Demand Planning: How to create a forecast in ODP

Our client is using Oracle Financials OM etc however it currently uses a separate tool for forecasting. We are planning to start forecasting in Oracle Demand Planning.
Following is the simplified calculation for forecasting, how can this be done in ODP:
Calculation is done for item type, 2 calculations are done for every month (X and Y changes every month):
JAN:
1. A= X% of Jan sales
2. B= Y% of last year sales
The forecast should pick greatest number among A and B (it should not pick A+B).
Is this possible in ODP, how to setup the forecast and its calculations.
Thanks in advance.

You could do this in ODP using the absolute value function and some formula measures.
I assume you are familiar with formula measures in ODP and hence I will focus only on the math behind the formula measures. I am ignoring the percentage aspect that can be easily achieved using formula measure capabilities.
The result set that you want is the following:
if X > Y return X else Y
Formula measure 1 = FM1 = X + Y
Formula measure 2 = FM2 = = |X - Y| (absolute value)
Formula measure 3 = (FM1 + FM2) / 2
How does this work?
|X - Y|
returns Y - X if Y > X
returns X - Y if X > Y
if X > Y then the result is
(X + Y + X - Y)/2 = X
if X < Y, then the result is
(X + Y + Y - X)/2 = Y
This will give you the results you want.
Note: the formula measures apply at all levels of the hierarchy and is not the aggregation from the lowest levels.
Please be careful and validate this solution against your total set of requirements.

Similar Messages

  • How to create SAP Extractor based ODP on Hana?

    Hi SAP Gurus,
    I am a HANA begginer and trying to create an SAP extractor based ODP.
    Till now i have created a source system under "ODP - SAP (Extractors)" node of source system screen. I didn't enter any source system and type because there was no choice in the help list.
    Connection test and authorization test through sm59 are working with no problem.
    In the source system i activated  datasource 0FI_GL_4 and made sure that's working through rsa3 . I can retrieve more than 1000 line of data. So everything seems alright but when i try to replicate data source in HANA system i got this error;
    "Destination DTYIDS_IDS_00: ping waiting time (5 seconds) exceeded
    Message no. RSDS571"
    Some information on this issue and latter steps in order to create an ODP will be greatly appreciated.
    Best regards,
    Yağız

    I got the solution.
    CREATE OR REPLACE FUNCTION conv_str_to_date(c VARCHAR2) RETURN DATE
    deterministic AS
    BEGIN
    RETURN(TO_DATE(c,'MM/DD/YY'));
    END;
    CREATE INDEX my_date_index ON XML_TEST
    et (conv_str_to_date (et.xml_msg.extract('//DDate/text()').getStringVal()));

  • Importance and how to create GB02

    i need the inportance of GB02 in PCA where for Actual and for also Planning how to create differently for actual and plan and assign     and also the document types how to assign them

    Hi,
    To post the documents in profit center accounting you need to maintain this.
    Procedure:
    Menubar--->group---->Maintain
    Group---->Insert--Enter the company code
    Enter the text,from year and number from and to etc
    Select the check box Act. document from direct posting with GB01---select interval (from menu bar and maintain and enter your company code.
    Repeat the above process for planned docs also.
    Thanks
    Aravind

  • How to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM

    Hello Guru's,
    Request for information on smart documentation on the integration between Trade Promotion Management and SCM-Demand Planning from an architecture perspective how to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM and from TPM promotions values can be considered in to APO demand planning: can anybody give me some insight on it.
    Thanks in advance.
    Kumar

    Hi Praveen
    There are several ways you can connect a DP system to a TPM. How are your interfaces and systems setup?
    Option1:
    Extract the baseline from APO to a BW cube, extract the data out of BW, may be using infospokes/open hub and pass it on to TPM.
    2. Have a custom program written in APO-DP to extract the selected keyfigure data at the aggregation level into an interface or a .txt file into APO directory and use some data transfer service such as EDI to take this data and send to TPM.
    In my experience it is simple to define an integration process. The much larger and complicated aspects are the date adjustments and the aggregation levels.
    Date adjustments:
    Understand the basis of the data in APO and TPM. APO is usually at the requested delivery date or material availability date ( when the customer like a store wants the product). However TPMs are usually at the consumption date ( when an end customer like you and me but from store shelf). Depending on the product and business style this can mean several days difference. Let's say it is 25 days on average, you need to add 25 days to APO base line date to get the TPM consumption date.
    Aggregation level:
    This can be product or customer. If the planning in DP is at product sku level and the TPM is at packs or brand level, you need to aggregate the data up before loading to TPM. The same with customer.
    To me the most complex part of the integration is to understand and transform the data in a meaningful way and a strategy to sustain this integration by keeping both DP and TPM in sync in terms of master data. Also important to have a process for identifying exceptions and failures. you send baseline from DP to TPM and if it fails, how do you know? how do you trouble shoot?
    Hope these help.

  • How to create a macro for a planning type in MC8b transaction

    Hi,
    I am presently working for a product allocation demand, which have a information structiure with characteristic and key field.
    the characteristic are production allocation quantity, incoming order quantity, and open order quantity.
    i have created a planning type in which the data updation takes from the excel file to the planning type in mc95.
    but i need to create a macro for this planning type .
    can any body give the details information how to create a Macro for a planning type.
    Thanks and regards
    GopalKrishna

    Dear Gopal
    May be the link would be helpful to you.
    [Planning Types and Macros|http://help.sap.com/saphelp_46c/helpdata/en/a5/631cc443a211d189410000e829fbbd/frameset.htm]
    Drill down the left tab once you opened the link, for more information.
    Thanks
    G. Lakshmipathi

  • How to create a Worklist in BPS for Forecasting?

    Hi
    In BPS, we are Forecasting for several company Codes. I
    would like to cretae a Worklist in BPS so that Users can
    choose a company Code for planning.  I am not sure how
    to create this.
    Can some please suggest a method.  I think it has to to do
    with using a "PX" variable, bt not sure how to do that.
    Thanks in Advance.
    Lee

    I don't really recognise the terms you are using, but it sounds like you need to use a user-specific variable on characteristic 0COMP_CODE. 
    In BPSO on the planning area, variables Tab, create  a new variable, (e.g. ZCOMPANY), variable type characteristic value.
    Add the characteristic 0COMP_CODE,  replacement type User-defiined values. Check 'Restriction of Values required by User'.
    Then enter the user ids together with relevant company code(s) for each user.
    The planning layouts should be restricted by this variable (either in the level/package restrictions or layout definition).
    In the planning folder, this variable must be added.  On opening the folder, the user should select the required company code from the authorised list available.
    Stephen

  • How to use user exit macros in demand planning?

    Hi all,
    I am have created an user exit macros? but then can anyone guide me how to use the abp code there in the User exit macros in demand planning.
    Thanks
    Pooja

    Hi Pooja,
    The ABAP code can be written inside the functional module assigned to user exit macro.
    Start Transaction SMOD.Enter APODM005 in the 'Enhancement' field. Select 'Display'.
    Then choose 'Components' or Shift+F11 and double-click the name of the function module.
    Double-click the include contained in the function module to enter the source code.
    For step by step details you can refer to SAP note 418801.
    Let me know if it helps.
    Regards
    Gaurav

  • Handling Planned order created from Demand planning and Sales order in MTO

    Hi all
    In MTO\ Repetitive we genrate Dependent requirement from demand planning (PIR) after running MRP which finally planned order created but on the other hand in short term we have Sales order which generate planned order after running MRP(In MTO), How we should handle planned order generated from Demand planning and the ones generated from sales order.(both after MRP Running).
    Regards
    Babak Bolourchi

    Dear,
    You can combine the planning strategy also main as 56 and second as 65 and in demand managment MD61 you have the option select requirement type.
    Then while creating sales order use MTO strategy and take MRP run through MD50 and then MD02.
    and if you want to assign the stock to sales order then you and do it through MB1b with 412 E movement type.
    As per my knowledge, generally 56 strategy only takes Sales Order Stock into consideration.
    Consider setting the Individual/Collective indicator to 2.
    Mark those characteristics that should have a usage probability in demand management as Relevant for planning.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • How to create a Demand in RPA from Service Request?

    Hi All,
    Could you please explain me how to create Demands to be shown in RPA when Service Request's status is set to Released.
    I have done the below mentioned configurations so far.
    Marked the "Resource Planning Relevance" in zitem category (copy of SRQI), created a Status profile with Released status with System status "RELE" and assigned this profile to ztransaction type (copy of SRVR).
    Generally, Service Orders are referred as Demands and the released service orders are shown in RPA to assign to the most suitable and available service engineer.  But our requirement is to create demands from Service Requests instead of Service Orders. 
    Please explain me how to proceed for this scenario.  What are the settings do I have to perform in CRM system? 
    Kindly help me with your inputs.
    Regards,
    Maddy

    Hi Anais Jaussaud,
    Thank you very much for your reply. 
    My issue now is, after setting the status to Released in Service Request and saved, I checked for the demands in Resource Planning but the released Service Request is not displayed in Demands. 
    I had performed the settings mentioned above in my first post.
    Please help me with what is missing..
    Regards,
    Maddy

  • How to create planning area?

    Hi Gurus,
    What is transaction to look for existing planning area?
    How to create planning (new version) in Demand Planning?
    How to copy a existing version (000) to a new version (010)?
    Thanks
    Gowda

    Hi Gowda,
    Check the following Tcodes
    /SAPAPO/MSDP_ADMIN
    /SAPAPO/VERCREATE
    /SAPAPO/MVM
    and follow the steps as in best practises http://help.sap.com/bp_scmv250/BBLibrary/HTML/DPL_EN_DE.htm for more details.
    Hope this helps

  • Customer Forecast Management vs. Collaborative Demand  Planning

    Hello,
    Currently my client is trying to replace 40-50 raw excel format forecast which they receive from multiple customers with SAP APO.
    They use a consolidated format and upload it into another 3rd party tool currently.
    My question is which best suits the purpose in short term as they are very limited on resources. I would also like to know the difference between using Customer forecast management vs. Collaborative demand planning in this context.
    Thank you all,
    Sai.

    You can use the GATP functionality known as Product Allocation for this scenario. This will basically mean that you need to maintain product allocations against each customer in your GATP planning book and every time you create a sales order in R/3, the quantity will be checked against the allocated quantity in APO GATP. If the quantity exceeds the allocated quantity for that given month, then sales order cannot be confirmed.
    You will need to explore this funcionality in APO GATP and this should help your requirement.
    Cheers,
    Srinidhi

  • Spare parts Demand Planning and Forecasting SCM

    Hi ,
    I am APO DP consultant can any body help me on questions on AS-IS and To-Be analysis Of Spare Parts Demand Planning and forecasting in SAP SCM.
    If You have any Documents or links or nay information on these please give replay.
    Ram

    Dear Ram..
    SPP is purely base on BOD (Bill of Distribution)..
    following are the points u can cover in AS is TOBE..
    1. On what Level (Chs) the Client performing Spare Parts Planning?nd how u want to disagreegate on lowest level ie.Hierarchy Level?
    Ex. from Region..to Branch..to ..Customer..
    2. Have u configured Spare Parts in R/3?
    3. What is the Pattern of Sales History?Seasonal/Trend/Constant  etc?
    4. u can ask questions on Deployment...Inventory?
    5. What is the Lead Time for Procurement?Distribution?Transportation?
    for more details...
    http://help.sap.com/saphelp_scm50/helpdata/en/a3/7ed240caeb752ae10000000a155106/frameset.htm
    Rajesh Patil
    SPINNOVATION

  • How to create a demand??

    Hi,
    I am new to MRS,I would like to know how to create demand in mrs?how te resources are allocated?
    Regards,
    Mehar.

    Hi Anais Jaussaud,
    Thank you very much for your reply. 
    My issue now is, after setting the status to Released in Service Request and saved, I checked for the demands in Resource Planning but the released Service Request is not displayed in Demands. 
    I had performed the settings mentioned above in my first post.
    Please help me with what is missing..
    Regards,
    Maddy

  • How to manage slow and fast moving goods in Demand Planning

    Hi All,
    Kindly let me know how to manage slow and fast moving goods in Demand Planning.
    1. First how to detect slow and fast moving goods
    2. which DP model to use
    3. Any Best practice while dealing with slow and fast moving goods
    Thanks
    Arun

    Arun,
    There are two main concerns with forecasting slow moving goods. For fast moving, yes, trend, level and seasonality combined with a decent demand level gets you through.
    So, either you don't have demand in the market for that product; if the product is not critical (like go/no go spare parts) I recommend just averaging out the demand over a period and going with that. Any errors incurred there won't have a significant business impact. On the other hand if it is critical, safety stock and/or contractual obligations come to play.
    OR, if there is market demand but your market share is too low for whatever reason, then it gets tricky because you need a predictor variable(s) for which you have good knowledge off (such as CPI index, demand for related products, etc). The forecast is then done on the predictor variable(s) and the low market share applied to 'translate' the expected demand to the product in question. Unfortunately, the case of low demand/low market share I have no idea of how to implement it on SAP. Since forecasting is just the tip of the iceberg, it may pay to do it outside of SAP (say in Excel) and manually input it (unless the products are many and varied).
    Hope this helps. Please let me know if this makes sense and/or applies to your question.
    Rodrigo

  • How to create z-report ( actual , planned , variance -production qty)

    Hi dear experts,
    My client need a report where we can see production order qty, actual production qty, dependent matl planned qty and dependent matl actual consummed qty, and difference between actual and planned quantities in one single screen?
    For this , sap have any std reports or else we have to create any z-report?
    In case of z-report plz explain me how to create it.
    please guide us.
    Regards,
    Imran

    Hi,
    you can check below standard PP reports transaction code:
    COOIS - Production Order Info system
    MCPM Production order anal.: Quantities
    MCPD Production order analysis: Dates
    MCPU Production Order Analysis: Lead Time
    MCP0 Shop Floor Information System
    MCP1 SFIS: Operation Analysis Selection
    MCP3 SFIS: Material Analysis Selection
    If you want to get Z development report, first you can go throgh your business requirement and what will client expect in your Z report, then you can check the production order header & component tables & its relevant fields.
    You can prepare for functional specification for Z report development and will send it to ABAPer's.
    Let me know any further clarifications.
    Regards,
    Mohan.R

Maybe you are looking for

  • Error while adding landed cost G/L account 5207010003      needs DR assignment for dimension 1;  fill in DR-related fields

    Error while adding landed cost G/L account 5207010003      needs DR assignment for dimension 1;  fill in DR-related fields

  • How to start wmii-hg?

    Hello-- I'm  a new Arch user. I was able to install Arch and get wmii up and running. I wanted to configure wmii such that the tag/status bar was at the top of the screen. On this forum (the wmii thread), I found the suggestion to run wmiir xwrite /c

  • Developer Mode Error

    Hi everyone, I'm trying to find out what I did wrong closing the connection after calling a Stored Proc, the stored works fine and it made the update and others intructions, the problem comes when I whant to reload some VO's before they data was upda

  • Insert images in CS3

    Hi, I love the feature in Dreamweaver 8 that automatically completes the image width and height in Code View. I've found that it saves a lot of time because I don't have to go find the images folder, look up the image, then type the dimensions myself

  • HT204408 iMessage will not let me log in.

    As of May 2014, I have not been able to log onto my iMessage account to talk to other iMessage accounts. I know my password so that is not it. My wifi router just got updated my it is a WPA2 now. So I have no idea why iMessage refuses to let me logon