5 WiSM blades is deployed in data centers which back each other up for cases of disaster recovery.
    Can I have one large Mobility group? This would be easier to manage.
    or
    Would it be better to back up each blade with a blade in the second data center? This would call for smaller Mobility Groups.
    Be glad to elaborate further if anyone has a similar experience and needs more information.
    All responses will be rated.
    Thanks in advance.
    Paul

    Well, that is a large group indeed, and I would say most organizations use nested groups instead of adding these behemoths to the directory as they are quite difficult to work with.  If it's a one-time thing, you could create it manually in bite-sized
    chunks with LDIF or the like, so that FIM only has to do small delta changes afterwards.
    The 5,000 member limit mostly applies to groups prior to the change to linked value storage.  What is your forest functional level, and have you verified that this group is using linked values?
    Steve Kradel, Zetetic LLC

  • IPhone Best Practices - A Work In Progress

    Hello all. I've been tasked with introducing my coworkers into the inner workings of the iPhone, and there are a good number of pointers that I find myself saying over and over again. I'd like to share my best practices with everyone, as well as collect more pointers and opinions from the community at large.
    Care and Handling:
    First - wash your hands, often. Now I know we all do this often anyway, but I'd like to point out that a healthy amount of hand washing will really go a long way to keep your iPhone screen smudge free. The worst offender, unfortunately, is doughnuts. A small layer of sugar will render that area un-tappable, without any real indication that it has done so. If you are frantically tapping the screen on the iPod button and nothing is happening, clean your phone before you do a hard reset.
    Second - Pockets. Keeping your phone in your front pocket is natural and what most of us do. In these summer months, however, keeping your phone in a sweaty front pocket can do a good deal to the dirt level of the screen. If you find yourself cleaning your phone constantly, try a belt clip.
    Lastly - Battery Life. Your iPhone's battery life is in your hands, literally. Being aware of your power consumption and planning accordingly is going to be infinitely more important that the battery's native charge-holding ability. This goes especially for the day of purchase - as tempting as it may be to open the box and activate, immediately running around the house watching YouTube, it is best to let the phone charge for 12 hours before use. Charging the phone every night is an absolute must, skipping a day will kill the battery life as your ride the bottom edge the following day. Most of us have access to a USB port while we're at work, best idea will be to plug in your phone when you sit down at your desk.
    iPod:
    Large Libraries: In the opening weekend, I got many complaints that you cannot manually manage your music. There is a workaround that has made me change the way I work with all of my iPods: the iPhone specific playlist. Simply create a playlist with all of the music you wish to put on your phone and sync that one playlist. This also helps with sync time - you have a start sync and an end sync, not a constant sync all throughout your music management, slowing your computer down in the process.
    TV Shows: I watch a lot of MST3K, which I have organized into iTunes as TV shows, split into seasons, the works. The problem that has arisen, therefore, is the one of selective synchronization - you cannot specifically select the TV show you want to sync to the device, instead getting the choices to sync all, unwatched, or latest shows. This is problematic when each show is 700MB large. Here's the work around - select all of the episodes of a specific show and right click, selecting "Mark as Not New", removing all of the little blue dots from the episodes. Select the one, three, or five episodes, and right click them, selecting "Mark as New", then sync the last one, three, or five unwatched episodes. The shows you selected will sync.
    iPhoto:
    Many users are complaining that iPhoto opens whenever the phone is connected. This is not a preference of the phone, but rather iPhoto. Remember when you first launched iPhoto and it asked you if you wanted to use iPhoto whenever your camera was attached? iPhoto is detecting that your phone is a camera and launching, just as you told it to do.
    Mail:
    POP accounts - too many unread messages: When first adding a POP account, all of the messages downloaded to the phone arrive as unread. Tapping a message, tapping back, and then tapping the next message can get tedious. Here's the workaround - tap the small down arrow to the upper right hand side of the screen, watching closely to the number next to Inbox. When that number goes down by one, tap the arrow again. If that number hasn't gone down yet, wait a sec, and do not try to tap tap tap tap tap, you'll flood the input queue and crash Mail.
    Syncing Mail accounts - All too often people blame the iPhone when their mail does not work. A perfect test is sync you accounts from Mail. If they work in mail, they'll work on the phone, if they are unreliable in Mail, they will also be unreliable on the phone. The Mail client on the iPhone is just as powerful as any other mail client in terms of how it connects to mail servers, if you are having problems you need to check your settings before blaming the hardware. If you prefer to leave your install of Mail.app alone, create a new user account on your Mac, set up all of the accounts you want there, and use iTunes to sync that data to the phone. Make sure to remove that portion of sync from your actual user account's instance of iTunes, however, or it will all sync back.
    This message has not been downloaded from the server: This message has snagged a couple users, but upon investigation, these users have filled their iPhones to the absolute brim with music and video. It hasn't been downloaded from the server because there is no space to download to - this also applies to the Camera application dumping to the Home screen. Because there is no space, it can't add any new data. Make some room, then be patient as the mail client gets to that message in cleanup (often a sync or reboot will clear it up).
    Safari:
    Safari and iPod: Many users have reported iPod stopping in the middle of browsing, often pouting and pursing their lips crying, "This is terrible, I can't even browse the web and listen to music at the same time?". I then check their phone, and lo and behold they have upwards of eight separate pages open at the same time. This device (like every other computer out there) has a finite amount of memory, each page taking up a significant portion depending on how busy the page is. I've routinely gotten through entire albums while browsing through Safari, but I've got one page open in total, and it's usually mostly text. Keep it to one or two pages open and iPod will run forever if you let it.
    Web Apps: "This web app is terrible, it keeps booting me to Home!" When was your last reboot? How many other pages are open? In the same vein as Safari and iPod, Web Apps need a good deal of breathing room - give it to them. Close down other pages, stop iPod, or even reboot. Give the app a clean slate and it will perform, every time. iPhoneRemote users will attest to this.
    iCal:
    Multiple Calendars - Default Calendar: When adding a new appointment, it adds to the default calendar. Appointments can't be shunted to the correct calendar until after sync anyway, so create an "iPhone" calendar and make that the default. Because it's in that calendar, you'll know enough to move it to the appropriate calendar after sync.
    Please feel free to add your own best practices, and ask questions, too.

    is there any application you can get for the iphone to enlarge text and phone numbers ?
    If included with an email or on a website, yes with no application needed.
    If you are referring to the text size for your iPhone's contact list, no.
    can you insert a phone number from your contact list into a text message ?
    No.
    i cant seem to figure it out, does the alarm clock work if you turn off the phone at night,
    No - powered off with the iPhone means powered off. Any phone that provides for this is not powered off - it is in deep sleep or deep standby mode, which the iPhone does not support. If you don't want your phone ringing or don't want to receive SMS at night but you want to use the iPhone's alarm feature as a wake-up alarm, you can turn on Airplane Mode before going to bed, which will also conserve the battery if your iPhone is not plugged in at night.
    can you send a multi media text message ?
    No.

  • Looking for some best practice regarding Content Administrator access

    Hi. I am looking for some best practice or rule of thumb from SAP or from different companies how they address Portal Content Administrator access in Production environment. Basically, our company is implementing portal to work with SAP BW.  We are on SP 9. Basically, I am trying to determine if we should have 1-2 Portal Content Administrator in Production with 24/7 access or we should limit them from NOT having this.  Can you share with me some ideas of what is right? and what is not?
    Should we have access in Production? Or Should we have this access but limited? By the way, our users are allow to Publish BI reports/queries into Production.

    Hello Michael,
    Refer to this guide about managing initial content in portal.
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/00bfbf7c-7aa1-2910-6b9e-94f4b1d320e1
    Regards
    Deb
    [Reward Points for helpful answers]

  • Best practice with WCCP flows for WAAS

    Hi,
    I have a WAAS SRE 910 module in a 2911 router that intercepts packets from this router with WCCP.
    All packets are received by external interface (gi 2/0, connected to a switch with port configured in WCCP vlan), and are sent back to the router via internal interface (gi 1/0 directly connected to the router) :
    WAAS# sh interface gi 1/0
    Internet Address                    : 10.0.1.1
    Netmask                             : 255.255.255.0
    Admin State                         : Up
    Operation State                     : Running
    Maximum Transfer Unit Size          : 1500
    Input Errors                        : 0
    Input Packets Dropped               : 0
    Packets Received                    : 20631
    Output Errors                       : 0
    Output Packets Dropped              : 0
    Load Interval                       : 30
    Input Throughput                    : 239 bits/sec, 0 packets/sec
    Output Throughput                   : 3270892 bits/sec, 592 packets/sec
    Packets Sent                        : 110062
    Auto-negotiation                    : On
    Full Duplex                         : Yes
    Speed                               : 1000 Mbps
    WAAS# sh interface gi 2/0
    Internet Address                    : 10.0.2.1
    Netmask                             : 255.255.255.0
    Admin State                         : Up
    Operation State                     : Running
    Maximum Transfer Unit Size          : 1500
    Input Errors                        : 0
    Input Packets Dropped               : 0
    Packets Received                    : 86558
    Output Errors                       : 0
    Output Packets Dropped              : 0
    Load Interval                       : 30
    Input Throughput                    : 2519130 bits/sec, 579 packets/sec
    Output Throughput                   : 3431 bits/sec, 2 packets/sec
    Packets Sent                        : 1580
    Auto-negotiation                    : On
    Full Duplex                         : Yes
    Speed                               : 100 Mbps
    The default route configured in WAAS module is 0.0.0.0/0 to 10.0.1.254 (router interface).
    Would it be better that packets leave WAAS module by the external interface (in place of the internal interface) ?
    Is there a best practice recommended by Cisco on this ?
    Thanks.
    Stéphane

    Hi Stephane,
    We usually advise the following in such scenario with an internal module:
    "ip wccp 61 redirect in" the LAN interface.
    "ip wccp 61 redirect in" on the WAN one.
    "ip wccp redirect exclude in" on the internal interface between the WAAS and the router.
    That way, we are sure that no loops are created because of the WCCP redirection.
    Regards,
    Nicolas

  • Best Practice - Bounded Task Flows, Regions and Nested Application Modules

    Using JDev 11.1.1.3; understand that it's generally considered good practice to just have 1 root application module servicing model content / services for each page. In our application, we've used a number of bounded task flows and page fragments deployed as af:region's into pages as either a) views targeted in page-flow navigation, b) tab panel content inside a regular jspx, or c) af:popup / af:dialog content. As it stands, we've not engaged nesting of the application modules for this embedded region content, so these regions are no doubt instantiating new AM's if/when invoked. Should the AM's servicing these embedded regions be deployed nested within the root AM's, and then if so, does this change the way that the jsff / fragment content is actually developed (currently as per any other jspx using the DataControl pallete). Or are the best-practice directives talking about a page as being the design-time / declarative composition of content rather than the run-time aggregation of page + fragments ... in which case the fact that our embedded fragments are not using nested AM's is unlikely to concern.
    Thanks,

    Probably a better question for the ADF EMG: http://groups.google.com/group/adf-methodology?hl=en
    CM.

  • Best Practice regarding using and implementing the pref.txt file

    Hi All,
    I would like to start a post regarding what is Best Practice in using and implementing the pref.txt file. We have reached a stage where we are about to go live with Discoverer Viewer, and I am interested to know what others have encountered or done to with their pref.txt file and viewer look and feel..
    Have any of you been able to add additional lines into the file, please share ;-)
    Look forward to your replies.
    Lance

    Hi Lance
    Wow, what a question and the simple answer is - it depends. It depends on whether you want to do the query predictor, whether you want to increase the timeouts for users and lists of values, whether you want to have the Plus available items and Selected items panes displayed by default, and so on.
    Typically, most organizations go with the defaults with the exception that you might want to consider turning off the query predictor. That predictor is usually a pain in the neck and most companies turn it off, thus increasing query performance.
    Do you have a copy of my Discoverer 10g Handbook? If so, take a look at pages 785 to 799 where I discuss in detail all of the preferences and their impact.
    I hope this helps
    Best wishes
    Michael Armstrong-Smith
    URL: http://learndiscoverer.com
    Blog: http://learndiscoverer.blogspot.com

  • Regarding work flow for credit block release in sales order

    Dear Experts,
    Kindly help me with work flow-
    my scenario is if customers credit limit of 5000$ exceeds in sales order it should be blocked and notification should go to authorize person through simple mail to release this block.
    for this i have done settings in out control i have used output type krml and determined partner as employee responsible to release block in customer master but mail is not triggered to authorized person for credit block and how i can create work flow for this so that authorized person should get notify for credit block as well he releases block also.
    Regards
    Supriya

    Dear supriyaparimal,
    Please find the below points to fix your issue.
    1. Configure the out put determination by using the condition type KRML.(Hope oyu have done it already).
    2.Maintain the condition records in VV11 for condition type "KRML"
    3.Then select the condition record and click the communication tab .
    4. If you want to give any information you can use "Note for recipient".
    5. If the information has to be sent to relevant person you recipient name in the recipient column.
    Save the documnet.
    If you raise the sales order and if it is blocked then system automatically send the information to respective person.
    You can get this in formation in ""SBWP" transaction code.
    Check the in box, the information what you have mentioned in the condition records will be appeared.
    Please let me know if you have any clarifications
    Thanks&Regards
    raghu.k

  • Best Practice With Work Efficient in Report server

    In SSAS cube I have two different roles:  
     - Manager (about 10 people)  
     - Salesman (about 43 people)
    Manager has full access to 4 report and salesman has access to 1 report. Totally, it is five report.
    I have the roles and its users in SSAS cube and when I deploy the cube I need to apply all 53 users in the report server.
    I have created two map, named "aa" and "bb" in the index page. The manager has access to "aa" and salesman has acess to "bb". I have moved the document to these map.
    What is the best practice to make right user to have right access to map and document in a efficient approach in report server?

    Hi Sakura,
    In SQL Server Reporting Services, we should verify that sufficient permissions have been granted for the user. At a minimum, we should grant the user the role that support both the "View reports" task and the "View folders" tasks to support viewing and folder
    navigation in SQL Server Management Studio. For more information about system-level permission and item-level permission, please refer to the following document:
    http://technet.microsoft.com/en-us/library/aa337491(v=sql.105).aspx
    Hope this helps.
    Thanks, 
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

Maybe you are looking for

  • MBA no longer reads the external drive - can anyone help?

    Hi My MBA no longer reads the external iOmega HD. I use the iOmega to store all my files and for the TimeMachine. My old Powerbook G4 continues can read it so it's not a problem with the external drive. Also, the MBA can read another external drive t

  • Transfering from iPod to iTunes ... is it possible?

    Recently my iTunes had a major problem where it would not open. Long story short, I had to reformat my hard drive, so I lost EVERYTHING. I couldn't save the music, because they thought the virus might be in my music files. So, the only place I have m

  • PDFMaker 9 adding bookmarks to Word index markers

    Hi folks, I recently updated to Acrobat 9.5.1 and am seeing an odd, annoying problem. I use Microsoft Word 2007 to create a document with a non-standard heading style called "Message Bar." When I make my PDF, I ask PDFMaker to create a Level 3 bookma

  • How create ear to setup file or exe

    how i will create setup or exe from ear.

  • Configuring end-to-end monitoring

    1) configuring end-to-end monitoring - we have to put monitoring level high for which components 2) activating end-to-end-monitoring -what's the frequency we have to mention ? what is the appropriate frequency? 3) in activating ccms monitoring for xi