Debug Command For Sequence Number on ACL
Is their a way to run the dubug command to see what is happening on a specific sequence number within and ACL?
So for example if I have:
Extended IP access list 101
301 permit udp any eq ntp host 10.251.1.1 (12 matches)
310 permit udp host 10.214.1.2 host 10.251.1.3
320 permit tcp 10.0.0.0 0.255.255.255 host 10.251.134.81 eq www (12 matches)
I want to run a debug on sequence number 310 and that is it. So I can see the type of traffic and stuff hitting this speficic sequence number of ACL 106
try changing the acl line to:
310 permit udp host 10.214.1.2 host 10.251.1.3 log
add the global config command 'logging bufferred' and you can view the traffic hitting the logged acl line by using the command:
show log
hth
andy
Similar Messages
-
I am looking for some debug commands for CatOs for my 4006 or 6509 running CatOs.
please!Perhaps you could tell us what the problem is and we can lead you in the right direction. 'debug' as known in IOS isn't really there in CatOS.
-
Debug command for FXO digits on called number
I'd like to be able to debug the digits being passed out an FXO port during an external call.
Does anyone know the best debug command to use?
thanks in advance for the help.Hi friend,
You can use the debug voip ccapi inout, check this link, may be helpful:
http://www.cisco.com/en/US/docs/ios/12_3/debug/command/reference/dbg_v1g.html#wp1106585
Regards,
-adrián. -
Debug commands for load-balancing on ACE
is possible to debug the load-balancing decision which is provided by ACE? For example: when the traffic comes to the VIP address I need to see which serverfarm is used for this traffic and which rserver was choosen for this traffic. Thank you.
no, you there is no debug to see the decision.
You could capture the queues infos and see what it contains but it is quite complicated.
A simple way is to capture a sniffer trace of front-end and backend simultaneously and you will be able to see where the traffic was loadbalanced.
You can also use the capture feature of the ACE module to get this info.
Gilles. -
Sequence number in process order
Hi,
Kindly brief about usage of sequence number, which is in process order with example. Is this can be used for capacity leveling. If so how that can be done.
If one sequence number is assigned to multiple process orders means double entries, then what is the impact during capacity leveling based sequence number.
Is number range is maintained any where in SPRO for sequence number. If so where? Is there any possibility to maintain number range for sequence number if required?
Thanks & Regards,
N. Laxman1.Seq. number in an order
Number that can be assigned to production orders or planned orders at the level of the task list header and is therefore valid for all the operations in an order.
The sequence number is used to sort the orders for the display on the planning table and to
form a dispatching sequence using the sort key.
3. -
Significance Sequence Number in PO delivery confiramtions
significance Sequence Number in PO delivery confiramtions.
I know its the sequence in which vendor confirms his goods to be delivered.
But, I want to know how the number gets generated. If i go to EKES table for 1 perticular PO with delivery confirmations.
I am not able to find the "Sequence number" in series. Number will be jumbled.. its ok...but say number 3 will be missing out of series.
Refer to last column in below table for Sequence number.
CC DDelivery DTimeQuantiReference Created onInb. DelItmHL IteBatch Quantity RedM MPN Materl C Seq. Number
ZH D11.03.2010 1,00 7008557420 14.12.2009 0 0 0,00 1 2
AB D11.03.2010 1,00 7008557420 18.12.2009 0 0 0,00 3 6
ZH D11.03.2010 1,00 7008557420 18.12.2009 0 0 0,00 1 7
ZH D31.03.2010 1,00 7008557420 18.12.2009 0 0 0,00 1 4Hi ,
Could be some of the confirmations have been deleted -
hi all
i created two text items in form one for sequence number and other for non sequence, i want when i add 01 in non sequence item-text so the sequence number does not change and it should remain the same? is it possible plz help me out thanks in advance.
sarah
Edited by: SarahSarahSarah on Aug 30, 2009 12:37 AMhere is the code:
on key-commit trigger
begin
if
:ins1.EDNO is null
then
SELECT sarahseq.NEXTVAL INTO :ins1.serial FROM DUAL;
end if;
:ins1.branch1 := :ins1.branch;
:ins1.class1 := :ins1.class;
:ins1.year1 := :ins1.year;
:ins1.serial1 := :ins1.serial;
:ins1.cno1 := :ins1.cno;
:ins1.edno1 := :ins1.edno;
:global.data := :branch || ' ' || :class || ' ' || :year || ' ' || :serial || ' ' || :cno || ' ' || :edno;
commit_form;
call_form ( 'c:\temp\plate no.fmx', no_hide, no_replace, no_query_only );
END;
sarah -
How to pass the sequence number of current loop in a for loop in FPGA vi to the host
PCI-7830R
LV 8.2
What I was trying to do is to use multiple DIO to generate pulse at different sequence. Mode one is to automatically sweep from DIO1 to DIO20; mode 2 is several DIOs generate pulse simoutaneously. So I use a case structure to make the selection, in the mean time, I set up two for loop in each case so that I can use multiple pulse generations. For example, in scanning mode, if I set 2 exposures, it sweeps from 1 to 20 then do it again.
Then I need to get the loop sequence number, i of each scenario. So I put an indicator within the first loop, and create a local variable of it and put in the second one. Running the FPGA vi alone, I can see the indicator change in each case from 0 to N-1, N being the for loop time.But in the host vi, I tried to add this indicator as an element in the read/write invoke method, in the debugging mode, I could only see it directly jump to N-1 without all the changes I saw in FPGA vi.
Is it possible to get this number passed correctly from FPGA vi to the host vi? ThanksThanks for the reply Jared.
Excuse me if it looks incorrect, but I'm new to FPGA programming, so I would have to look into the FIFO you referred to. I used local variables because for one thing I have several different cases containing for loop in each of them, and I only want one indicator for the "i". If I put the indicator out of any for loop, it's only gonna show the last number which is N-1. For the other thing, it seems like property nodes are not allowed in FPGA vi. And by doing this, I can see the i number changing from 0 to N-1 in each case, well, in FPGA vi's front panel. But while I ran the host vi with everything, the indicator in host vi's front panel only showed the last number N-1. It may be the reason you said, it happened too fast before the indicator in host vi can catch it.
What I want to realize is to group the data I collect in host vi, for example, when I choose multiple exposure in each mode, and the FPGA runs 1 through 20 then do it again, I want the data stored in two groups using the loop sequence number as the seperator in file name. So it goes like 1-1, 2-1.......20-1; then 1-2, 2-2,.....20-2. -
Are there any ways to get sequence number other than getting it for each re
are there any ways to get sequence number other than getting it for each record
CACHE is the number of values Oracle stores in memory. So the first call to NEXTVAL Oracle grabs x numbers; subsequent calls to NEXTVAL are served from memory until they're all gone and them another bunch is grabbed. The attached sql*plus output demonstrates this behaviour.
Note that normally unused numbers in the cache are returned to the data dictionary but in exceptional circumstances (DB crash) they may be lost.
Cheers, APC
SQL> create sequence seq cache 3
2 /
Sequence created.
SQL> select last_number from user_sequences
2 where sequence_name = 'SEQ'
3 /
LAST_NUMBER
1
SQL> select seq.nextval from dual
2 /
NEXTVAL
1
SQL> select last_number from user_sequences
2 where sequence_name = 'SEQ'
3 /
LAST_NUMBER
4
SQL> select seq.nextval from dual
2 /
NEXTVAL
2
SQL> select last_number from user_sequences
2 where sequence_name = 'SEQ'
3 /
LAST_NUMBER
4
SQL> select seq.nextval from dual
2 /
NEXTVAL
3
SQL> select last_number from user_sequences
2 where sequence_name = 'SEQ'
3 /
LAST_NUMBER
4
SQL> select seq.nextval from dual
2 /
NEXTVAL
4
SQL> select last_number from user_sequences
2 where sequence_name = 'SEQ'
3 /
LAST_NUMBER
7
SQL> -
Sequence number for group of values in column
I need to create a sequnece number in a column starting from 5 and incremented by 5, based on values presenet in first column. If the value in first column changes then the sequence should start again with 5 and increment by 5.
for example: I want to generate the following output
Cat_code Seq_No
1001 5
1001 10
1001 15
1001 20
2001 5
2001 10
2001 15
3001 5
3001 10
4001 5
4001 10
4001 15
4001 20
5001 5
6001 5
7001 5
7001 10
7001 15
7001 20
7001 25
So if the cat_code changes, the sequence number should again start from 5 and should be generate sequence number until the cat_code changes again.
any help apreciated.
Thanks
RahulHi, Rahul,
You can use the analytic ROW_NUMEBR function to generate the numbers, like this:
SELECT cat_code
, 5 * ROW_NUMBER () OVER ( PARTITION BY cat_code
ORDER BY NULL
) AS seq_no
FROM table_x
ORDER BY cat_code
, seq_no
;You must use an analytic ORDER BY clause when you call ROW_NUMBER. If you don't really care about the order, then you can ORDER BY a constant, but you still need the analytic ORDER BY clause. -
Hi,
I need to implement a sequence number in the target structure for each time a message mapping is executed.
As far as i can see on this forum and on sap.help.com it can be easily done with RFClookup inside the message mapping, and best implement something on abap-stack.
I need to decide on using either a z-table or a number range and i need to decide whether to use PI abap stack or ECC abap stack.
Any comments are useful.
kr
RobertHi Bhavesh,
I get interesting considerations on my question.
It will be sequentially, almost for sure, because i get this message via flatfile.
Your second consideration is also interesting. Maybe the source can provide, maybe not (i'm not sure)
Even more interesting if it is really necessary at the receiver side. This i actually asked the business, but still waiting for an answer. Meanwhile i just started looking around for the correct solution.
kr
Robert
On second thought. It will be unique if i use number ranges with RFC lookup, because each number can only be used once.
Edited by: R. den Hoedt on Mar 16, 2011 4:37 PM -
Sequence Number By Date Option For File Naming
I would like to see Lightroom have the option to have the sequence numbers be reset when the date changes and increment accordingly. For example, I have the file naming set to use Date (YYYYMMDD) Sequence Number (0001) and the sequence number starting at 1. As Lightroom is now I will end up with 200909010001, 200909010002, 200909020003, 200909020004, 200909030005 200909030006 etc. and what I would like to see is the option for 200909010001, 200909010002, 200909020001, 200909020002, 200909030001 200909030002.
This would make it much faster for renaming or import when using this combination of date and sequence in file names.Hi
For the Transport Protocol "File Transfer Protocol (FTP)" files are always processed in ascending alphabetical order
If you want the file to be processed in sequence then you can use Quality of Service EOIO in the sender adapter.
The files are processed in the sequence they are picked up.
otherwise use BPM for File Sequencing..
Refer the following Threads
FTP Sender Adapter - Processing Sequence
Processing Sequence issue of FTP protocol
Regards
Abhijit
Edited by: Abhijit Bolakhe on Nov 4, 2009 10:32 AM -
Sequence number - increment one for every 3 rows
Dear All,
I want to get a sequence number /group number, which increments 1 for every 3 rows.
For Example:
Seq Name
1 a
1 b
1 c
2 D
2 E
2 F
3 G
3 H
3 I
4 abc
4 aaa
4 bbb
Is there a function to do this?Please post DDL, so that people do not have to guess what the keys, constraints, Declarative Referential Integrity, data types, etc. in your schema are. Learn how to follow ISO-11179 data element naming conventions and formatting rules. Temporal data should
use ISO-8601 formats. Code should be in Standard SQL as much as possible and not local dialect.
This is minimal polite behavior on SQL forums. Did you read the header of this forum?? But besides being rude, you are also ignorant. A table has no ordering, so
there is no concept of every third row. What are you using for a sort key? What happens when a new row is added to or deleted from this table?
--CELKO-- Books in Celko Series for Morgan-Kaufmann Publishing: Analytics and OLAP in SQL / Data and Databases: Concepts in Practice Data / Measurements and Standards in SQL SQL for Smarties / SQL Programming Style / SQL Puzzles and Answers / Thinking
in Sets / Trees and Hierarchies in SQL -
Sequence number for opportunities
Hello,
My customer needs a sequence number for opportunities... So I can create a custom field but is there a way to automatic generate a number to fill it ? or for that matter a sequence ?
Txs.
AntonioAntonio, this functionality is not available at this time. This could be done using a custom web service program.
-
How to execute a same sequence number for the resulting dynamic rows
Hi friends,
I have a sequence and trigger(which will fire id for each and every row insert).
My scenario is, If i update more than 5 rows at a time means, i need to set a same sequence number example(1) for all the 5 rows.
Next time, if i update another 5 rows means, then i need to set a same sequence number (i.e) 2 for the next 5 rows.
So, my updation will be dynamic(may be 2 ,5, 10 rows at a time), But i need to set a same sequence number for one of the column for all the rows that i update.
Next time, if i update another set of rows means, then i need to set only the next sequence number(i.e) 2(assume that previously updated sequence for the before set of rows is 1) for another set of rows.
Like that sequence has to update in a sequential manner for more than one set of rows in that column.
How to achieve it friends.
example
id-----------------name
1-------------------A
1-------------------B
1-------------------C
1-------------------D
1-------------------E
2-------------------D
2-------------------E
2-------------------F
2-------------------G
3-------------------H
3-------------------IBrgds,
MiniHi,
You forgot to mention your version.
If you want a trigger based solution, then in 10g you need two triggers
1. A statement level trigger that takes sequence.nextval into a dummy variable that will not be used.
2. A for each row trigger that uses sequence.currval.
In 11g you should be able to write a single, composite trigger.
If you want a solution with no triggers, it could look something like
SQL> create sequence s start with 10;
Sequence created.
SQL>
SQL> create or replace function s_wrapped
2 return number
3 as
4 v number;
5 begin
6 select s.nextval
7 into v
8 from dual;
9
10 return v;
11 end s_wrapped;
12 /
Function created.
SQL> create table tab1 as (Select level x, cast(null as number) y from dual connect by level <= 5);
Table created.
SQL> update tab1
2 set y = (select s_wrapped from dual)
3 where x <= 3;
3 rows updated.
SQL> commit
2 /
Commit complete.
SQL> select *from tab1
2 /
X Y
1 10
2 10
3 10
4
5
SQL>Regards
Peter
Maybe you are looking for
-
How to deactivate Windows Key on Qosmio X500 while gaming?
Hey, I just bought my first ever laptop and went with the Qosmio X500/02M. Am having a bit of trouble adjusting to the keyboard layout at the moment after years of desktop and normal keyboard use. I seem to have trouble epsecially with the Windows Lo
-
I have an older version of the Mac Laptop - Power Book G4. My version is Mac OS 10.4. I had FireFox and really liked it. Gmail said I needed to update my version of Firefox so I got ambitious and tried to update my version on my old hardware and soft
-
IPhoto 6 not reading old iPhoto library - Old Toad?
Hi folks, been reading the discussions but couldn't see this one answered, hope you can help! I recently updated to OS 10.4.9 (from 10.3.9), taking the opportunity to format my Powerbook and install new versions of my applications. Naturally I backed
-
Changing the color of text while mouse listener.
Hi all. working on an assignment for school and I need a little hint. I am creating an applet to basically input names in txt blocks, and then you hit a button that will move the names to a text area. Well the instructor asked us to use a mouse liste
-
How to draw faster with brush tools in illustrator CS 5
If I draw with brush pen in Illustrator CS 5 the performance become slow, how to overcome this problem?