I have found the following problem with LabVIEW 7.0. This only occurs when running the application as built with the application builder and does not appear to be a problem in the development environment.
Given an open refnum for a config file one can loop through several read key operations while passing the data and the refnum to outputs on the for loop. If you disable indexing on the refnum output of the for loop you should get a usable refnum out. What happens instead when you try to close the refnum is an error indicating that the refnum is invalid. If you simply route the refnum around the loop avoiding the for loop output altogether this doesn't happen. It appears that somehow, going through the indexing output of the f
or loop invalidates or changes the refnum when in a built application using the runtime.
If anyone can reproduce this or prove me wrong it would be helpful. This bug cost me days of chasing down why my "major app" would only work when in development but fail when built. The lack of debug capability in a built app of course leant to the effort that it took to track this down.
Thanks,

Hello, i'm french so scuse for my writting...
I don't find where put this question so i writte here.
I want to do a soft who's objective is to writte config data (open config data + write key + close..).
you can find it in the join piece.
this soft run correctly but when i do an exe with the application builder, when i try to run the exe, that saying me error 7 about the Nex file in Open config data...
How can i solve this problem???
Tanks for all....
Attachments:
chconfexe.vi ‏32 KB

Similar Messages

  • Reading config data in a project panel for a jDev 10 Extension

    I have made it past creating config and project setting panels as jdev extension. My question is how can I read the config data when the project panel is displayed? 1) I would like to use the config data as default when the project is first created and/or 2) the panel extension is first accessed. Thanks!

    Thx Olivier,
    The problem is that I need a functionmodule that can apply the OLAP aggregation for a hierarchy to the data outpu from RSDRI_INFOPROV_READ_RFC.
    ... or the best alternative would be if there were a fm/class that could provide me with the hierarchy aggregation of the data.
    /Martin

  • For loop pause till event occurs

    I'd like to know if it's possible pausing for loop in a fixed step till en event occurs.
    I need to use for loop index to indexing some vector's data, but the steps in for loop must be exectuted only if  precise condition occurs.
    thank you very much for possible solutions
    Francesco

    Without seeing any code, it is hard to recommend what to do.
    You probably want a State Machine architecture so that you can stay in a certain state of a while loop, then move on to the next step (state) when your condition is met.
    You could also use event structures.  You could also use notifiers or occurrences to hold the execution of your loop until the notifier is written to or occurrence executed in a parallel loop of your code.

  • A tunneled Excel refnum goes from a valid value to a NULL between iterations of a For Loop?

    How would a tunneled Excel refnum go from a valid value to a NULL between iterations of a For Loop?
    For
    some reason this works find in one VI and when executed and not in
    another.  Here's screen shots of the highlighted execution with probes
    appropriately. The "Open" refnum is passed into "Performance Test -
    Write Data To Files.vi".  That's where the trouble is.  You can see
    that it goes into the For Loop.  The first iteration is okay, but the
    second and subsequent iterations have the refnum NULL.  See images
    below.
    (I don't know how to delete an accidental double post, sorry)
    Message Edited by James DiLiberto on 01-22-2008 01:48 PM
    Attachments:
    Second Iteration1.jpg ‏158 KB
    First Iteration1.jpg ‏145 KB
    Second Iteration Error Dialog1.jpg ‏20 KB

    Is there any chance that the Insert Data Into Excel VI is closing the reference or that it is closed anywhere else (e.g. through a local or by having its owner destroyed)?
    I wouldn't expect the numeric value of the reference to change to 0, but since ActiveX is an external resource, I suppose that it's possible that the probe shows the number only if the resource is actually accessible.
    Try to take over the world!

  • I'm doing a scan around a line by sampling data 360 degrees for every value of z(z is the position on the line). So, that mean I have a double for-loop where I collect the data. The problem comes when I try to plot the data. How should I do?

    I'm doing a scan around a line by sampling data 360 degrees for every value of z(z is the position on the line). So, that mean I have a double for-loop where I collect the data. The problem comes when I try to plot the data. How should I do?

    Jonas,
    I think what you want is a 3D plot of a cylinder. I have attached an example using a parametric 3D plot.
    You will probably want to duplicate the points for the first theta value to close the cylinder. I'm not sure what properties of the graph can be manipulated to make it easier to see.
    Bruce
    Bruce Ammons
    Ammons Engineering
    Attachments:
    Cylinder_Plot_3D.vi ‏76 KB

  • Read data from text file one by one using for loop

    Dear Forum
    I want to read data of single colum of text file inside the for loop one by one(for each iteration value must be replaced by another value of text file).This value is used by a formula inside for loop. also after completion of iterations the values must be plotted on xy graph. How to do it.? please help me.
    profravi

    It's not very efficient to read a file line by line. Much simpler to read it all at once and then auto-index the results inside a for loop. The image below shows a generic solution to your problem. This assumes that the data in the file is in a single column.
    I would also recomend checking ou the learning LabVIEW resources here.
    I would aslos suggest that since this type of question is not specific to either NI-Elvis or the LabVIEW SE, you should post similar questions to the LabVIEW board. If you have problems, attaching a sample of the text file would help.
    Message Edited by Dennis Knutson on 10-18-2007 09:11 AM
    Attachments:
    XY Graph From File.PNG ‏4 KB

  • Step wise config data for schedule line agreements

    DEar All,
    I need urgently one the foolowing doc:
    step wise config data for schedule line agreements.
    thanks
    regards,
    s KUMAR

    Hi,
    1) Scheduling Agreement is a long term agreement and PO is normally a one-off. When you have long term relation with supplier you will go with SA.
    2) SA need not have delivery schedules at the time of ordering. It's like a contract with vendor for all basic prices, quantities & terms. You will release schedules as & when required. This method is very popular with manufacturing ind (e.g. automotive) where they negotiate prices but delivery schedules are given periodically based on their actual production/sales demands.
    3) In a PO, you must give schedules in PO itself.
    4) If you know contract & release order (or call-off) concept, then SA is like contract and SA schedule is like release order. PO is release order.
    or
    While using schedule agreement, you will create delivery schedule, when ever you require materials.
    Firm and trade off zone in delivery schedule details will be forwarded to your vendor. you can create daily , weekly , monthly schedule lines
    Example : if you have created a schedule agreement for product " A " for quantity 1000, and you require material of 100 nos in the first month, you can create schedule line for this 100 only and this will be transmitted to vendor( if you are using LPA you have to release schedule line). when ever you require further qty based on your requirement you will create another delivery schedule line, then it will be transmited to vendor.
    In case of PO if you are ordering 1000 qty , you need to specify the delivery date in Purchase order it self, and all the dates are immediately transmited to vendor along with Purchase order.
    For configuration steps please follow
    http://help.sap.com/saphelp_47x200/helpdata/en/93/7439fb546011d1a7020000e829fd11/frameset.htm
    Hope this will help.
    Thanks,
    Raja

  • How to output data outtside a for loop every 10 iterations​?

    Hi friends,
    does any body help me to sort out this problem?
    please check the attchement for my vi.
    all i want is output data from inside for loop to outside for loop every 10 iterations. please do not use local variable.
    Many thanks
    dan
    Attachments:
    output.vi ‏16 KB

    Hi Dan,
    I am not sure what you want to do every 10 iterations with the value outside, but If you want to update your graph every 10 iterations use the following way:
    If you want to handle the specific value every x iterations outside the loop you could either use queues or notifieres.
    BR,
    ThSa
    Message Edited by ThSa on 08-23-2006 09:05 PM
    http://www.newgistics.com
    Attachments:
    1.png ‏6 KB

  • Facing problem in saving data without overlapping in for loop

    Hi,
    I am facing problem in writting data withou overlapping if i run outer loop for 2 or more times and in inner for loop i am getting array in a way I want but when i try to build that array with logging temperature i am not able to do it. Please guide me through ths.
    Thank You
    Hnagpal
    Solved!
    Go to Solution.
    Attachments:
    data storage.vi ‏31 KB
    what i am getting.xlsx ‏10 KB
    what i want.xlsx ‏10 KB

    Thanks odessy27, Matthew Kelton, for replying.
    Matthew Kelton: Thanks for the solution i am adding outer loop so that i can increase the number of row. I am using it for some application which require me to save data several time and i used random number here but originally instead of random number there will be power meter reading and i want to save it every hour and plot it. I am also attaching a file what i made I don't know is this a good way or not. Actually i will also beneeded to plot a graph. But again how to increase a row and without replacing previous data i can write another row.
    Yes i want to make one row for each iteration.
    I attached both files in 2009 version.
    Thank You
    Himanshu Nagpal 
    Attachments:
    desired result.xlsx ‏10 KB
    data storage (1).vi ‏26 KB
    data storage.vi ‏37 KB

  • Deployment failed: No config data persisted for component apache

    When we are deploying the ear file we are getting the following error.
    Deployment failed: No config data persisted for component apache, transaction ID 10.236.30.86.43c315.fd76033ac1.-7ff4

    Exactly the same problem...
    Impossible de deploy a new app.
    Write down that I also can't cancel a deployment, i get the message :
    No ApplicationInfo is associated with application named: AppName

  • Transposing data in an array using a For Loop

    I am trying to transpose some data in an array using a  for loop starting from the size of the array then decrement down to 0. Can someone please help if you have an example?
    Solved!
    Go to Solution.

    I feel as if reverse 1D array may help
    Edit: misunderstood what your second post meant.
    CLA, LabVIEW Versions 2010-2013

  • Why are date and time strings lost when indexing an array in a for loop

    Hi, 
    I have an application where i'm reformatting data from a spreadsheet for graphical display on a LabVIEW dashboard.
    the original spreadsheet has date and time values in separate columns, and i'm merging them and converting to a timestamp value.  But something's not working.  Does anyone know why the string value is lost when the array indexes into this for loop?
    Attachments:
    failed array index.png ‏142 KB

    Can you attach your VI with some typical values? (e.g. create in indicator on the 2D array, run your VI, then turn the indicator (now containing data) into a diagram constant). Place the FOR loop related code and that diagram constant into a new VI and attach it here.
    How many times does the FOR loop run? Could it be that the last element of each 1D array is an empty string? (unless you put a wait inside the FOR loop, you'll never see the other elements in the probe)
    LabVIEW Champion . Do more with less code and in less time .

  • Indexing data on a for loop to overlay data on a xy graph

    I am using express VI's to measure both voltage and current data in a For Loop. I want to plot a current vs voltage graph but have each iteration of the loop overlay the others as if it were its own independent data set. I have been unable to bundle the data and convert it into a xy graph because of the number of elements, 3 for the bundle and 2 for the graph. I need a method to index the dynamic data wires so that I can overlay them.

    Hello,
    After reading the thread, it sounds like you're looking for a chart-like graph - I have attached an example with illustrates this.  Keep in mind that "graphs" in LabVIEW generally plot arrays of data (in the case of an XY graph, you pass a cluster which contains an X and Y array).  The example behaves like a chart by building an array one data point at a time (in this case both an X and Y array of course) on each iteration of a loop, and displaying the data at each loop iteration - this gives the look and feel of a chart which accumulates data.  It is attached in version 7.1 - hopefully you have that version or later to open it.  I have also attached a program which shows how to plot multiple data sets on an XY graph, in all 3 current formats accepted by the XY graph - it's attached in version 8.0 because the ability to plot complex data to an XY graph was added to version 8.0, and it illustrates this as well.
    Best Regards,
    JLS
    Best,
    JLS
    Sixclear
    Attachments:
    XY Chart-like Example.vi ‏24 KB
    XYGraphWithArbitrarilyManyPlots.vi ‏32 KB

  • I'm having problems manipulating array data within a for loop, and extracting the required sub-arrays generated.

    Hi,
    I'm using labVIEW V5.1
    I'm trying to generate 10 1D arrays, the first array is initialized to all zeroes, then I have set up a for loop which shifts the first element by 1, then a random number is placed into the first element position. I am using a shift register to feed back in the newly generated array into the start of the loop.
    By the end of the each loop I want to be able to use the array generated in an algorithm outside the loop. However I only want the Nx1 array that has just been generated.
    Unfortunately, I cannot figure out how to resize, reshape or index the output array to do this.
    I would like the loop to
    give me out a 1D array after each iteration.
    Any help would be greatly appreciated.

    I hope I've understood your problem.
    First your vi was lacking of the sub-vi working as shift register, I've replaced it with the rotate function.
    The indexing of your arrays create a 2D array whose rows are your 1D array.To pick only one of them you have to use the index array function and select which one you want.
    To use your temporary data in another part of your application you should use a local variable of array2.
    I did it in a separated while loop That I syncronized with the for loop using occurrence, in this way the while loop runs each time a new value is inserted in array2 (each loop of the for loop structure).
    If you don't need this syncronization just get rid of occurrence functions.
    I place a delay in the for loop to show what happens when running.
    Hope it was helpful.
    Alberto Locatelli
    Attachments:
    array_test_v3.vi ‏35 KB

  • I have used a 'for loop' to create an array of output data, however I want the each of the data sets from the array to be placed into a 1-D array. How do I concatenate the output of the for loop into a 1-D array?

    I am using this to create a data set that will be passed as an anolog output therefore it needs to have the correct array dimensions to go into the analog write vi.

    I'm updating my request... I've figured out how to do this by copying an example that uses a simple FOR loop (as seen in the attached current version of my VI). My question now becomes this: Is there a way to save the Y values corresponding to those X values into two more arrays? That is, just for argument's sake, let's say I took the first 100 elements from the X array, and found them to be positive. Then I would like to take the first 100 elements of the Y array and put them into a 'Y Values for X > 0' array. ...And likewise with the negative X values, they should have a separate array of corresponding 'Y values for X < 0' array.
    I can see that I should somehow save the indices of the positive X values from the large arrray wh
    en I sort them out, and use those indices to pick out the elements from the main Y array with the same indices.
    I just can't seem to set up the code necessary to do this. ...Can anyone help, please?
    Attachments:
    Poling_Data_Reader_5i.vi ‏79 KB
    30BLEND.txt ‏3 KB

Maybe you are looking for

  • Problems with musicplayer on a Nokis N95 8GB

    has anyone found a solution for the probs with the music player. I have in the music player 8 songs showing but in file manager on the phone or using the pc either by bluetooth or USB the no songs at all. The songs will not delete either, when I atte

  • Invoices u0096 Report

    Hi,I have a requirementto develop the report to view Novertis invoices –  that will list invoice information for all divested products sold on behalf of Novertis.  Current company has list of divested material that are sold by company Archis but now

  • Parse xml for newline chars using xpath

    Hi guys, need your help. I was curious to how can we use subString-before and subString after function to extracts records based on newline. Ex. for an strin xml field with data 1st line 2nd line and want to extract each line as separate record. Hope

  • CS4 will not start.

    My CS4 will not start. I removed in through the control panel and reloaded.  It still will not start.  What should I do?

  • [Weblogic 11G] FrontEnd Average Response time exploded

    --- windows server 2008 R2 --- weblogic 10.3.2 --- Sun JVM 1_6 Good morning, We have an web app (war archive contained in an ear) deployed on weblogic cluster (2 managed nodes). This application is monitored through Wily Introscope and regularly I ca