Costing and Pricing

Hi,
This thread probably doesnt belong here...
I am working on a margin tool that is an extension of sales online quoting 'lines' page.
-The old page allows you to add products and see prices.
-The new page also contains product cost for margin calculations.
Now the issue is that for configured products the costs that are in cst_item_costs are rolled up, and the price that shows up is not rolled up. Please suggest what can be done.
thanks
Kalpana

No the material type should be a FG : it is relevant for sales reporting. For example I call it material "A". In the material master data within the sales screen the item category group ERLA is assigned to "A" . The material A is a grouping material with a sales BOM which contains some sub-items for example B and C which are picked and shipped together. The grouping material is not handled as stock material: only the sub-items are stocked and moved.
The customer could  only require the material A with its price and receive phisically the two sub-items with a unique package unit or with two separate ones.
In this scenario the FG with ERLA item could be estimated for standard cost or not?
Thanks in advance
Andrea

Similar Messages

  • Material with  item cat.group ERLA impact on costing and sales pricing

    Hello,
    I would like to know if a material which is defined as item category group ERLA and which has two sub-items posted in the BOM with usage 5 with its respective std cost could  be calculated for costing or not?
    Can I have some information about the impact on  costing and pricing in sales?
    Thanks in advance
    AB

    No the material type should be a FG : it is relevant for sales reporting. For example I call it material "A". In the material master data within the sales screen the item category group ERLA is assigned to "A" . The material A is a grouping material with a sales BOM which contains some sub-items for example B and C which are picked and shipped together. The grouping material is not handled as stock material: only the sub-items are stocked and moved.
    The customer could  only require the material A with its price and receive phisically the two sub-items with a unique package unit or with two separate ones.
    In this scenario the FG with ERLA item could be estimated for standard cost or not?
    Thanks in advance
    Andrea

  • Freight costs in Pricing procedure and Shipment costs

    What is the difference between freight costs in pricing procedure for a sales document and shipment costs in shipment documents. Arent they meant for the same thing. Why do we have to create them separately.

    hello, friend.
    freight charges in the sales pricing procedure may be represented by condition type KF00 (standard).  this condition type is a surcharge to your customer, meaning there is an inflow into your company.  this surcharge may be manually entered (if configuration allows this) in the condition tabs of your sales order or this could automatically be entered if the appropriate condition records (via VK11 or VK31) have been created.
    the shipment costs in shipment documents is what your company is billed or quoted by your forwarder, shipper or other transport related agent.  the shipment cost data will be used by the system to calculate and settle shipment costs.  when you have freight condition records (via TK11), purchase-vendor records and if all route/connection point/etc.  settings correct, all shipment cost data will be determined when you do shipment cost document creation.  you may also manually enter cost items, depending on the configuration.
    hope this helped.  is so, will appreciate reward.
    regards.
    jty

  • Set up cost in Pricing

    Hi
    Scenario:
    For drawing parts, we need to pay a fixed "Set-up" cost to the vendor. Irrespective of the quantity this cost will be fixed. Since same component is required in several end products and we get the requirements for these products at different time intervals, we can't combine all requirements into one single PO. We run MRP on daily basis and whatever requirements are noticed, they are converted into PO.
    Also economic order quantity is not feasible, as these are associated with high cost and demands are not consistent.
    However, many a times supplier is able to combine all these (atleast many of these) requirements into one single delivery and will charge us the set up cost only once against all these various PO's.
    We are not finding a solution, other than manually tracking the set up cost.
    I was just wondering do any of you had this situation and how it was solved.
    Regards,
    Jagadeesh

    As already suggested, it should be 'D', as it copies the pricing elements unchanged with automatically determined or manually entered surcharges and discounts from the reference document (scales are not read again). This means that the value remains unchanged even if the billing quantity is different to the order quantity. Also, it does not redetermine the taxes
    Regards,
    gauravjit.

  • Visual Studio Online- Features and pricing.

    I am TFS Admin in my organization and we(approx 100 users) have Visual Studio Professional
    with MSDN subscription and i want to know about following things:
    1. Is Visual Studio Online free for me(as we have MSDN Professional license)?
    2. How much storage(on cloud) we can get with this subscription ,as we have thousands
    of applications to store?
    3. What are the features available for me with my current(Visual
    Studio Professional with MSDN) subscription.
    4. is there any other cost or pricing which i will have to pay in order to use Visual
    Studio Online?
    5. Authorization
    migration from existing project : If we migrating from an On-Premises Team Foundation Server to Team Foundation Service:
    1. IS source code history preserved
            2. Are we able to migrate WorkItems with history.
    6. SharePoint Integration with Team Foundation Service: Does
    hosted team foundation service support integrate with SharePoint.

    I have Visual Studio Professional with MSDN subscription and i want to know about following
    things:
    1. Is Visual Studio Online free for me?
    2. How much storage we get with this subscription?
    3. What are the features available for me with my current(Visual
    Studio Professional with MSDN) subscription.
    4. is there any other cost or pricing which i will have to pay in order to use Visual
    Studio Online?

  • Hide the cost and margin fields on Sales Orders and Invoices

    Hi all,
    I need to hide the cost and margin fields in Sales Orders and Invoices. We sell our products to our employees sometimes, hence we don't want them to know cost and margin information.
    Can this be done?
    Cheers

    Go to VOV7 & as per the Item category ,de - select the Check Box Determine Cost.
    Else remove the Condition Type VPRS & Margin Condition type from the Pricing Procedure
    Best Regards,
    Ankur

  • Difference between Tax Procedure and Pricing Procedure

    What is the major difference between tax procedure and pricing procedure. Can any one explain in detail.

    Procedures are used, for example, in the following applications:
    Pricing in sales and distribution
    Applying overhead in Product Costing (costing sheets) and for CO internal orders
    Calculating accrued costs in Profitability Analysis
    Output control (printed confirmations, EDI messages, electronic mail)
    Account determination
    Calculating taxes on sales/purchases
    Calculating accruals in Cost Center Accounting
    Pricing for resource planning

  • Remove Shiping Cost and Tax from Order Confirmation Screen

    Hi Gurus,
    Can anybody tell me if there is any setting to Remove Shipping Cost and Tax from Checkout Confirm Page , other than hiding from JSP page ? Also is it possible to add any other Criteria like the same with any setting ?
    Thanks and Regards,
    Tony Isaac

    Net = getHeaderValue()
    Total Freight = header.getFreightValue()
    Total Tax = header.getTaxValue()
    Gross = header.getGrossValue()
    The document header is used to get the price information and the fields are almost set in stone. Getting other pricing conditions is technically possible but need better business evaluation. Ask the question, if this is needed in a web environment.

  • Can the BAPI_SALESORDER_SIMULATE identify the shipping cost and the tax?

    Hello all,
    do you know if the BAPI_SALESORDER_SIMULATE can display the shipping cost and/or tax (VAT)?
    Thank you in advance.

    Hi,
    If the shipping cost is a condition type assigned to the pricing procedure of the order type you want to simulate the creation, the answer is yes.
    You should check the result in the output table ORDER_CONDITION_EX [ ]. This table contains the results of the pricing determination.
    Regards,
    Andrea

  • Price and Pricing conditions are not copied to PO for a line item !!

    Hi
    I have created a PO w.r.t a PR which has only one line item.
    Now, I add another line item to this existing PO, i get an error message that the Price and Pricing conditions are not copied.
    How do i rectify this error !!
    Where might be the link for this Price and Pricing conditions to get copied in to this PO ??
    MaruthiRam

    What kind of PR and in the PO same material you enter for new line or new material and do you have any funcitonal authorization assigned o your user id
    please reply

  • Report on Cost And Utilization in PM Module

    Hi Experts,
    I want some help in generating a report called Cost And Utilization in PM Module.
    Any body can help me with some documents or if any body created same kind of report in Pm just do provide me some details on how create the report.
    The requirement of this report is as follows,
    This Report is generated from the service order or the notification which ever is latest on the equipment in the date range given by the user.
    In Report I want to calculate the field Estimated Hours.The main problem we are having here is the Hour Meter infobject is of Type characteristic it is not key figure.
    Based on the User input Date range the Estimated Hours calculation needs to be done.The Estimated Hours are calculated from Estimated Hours Begin and Estimated Hours End.
    For calculating the Begin and End Hours we need to have some fields.The fields required for calculating the Begin and End are,
    Initial Hour Meter,Adjusted Hour Meter,Fleet Management Date these three  fields are picked from the Equipment Master data for a particular Equipment and the Hour Meter Reading is the latest Meter Reading of the equipment it is populated from the Service Order or Notification which ever is latest in the date ange given by user.
    There are some conditions in calculating the Hour Meter Reading Begin and End.
    If the Fleet Management Date (Start-up Date on EM) started before the input date Date Range (From-Date), calculate the average usage (in hours) based on the initial hours and
    If the Fleet Management Date started after the From-Date, use the Hour Meter (EM) as the Estimated Hours Begin. 
    If the last PMN (or SO) fell short of the Date Range (To-Date), obtain the Estimated Hours End by applying the average usage to fill the time-gap. 
    If the last PMN (or SO) fell after the Date Range (To-Date), get the Estimated Hours End by getting the next to last PMN performed inside the window parameter,
    Adjusted Hours, if not zero or null, needs to be added to the Ending Hours to achieve the real number. 
    The example for calculating the above requirement is below,
    User Input Date Range:  Jan. 1, 2006 - Dec. 31, 2006     
    Initial Hour (Equipment Master):  10     
    Adjusted Hours (Equipment Master): 0     
    Fleet Management Date (Equipment Master):  Dec. 1, 2005     
    1st PM Notification (Feb. 1, 2006):  410     
    Last PM Notification (Feb. 1, 2007):  2810     
    Second to last PMN (Dec. 1, 2006):  2410
         Equipment was put into service (12/1/05) before the Date Range, needs to find the Estimated Hours Begin.
         The first PM was performed (2/1/06) exactly two months from in-service date (12/1/05).
         Average monthly usuage from first PMN = (410 - 10) / 2 = 200
         Estimated Hours Begin = 200 + 10 = 210 (estimated Hour Meter Reading on Jan. 1, 2006)
         Average monthly usuage from the last 2 PMN = (2810 - 2410) / 2 months = 200
         Estimated Hours End = 2410 + 200 + 0 (adjusted hours) = 2610 (estimated Hour Meter Reading on Dec. 31, 2006)
         Estimated Hours Total = 2610 - 210 = 2400
    If you have any queries regarding the requirement just let me know i will let you know.
    Thanks in advance
    Bobby

    Mahee,
    We have maintained all personnel no of the employess working under a particular Maint.Work center in HRMS tab. Employee master data for all Infotypes are maintained in Personnel Management in HR module.  So wen the Employee enters Time details of his working hours per day, he has to mention the maintenance order Or it is like a standing order on the time sheet per line item. Wen transfer of working hours will be done on  a particular order the entire cost will be reflected in Cost tab page. Since me have maintained different Activity type/Activity price per employee I am confused about the flow of cost...
    Ur suggestions were valuable.... hope to get some more clearity...

  • Data Source to upload plan data for CO_OM_CCA_: CC: Costs and Allocations

    Hi Guru's,
    We have Data source that which upload Actual data for CCA (0CO_OM_CCA_1 - Cost Centers:cost and allocations).  Every time it is full upload before loading the data deletion of previous load request will be done.
    One more information required that i have checked in the BW cube for plan data it is available in the info cube for one cost center and rest of the costcenter i don't have the data now the users are requesting to upload the plan data for rest of cost centers.
    Now as per the business requirement the users are requesting to upload the plan data in to the same i am not sure whether it will pull the plan data with actuals in to BW cube. Is there any alternate with the same data source or else is there any specific data source for uploading Costs and Allocations plan data
    Please suggest me how can i go a head with this requirement.
    Thanks in Advance.
    Ganni

    You can use the same datasource to load plan/budget data to the cube for all the costcenters. And regarding the actuals, you can use 0CO_OM_CCA_9 datasource to load to actuals cube and create a multi on top of both plan and actuals cube for reporting purposes.

  • Engineer to Order Scenario-Target Costs and Stock Valuation

    I have got a query  pertaining to Engineer to  Order Scenario. A production order has been created with WBS element as the account assignment .Its a valuated project stock scenario, with configurable material. As per SAP standard behaviour  and my limited knowledge, the Goods Receipt for FERT/HALB happens according to either of the four strategies:
    •     Standard Price ( if there exists one)
    •     Customer Exit COPCP002
    •     Sales Order Cost Estimate
    •     Preliminary Order Cost Estimate for prod order
    However ,I have come across a case where although a preliminary order cost estimate exists for the production order, the system is not able to determine target costs. As a result the entire variance is posted as remaining variance at the time doing a variance calculation on the production order. Moreover at the time of Goods Receipt for FERT material,the system passses an entry Price diff A/c -Debit to Cost of Production, instead of debiting Inventory  and crediting cost of production(Price Control is S, no standard price exists for the material)
    Thus my query is :
    1) In case of Engineer to Order Valuated Stock Scenario where prod order is created with reference to WBS element, how is the standard price (or target costs for version 0) determined
    2) Under what situation at the time of goods receipt ,will an entry " Price diff A/c Dr & cost of production-Credit will be posted, instead of  Inventory A/c being debited?
    Awaiting a reply
    -Regards
    Amit Kulkarni

    Hi Amit
    the easy answer first: The standard price is just taken out of the material segment without WBS assignment. That means if you maintain a standard price in the accounting view of the material master for the material number + plant that will be the fallback to be used. That will at least reuslt in a inventory posting, instead of pure price differences (against a price of zero)
    Why your production order cost estimate could not be derived I cannot say. But he first startegy will be to search for the cost estimate to the WBS. Is there not something in the project system to perform a project costing and save it? in that case that will be searched and used for the order target cost and inventory posting.
    best regards,
                      Udo

  • PM Order, cost and key figures

    I have created and configured a new PM planning plant, cost center, work center, pm types and all that usual of PM requirement, but still I think something is missing in in the ingredient because when I try to creat a PM order and assign a bunch of operations with man hours to it, I discovered that there is NO cost and key figures showing...basically the estimated cost show $0.00. In other Plant it shows correct est cost.
    Any help will greatly appreciate with rewarding points.
    Thanks,
    Tim

    COst in order operations will get summarised under cost tab as labour/internal cost provided-
    1.Activity rate is maintained for activity via KP26 for cost centre
    2.Cost center is entered into work centre master data.
    3.Value category maintained correctly for cost element group where cost elemnt for internal cost is within this group.
    In your case it seems missing link is activity rate maintenace.
    Thanks
    Atul

  • VPRS cost and batch management

    Hi Gurus,
    Is there any link between the cost and batch management? Currently users has posted a billing document and the cost is 0. The VPRS value in the SO is correctly but it is not brought to the billing document.
    We have tested and it seems that this is because the batch management checkbox is not checked in material master, so the VPRS is not generated in billing.
    Please advise. Thanks.
    Regards,
    FY

    Hi Javier,
    what do you do with the VPRS in your calculation- system ?
    If you need i, you delete the requirement 004 in your calculation -system.
    on the other hand, you can change TANN to komp-evrwr (price determination on the item category) is  'X'. Then you have to add an 100% rabate for TANN and the resukt will be free good.
    Hans

Maybe you are looking for