Change in Business System

Hi Friends,
I've done the change to an Existing Business System and saved.
How to know whether this change is reflected or not.
Next what all steps i need to take care..
please suggest.
Thanks in advance!!!
Best Regards
Prasad

hi,
Many Thanks...
I'm able to compare...and found that changes not reflected
I've chagned the Logical system name in the Business System and that chagnge is not reflected...in the ID buisness system...
If you have changed logical system name you need to clear sld data cache in ID and also check in the adapter specific settings of business system and synchronize with sld.
Please let me know how i can clear and do the above chagnes
Thanks a lot!!!
Awaiting your reply!!!
Regards,
Prasad

Similar Messages

  • Interface getting failed after changing the Business system to that service

    Hello All,
    Our Env... is XI 3.0 and this is related to produciton env.
    Based on our client requirment to change the business system from client 871 to 100 for  one of the R3 system which is reciever type(rfc).
    After doing all the necessary changes , that particular service is getting failed and in the CC monitoring for that service I can see the log as "RFC_ERROR_LOGIN_FAILURE" mandate 871 (earlier client) does not exist in  the system.
    The steps which I have followed to change the Business system.
    1>I loged into the SLD of PRD system and clicked on businsess landscape .then i have clicked on the specified system to be changed (RY1 ) and then clicked on change mode and selected the required client (100) and saved the settings.
    2>I have logged into ID(Integration Directory) and selected the service (RY1) which need to be changed .Under service -->Adaper specific -->compare sld configurations and then clicked on apply changes.
    3>Now selected that communication channel of service (RY1) RFCRecieverR3 and changed the client 871 to 100 and the password of user XIRFCUSER ...
    Then i saved the changes and after that i have activated that interface.
    After that when i logged into CC monitoring and viewed that service channels and see the following errors:
    Receiver channel 'RFCReceiverR3' for party '', service 'RY1'
    Error can not instantiate RfcPool caused by:
    com.sap.aii.af.rfc.RfcAdapterException: error initializing RfcClientPool:com.sap.aii.af.rfc.core.repository.RfcRepositoryException: can not connect to destination system due to: com.sap.mw.jco.JCO$Exception: (103) RFC_ERROR_LOGON_FAILURE: Mandante 871 não existente no sistema (selecionar mandante existente)
    Can any one help me out of this situation , and i need to fix this ASAP as this is production system.
    Awaiting for your reply.
    Best Regards
    Rakesh Reddy

    Hello Nisar
    Thanks for the update,
    Let me say few points  about this particular problem:
    1>The interface "XX" from XI sends data to two systems( R3 -->RP1 & RY1), some thing like branched (same data is passed to both the reciever systems).
    And the second RY1 is copy of First system RP1 (Production sys) which is used for data loading purpose and every week there will be a refresh from First sys (RP1) to Second(RY1).
    2>Now the first sys(RP1) is recieving the data successfully from XI , and the second one (RY1) is getting failed .And this started after changing the Business system 871 to 100 .
    3>As mentioned by you , I have checked all the points mentioned
        i)In SM59 for XI (ABAP part) two rfc's are maintained (LCRSAPRFC & SAPSLDAPI) and the test connection is also fine...But I did not find these two connections in reciever systems(RP1 & RY1 too).
       ii)In reciever system RY1 ,when i went to RZ70 , i did not noticed any special settings and SLD Bridge :Gateway Information is not maitained over there .and the same thing in other reciever system(RP1) , with this can we confirm that there is nothing wrong in RZ70 settings.
       iii)In SLDAPICUST at recievers end for both systems nothing is mantained , where as in XI system all the details are maintained(Host name,port, user & password).
    I have translated the error log into english from the CC monitoring for this interface which is in portuguese language .
    It says that:
    RFC_ERROR_LOGON_FAILURE: 871 Mandante not in the system (select principal existing)
    Kindly advise me what to do ..for fixing this problem(this is pretty urgent and it is production env...)..
    If any information required , I can provide that.
    Best Regards
    Rakesh Reddy

  • Dynamically change Receiver Business system in message mapping

    Dear all,
    I would like to change the receiver business system in the message mapping that is used in the interface determination. I do understand there is an enhanced receiver determination where I can use a mapping but that is not what I am looking for.
    I think this should be possible if we can change the appropriate value in the SOAP(message) header.
    Possible candidates I can think of by looking at the SOAP header in SXMB_MONI are
    1. SOAP:Header- SAP:Main- SAP:Receiver- SAP:Service
    2. SOAP:Header- SAP:OutboundBinding - SAP:OutboundBindingEntry - SAP:ToServiceName
    Q1. Which one of the above is relevant while identifying the receiver agreement ?
    Q2. What is the best way to access them from the mapping(preferably from a UDF) ?
    Thanks in advance.
    Cheers
    danus
    PS: I have tried to set "http://sap.com/xi/XI/System","ReceiverService" in Dynamic config & ReceiverService, BusinessSystemReceiver and ReceiverSystem in the Container’s Transformation Parameters, but didn't get the expected result.

    Chidambaram,
    You use an enhanced receiver determination to have a mapping program determine the receivers of the message dynamically at runtime. Instead of creating the receivers in the receiver determination manually, you assign a mapping to the receiver determination and this returns a list of receivers at runtime.
    A typical usage case is if you do not yet know the names of the receivers at configuration time. In this case, you can define a mapping program, for example, which reads a list of receivers from a table or from the payload of the message at runtime.
    Go through the following link:
    [Receiver Determination enhancement|http://www.****************/Tutorials/XI/RecvDetermination/Enhancement.htm]
    Hope your problem gets resolved.
    Regards,
    Kiran Bobbala
    Edited by: kiran Bobbala on May 7, 2008 5:47 PM

  • How can ID automatically change the business system while importing?

    Hi gurus,
    There are many scenarios in our PI system. It will be a tedious work if we don't use transport system(CTS+).
    You know we have to create the scenarios manually in Integration Directory since the business system is different.
    The question is as below (BTW:We are using local SLD for dev,qas,prd separately):
    If we don't use transport system, and only use export and import functionality, and create business system group, can we make the ID automatically change the name of business system while importing?

    Hi Xinjiang,
    You can follow below method.
    In Quality system transport targets will be DEV(Dev pi system) ---> QEA(Quality PI system)
    In Production system transport targets will be DEV(Dev pi system) ---> PEA(Production PI system)
    This will ensure that you does not need to create separate request in Quality system. You can use the same request created in Dev to transport to production system. This will reduce your efforts of transportation. This is the same type of approach that is followed in ECC system as well or next solution is creating transport target in each sld system as you mentioned below,
    we have three local SLD, so we need to create TS and BS for PI DEV in SLD QAS, and create TS and BS for PI QAS in SLD PRD,
    Following link will help you for defining transport target.
    http://help.sap.com/saphelp_nwpi71/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm

  • Changing Business System

    Hi Experts!
    What do I need to change in order for changing a Business System in an interface from one to another?
    Here is a little more information. I have to change all our interfaces from one R/3 system to another meaning that sometimes the system is sending and sometimes it is receiving. The communication channel is alway using the IDoc Adapter.
    I have considered changing the RFC Destination, but I don't like that solution since I will have a Business Systems called e.g. R3_1 but the RFC destination will point to R3_2. This will be very confusing in future maintenance situations.
    What do you think?

    I had to undergo this recently and the only option was to remove and recreate.
    We had to do this for consistency as we are handing over to a different support team...
    With Idocs, there were a few issues with adapter specific identifiers, so it was easier to take them out and start again.
    Depending on the volume, this may not be a solution...

  • Logical system and business system

    Hi experts, please help me with the below questions---
    1) What is the diff between logical system and business system?
    2)what is the difference between logical system(defined in R/3) and business system (defined in SLD) in idoc to file scenario.
    3) Is it require to give the logical system name of the xi server(Which we define in idx1 port) to the 3rd party system(Application system at the FTP side) to carry out file to idoc scerario?

    Hi,
    Business System :
    1. Business systems are logical systems, which function as senders or receivers within XI. Business systems can be SAP systems or third-party systems. Depending on the associated technical system.
    2. Business Systems should be mandatory used when dealing with Idoc's and Proxies .
    Business Service:
    1. Business Service requires manual adding on Inbound and Outbound Interfaces, Business Systems do not.
    2. Business Services are maintained across environments and so, their names cannot be changed. Business Systems names can be changed across environments by providing SLD level transport targets.
    3.In the Business Services we cannot maintain the Group and Targets in SLD. For Ease in transporting your ID/Configuration objects Groups and Targets are used in SLD for Business Systems.
    4.Business Service has no SLD Entries and No Assigned Products and SWCV's
    Regards
    Sangeetha

  • Business systems group setting in location master

    Hello experts,
    I am currently in the process of trying to set up the integration models for a second R3 system to be connected to one APO system.  All of the locations / plants for the first R3 system were created under BSG1.  The locations / plants for the second R3 system were created under BSG2. 
    I have identical product in both R3 systems.  They have the same material numbers.  The materials have existed in APO for quite some time under BSG1.  When I try to send the material numbers from the second R3 system, I get an error that the materials already exist in a different business systems group.  I changed the config for the second R3 system to be BSG1 (same as first r3 system).  But now I cannot create an integration model for my plants, because they already exist under BSG2. 
    If I change my locations / plants to BSG1 would that correct my initial error message?  Is there a way to change the business system group of a location once a location already exists in APO? 
    FYIu2026 I tried using /SAPAPO/DELETE_LOCATIONS to delete the locations and resend them, but /SAPAPO/DELETE_LOCATIONS doesnu2019t seem to do anything.  After I run the program, I still have all of the locations in APO, whether the location was flagged for deletion or not. 
    Thanks,
    Matthew Bruckner

    Hi Matthew Bruckner
    do you set deletion flag to your location master ? If not, please set deletion flag at first, then please delete your location by using /SAPAPO/DELETE_LOCATIONS .
    To set deletion flag to your location, please perform following.
    1. Open transaction /n/sapapo/loc3
    2. From the menu, select "deletion flag".
        (the location should be de-assigned from related data like product, model)
    3. delete your location by using /SAPAPO/DELETE_LOCATIONS .
    And if you have same location or same location product, I recommend you to add some kind of information to your location and product by using CIF user exit.
    Please take a look at my comment in following thread.
    Re: Integration multiple R/3 systems with APO via CIF
    best regards
    Keiji Mishima

  • Problem by Maintaining a Business System for the Integration Server

    Hi to all,
    I have the following problem. I tried to change some Business systems configuration in SLD but accidentally deleted defined Business System for our Integration Server. After that I tried to create that business system again but I have the following error:
    Integration Server already defined. There is already an integration server defined for the selected technical system. Please select role Application System.
    Since than I’m receiving the following error message when I try to refresh my adapter engine cache:
    com.sap.aii.ib.server.abapcache.CacheRefreshException: Unable to find an associated SLD element
    Do you know how can I define the Business System again currently I can't see it in SLD Business systems?
    I’ve also checked the IS URL (TR: SXMB_MONI) and it seems that it’s ok. 
    Regards
    Naycho

    Hi Naycho,
    i think you have to clean up some sld rubbish
    Go to SLD / Administration / Content Maintenance. Choose left side "all classes" or "landscape description" and right side  "business system". Delete all entries you find for your business system, after that try to recreate it.
    Regards,
    Udo

  • Diff between Business service and Business System?

    HI Experts,
      Pls let me know wht is the difference between business service and business system??
    when we will have to go for business service and when for business system??
    thnx in advance..
    New XI

    Hi,
    Difference between Business Service and Business System are :
    1) Business sytem require all details like login user id
    password require to create but in case of business service
    log in details does not require..
    2) A Business System  is purely for SAP-Systems and
    Business Service for Non-SAP systems
    3) Business service refers to any business applications where
    as the business system is defined in SLD(System Landscape
    Directory)
    4) When we have full details of application system the we are
    going to use the business system and it is created in the
    SLD so we dont have authorization to change the business
    system name.
    When we have partial details or no details of Technical
    system then we r going to use the business service. it is
    created in the ID. we can see and change it.
    5) A Business system is something that physically exists
    For example, if u want to download a file from a system
    ABC, by using file adapter and then want to update the
    content of this file into r/3 database by using RFc,then
    the system  abc and the r/3 will be ur business systems
    i.e. they physically exists. Business Systems are
    configured in SLD.
    Business service is mostly usedin B2B Scenario (cross-
    component),where you don't know the Business System of your
    partner. In other words business Service will be used only
    for those partners which do not have a physical landscape
    set up . Business servces do not have an entry in SLD.
    6) A Business Service is an Abstract Unit(which is not in
    System Landscape Directory) addressing Senders and
    Receivers of Messages.
    Physicals systems which use their communication channels
    and routing rules to communicate with other systems are
    called as Application Systems OR physical systems.
    7) In simple when u going for A2A integration then we define
    our Technical systems are Business system. If we r going
    for B2B integration then we dont know the complete
    information about the other end Business Landscape so, we
    configure it as a Business Services. Business system are
    created at SLD. Where as a Business Services are created at
    Integration Directory.
    8) Business systems:
      These are logical senders or receivers that exchange
    messages by using the Integration Server and that are
    entered in the System Landscape Directory.
    The business systems in the System Landscape Directory
    relate to a system landscape. The business systems of
    business partners are therefore not entered in the System
    Landscape Directory. To be able to address such business
    partners logically, use communication components in the
    Integration Directory. A business system is a way of
    specifying a communication component in the Integration
    Directory more precisely (business system component).
    Hope this will hwlp u..
    Regds,
    Pinangshuk.

  • General XI Connectivity  activities in the business system to connect to XI

    Hi,
    Is there any general/common XI connectivity activities/configuration to be done for a business systems (both SAP and Non-SAP) to preparfe it to able to talk to SAP XI ? Is there any mandatory tasks (sort of a checklist) to make a business system to be able to integrate it with SAP XI (apart from specific configuration).
    The SAP XI Master guide talks about XI Connectivity add-on client to be installed in the business system. I am not understanding as to what does that mean. For Example, if i want to integrate SAP SRM business system to SAP XI, what are the minimum XI connectivity related activites to be done on the SAP SRM system.
    I appreciate your input in this regard.
    Regards
    Ganesh

    Hello Nisar
    Thanks for the update,
    Let me say few points  about this particular problem:
    1>The interface "XX" from XI sends data to two systems( R3 -->RP1 & RY1), some thing like branched (same data is passed to both the reciever systems).
    And the second RY1 is copy of First system RP1 (Production sys) which is used for data loading purpose and every week there will be a refresh from First sys (RP1) to Second(RY1).
    2>Now the first sys(RP1) is recieving the data successfully from XI , and the second one (RY1) is getting failed .And this started after changing the Business system 871 to 100 .
    3>As mentioned by you , I have checked all the points mentioned
        i)In SM59 for XI (ABAP part) two rfc's are maintained (LCRSAPRFC & SAPSLDAPI) and the test connection is also fine...But I did not find these two connections in reciever systems(RP1 & RY1 too).
       ii)In reciever system RY1 ,when i went to RZ70 , i did not noticed any special settings and SLD Bridge :Gateway Information is not maitained over there .and the same thing in other reciever system(RP1) , with this can we confirm that there is nothing wrong in RZ70 settings.
       iii)In SLDAPICUST at recievers end for both systems nothing is mantained , where as in XI system all the details are maintained(Host name,port, user & password).
    I have translated the error log into english from the CC monitoring for this interface which is in portuguese language .
    It says that:
    RFC_ERROR_LOGON_FAILURE: 871 Mandante not in the system (select principal existing)
    Kindly advise me what to do ..for fixing this problem(this is pretty urgent and it is production env...)..
    If any information required , I can provide that.
    Best Regards
    Rakesh Reddy

  • Transport does not map business systems

    Hello,
    we have a problem when transporting XI configuration objects (via normal file export/import, not CMS). In the SLD, we have configured business systems
    T01CLNT010, belongs to group dev  and has transport target PROCLNT010
    T01CLNT020, belongs to group dev  and has transport target PROCLNT020
    the strange thing is the first business system is not converted correctly to the prod business system after transporting the XI config from XI dev to XI Prod. For the second business system, that works fine. I compared the entries in the SLD, both look fine. But one does not work, the other does.
    For the one that does not work, the transport goes fine, does not show any error, but just does not convert the name. (which of course will lead to an error when trying to activate the objects, because T01CLNT010 does not exist in XI prod). So it seems it cannot find the SLD transport target for that object.
    Does anyone know how XI exactly finds out how to convert the business system while transporting it to production ? How does it find the connection between the XI business system object and the corresponding SLD entry ? Just by name ? Or is some kind of internal GUID used which may have been broken ? Can I see that anywhere ?
    Is it safe to re-associate the SLD business system to the XI business system in the XI integration builder ? Or are dependent objects (e.g. receiver det.) then lost ?
    CSY

    Does anyone know how XI exactly finds out how to convert the business system while transporting it to production ?
    The only thing that matters here is properly defining the Transport Targets.
    How does it find the connection between the XI business system object and the corresponding SLD entry?
    Not sure about this but I think the name in the transport target would suffice for this requirement. Also, make sure that the groups are properly defined and target SLD has all business systems properly maintained.
    Is it safe to re-associate the SLD business system to the XI business system in the XI integration builder ?
    How will you be doing this re-association? If you are thinking of changing the Business system name in ID manually, then it would mean almost complete development in ID.
    Regards,
    Prateek

  • Business system re-point

    Hi all,
    We need to re-point all the interfaces in our PI system from one R3 system to another so we need to change the Business system. We can not do it via transports as it is the only PI system that we have at the moment. Is it any way to do it automatically? -we can not mantain the BS name-
    I know it is not a typical question and we are not sure if there is a way to do it but it can prevent us to re-point more than 100 interfaces manually....
    Thanks a lot!!
    Diana

    I am not sure my assumption is correct or not, but I want to share it, in case it might help you. Since you want to re-point your existing Business System( say B1) of existing R3 system (say R-1) to new R3 system ( Say R-2). I think you can create the new R3 Systems(R-2) system in SLD in the same way you have done for R-1 and point your Business System B1 to newly created R3 System R-2. Then save the changes in SLD and refresh them in ID( SLD Refresh). See if this works out. I am assuming this since while creating business system through wizard we will provide for which technical system business system should point to. So I feel that we can edit exist business system and change the current pointing technical system R-1 to new technical System R-2.
    Edited by: Guru on Mar 24, 2008 2:48 PM

  • What does the table save business system informations?

    Hi...
    When we create or change the business system in SLD,
    What table does the information about business system save in the database?
    Thank you..

    Hi,
    There is no direct way but u can get it:
    Go to SXMB_MONI. when u run the scenario it has all the information about Sender,receiver systen and interface information,
    But this information is message specific.
    U can get all the details from.
    SXMB_GET_MESSAGE_LIST through which you can get the messages in SXMB_MONI.
    refer the below thread:
    SXMB_MONI transaction table
    chirag
    Edited by: Chirag Gohil on Apr 10, 2008 11:49 AM

  • How to change the ROLE: Integration server in business system in SLD

    Hi,
    I am facing error in communication, becuase the integration server has been attached to in correct business system with incorrect client (001 instead of 700).
    In SLD, business system, 'integration' tab there is button "Associate with XI'.
    I have selected the role as integration server for the corrrect business system and aslo gave the correct pipeline url for integration server.
    When I press the button "Associate with XI" and Save nothing happened.
    How do i change my integration server.
    Please help.
    Regards,
    Rehan

    Hi Gaurav,
    I have checked the teachnical system  and its of type WEB AS ABAP. and when i click on the business systems tab, there are two business systems. When i double click on the business systems
    I realised that both the business systems has been defined with role: integration server.
    IN one business system i can see that there is "associate with XI" button.
    But when i want to chnage the business system with correct client 700 , i tried pressing the button after entering the correct pileline url.... nothing happens.....
    Can you please let me know the procedure to chnage the technical system with respect to integration engine???
    PLease help as our project is held up due to this.
    regards,
    Rehan

  • Business system change - PI 7.0 to P 7.3

    Hello Everyone
    We are in the process of  upgrading from PI 7.0 to P 7.3
    Now we have two ports - meaning two sld - Different landscape
    The objects reside in PI 7.0 - We have three business systems
    on this Sld: say port 1000
    DEV - ABCD000
    In PI 7.3 : port :  2000
    DEV - XYZD000 
    In  PI 7.3
    DEV - All the ID and IR objects of  XYZD000 is copy from PROD - ABCP000 (PI 7.0)
    now in DEV - XYZD000 all my Directory Objects are pointed to  buisness system ABCP000.
    I want in to point to XYZD000 automatically . I have more than 300 objects. so changing manually is tough task
    We are on dual stack -
    is there a possibilty on how to do this.. I am sure there should be some option . 
    migration tool - is not an option - tried that already

    Hi Deepa - I don't think we have a way.. You have to create them manually.
    As it's a production system copy,obviously all your connections points to that "P" system.
    Morover i assume it would be your proper development system which will be used to develop& transport your objects so it's good to define the business systems again in SLD and configure the scenarios accordingly.
    http://scn.sap.com/thread/3491372

Maybe you are looking for