Delete OR Change Validity of  COST ELEMENT

Hi,
     I want to delete the wrongly created COST ELEMENT but after Excution of same through  Tcode  KA04,again it is apearing and
     even change in validity date is also not reflecting.
     Kindly suggest how to do the same. Thanks in advance.
Regards
AJIT K SINGH

Dear Sai,
               As per ur suggestion it allow me to change but after saving the same it is giving message that no changes were made.
               And when I open it again showing me the old one validity period only.
               Kindly help me out.
Regards
AJIT K SINGH
Edited by: AJIT K SINGH on Nov 27, 2009 10:33 AM

Similar Messages

  • Value BLANK/SPACE not valid for cost element "Fund"

    Hi!
    We use funds management in our solution. It has worked fine in development but when doing the module tests we get the following error when creating a shopping cart:
    Value BLANK/SPACE not valid for cost element "Fund"
    When creating a PR in backend we do not get an error. So it should not be a problem in funds management.
    Everything works fine when using BBPSC01 (central)
    Any ideas?
    Sincerely
    Anders
    Edited by: Anders Öhrling on Sep 29, 2008 11:33 AM

    Ple provide the solution for Problem Resolve.

  • Change date for cost element

    hi
         i created the cost element vaild from 01.04.2008 instent of 01.04.2007 then i saved. now i want change the date i.e valid from 01.04.2007,. i don't want delete the cost element in ka05 then create,
    i want change the validty with out deleting the cost element.

    Please read the post. WIth the suggestion you have given teh system will allow to change the period to a future date and not to the past date.
    In this case the hasc reated a cost element with effective from 2008 where as he wants to change this to 2007.
    system will not allow this.
    "You selected an analysis period extending beyond the period for which the object was defined. This is not allowed in the change or display functions."

  • Change of Allocation Cost element in Activity type during Fiscal year

    Hi,
    An activity type was planned on a cost center in KP26 with a wrong cost element. Then actual activity allocations were posted with this acitivity type. Now I have reversed all actual allocations on this cost center with this activity type and keep trying to delete the plan line item in KP26 to be able to change the cost element.
    Unfortunatelly the deletion is not succesful. I get the Message no. K8098:
    "Costs already posted under cost element 12345. No deletion possible
    Procedure
    First reverse the posted record under cost element 12345."
    I have reversed the allocations. The Balance on the cost center is 0. However the reversal seems not to be sufficient.
    Do you have any idea what needs to be done to be able to delete the plan line item in KP26?
    With best regards,
    Robert

    Robert,
    Follow this note it may be helpful. I guess you need to delete the records from table before doing anything else.
    SAP Note-175522
    Hrusikesh

  • Change value in cost element report

    Dear Experts,
                           Is dere any option to change value in the cost element report ie S_ALR_87013543...If it is possible please let me know......
    By
    AS

    Hi,
    I don't think that Price Change Functionality would be possible in any of the PS reports.
    Regards,
    Harsh.

  • Changing assignment of cost elements to cost components

    Hello,
    I want to assign a cost component to another cost element. Message no. KQ312 Maintenance after deactivating 10 makes cost estimates incomparable appears.
    After the change, isn't it possible to compare the cost estimate anymore at all or just the changed cost components?
    Regards, Jan

    If you change the cost element grouping in your cost component - the standars SAP gives the message that previous cost estimate cost component will not be comparable.. It has got logic because once you do the Actvity price calculation system stores the value as per cost component strcuture in KEPH table . The 40 cost feils in KEPH get dynamically linked as per your cost component.
    So if you want to change it  , you can change it but makesure you run the KSPI again . If you are moving your existing cost element to another group , the previous saves cost component will not display correctly , although all the future cost estimate will show you as per revised strcuture.
    If you not bother about previous cost compoent display then you can change it.
    Regards
    Ranjan

  • Validation rule cost element via Idoc

    Hi all,
    i am sitting on the following Problem:
    we are creating master data via an external tool, called MDM. It is an Access based tool as far as i know.
    These data's are send via Idoc into our SAP R/3 system. It works fine.
    The only issue we have:
    If you create cost elements, you have normally a validation with gives you a warning that e.g. this cost element already exist. Via our Idoc its just overwriting this already existing cost elements, also the history, all data's are nearly lost.
    Do we have to customize special validation rules? Is it because of Idoc? why is the existing validation not be activated via Idoc?
    I hope i have written down enough information, so that somebody can help me. Thanks
    Michael

    Hi Christian,
    I have set a breakpoint in validation rule. The step from Financial Accounting is processed.
    Prerequisite
    BKPF-BUKRS = 'FAI' AND BKPF-BLART = 'WA' AND
    BKPF-AWTYP = 'MKPF' AND BSEG-HKONT IN TESTE_CL
    Check
    BSEG-AUFNR IN TESTE_OP
    The validation rule check only the first item from accounting document. So, all postings on account 1103010008 are blocked.
    Itm   PK   Account           Account short text              Order            Amount                                                                               
    1   99   1103010008     STOCKS OF AUXILIARY                            63,15-
      2   81   5102040001     Maintenance and Repa        101541          63,15 
    I need to check the second item from accouting document.
    Do you have any suggestion to solve my problem?
    Thanks.
    Osmar.

  • Want to change the cost element for a activity type (KP26)

    Hi,
    I want to change the Allocation cost element for an activity type in KP26. I have already changed the cost element in the activity master data in KL02. Now i want to change it in KP26. I am trying to delete the existing line item in KP26  to create the new line item with the new cost element, but system not allowing to delete the existing one. It throws the error message ""Allocations with XXXXXXX/XXXX (Cost center/Activity type)  exist ; deletion not possible". Can someone please help me to change the cost element?
    Regards
    Dev

    Hi Rao and Lalit,
    Thanx for you people for helping me. i havin gone doubt here. If i am deleting the existing line in KP26 and create new line with appropriage cost element will it be cause the existing datas? I don't want to go for another activity type, because our process is a complex process exist all over the world in more than 300 company codes. So i want to use the existing activity type but want to change the allocation cost element alone. Is there any possibility to change the cost element alone?
    Regards,
    Dev

  • Error while creating/changing/desplay cost element

    Gents
    Need urgent help. I am getting a below error while creating/changing/Displaying the cost element.
    Table CI_CSKB is not an active table
    Message no. AD 228
    Kindly help me to get the resolve this issue.
    Thanks and Regards
    Vinay Thakre

    hi
    In Cost Elements (Data is Dependent on Controlling Area), please go to extras and check your controlling area while creating the cost element, and make sure if u r creating Primary CE, it has been created as a G/L account and also make sure you use correct CE Category.
    Thanks
    plz award points if helpful.

  • Cost Element Group - Track Changes?

    Hi - Is there any way of tracking changes made to Cost Element groups? Thx.

    Hello,
    Go to KAH2 and
    Select the cost element group
    Then
    Go to ==> Change documents
    This will give you the list of changes made to the cost element group.
    Regards,
    Ravi

  • Check list for creating a cost element?

    Hi,
    Who can provide a check list for creating a cost element?
    Thank you.
    Kind regards,
    Linda

    Hi,
    Cost Elements are broadly of two categories - Primary and Secondary cost elements.
    In case of primary cost element a GL Account should have been created and in case of secondary cost no corresponding GL account should exist. Secondary Cost Elements are used only in Controlling Module. The transaction codes are:
    KA01 - Create Primary Cost Element.
    KA06 - Create Secondary Cost Element.
    KA02 - Change Cost Element
    KA03 - Display Cost Element
    KA04 - Delete Cost Element
    KA05 - Display Changes
    Once transaction data is posted Cost Element cannot be deleted.
    Another point in Cost Elements is defining the Cost Element category. Cost Element category determines which Cost Element category can be used for which Business Purpose. For example cost element category 1 is used for primary costs and 11 is used for revenues.
    In the default account assignment tab, we can define a cost center / internal order and always the postings for that cost element will be posted to that cost object.
    Thanks
    Murali.

  • Error message at changing Valiadity of cost center

    HI Friends,
    I am getting error messege
    Deletion is not possible (dependent records exist in table COKA)
         Message no. KS 133
    Diagnosis
         To maintain the consistency of existing data, you can only delete data
         if no transaction data exists in the change period. You are not allowed
         to post either plan data or actual data.
         As transaction data already exists in table , you cannot execute the
         deletion in time period.
    while changing Validity of cost center in OKEON
    Please tell me what is resoan for that?
    Regards,
    Chetan.

    Refer OSS notes 621108 & 952912
    Regards
    Sreenivas

  • Changes in Assignmentand costing details

    Hi all,
    Heartly appreciate for any reply on following...
    I need to write a query for a Payroll Audit report which will capture the details of all the changes in assignment, costing, element entries for employee along with the person who changed it, and when changed it.
    I can find the change date based upon last_updated_date/by but how to find how many columns has changed?
    Please reply.. !!
    Thanks
    Edited by: OnlyMadhav on Jul 4, 2011 4:56 PM

    >
    Chidanand Chauhan wrote:
    > Hi Siddu,
    > I have told you to create a ZTable and update that Ztable while saving the Vendor Master . and you can use that Ztable in your report to identify on which date the value was updated.
    >
    > Thanks,
    > Chidanand
    Why create a separate table and a mod to the SAP standard when the existing functionality of change pointers does exactly what is needed?
    Rob

  • Cost element categorey

    The category of a primary cost element was defined as 1, as a result the value from SD module can't be transported to COPA. We should change the category to 11 or 12. However there has been transction data related this cost element. we can't change it for the current fiscal year. could anyone help me?
    Thank you very much in advance.

    Dear Chiristina,
    Since the transaction has already been posted the value cannot be transported. Rather you can create a secondary cost element and then transfer the value. Later you can change the primary cost element category or you can also continue with the value captured through secondary cost element.
    Assign points if this helps you
    Regards
    Kaarthik

  • In KP26 activity types allocation cost element displaying old cost element

    Hi,
    I changed cost element in activity types. But in KP26, activity types picking old cost element only.
    Ex: I changed 9430000002 for Labour activity with old one 9430000001 but in KP26, while planning for Labour activity it is picking 9430000001. so its becoming problem while running CK11N.
    Please suggest.
    Thanks
    Neeraja

    Dear Neeraja,
    While changing the secondary cost element for activity type, hop you got the following warning message.
    So you must check whether the existing data is there or not for that activity type.
    One more important thing.
    The cost element field is a time based filed.
    You can change this field for each fiscal year. For example, you can change the field content for a new fiscal year.
    Regards,
    Pavan Kumar Arvapally

Maybe you are looking for

  • CUCM 10 publisher & subscriber.

    Dears, I have a publisher and subscriber CUCM 10.5 with 2 voice gateway within a single site, instead of subscriber sleeping always i want to make it work also, so i have thought that i will split the 1000 phones on pub and sub  with 2 no's cucm grou

  • Need Help Centering Page Content

    Hi, I have added a white box behind my main page content but the content is not centered within the box. It seems to be on the left. There are a number of different style sheets and I need to find out which style is affecting how the content is posit

  • How to highlight result set data on world map

    Hi, I want to show the graphical representation of world map to highlight the countries which having the maximum booking of hotels of our client xyz. All the values are coming from the mysql db . I want the library which will draw the world map on th

  • Scheduling a background job based on fiscal variant

    Hi All The organisation which i am working for has a 4-4-5 calender. The requirement is to schedule a job( A Z program which fetches data from R/3 table) in background so that it gets executed in 4-4-5 fashion. Thanks in Advance Regards

  • Transfering iPhoto '08 library to new mac iPhoto '11

    I have a new iMac OS Lion with iPhoto '11. I wanted to migrate my huge (67,000 photos) iPhoto '08 library from my older Snow Leopard iMac. I've got them hooked up via ethernet. Since it looked like the newer iPhoto had some different little files ins