Costing Sheet in requirement class for Sales Order costing

Hi Experts,
Could you please explain me the necessity of costing sheet in requirement class configuration.
There is a field for costing variant in requirement class. I hope costing sheet can be taken from that costing variant.
So what is the purpose of costing sheet in requirement class and could someone explain me the use of that field in requirement class.
What happens if the costing sheet in requirement class and costing sheet in costing variant mentioned in requirement class does not match.
Thanks.
Edited by: DSK on Dec 18, 2011 3:21 PM

Costing Variant is assigned to Requirement class
Requirement class is assigned to Requirement type
Requirement type is assigned to Planning Strategy
Planning strategy is assigned to strategy groups
Strategy group is assigned to MRP3 tab in Material Master
System picks the costing sheet in requirement class
In this way product will be costed for Make to Order sale order costing.
Srinivas

Similar Messages

  • Valuation Strategy for Sales Order Costing

    We are currently using valuated sales order stock in ECC 6.0. The "without valuation strategy field" on the requirements class is not checked. However, the valuation strategy varies for a material and for a sales order. Sometimes it is using valuation strategy 2 - cost from the production order cost estimate - which is desired and other times valuation strategy 3 - cost from the standard price field in the material master - which is not desired. When is the valuation strategy determined for a production order for valuated sales order stock?

    Costing Variant is assigned to Requirement class
    Requirement class is assigned to Requirement type
    Requirement type is assigned to Planning Strategy
    Planning strategy is assigned to strategy groups
    Strategy group is assigned to MRP3 tab in Material Master
    System picks the costing sheet in requirement class
    In this way product will be costed for Make to Order sale order costing.
    Srinivas

  • FM/BAPI/Method for Sales Order Costing

    Hi,
    I need the FM/BAPI/Method for Sales Order Costing.
    Which is calculating at run time while process of Sales Order Costing
    Can any one please help me out.
    Thanks
    Chinni
    Edited by: Tirumula Rao Chinni on Mar 10, 2010 3:04 PM
    Edited by: Tirumula Rao Chinni on Mar 10, 2010 3:35 PM

    Vinraaj, thank you very much for your advice and the time you've spent for the ask.
    I am searching for whether there is any SAP offered FM. Therefore, I did not think to check the background (code side) of the process by debugging.
    There is not any documentation about the FM that you have offered, in the system.
    So , I can not be sure about the usage of it, too.
    Thank you very much.

  • Purchasing condition for sales order costing

    I am trying to add a condition to a purchasing document calculation schema that retrieves the sales order cost for a configurable material.  I am using account assignment of M for this purchase order and have tried several settings in a conditin type.  But no cost is ever found.  Has anyone ever tried this?

    Hi Arpit,
    1. Go to t-code SWO1.
    2. Click Settings -> Delegate.
    3. Delegate the BO YBUS2032 to the BO BUS2032.
    In workflow perform the following steps:
    1. Go to t-code SWDD and open your workflow template.
    2. Go to Basic Data (cap sign button at the top of the screen) or click Ctrl + F8
    3. Go to Start Events tab.
    4. In the Object type enter your BO name BUS2032 (not YBUS2032), in Event of object enter the BO event.
    5. Click on 'B' i.e. Binding Defined, click on generate automatic binding. It would automatically generate the appropriate binding for the workflow. You can also alter the binding as per requirement.
    6. Click on 'C' i.e. Start Condition. A dialog would open, select the appropriate start condition for the workflow. Use the attribute that you created and make the start condition. Check the condition before saving (recommended).
    6. Click on 'A' to Activate the binding and start condition. All 'A', 'B' and 'C' would get green.
    7. Save the changes made and activate your workflow.
    Hope this helps!
    Regards,
    Saumya

  • Table for Sales order Cost Est?

    Cost estimate data for sales orders used to be kept in KEKO and KEPH -
    Now that we've upgrade to 5.0 - there are only product cost estimates.
    Anybody know the tables for sales orders?
    thanks

    Dear Althea,
    please check with this tables.
    VBAG                           Sales Document: Release Data by Schedule Line in Sch.Agrmt.
    VBAK                           Sales Document: Header Data                               
    VBAP                           Sales Document: Item Data                                 
    VBBE                           Sales Requirements: Individual Records                    
    VBBS                           Sales Requirement Totals Record                           
    VBDATA                         Update data      
    Regards
    Mangal.

  • Standard reports for Sale Order costing

    Hi all
    Can anybody Please tell sale Order costing reports.
    Thanks
    Sandeep

    for doing mass sales order costing use CK55
    or for individually in VA02 -->Extra --> costing.
    & for report use KKAC.
    rgds
    Arpit.
    Edited by: Arpit Shah on Jan 1, 2008 2:34 PM

  • Please give some inputs for Sales order costing

    please give some inputs for Sales order costing

    Dear Chandu
    If you use the valuated sales order stock, the actual cost of goods manufactured is updated to the sales order item (item in an inquiry, quotation, or sales order) under an inventory change cost element.
    If you use the nonvaluated sales order stock, the actual cost of goods manufactured is updated to the sales document item under a settlement cost element or a source cost element.
    Sales and administration costs are updated under a separate cost element.
    Thanks
    G. Lakshmipathi

  • Net requirement calculation for Sales Order

    Dear Experts,
    I have configured a strategy comprising both( KE,040) and (LSF and 100), say the strategy is Z0.But the system is not doing net requirement calculation for the dependent requirement(always proposing Pr Req though there is stock).Checking group and checking rule, I have created like the standard PP order.Will anybody Pl. guide me regarding this?
    Regards
    Reshmi

    Hi,
    1. The MRP group or the strategy group in the MRP view of the material master record determines what requirements type is used.
    If you have not specified this information, the requirements type will be selected through the item category of the sales order item and the MRP type in the MRP view of the material master record.
    If you have maintained both an MRP group and a strategy group, the system uses the strategy group (precedence to strategy group).
    You can enter the strategy group directly in the MRP view. If you have specified a strategy group, you do not need to enter an MRP group.
    The configured Strategy group need to be copied from a standard Strategy and even if you group many Strategies(Max 7) you ned to check the req Type assigned to it .
    2. The item category is derived from the item category group in the Sales view of the material master record and from the order type of the sales document. Together with the MRP type in the MRP view of the material master record, the item category determines what requirements type is selected. The MRP group in the material master record is irrelevant here.
    The advantage of this method is that the selection of the requirements type depends on the business process (such as quotation, sales order, or repair).
    All the above Points need to checked in your case
    Pavan

  • Varient classes for sales order

    Hi,
    Mat A is a configurable mtl. Assume class C (300 class type) is assigned to the material in material master & in configuration profile.Sales orders are presently created using class C.
    Now I want use another class --D for the same material for creating sales order. I have assigned the class D in material master & configuration profile with the standard class indicator marked as on.
    But system is proposing the Class C only during sales order configuration???
    Can anybody guide me on this???? Can I delete the assignment of the previous class C???
    Regards,
    Manish

    Only the class which is of class type 300 is relevant for variant configuration. other Class type  will not be available fo r you for configuration
    If you want to test this,
    make the characteristics in Class1(300) and Class2(of some other type) mutually exclusive and then, try configuring the material. Only the class of class type c will be available for you to configure.
    Rwd if it helps.

  • How to fetch data for sales order costing

    Hi All,
    How to fetch data for VA03 --> Extras --> Costing having cost element details.
    Thanks
    Gaurav

    Hi Gaurao ,
    There is no such function module  to extract data  in one column   , you have to  Convert all the columns data    in one column
    for period   .
    regards
    Deepak.

  • Sales order costing for Configured Material (Material Variant Not KMAT Mat)

    Hi All
    For a Configured Material (Variant) (Not KMAT Material), which is having Std price costed.
    But if we create a Sales Order for the Configured Material, what options are availale to Execute Sales order costing and take the sales order value to COGS during Delivery.
    The reason being Client wants to Cost BOM items are price which is different from the Price used in Std cost estimate due to Price Volatility.
    I can understand we can do this in KMAT, but not sure how to do in Conifgured material. We can execute sales order costing and get Statistical cost value in EK02/EK01, but how to get this value posted during PGI..?
    Thanks
    Aravind

    Hi Ajay
    Even if i maintain M in Valuation filed, my Material Variant HALB material is already having standard cost in its material master and it is picking the std cost during PGI Delivery and hitting COGS A/c.
    Now how to get my sales order costing to real and post my sales order costing value to GI..this is the client requirement.
    Due some complication KMAT is not used and logistics go with Material Variant

  • Routing data for configurable products (Sales order costing)

    Hi
    I am runnign sales order cost estimate for configurable product. here I want to confirm the activity quantity with cost estimate.
    Pls let me know where can I check the activity quantity information . Pls help
    Thanks
    Sneha

    Hi Sneha
    I am bit confused with the terms you used..
    you cannot confirm activity qty while doing cost estimate... Activity confirmation happens during Production Confirmation
    Are you talking about missing activity qty/cost in sales order cost estimate?? Contact your PP consultant... You should have a routing attached while creating the sales order.. If that is there, then Activity cost would show up in the sales order cost estimate
    Br, Ajay M

  • Costing for sales order BOM vs Production BOM

    Hi gurus,
    can some one please explain in clear how is costing different if we use sales order bom versus if we use production bom.
    Thx

    I Feel Your are asking about Sale order costing and Std cost estimate using production BOM
    IN sale order costing- You can use any BOM ( sale BOM or production BOM), IF you carried out costing in sale order level in Va01/Va02, system will read the BOM, routing for that material  & system will take the costing lot as sale order qty and carried out cost estimate, This cost estimate value will update In condition as EK02. & system will take this Ek02 price for production GR value, PGI value and the profit is calculated based on Ek02 not based on VPRS( std cost estimate)
    Production costing:
    System will take the costing lot size in material master costing view, System will read the BOM and routing for the material in Ck11n, And you need to mark and release in Ck24, this value will update as Std cost  price in material master, this value is atken for Goods movement for that material

  • Sales order cost estimate not happening because of GIT B/S account

    Hi,
    Requirement is to have Goods in Transit account in PGI and reverse it in Invoice no issues iwth it.
    For the same sales order user wants to get cost using sales order cost estimate.
    When i run that am getting following error
    Item 00001 : Cost element 14001212 does not exist in CO area 0010 for 10/07/2011
    Message no. KK689
    Even though i maintain the CE for Balance sheet account with Cost element category 90 its not accpeting.
    Can you please help me on how to proceed for sales order cost estimate.
    Thanks,
    sudha

    hi,
    if you give a balance sheet account in obyc , you will not be able to create a cost elementin category 01 , accordignly system will give error in sales order costing , as its not able to get correct cost element in cost planning.
    if your requirement is just to post  cogs to a balance sheet account which is goods in transit and when invoice is done cogs to be posted.
    you should actually use  revenue based RA functionality on sales order instead of assinging a balance sheet account in obyc.
    in this approach;
    - first assign a p/l account in obyc and create cost element in cateogry 01.
    - create revenue based RA and assign RA key in requirement class.
    - in OKG8 for RA category  WIPR and your ra key assign , goods in transit account and give a offsetting account which is not cost element (credit entry in offsetting account nullify debit in account given in OBYC when GIT is posted , when billing is done system will automatically post a oppsite entry in both account).
    -in OKG8 for RA category COSR give the COGS account and a offsetting account without cost element (credit entry in offsetting account nullify debit in account given in OBYC when COGS is posted).
    regards
    rajesh

  • BOM not picking correctly in Sales Order Costing

    Hi,
    During Sales Order costing of configurable material Say ABC is configurable material(finished material) and it has 4 components. I am using standard sales order costing variant as PPC4. During sales order costing from VA22(quotation) of the material ABC(finished material) system take its first two components during costing. Remaining two components system does not take. It shows correctly BOM usage as 2. But two components are missing during calculation.. What may be reaon or special configuration is required for sales order costing ?
    Best Reagrds,
    Samrat

    Dear,
    please check your condition type : Ek02
    It is used for statistical posting. If you use this condition type, the result of unit costing is simply a statistical value which you can compare with the price. So, this can be can used instead of VPRS to calculate the profit margin for the assembly item.
    Please note the following points:
    1) The condition type must have condition category 'Q' (costing).
    2) The condition type must agree with the condition type defined for unit costing in the pricing procedure.
    So, EK01 & EK02 are the condition type that will display the results of the unit costing for certain type of sales document and can be used in Make To Order scenario.
    Sales order cost estimate can be flow to COPA. Where you have to maintain setting in COPA in Define access to Standard cost estimate for costing key select sales order cost estimate.
    For transfer SD to COPA you have to use Transaction KE4I here enter SD conditions with COPA Value fields.
    So, whether EK01 or EK02, these will determine from Requirement class configuration. Requirement class in turn there is requirement type and requirement type is determined by item category and MRP type when you cost a sales order (valuated/non valuated sales order) at that time when save the cost estimate then the cost value automatically gets populated in your condition tab. Hence, if the item is not relevant to sales order costing then the cost comes from VPRS.
    For more details please check below links
    http://wiki.sdn.sap.com/wiki/display/ERPLO/VPRS%2C+EK01%28ActualCost%29andEK02%28Calculated+Cost%29
    Std Cost Calculation in Sales Order - EK02 and by T-Code CK11N
    Thanks,
    Ram