Correlated schedule lines in sales BOM

Hi all,
I'm having an issue with correlated schedule lines using a sales BOM in a sales order.
I've created a sales BOM in which the parent item has item category group LUMF (resulting in item category TAP) and child items with item category grp NORM (item category TAN). Pricing, inventory, cost etc is at item level. So far so good. No problem with the functionality.
I've got BOM configuration set up for item category TAP with "A" (Delivery group with correlated schedule lines) for creating the delivery group.
However, when a create a sales order the schedule lines are getting created with different quantities depending upon the availability of individual quantities instead of creating co related schedule lines.
Ordered
BOM parent Qty: 100
Bom Item A : 100
BOM Item B: 200
__Desired outcome__
Confirmed
BOM parent Qty: 20
Bom Item A : 20
BOM Item B: 40
Current Outcome
Confirmed
BOM parent Qty: 20
Bom Item A : 20
BOM Item B: 120
I believe I've configured it right. Am I missing something?
Any inputs / expert opinion would be greatly appreciated.
Thanks,
Srini

Hi,
Please check the below configuration settings for Successful BOM.
BOM item consist of combination of the materials by having a structure like header and sub u2013 items.
Different combination of the materials combined together to make one single object. The complete combination of
materials only called as a BOM item.
Ex: u201CComputeru201D as it contains monitor as a header item and keyboard, hard disk, mouse as sub-items. The BOM
items can independently sold to the customers separately.
Ex: If the mouse is going to participate as sub-item in the BOM.
But the customer requires same mouse as a u201Cstand byu201D (spare). So the business can offer.
In BOM the pricing, delivery can be carried out at header level item (above structure) or sub-item level (below
structure).
If BOM with above structure then system carries out delivery, billing process only for header item (item category
group ERLA). Then system treats sub-items as text items (no pricing and no delivery for text items).
Above structure: Item category TAQ for header item.
Item category TAE for sub u2013 items.
If BOM with below structure then system carries out delivery and billing process only for sub u2013 items (item
category group LUMF). Then system treats header item as text item.
Below structure:Item category group for header item TAP
Item category group for sub u2013 item TAN
Delivery group: The delivery group facilitates to confirm the quantities of all items in the BOM with best schedule
lines.
Ex: As the BOM contains number of items system can confirm the quantities for some items on required delivery
date, and it may not confirm the quantity for some items on required delivery date. In this context we can put all the
items in a single delivery in a delivery group by specifying delivery group as one in delivery group field at header
level of sales document under shipping tab in delivery group field.
NOTE: Item category group should only be changed for header item.
BOM can be exploded in application areas like production planning, material management and sales and
distribution. While configuring BOM we have to specify the application area where it has to explode. BOM can be
exploded single level or multilevel. Usually multilevel BOMu2019s are exploded in production planning.
Ex: Material is the u201CBikeu201D, as it has so many sub-items, again those sub-items will have some sub-items.
Configuration settings: [ABOVE structure]
 Create a material with item category group ERLA
 Create another 2 materials as sub-items with item category group NORM
 Go to MB1C and maintain the stock for 3 materials
 Go to VK11 and maintain condition records for 3 materials
Configure BOM item: Transaction code: CS01
167
Path:
 Logistics
 Production
 Master data
 Bills of Material
 Bill of Material
 Material BOM
 CS01 u2013 Create
 Specify the BOM header item [ERLA item] and plant
 Specify usage as [5]  Sales and Distribution
 Maintain the sub u2013 items
 Save and Exit
NOTE: Item category u201CLu201D  Stock item.
It is categorization item in the BOM according to set criteria.
Use: This categorization allows us to process data that is relevant to individual items in a BOM. It controls field
selection default values for BOM triggering of specific system activities.
 Go to VA01 and raise the sales order by specifying header item and check whether BOM has exploded or
not.
Item Item category Schedule line
Header item TAQ CP = Deterministic MRP
Sub u2013 item TAE CT = No inventory management,
No goods issue.
VOV7 of TAQ  Extent delivery
 Go to VOV7
 Select TAQ from position button
 Click on details icon and maintain the values like below
Billing relevance [A] = Delivery related billing document.
Price [X] = Standard
Structure scope [A] = Explode single level of Bill of Materials
[The value of this field causes to explode BOM in the document]
Application [SD01] = Sales and Distribution
It indicates the applications are where it has to explode
 Check manual alternatives.
168
169
VOV7 of TAE  Explanation
170
 Statistical value [X] = No cumulation values cannot be used statistically.
VOV6 of CT  No inventory management/No goods issue
 Check item relevant for delivery
It is used for only information purpose
Item category determination table:
OR + ERLA + NIL + NIL = TAQ
OR + NORM + NIL + TAQ = TAE
Configuration settings: [BELOW structure]
 Create material with item category group in the header item should be LUMF
 Go to VA01 and raise the sales order by specifying header item
 Check the BOM explosion
NOTE: For Below structure also we have to follow all the steps like above structure, except the creation of
LUMF material instead of ERLA material.
VOV7 of TAP:
Billing relevance is [A]
Pricing [NIL]
Structure scope [A]
Application [SD01]
171
172
VOV6 of CT:
 Check item relevant for delivery
 Go to VL01N and do the delivery
 Go to VF01 and raise the invoice
Item Item category Schedule line
Header item TAP CT
Sub u2013 item TAN CP
Multilevel BOM: [ABOVE structure]
Item category Schedule line
Header item: TAQ CP
TAE CT
TAE CT
TAE CT
Multilevel BOM: [BELOW structure]
Item category Schedule line
TAP CT
TAN CP
TAN CP
TAN CP
Important notes:
 For Above structure in the material master record should have the item category group ERLA in the Sales:
Sales organization 2 screen.
 This process ensures that pricing, inventory control and delivery processing is carried out at the u201Cheader level
itemu201D only.
 That means the associated sub-items function only as text items, and thus is not relevant for delivery.
 For Below structure item category group is LUMF.
 In this process the sub-items are responsible for pricing, inventory control and delivery processing.
 To ensure all the components in a u201Csingle deliveryu201D use the functionality of the u201Cdelivery groupu201D.
The delivery group: The sub-items of a BOM may be available at different times due to the lead times in
procurement (MM) and production (PP). You can use the delivery group to indicate that all the sub-items must be
delivered as a group (single delivery).
Regards,
Siva

Similar Messages

  • Schedule Lines for Sales BoM Material

    Hi All,
    When i trying to maintain the multiples schedule lines for the Sales BoM Material(Both Header and Item), system is not allowing to maintain it.Please guide me how to achieve this?

    Hi,
    "Schedule Line allowed" is enabled at Item category. The Requirement is If we have multiple schedule lines for BoM Line Item, we are not able to maintain. Suppose the Order Quantity is 50 Units and we need schedule line of 10 Quantity each month. We are not able to maintain. System takes the complete 50 quantity and do the availability check and proposes the availablity Date. We are not able to maintain different schedules manually.

  • Ignore the number of schedule lines in sale order item when run MRP

    Dear All,
    I have a problem when I create production order (discrete manufacturing)
    When I create a sale order with one sale order item and 3 schedule lines for this sale order item.
    After that, I run MRP for this sale order, what I get is 3 planned orders for 3 schedule lines. It means that I will have 3 production orders for 1 sale order item.
    I want  create one production order for one sale order item whatever the number of schedule lines in sale order item.
    I think I have to config in MRP. Please help me.
    Thanks in advance

    Dear
    Check in OPPQ then look in Master data Availability Check & strategy for material also check whether u have maintained strategy for same material and see did u extended sales views for other material
    As u said 3 schedule lines for this sale order item check whether u have extended sales views for next material
    With Regards
    Pushpalas

  • How to deactivate schedule line in sales order

    hi friends,
    how can i deactivate the schedule line in sales order so that we can deliver the sales order after the schedule date. i can uderstand that system is not allowing before schedule date. but what if i want to deliver after that.
    Thanks in advance.
    Regards,
    Solomon

    hi,
    this is to inform you that,
    here you need to switch off:
    schedule lines allowed
    in schedule lines control data - remove or un check - availability/TOR
    In SPRO - Availability Check settings.
    but i have a question here:
    what is the business logic.
    do you want to do the same with all the sales orders or not.
    please update the forum
    then answer will be different
    balajia

  • Schedule Lines in Sales Order

    Hi Experts,
      We have an indent for material X with Qty 1200,Progressive monthly dispatch plan from customer for an Year.
    Material X 
    Delivery Date       Qty           CumulativeQty Planned              Actual Delivered Qty
    01.01.2011         100           100                                             100
    01.02.2011         100            200                                             50
         If I could able to deliver Qty 50 only in month 01.02.2011, Undelired qty of 50 has to automatically distribute to remaining months .
    Also wanted to get the report of Total Planned Qty, Actually Dispatched Qty and Remaining qty to be dispatched for the current month and whole Year. Please help me how can give solution to my client..
    Thank You
    Saravana

    Hi,
    As pe rthe client requirement, this process is not allowed in standard SAP, in this scenario you have to use the user exit as mentioned below-
    USEREXIT_MOVE_FIELD_TO_VBEP - Use this user exit to assign values to new fields at the level of the sales document schedule lines. The user exit is called up at the end of the FORM routine VBEP_FUELLEN.
    Thanks & Regards,
    Rahul Verulkar

  • Printing last delivery date in schedule lines for sales order

    Hi!
    We should create a sales order with more then one schedule line. This schedule lines are only for internal use (only to plan our production) and not for printing on the sales order paper. Only the last line is the real delivery date which should be printed on the sales order paper. Now I'm searching for a solution to print only this schedule line.
    Have anyone a good idea?
    Thanks
    Markus

    Hi, 
    Select <required fields> from VBEP
    into table <itab>
    where vbeln = <order number>.
    sort itab by posnr etenr descending.
    read table itab into wa index 1.
    contents of work area will have the last schedule line details of order.
    Regards
    Vinod

  • Issue in schedule lines on sales order

    Hi all,
    While creating a sales order, system is creating schedule lines after two days of order creation. I want that schedule lines should be created for the same date.
    Please suggest that what should I do for this?
    Please respond.
    Best Regards,
    AI.

    hi,
    check whether any delivery scheduling is been maintained
    IMG>SALES AND DISTRIBUTION>BASIC FUNCTION>DELIVERY SCHEDULING AND TRANSPORTATION SCHEDULING>MAINTAIN DURATION
    choose shipping point and remove the "Loading time w.days" and "Pick/pack time wrkdys" if maintained any
    choose route and remove "transit lead time"
    now try with new sales order
    regards
    senya

  • Quantity clubbed for two schedule lines in sales order

    Hi,
    One finished item F1 having strategy 20. special procurement key as 40( to get from another plant) Its sales order is created for 20 EA on 6 nov.So one line item in sales order.
    Item availability check is done.in schedule line I can see system proposes available date as 9 Nov. I manually split the quantity as 13 EA on 10 Nov and rest 7 EA on 18 Nov.
    Now in schedule lines tab I can see three line items:
    date      confirmed qty
    6 Nov      zero
    10 Nov      13 ea
    18 Nov        7 ea
    MRP is run. system generated Stock Transport Purchase requisition of 20 ea dated 6 Nov.Qty and date both is wrong. Why quantity gets clubbed?? Why date is picked as 6 Nov?? I expected system to create two Stock transport purchase requisition of qty 13 dated 10Nov and qty 7 dated 18th Nov.
    Please guide if there is any config mistake in PP or SD side.
    Regards.

    PP,
    That is pretty standard.  If you do not meet the customer's requested date when you confirm the sales order, the system assumes that you sitll intend to make the attempt.  MRP will produce a proposal based upon the customer's requested date and requested quantity.
    If you want MRP to consider the confirmed dates/quantities, set the Fix Date Qty flag in the sales order item.
    http://help.sap.com/erp2005_ehp_05/helpdata/EN/93/744bcb546011d1a7020000e829fd11/frameset.htm
    If your standard business process is that you always wish to plan based on the confirmed date(s) rather than the requested date, you can configure to have the Fix Date Qty flag defaulted; in OVZJ.
    Best Regards,
    DB49

  • Regarding Schedule lines in Sales Order

    Dear Friends,
    While Creating Sales Order the Order Quantity gets Confirmed and Schedule Lines created even though there is NO STOCK.
    Kindly suggest me for this.
    Thanks & Regards
    T.Arulvanan.

    Hi
    It is because the replinishment time is maintained in MRP 3 view in material master  as also blank and because you havent made the tick there the system assumes the quantity is available in 0 days and hence it is confirmig
    You have kept check without RLT as blank it means the system is checking with RLT and the RLT Time is 0 that means system assumes at the end of end of 0 days the stocks are available and finally it will hit you in PGI if stocks are not there
    Pls maintain rep lead time as two days in MMR in the MRP3 view and see
    While creating sales order the availability check pop up will come confirming the delivery after 2 days
    You can check and see
    Regards
    raja

  • How to insert new schedule line in Sales order using BAPI

    Hi All,
    I am using the below code to add a new line in the schedules line of a existing sales order.But i am not getting the extra line after running the report.
    Kindly guide me in how to achieve this.
    thanks and regards
    shilpa
    REPORT  Z_VA32_EDI1.
    data: v_vbeln type BAPIVBELN-VBELN,
          wa_order_header type BAPISDH1X,
          i_sch_line type standard table of BAPISCHDL with header line,
          i_sch  type standard table of BAPISCHDLX with header line,
          i_return type standard table of BAPIRET2 with header line.
    v_vbeln = '0030001227'.
    wa_order_header-UPDATEFLAG = 'U'.
    i_sch-ITM_NUMBER = '000010'.
    i_sch-UPDATEFLAG  = 'I'.
    i_sch-REQ_DATE  = 'X'.
    i_sch-REL_TYPE = 'X'.
    i_sch-PLAN_SCHED_TYPE = 'X'.
    i_sch-REQ_QTY     = 'X'.
    append i_Sch.
    i_sch_line-ITM_NUMBER = '000010'.
    i_sch_line-REQ_DATE  = '20080127'.
    i_sch_line-REL_TYPE = '2'.
    i_sch_line-PLAN_SCHED_TYPE = '2'.
    i_sch_line-REQ_QTY     = '65'.
    append i_Sch_line.
    CALL FUNCTION 'BAPI_SALESORDER_CHANGE'
      EXPORTING
        salesdocument               = v_vbeln
      ORDER_HEADER_IN             =
        order_header_inx            = wa_order_header
      SIMULATION                  =
      BEHAVE_WHEN_ERROR           = ' '
      INT_NUMBER_ASSIGNMENT       = ' '
      LOGIC_SWITCH                =
      NO_STATUS_BUF_INIT          = ' '
      tables
        return                      = i_Return
      ORDER_ITEM_IN               =
      ORDER_ITEM_INX              =
      PARTNERS                    =
      PARTNERCHANGES              =
      PARTNERADDRESSES            =
      ORDER_CFGS_REF              =
      ORDER_CFGS_INST             =
      ORDER_CFGS_PART_OF          =
      ORDER_CFGS_VALUE            =
      ORDER_CFGS_BLOB             =
      ORDER_CFGS_VK               =
      ORDER_CFGS_REFINST          =
       SCHEDULE_LINES              = i_sch_line[]
       SCHEDULE_LINESX             = i_sch[]
      ORDER_TEXT                  =
      ORDER_KEYS                  =
      CONDITIONS_IN               =
      CONDITIONS_INX              =
      EXTENSIONIN                 =
      NFMETALLITMS                =
    CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
    EXPORTING
    wait = 'X'.
    write: 'Done'.

    hi,
    pass the values 'x' to the bellow structure for all the fields that u want use and provide the item no ,schedule line no.
    SCHEDULE_LINESX

  • Link between actual ship date of an item and schedule line in Sales Order

    So, we are developing a custom report that compares actual Ship Date (Goods Issue Document MKPF-BUDAT) and the date the item should've been shipped (Schedule Line Date).
    I am able to link the GI Document to Delivery Document and can then link to Sales Order Number/Item Number.  However, a line item can have multiple schedule lines.  What logic can be put in the mapping so that the correct scheduling line is picked for the GI date to be compared against?
    Example:
    Sales Order 123
    Item 10 Product X - Quantity 10
    Schedule Line 1: 11/15/2014 8 pieces
    Schedule Line 2: 12/15/2014 2 pieces
    Let's say first shipment gets delayed 2 months and ships 1/15/2015
    Due date in report should know to select 11/15/2014 to calculate that shipment was late 60 days
    Any way to link delivery document to a specific schedule line??
    Thanks!!

    Hello,
    Just did similar development for customer report. List of deliveries based on sales order number and sales order line item numbers. Sort these deliveries either with number or actual goods issue date. Compare goods issue quantity with schedule line quanity and start allocating deliveries to schedule line. For example
    Schedule line 1 - 10 MT, Schedule line 2 - 5 MT. Now you have created 3 delivery. First with 7MT, second with 5MT and third with 3MT. Your first delivery will be for first schedule line. Your second delivery is for first and second schedule line and your thrid delivery will be for second schedule line
    Regards,

  • Schedule line in sales order

    Hello Friends,
    While creating sales order, a line item in sales order creates schedule line with delivery date and quantity. How does this happen and what are the criteria to be met to enable this to happen?
    Thanks

    The schedule line represents the customer intended delivery date and quantity to be delivered.
    This information is transferred to material requirements planning. This is known as Transfer of Requirements or TOR.
    MRP will then determine if there is enough quantity of stock available for the scheduled delivery date.
    If there is stock, then system would confirm schedule lines.
    For TOR to be carried out, the following criteria are to be met:
    A plant must be assigned to the sales document line item level.
    The schedule line category must be switched on for the TOR.
    The TOR must be switched on at the requirements class level.
    A checking group must be defined and allocated to the material master record in the sales/plant view in the availability check field.

  • Status of Schedule Line in Sales Order

    Which field in which of the tables shows the status of a schedule line for an item in the Sales Order?

    Hi pooja,
       In sales order schedule line table is vbep, vbeh and vbag.
    might be these are suitable table and field for u r requirement.
    VBEP-WEPOS ( Confirmation status of schedule line )
    VBAG-ABSTA ( Release Status ; current & old release )

  • FM which give delivery no of a schedule line of sale order

    Can anybody tell whether there is a function module or any method to find a delivery no and item no of a particular schedule line of item no of a sale order. pls its urgent.

    Hi
    Simple pass the VBEP-VBELN (sales Order) to LIPS-VGBEL and
    Scheduline Item VBEP-POSNR to LIPS-VGPOS and get the LIPS-VBELN ie. delivery number
    why fun module required.
    I think there is no such fun module
    Reward points if useful
    Regards
    Anji

  • Create a schedule line in sales order using Bapi

    Hi Guys,
    Here the requirement is automating the process of creating the schedule lines using Bapi.
    I am using the bapi BAPI_SALESORDER_CHANGE for the same.
    I could able to create a schedule line but the problem is,its not updating the CONFIRMED QUANTITY and COMMITTED  QUANTITY on
    sales order schedule line tab,its updating ORDER QUANTITY and ROUNDED QUANTITY.
    the structures and tables parameters i have updated are:
    IMPORT PARAMETERS: SALESDOCUMENT,ORDER_HEADER_INX-UPDATEFLAG= 'U'(change sales order).
    TABLES:SCHEDULE_LINES(ITM_NUMBER,REQ_DATE,REQ_QTY,DLV_DATE)
                   SCHEDULE_LINESX(ITM_NUMBER,UPDATEFLAG='I',REQ_DATE,REQ_QTY,DLV_DATE).
    Please help me out if i need to fill up any other parameters or anything am missing out here.
    Would appreciate your help.
    Thanks in Advance
    Ramu

    Dear Ramu ,
    Any solution to this Issue i have the same Requirement and faceing the very same problem.
    Thanks in advance for reply .
    Thanks alot.
    regards
    Prashant Singh

Maybe you are looking for

  • How do I tell iTunes not to install on sync apps that I downloaded?

    I upgraded my SSD on my Mac and I thought I'd download all my apps so they were backed up on my computer. However, now iTunes tries to install them all on my iPhone whenever I try to sync it. I don't have nearly enough space on my iPhone so I always

  • Flex 2 Accessibility and Mozilla browsers?

    I found an article dated back to 2005 that mentioned this: This works fine as long as the browser itself works with this technology. The Flex blurb on accessibility mentions that Flex provides components which "out of the box" use MSAA, but doesn't m

  • Validating a date using Struts

    Hoi all, I am trying to validate a date in struts, I have googled for a information and searched the forum but didn't find anything useful, I might have been asking the wrong questions. I have set up my validate.xml and it captures a date that is lik

  • EARLY DELTA INITIALIZATION IN LO COCKPIT

    HI EVERYBODY, SORRY FOR ASKING A SILLY QUESTION --BUT I REALLY NEED AN EXPLANAITION <b>WHAT IS EARLY DELTA INITIALIZATION</b>????(can we select this method the same way we do for Delta init) I KNOW THAT BEFORE DOING DELTA WE WILL DO DELTA INITIALIZAT

  • Source System mapping for BW configuration transport

    I create a data model mapped to the testing source system i.e DEV201 but the configuration source system is DEV200. Now i am about to transport the BW configuration to BW-QAS , I am wondering if I have to assign the data model to the config. source s