Best practices for approval of MRP generated PRs

Hi, all.  I'd very much like to route our MRP generated purchase requisitions directly to the Purchasing department without the need for additional approvals, regardless of $ amount.
PRs not generated by MRP (manual) will still need to pass through a release strategy.
What is the standard industry practice for processing MRP generated PRs? 
What have you seen?
Thanks in advance.
Sarah

Hi,
Well i haven't come across a situation which requires an approval of MRP generated PR's.
If the process of loading demands is controlled, then the output from MRP is by default controlled, unless there is some specific enhancements put in MRP calculation which does a change.
So if there is no such enahancements, then i do not see a need for the same.
So from a good practise perspective, i would look at controlling the demand & the manner in which it is entered into the system.
Regards,
Vivek

Similar Messages

  • Best practice for storing user's generated file?

    Hi all,
    I have this web application that user draws an image off the applet and is able to send the image via mms.
    I wonder what is the best practice to store the user image before sending the mms.
    Message was edited by:
    tomdog

    java.util.prefs

  • Separate Doc.Type for MRP generated PRs

    Dear All
    We are facing an issue with MRP process where we want to automate the process from MRP run to PO creation.
    In source list we will add the existing contracts and make it relevant to MRP so that after MRP run we will get source (vendor defined in the contract) assigned purchase requisitions. After that, we will create a background job for ME59n in order to get the POs automatically after MRP run.
    In this process we are facing issue with the auto PO generation through ME59n as funds management (FM) related parameters such as Fund and Fund center need to be enetered manually at the time of PO creation in our system. So in order to avoid this manual entry we want to define FM derivation which automatically populate the fund & fund center in the MRP generated PRs.
    Further, we have two options for FM derivation one is valuation class and the second one is Document type. If we define the FM derivation based on the valuation class we cannot only restrict to MRP generated PRs. Second option is separate document type for MRP generated PRs.
    Please provide pros and cons regarding the creation of new document type for MRP. Also, please provide your suggestions or any work arounds for the above discussed scenario. Your inputs are highly appreciated.
    Thanks in advance.
    Prabhas

    Hi nagaraj
    it makes sense . i will explore and tell you.
    what about your source assignment standard program. hope it will assign source of supply if it is a valid unique source of supply else it will assign eprofile to your purcase request. check with technical resource how the satndard program behaves.
    i will also explore my side again. check mm forum too on your purchase organisation assignment for your userexists.
    one question to you.
    when you create a PR for material and go to source of supply .why do we get many fixed vendors like contracts,info record if we have valid fixed vendors as sap ecc standard.but in my PR i may not have Purchase organisation information.
    muthu

  • Best Practices for Service Entry Sheet Approval

    Hi All
    Just like to get some opinion on best practices for external service management - particularly approval process for Service Entry Sheet.
    We have a 2 step approval process using workflow:
    1 Entry Sheet Created (blocked)
    2. Workflow to requisition creator to verify/unblock the Entry Sheet
    3. Workflow to Cost Object owner to approve the Entry Sheet.
    For high volume users (e.g. capital projects) this is cumbersome process - we looking to streamline but still maintain control.
    What do other leaders do in this area?  To me mass release seems to lack control, but perhaps by using a good release strategy we could provide a middle ground? 
    Any ideas or experiences would be greatly appreciated.
    thanks
    AC.

    Hi,
    You can have purchasing group (OME4) as department and link cost center to department (KS02). Use user exit for service entry sheet release and can have two characteristics for service entry sheet release, one is for value (CESSR- LWERT) and another one for department (CESSR-USRC1) .Have one release class for service entry sheet release & then add value characteristics (CESSR- LWERT) and department characteristics (CESSR-USRC1). Now you can design release strategies for service entry sheet based on department & value, so that SES will created and then will be released by users with release code based on department & value assigned to him/her.
    Regards,
    Biju K

  • Determination of Porg for MRP generated PRs

    Hello All,
    We have a requirement to transfer the PR into the SRM after ensuring that the Porg is also available so that
    only the unsourced items are sent to the SRM for sourcing.
    For certain MRP generated PRs wew finsd that the Porg is not available .
    In order that the Porg  (the standard Porg assigned to the plant) is to be detrmined in the PR
    is there any user exit or a development may be required?If so what and where can we influence this pls?
    We are working with SRM 5.0 and ECC 6.0 and R3 4.70 as a Back end systems
    Regards,
    Nagarajan

    Hi nagaraj
    it makes sense . i will explore and tell you.
    what about your source assignment standard program. hope it will assign source of supply if it is a valid unique source of supply else it will assign eprofile to your purcase request. check with technical resource how the satndard program behaves.
    i will also explore my side again. check mm forum too on your purchase organisation assignment for your userexists.
    one question to you.
    when you create a PR for material and go to source of supply .why do we get many fixed vendors like contracts,info record if we have valid fixed vendors as sap ecc standard.but in my PR i may not have Purchase organisation information.
    muthu

  • What are the best practices for generating an EPS logo from InDesign?

    Our costomer is running into technical issues with the logo we sent them, which was exported from Indesign. Images were not embedded and fonts missing. I was able to embed the images and fonts. However, we DO NOT want them to be able to make any text changes. So after exporting an eps, I opened the file in Adobe Illustrator and made all the text outlines. I hope this works. But I just wanted to post the question on what are the best practices for doing this?
    The client needs the logo with transparent background, images emebdded and type in outlines. Also, they need some space around the text. When I exported the eps, the file is right up on the edge of the type.

    It sounds like you are pretty far from "best practice" with regard to logo design and delivery.
    These days, the very use of the EPS format should be considered bad practice, and some other terms in your post, (i.e., 'images,' 'missing fonts'), make it sound like there is not a seasoned logo designer involved.
    That said, you probably already got the advice you need to get out of the immediate jam. However, without proper logo design, you and the client will soon be facing other problems. You should be delivering a 100% vector graphic in single-color (black) and corporate-color(s) versions, with no live font data, that has been test-scaled to very small and very large sizes; ensuring it will work at postage-stamp size and on the side of a truck or building, with specific spot color(s) and proportions that will enable it to be offset printed, embroidered and screen-printed on apparel, and cut into signage materials and decals.

  • What is best practice for dealing with Engineering Spare Parts?

    Hello All,
    I am after some advice regarding the process for handling engineering spare parts in PM. (We run ECC 5)
    Our current process is as follows:
    All materials are set up as HIBE's
    Each material is batch managed
    The Batch field is used for the Bin location
    We are now looking to role out PM to a site that has in excess of 50,000 spare parts and want to make sure we use best practice for handling the spare parts. We are now considering using a basic WM setup to handle the movement of parts.
    Please can you provide me with some feedback on what you feel the best practice is for dealing with these parts?
    We are looking to set up a solution that will us to generate pick lists etc and implment a scanning solution to move parts in and out of stores.
    Regards
    Chris

    Hi,
    I hope all the 50000 spare parts are maintained as stock items.
    1. Based on the usage of those spare parts, try to define safety stock & define MRP as "Reorder Point Planning". By this, you can avoid petty cash purchase.
    2. By keeping the spare parts (atleast critical components) in stock, Planned Maintenance as well as unplanned maintenance will not get delayed.
    3. By doing GI based on reservation, qty can be tracked against the order & equipment.
    As this question is MM & WM related, they can give better clarity on this.
    Regards,
    Maheswaran.

  • Best practices for ARM - please help!!!

    Hi all,
    Can you please help with any pointers / links to documents describing best practices for "who should be creating" the GRC request in below workflow of ARM in GRC 10.0??
    Create GRC request -> role approver -> risk manager -> security team
    options are : end user / Manager / Functional super users / security team.
    End user and manager not possible- we can not train so many people. Functional team is refusing since its a lot of work. Please help me with pointers to any best practices documents.
    Thanks!!!!

    In this case, I recommend proposing that the department managers create GRC Access Requests.  In order for the managers to comprehend the new process, you should create a separate "Role Catalog" that describes what abilities each role enables.  This Role Catalog needs to be taught to the department Managers, and they need to fully understand what tcodes and abilities are inside of each role.  From your workflow design, it looks like Role Owners should be brought into these workshops.
    You might consider a Role Catalog that the manager could filter on and make selections from.  For example, an AP manager could select "Accounts Payable" roles, and then choose from a smaller list of AP-related roles.  You could map business functions or tasks to specific technical roles.  The design flaw here, of course, is the way your technical roles have been designed.
    The point being, GRC AC 10 is not business-user friendly, so using an intuitive "Role Catalog" really helps the managers understand which technical roles they should be selecting in GRC ARs.  They can use this catalog to spit out a list of technical role names that they can then search for within the GRC Access Request.
    At all costs, avoid having end-users create ARs.  They usually select the wrong access, and the process then becomes very long and drawn out because the role owners or security stages need to mix and match the access after the fact.  You should choose a Requestor who has the highest chance of requesting the correct access.  This is usually the user's Manager, but you need to propose this solution in a way that won't scare off the manager - at the end of the day, they do NOT want to take on more work.
    If you are using SAP HR, then you can attempt HR Triggers for New User Access Requests, which automatically fill out and submit the GRC AR upon a specific HR action (New Hire, or Termination).  I do not recommend going down this path, however.  It is very confusing, time consuming, and difficult to integrate properly.
    Good luck!
    -Ken

  • Workflow not completed, is this best practice for PR?

    Hi SAP Workflow experts,
    I am new in workflow and now responsible to support existing PR release workflow.
    The workflow is quite simple and straightforward but the issue here is the workflow seems like will never be completed.
    If the user released the PR, the next activity is Requisition released that using task TS20000162.
    This will send work item to user (pr creator) sap inbox which when they double click it will complete the workflow.
    The thing here is, in our organization, user does not access SAP inbox hence there are thousands of work item that has not been completed. (our procurement system started since 2009).
    Our PR creator will receive notification of the PR approval to theirs outlook mail handled by a program that is scheduled every 5 minutes.
    Since the documentation is not clear enough, i can't digest why the implementer used this approach.
    May I know whether this is the best practice for PR workflow or not?
    Now my idea is to modify the send email program to complete the workitem after the email being sent to user outlook mail.
    Not sure whether it is common or not though in workflow world.
    Any help is deeply appreciated.
    Thank you.

    Hello,
    "This will send work item to user (pr creator) sap inbox which when they double click it will complete the workflow."
    It sounds liek they are sending a workitem where an email would be enough. By completing the workitem they are simply acknowledging that they have received notification of the completion of the PR.
    "Our PR creator will receive notification of the PR approval to theirs outlook mail handled by a program that is scheduled every 5 minutes."
    I hope (and assume) that they only receive the email once.
    I would change the workflow to send an email (SendMail step) to the initiator instead of the workitem. That is normally what happens. Either that or there is no email at all - some businesses only send an email if something goes wrong. Of course, the business has to agree to this change.
    Having that final workitem adds nothing to the process. Replace it with an email.
    regards
    Rick Bakker
    hanabi technology

  • SAP Best Practice for Document Type./Item category/Acc assignment cat.

    What is the Best Practice for the document Type & Item category
    I want to use NB -  Item category  - B & K ( Blanket PO) , D ( Service)  and T( Text) .
    Is sap recommends to use FO Only for the Blanket Purchase Order.
    We want to use service contract (with / without service entry sheet) for all our services.
    We want to buy asset for our office equipments .
    Which is the best one to use NB or FO ?
    Please give me any OSS notes or reference for this
    Thanks
    Nick

    Thank you very much for your response. 
    I hope I can provide some clarity on how the accounting needs to be handle per FERC  Regulations.  The G/L balance on the utility that is selling the assets will be in the following accounts (standard accounts across all FERC Regulated Utilities):
    101 - Acquisition Value for the assets
    108 - Accumulated Depreciation Value for the assets
    For an example, there is Debit $60,000,000 in FERC Account 101 and a credit $30,000,000 in FERC Account 108.  When the purchase occurs, the net book value for the asset will be on our G/L in FERC Account 102.  Once we have FERC Approval to acquire the plant assets, we will need to enter the Acquisition Value and associated Accumulated Depreciation onto our G/L to FERC Account 101 and FERC Account 108 respectively with an offset to FERC Account 102.
    The method that I came up with is to purchase the NBV of the assets to a clearing account.  I then set up account assignments that will track the Acquisition Value and respective Accumulated Depreciation for each asset that is being purchased.  I load the respective asset values using t-code AS91 and then make an entry to the 2 respective accounts with the offset against the clearing account using t-code OASV.  Once my company receives FERC approval, I will transfer the asset to new assets that has the account assignments for FERC Account 101 and FERC Account 108 using t-code ABUMN or FB01.

  • Best practice for invoice posting inSRM

    Dear expert,
    what is the best practice for posting an invoice? Is it in SRM system or MM system? In SRM, the system allows one to use approval procedure for invoice posting; wheras in MM, one cannot use the apporval procedure to post an invoice. similar is the case, in SRM-SUS and MM-SUS scenario?
    I would appreciate if you can feedback on the industry practice.
    thanks and regards,
    Ranjan

    Ranjan,
    As a SAP customer we use invoice entry in ERP using MIRO and FB60 as these are the most efficient for our busines.
    1. Invoice entry using MIRO tcode is faster as it can be done with minimal use of the mouse.  Invoice entry is slower in SRM as browser response and interactions with the backed ERP system slows the systems reponse to the user input.  Repeated use of a mouse in the SRM browser is detrimental to fast input.
    2. Not all types of invoices can be handled in SRM e.g. Invoice without PO.
    3. We process approx 20,000 invoices per month with multiple input operators, SRM could not handle that sort of load.
    4. SRM is really a procurement application and although invoice entry is included it is probably more for users who wish to use SRM in a stand alone scenario.  We use extended classic so all our financial transactions take place in the ERP backend.
    Your choice also depends upon the number and quality of the invoices you plan to process, and the need for the operators to be trained on one or two systems.
    Hope these personal observations assist with your decision
    Regards
    Allen

  • Best practice for distributing/releasing J2EE applications.

    Hi All,
    We are developing a J2EE application and would like some information on the best
    practices to be followed for distributing/releasing J2EE applications, in general.
    In particular, the dilemma we have is centered around the generation of stub, skeleton
    and additional classes for the application.
    Most App. Servers can generate the required classes while deploying the EJBs in the
    application i.e. at install time. While some ( BEA Weblogic and IBM Websphere are
    two that we are aware of ) allow these classes to be generated before the installation
    time and the .ear file containing the additional classes is the one that is uploaded.
    For instance, say we have assembled the application "myapp.ear" . There are two ways
    in which the classes can be generated. The first is using 'ejbc' ( assume we are
    using BEA Weblogic ), which generates the stub, skeleton and additional classes for
    the application and returns the file, say, "Deployable_myapp.ear" containing all
    the necessary classes and files. This file is the one that is then installed. The
    other option is to install the file "myapp.ear" and let the Weblogic App. server
    itself, generate the required classes at the installation time.
    If the first way, of 'pre-generating' the stubs is followed, does it require us to
    separately generate the stubs for each versions of the App. Server that we support
    ? i.e. if we generate a deployable file having the required classes using the 'ejbc'
    of Weblogic Ver5.1, can the same file be installed on Weblogic Ver6.1 or do we
    have to generate a separate file?
    If the second method, of 'install-time-generation' of stubs is used, what is the
    nature/magnitude of the risk that we are taking in terms of the failure of the installation
    Any links to useful resources as well as comments/suggestions will be appreciated.
    TIA
    Regards,
    Aasif

    Its much easier to distribute schema/data from an older version to a newer one than the other way around. Nearly all SQL Server deployment features supports database version upgrade, and these include the "Copy Database" wizard, BACKUP/RESTORE,
    detach/attach, script generation, Microsoft Sync framework, and a few others.
    EVEN if you just want to distribute schemas, you may want to distribute the entire database, and then truncate the tables to purge data.
    Backing up and restoring your database is by far the most RELIABLE method of distributing it, but it may not be pratical in some cases because you'll need to generate a new backup every time a schema change occurs, but not if you already have an automated
    backup/maintenance routine in your environment.
    As an alternative, you can Copy Database functionality in SSMS, although it may present itself unstable in some situations, specially if you are distributing across multiple subnets and/or domains. It will also require you to purge data if/when applicable.
    Another option is to detach your database, copy its files, and then attach them in both the source and destination instances. It will generate downtime for your detached databases, so there are better methods for distribution available.
    And then there is the previously mentioned method of generating scripts for schema, and then using an INSERT statement or the import data wizard available in SSMS (which is very practical and implements a SSIS package internally that can be saved for repeated
    executions). Works fine, not as practical as the other options, but is the best way for distributing databases when their version is being downgraded.
    With all this said, there is no "best practice" for this. There are multiple features, each offering their own advantages and downfalls which allow them to align to different business requirements.

  • Best practices for gathering statistics in 10g

    I would like to get some opinions on what is considered best practice for gathering statistics in 10g. I know that 10g has auto statistics gathering, but that doesn't seem to be very effective as I see some table stats are way out of date.
    I have recommended that we have at least a weekly job that generates stats for our schema using DBMS_STATS (DBMS_STATS.gather_schema_stats). Is this the right approach to generate object stats for a schema and keep it up to date? Are index stats included in that using CASCADE?
    Is it also necessary to gather system stats? I welcome any thoughts anyone might have. Thanks.

    Hi,
    Is this the right approach to generate object stats for a schema and keep it up to date? The choices of executions plans made by the CBO are only as good as the statistics available to it. The old-fashioned analyze table and dbms_utility methods for generating CBO statistics are obsolete and somewhat dangerous to SQL performance. As we may know, the CBO uses object statistics to choose the best execution plan for all SQL statements.
    I spoke with Andrew Holsworth of Oracle Corp SQL Tuning group, and he says that Oracle recommends taking a single, deep sample and keep it, only re-analyzing when there is a chance that would make a difference in execution plans (not the default 20% re-analyze threshold).
    I have my detailed notes here:
    http://www.dba-oracle.com/art_otn_cbo.htm
    As to system stats, oh yes!
    By measuring the relative costs of sequential vs. scattered I/O, the CBO can make better decisons. Here are the data items collected by dbms_stats.gather_system_stats:
    No Workload (NW) stats:
    CPUSPEEDNW - CPU speed
    IOSEEKTIM - The I/O seek time in milliseconds
    IOTFRSPEED - I/O transfer speed in milliseconds
    I have my notes here:
    http://www.dba-oracle.com/t_dbms_stats_gather_system_stats.htm
    Hope this helps. . . .
    Don Burleson
    Oracle Press author
    Author of “Oracle Tuning: The Definitive Reference”
    http://www.dba-oracle.com/bp/s_oracle_tuning_book.htm

  • Best Practice for Distributing Databases to Customers

    I did a little searching and was surprised to not find a best practice document for how to distribute Microsoft SQL Databases. With other database formats, it's common to distribute them as scripts. It seems that feature is rather limited with the built-in
    tools Microsoft provides. There appear to be limits to the length of the script. We're looking to distribute a database several GBs in size. We could detach the database or provide a backup, but that has its own disadvantages by limiting what versions
    of the SQL Server will accept the database.
    What do you recommend and can you point me to some documentation that handles this practice?
    Thank you.

    Its much easier to distribute schema/data from an older version to a newer one than the other way around. Nearly all SQL Server deployment features supports database version upgrade, and these include the "Copy Database" wizard, BACKUP/RESTORE,
    detach/attach, script generation, Microsoft Sync framework, and a few others.
    EVEN if you just want to distribute schemas, you may want to distribute the entire database, and then truncate the tables to purge data.
    Backing up and restoring your database is by far the most RELIABLE method of distributing it, but it may not be pratical in some cases because you'll need to generate a new backup every time a schema change occurs, but not if you already have an automated
    backup/maintenance routine in your environment.
    As an alternative, you can Copy Database functionality in SSMS, although it may present itself unstable in some situations, specially if you are distributing across multiple subnets and/or domains. It will also require you to purge data if/when applicable.
    Another option is to detach your database, copy its files, and then attach them in both the source and destination instances. It will generate downtime for your detached databases, so there are better methods for distribution available.
    And then there is the previously mentioned method of generating scripts for schema, and then using an INSERT statement or the import data wizard available in SSMS (which is very practical and implements a SSIS package internally that can be saved for repeated
    executions). Works fine, not as practical as the other options, but is the best way for distributing databases when their version is being downgraded.
    With all this said, there is no "best practice" for this. There are multiple features, each offering their own advantages and downfalls which allow them to align to different business requirements.

  • Best practice for version control B2B, ESB and BPEL

    Hello,
    we are setting up a new system using B2B, ESB and BPEL. The development team is more experienced working with PL/SQL, Oracle Workflow and we are worried that Jdeveloper generates changes to the source files during development and that we might have problems with the version control.
    Is there any best practice for setting up version control for these systems? Do we need to take anything in particular into consideration when setting up the projects?
    We are using Serena Dimensions 9.1 for version control with the add-on in Jdeveloper.
    Thanks in advance!

    I believe JDeveloper has a plugin for Dimensions.
    I havent used it but to get it, go to tools (It may be help I don't have JDeveloper on this machine to confirm) check for updates.
    If you select the thrid party check box - next, you will see an entry for dimentions.
    Configure the connection and develop as you would any other project.
    cheers
    James

Maybe you are looking for

  • How do I get my Sony ebook Reader to show up ("be recognized") in the top left corner??

    How do I get my Sony ebook reader to show up ("be recognized") in the top left corner of the window.  It never shows up and I cannot transfer books from my Mac computer to ADE.  I am using Sony Reader Library but it is developing problems!!  Can anyo

  • My Mac Book Pro keeps crashing. I don't know why.

    My macbook keeps crashing, I've cleared my hard drive, I'm not running that many programs and I've updated to the latest OS. 10.9.5 Anonymous UUID:       B9046962-A54E-2C3F-6C24-5FB3000426E3 Fri Mar 13 19:21:36 2015 panic(cpu 3 caller 0xffffff8009a20

  • Excel not showing up as a "Save As" option

    I have an existing pdf that I'd like to save as an Excel Spreadsheet but that option isn't showing up in the drop down list (Word shows up fine). It's not in the Export drop down either. Is there a setting somewhere that I should know about? I'm usin

  • Chart Builder on JSP doesn4t work ! :-(

    Hello forum, I have a problem, I want to do graphics with the Oracle Chart Builder 10 kit. I read the doc and found information for install on ApacheJServ and use with JSP, the instruccions say : Install the Chart Builder library under Apache Copy th

  • CS3 InDesign Stroke panel not showing

    I use CS3 on a MacPro. I've just found that the Stroke panel does not show in InDesign, so I cannot add or change the stroke on graphics. Unlike all [as far as I've explored so far] the other Window options, when I click on Stroke I do not get a full