Combined upgrade & Unicode conversion.

Hi
I need some suggestions for my concerns: I would appreciate, if you reply ASAP for below situations and actions.
Current system: HP unix DB: Oracle10.2.0.2
SAP 6.20 with SP 61, single code page
strategy: resource minimized.
Upgrading from 4.7 was 6.20 to ECC6.0 with CU & unicode conversion.
we ran UCCHECK and provide the list to ABAP, but they are not modifying now.
Mean while we started the preconversion steps for unicode conversion and completed. SPUMG.
Upgrade prepare is completed and currently in begining of down-time.
so far ABAP programs are not unicode complaint!!!
we don't know, when would they modify??
If we complete the upgrade and post upg steps for ecc 6.0 and
pre coversion steps for unicode.
is it a problem, if the ABAP programs are not modified yet, can it be done after conversion and before export???
or after import??
Your time is highly appreciated.
Thanks
creddy

Per CU&UC guide, you can do some conversions in parellel
and after upgrade, you have to perform preparation steps and then export, that is what i am following.
What you said is right for single code page conversion method.
upgrade first
unicode conversion second.
I am following CU&UC method.
Thanks
reddy

Similar Messages

  • Combined Upgrade & Unicode Conversion (Consistency & Scans)

    Hi
    We are doing a combined Upgrade & UC conversion. 4.6C NUC to ECC6 eHP7 UC with an SLO MWB for Data. We have made a clone (System copy) of 4.6C and are running the SPUM4 tool on it (as per the guide) . My question: after I export the glossary from the Cloned 4.6C system and import it into the productive 4.6C system - do I have to run the Consistency Checks & SPUM4 Scans in the productive system or can this be avoided. I know I need the glossary in production so that delta data loads to the MWB can use the glossary, but do I need to run the scans in Production.
    Thank you in advance for your help in this question
    Robert

    Hi Robert,
    SPUM4 needs to be executed on the PRD system. Hence you need to import the vocabulary (you called it glossary) and then all the scans need to be executed in CU&UC. This is to ensure that all data on your system is scanned and ends up in the vocabulary / reprocess logs.
    Best regards,
    Nils Buerckel

  • MDMP: TWIN Upgrade + Unicode conversion

    Hello ,
    We have adopted twin upgrade and unicode conversion method and at present we are converting the twin system to unicode conversion.
    In Twin system we have completed SPUMG 7 scans. Whether i need to run UMG_TWIN_CREATE_TRANSPORT  now to save the results for twin preparation run or i need to perform this step after Additional preparatory step.
    Kindly suggest
    Regards
    Vinay

    Hi Vinay,
    Excerpt from the UCG:
    2.4 Final Preparation Steps
    2.4.1 SPUMG Updates
    If there is a time difference between the scan and the database export, it may happen that a new table has been created or a Support Package has brought a new table with it. In such a case, the preconversion must be rerun right before the export is carried out to ensure that the data change is reflected in the Export Control Table.
    End excerpt
    Hence this step is necessary in case of DB changes (e.g. new tables with or without  content).
    Therefore if you have significant changes, I would recommend to create the twin transport after this step.
    However this step has to be repeated in the PRD system as well (see TU&UC-Guide) to reflect the changes between Twin and PRD system. In order to minimize downtime, the differences between the two systems should be small.
    Best regards,
    Nils Buerckel
    SAP AG

  • SAP R/3 4.6 C to ECC 6.0 Upgrade using CU &UC method- Unicode conversion

    Basis Gurus
       I am working on upgrade from R/3 4.6C to ECC 6.0.
    ECC 6.0 upgrade completed( still in non Unicode).  Now I am in the process of Unicode conversion.
    I have used following methods for the upgrade.
    1. Combined Upgrade & Unicode conversion(CU & UC)
    2. Resource minimized( as I am doing it in Sandbox).
      As I understand I need to perform the DB export and Import now for the unicode conversion.
      According to the Upgrade document, First I need to run Export using R3load in ECC6.0(Non unicode)
      and then install Unicode system and import the same data file.
      My understanding was, when I choose, Resource minimized, I need to run Export and import
      in the same system.
      Can you please help me , whether I need another Unicode system for import ??
    Graham

    Hi,
    Dont get confused with upg strategy and unicode conversion.
    In general Upgrade strategy (either downtime-minimized/resource minimized)
    In unicode conversion you have export/import(exp/imp) of data concept
    In CU&UC approach you have to do in a streach to complete migrate from old release to new realease ECC 6.00.
    Using database independent (sapinst only) or Using database dependent (migration monitor or Distribution monitor)
    It can be done in 2 ways.
    If you dont have addtional server for unicode conversion
           1)you can either do exp on same hardware and take bakup and do import using the exp dump.
           2)Do exp on one server and prepare your target empty database on another server and complete imp of data.
    Hope this is clear.
    Regards,
    Vamshi.

  • Unicode conversion in situ

    Hi SCN,
    I'm looking at the possibility of running a Combined Upgrade & Unicode Conversion (CUUC) in-situ; i.e. without a migration to new hardware.
    However in all my years of SAP Basis projects any Unicode conversion I've seen has involved a migration to new hardware (which makes good sense as the process is the same as an OSDB migration with R3load/MigMon).
    What I want to know is - has anyone ever run one in-place. I.e. keeping the same server and running the CUUC entirely inplace?
    This seems logically problematic as you need a target system to import to.
    I can imagine a process along these lines though...:
    1. Take SAP layer offline
    2. Run full backup of system
    3. Export system
    4. Drop database* (to make clean ready for new import)
    5. Run SPUMG/SUMG/SAPINST to setup Unicode database ready to receive import...
    6. ....and continue to run import into that database
    7. Complete Unicode conversion process
    However the big issue here for me is
    (a) *dropping the live production system is far from attractive.... I'm presuming everyone would do as I've always seen and combine this with a migration to new improved hardware, so that a backout to the old system is simple
    (b) I'm not sure at what point with the SAP tools (SPUMG/SUMG/SAPINST) this process would become convoluted with it all being in-situ on the same box. I.e. I'm not sure if it's something the SAP tools are really designed to cater for.
    Any input/discussion on these points would be very welcome.
    Regards, doonan_79

    FYI Community. Feeling after reading and research is to use a temorary server to import unicode converted system data into; then swing disks back to the original host. Making all required hostname updates during the process.
    Allowing for parallel export/import, but going back to the original configured host to complete the process.

  • ABAP and Kernel Patches for Upgrade and Conversion in 4.6C

    Hi,
    We are in a process of upgrade and unicode conversion for the source release 4.6C (Kernel  46D_EXT Patch 2225).
    "Combined Upgrade&Unicode Conversion Guide"  for "SAP Basis 4.6C u2192 SAP NetWeaver 7.0 application Server ABAP Unicode Including Enhancement Package 1 Support Package 01 - 06" , In Software Requirements step,  it says
    "3. Import 4.6D Kernel patch 2326 from SAP Service Marketplace according to SAP Note 19466"
    We wanted to know whether "IT IS ABSOLUTELY NECCESSARY TO GO FOR THE KERNEL PATCH 2326".  We dont have "EBCIDIC code pages" in our MDMP system.
    We need to know  becauase we are also doing OS migration from AIX to Sun and this step will add to our production downtime.
    Please advice what are the other causes we should go for the kernel 2326.
    Regards

    Hello Mr. Nils Buerckel,
    Thanks for the reply.
    We wanted to be very sure whether we should used Kernel 46D Kernel patch 2326 (As it is specifically mentioned in the SAP CU&UC guide and in SAP Note 867193, It is mentioned that  "This patch contains enhancements that are required to execute the "INDX Analysis" scan)
    OR
    Can we go for the latest kernel patch avaialable at market place? And Will the latest kernel patch also contains the "enhancements that are required to execute the "INDX Analysis" ?
    Please reply
    Thanks

  • Unicode Conversion for SAP BI

    Hi
    We are upgrading out SAP BW 3.1 system to SAP NW 7.0. We are also planning to do a Unicode conversion of the upgraded system.
    Please let me know the following:
    1. What extra tests we need to do for Unicode Conversion
    2. If you have done a Unicode conversion, please share the errors that you have got after the conversion, and the possible solutions.
    Best Regards,
    Rajib

    hi,
    Please refer
    SAP Note Number: 928729 : Combined Upgrade & Unicode Conversion (CU&UC)
    https://wiki.sdn.sap.com/wiki/display/unicode/ChallengesinBIUnicodeconversion
    Below is the link for R/3... but still will give you some insight.
    /people/tikkana.akurati/blog/2009/02/27/combined-upgrade-and-unicode-conversion-cuuc-cutover-project-plan-execution
    This will also help you understand more about unicode...
    /docs/DOC-8284#section5 [original link is broken]
    Hope this helps
    Regards
    Raj

  • 4.7EEx1.10 to ECC6.0 upgrade and Unicode conversion

    Hi Experts,
    We are going to initiate the upgrade from next month onwards. Subsequently i have started preparing the plan and strategy for the same.
    As our current setup is 4.7EEx110/Win 2003 R2-64 bit/Oracle 10.2.0.4.0 (Non unicode). And we have recently migrated on to this setup from WIn2k 32 bit. Also the current hardware is Unicode compatible.
    With respect to strategy for achieving this Upgrade and Unicode conversion, i am planning as follows.
    Step 1) Perform Unicode conversion on the current landscape (Both Export/import on the same servers)
    Step 2) Setup Temporary landscape as part of Dual maintenance strategy and migrate data from the current systems to temporary systems using backup/restore method.
    Step 3) Perform the SAP version upgrade on the current landscape and setup transport routes from temporary to current landscape in order to keep it in sync
    Step 4) after successful upgrade, decommission the temporary landscape
    Please provide your suggestions and valuable advices if there is anything wrong with my strategy and execution plan.
    Regards,
    Dheeraj

    Hi,
    Thanks. As i have already referred these notes as i am seeking advise with respect to my upgrade approach.
    However i have planned to perform in the following manner.
    1) Refresh Sandbox with Prod data and perform Upgrade to ECC6.0 EHP5 & subsequently Unicode conversion on the same server (Since both export & Import has to perform on the same hardware as we have recently migrated on this hardware which is Unicode compatible)
    2) Setup temporary landscape for DEv & QAs and establish transport connection to Production system in order to move urgent changes
    3) Keep a track of the changes which have transported during upgrade phase so that the same can be implemented in the upgraded systems i.e. Dev & QAS
    4) After Sandbox Migration and signoff, we will perform Dev & QAS upgrade & unicode conversion on the same hardware (Note: Since these are running on VMware can we export the data from the upgraded system and import on to a new VM?)
    5) Plan for production cutover and Upgrade the Prod system to ECC6.0 Ehp5 and then Unicode conversion. As i am planning to perform upgrade over the weekend and then Unicode conversion activity in the next weekend (Is it a right way?)
    My Production setup: DB on one Physical host and CI on separate Virtual host
    6) After the stabilization phase, we are planning for OS & DB upgrade as follows:
          a) Windows upgrade from 2003 R2 to Windows 2008 R2
          b) Oracle Upgrade from 10.2 to 11.2
    If anyone thinks that there is anything wrong with my above approach and need changes then please revert.
    I have one more doubt as I am going to upgrade 4.7EEx110 (WAS 620, Basis SP64) to ECC6.0 EHp5.As I presume that I can straight away upgrade from the current version to ECC6.0 Ehp5 without installing EHP. Kindly confirm
    Thanks

  • Unicode conversion & SAP Office functionality.

    Hi All,
    We are in a process of combined upgrade & Unicode coversion. Our source release is 4.6C and we are going for "SAP NetWeaver 7.0 Application Server ABAP including SAP Enhancement Package 01 ". As per CU&UC guide in "Component-specific Requirements" there is SAP office related requirement.
    I have gone through sap note 691407, 690074 and I understand that from the release 4.6C SAP will not loger enhance it as some of the components are not unicode enable.
    I query is
    1) How to find out whether we are productively using SAP offce in our system and which of these components wil not be available after unicode conversion.
    2) What exactly will happen after unicode conversion to these fuctionalities.
    Please reply.
    Regards

    Hi Nikhil,
    I do not think you will find a detailed list of functionality which works.
    As far as I remember, the 'deprecation status' of sophisticated SAP Office functions (e.g. SAPMAPI) is more than 8 years old ...
    Therefore I do not see another option than testing your scenarios and find out which functionality still works (this might be also caused by the upgrade, not only Unicode).
    Best regards,
    Nils Buerckel
    SAP AG

  • Unicode conversion and patching simultaneously

    Hi All -
    We are planning to convert our core ECC 6.0 system to Unicode this year as well as patch it to the latest support pack stack.  In order to minimize regression testing time, we are going to do them both at the same time so the functional teams only have to test once. 
    The question is which order to perform the tasks in:  convert to Unicode first, THEN patch, or patch, THEN convert?    I'm not sure the order matters, but I can't find any definite documentation either way.  Has anyone had any experience with this that they would be willing to share?
    Thanks for your help!
    Abby

    Hi Abby,
    this depends on what you mean by "patches" ?
    Do you want to combine the Unicode conversion with applying support packages only ?
    Or do you want to implement EhPs as well ?
    If you go for EhPs, I would recommend to do this before the Unicode conversion. This is also the "normal" approach when combining an upgrade with a Unicode conversion.
    In case of support packages only, both ways are possible (Unicode first and then SPs or vice versa) ...
    By the way I assume you do not have an MDMP system - this would add some additional constraints ...
    Best regards,
    Nils Buerckel
    SAP AG

  • Print Servers Impact after unicode conversion

    Hi
    We are performing an CUUC from 4.6C to ECC 6.0
    Our customer has around 4-5 windows special print servers which are used for chinese, japanese, korean printing..etc.
    After the upgrade & unicode conversion
    - Do we still need to use all these 4-5 special print servers for each languages seperatly? or
    - We shall consolidate all these print servers into one print server? Or
    - We don't need to have any print servers, all the print queues can be pointed to unix print queues and then to the printers directly.
    Kindly advise
    Thanks & Regards
    Senthil

    I would think you could consolidate the print servers, but you still need the separate printers/device types in SAP. We use a single print server for EN/DE/ZH but have different SAP printers (usinging different device types) for EN/DE & ZH printers.

  • Combined Upgrade and Unicode conversion of Sap 4.6C to ECC6.0

    Hello all,
    my project team intends to carry out a combined upgrade and unicode conversion of an SAP ERP 4.6C system with MDMP to ECC6.0 (no enhancement package). The system is running on Oracle 10.2.
    In preparation for this upgrade, I have gone through the SAP notes 928729, 54801.
    We need to get a rough estimate of the entire downtime so as to alert our end users. From the CU&UC documentation in 928729, I read up note 857081. However the program in this note cannot be used to estimate the downtime as my system is < SAP netweaver 6.20.
    Is there any other SAP note or tool or program that I can use to estimate the downtime for the entire CU&UC? Thanks a lot!

    Hi,
    Combined upgrade depend upon number of factors like database size, resources on the server and optimization. In order to get idea of how much downtime, it will take, I would suggest you to do combined upgrade and unicode conversion on sandbox system which should be the replica of your production system. And try to optimize it. From there you can get approx. downtime required.
    Also, please read combined upgrade and unicode conversion guides on  http://service.sap.com/unicode@sap
    Thanks
    Sunny

  • Combined Upgrade and Unicode conversion question

    Hello Everyone,
    I will be performing combined Upgrade and Unicode conversion soon. Currently i have run Prepare and do not have any errors.
    I have already run SPUMG consistency check and i do not have any errors there. Since this is Combined Upgrade and unicode conversion according to guide i do not need to do the Nametab conversion right now. But now if i go this place:
    SPUMG -> Status -> Additional Information  , i see a status with red for Unicode nametabs are not consistent or not up-to-date.
    Please let me know if i can ignore this step and do the nametab conversion after upgrade is complete and before unicode conversion.
    Thanks,
    FBK

    Please follow the instructions from the guides.
    The Unicode nametabs will be generated automatically during the upgrade.
    An additional check is integrated into the final preparation steps in the target releases.
    Regards,
    Ronald

  • Combined upgrade and Unicode conversion for ECC5 MDMP system

    Hello,
    We are planning to do Upgrade and Unicode conversion of ECC5 MDMP system to ECC6 EHP4 Unicode. We are adopting Combined upgrade and Unicode conversion strategy to minimise the downtime.
       In source version ECC5 we are in support pack level 6. Should we need to update the support pack to any target version to start with CU&UC or we can start with ECC5 with SP 6 itself.
    Since we cant afford more downtime for support pack update also, is it ok to start with upgrade and unicode conversion with current version.
    please advice.
    Regards
    Vinay

    Hello Vinay,
    please note that as a prerequisite the Basis SP should be accurate for an MDMP conversion.
    There is no MUST to have the latest Basis SP, but without you could have severe issues in SPUMG.
    On the application side, there are in most cases no hard requirements on the SP level.
    Best regards,
    Nils Buerckel
    SAP AG

  • Where is the Combined Upgrade and Unicode Conversion Guide

    Hi All
    Embarassing question time.
    I am after the Combined Upgrade and Unicode Conversion Guide for 4.7 to ERP 6.0, but can only find the Combined Upgrade and Unicode Conversion Guide for 46C to ERP 6.0.
    Can anyone advise where the 4.7 guide is.
    Thanks
    Sam

    Thank God SAP don't include it in the Install guide. The Install Guides are complex already. BTW if you need more info on unicode and its conversion go here
    https://service.sap.com/unicode@sap

Maybe you are looking for

  • Big iPod Nano Issues

    Well, after my brother got a new iPod for Christmas I kept asking him why he didn't use it, he just said because his computer is very slow and can't be bothered to put it on, so I told him I would set it all up so he only has to sync it. I plugged it

  • NAS that's Windows PC and Mac compatible?

    Hi All, I'm brand new to the Mac world, I've never own a Mac of any kind before and I've played with one for a grand total of 10 minutes before deciding I want one. I ordered one last week and it should be here in a few days. I'm excited to say the l

  • Spotlight can't find iPhoto 6 keywords

    Hi, I've got Tiger 10.4.4 installed with iPhoto 6. I've keyworded some of my photos in iPhoto but I can't search on them with Spotlight. To attempt to address this I've tried the following with no joy: - Added my hard disk to the privacy window in Sp

  • Sub controller problem

    Hello Guys,                   I have created  one e.g. using MVC and  i have called three sub-controller using <bsp:call> tag in main controller's view.  I have some input fields in 1st sub-controller's view. I wanted to read this value in 1st sub co

  • I have a working problem, but still need some help

    import javax.swing.JOptionPane; class testing   public static void main(String args[])     int firstNum = 0, secondNum = 0;     int evensTotal = 0, oddsTotal = 0;     while(firstNum >= secondNum)       int num = Integer.parseInt(JOptionPane.showInput