Diferrence between throws ,throw and throwable

i need basic difference between throw ,throws and throwable in java with examples where these things can be implemented
thanx a lot in advance for ur answers

Hi,
throw - It is used to throw an Exception.The throw statement requires a single argument : a throwable
class object
throws - This is used to specifies that the method can throw exception
Throwable - you can throw only objects that derive from the Throwable class
Refer http://java.sun.com/docs/books/tutorial/essential/exceptions/throw.html for details
Ex.
public ExceptionClass( String name )
    throws NullPointerException //NullPoinerException extends throwable class
       if ( name == null )
     throw new NullPointerException( );
    }-Amol

Similar Messages

  • Reg : diferrence between SeeBeyond middleware and SAP PI

    Hi Guys,
    Can any one please let me know the diferrence between SeeBeyond middleware and SAP PI.
    Thanks,
    Madhu

    Hi chirag,
    Thanks for the reply. i gone through the link.but those are very specific about their own technologies.
    But, i need the diferrences for SAP PI over SeeBeyond middleware.
    i mean, what is PI Great over SeeBeyond and or what can PI Do which SeeBeyond cant do.
    It will be great if you can list out some points over my requirement..
    Thanks,.
    Madhu

  • Receivables: Diferrence between "transaction number" and "document number"

    Hi!
    What is the difference between "transaction number" and "document number" as shown in the transactions window?
    Where are they used?
    thanks!

    Transaction number is the Invoice number. It can be a manually entered number in case of manual invoices. Even in case of imported invoices, it can be a manually assigned number if the trx_number field is populated in the ra_interface_lines_all table. If you Invoice batch source setup indicates automatic transaction numbering, the transaction (invoice) number will be automatically generated sequentially. The starting number is mentioned in the Trx batch source.
    The document number is a number which is generated by Document sequencing. To have the document number generated, you have to do few Doc sequencing setups like setting the 'Sequencial Numbering' profile options, creating document sequences and assigning the sequence to the Categories. The trx types are created as categories.
    The Transaction number can be the same as the document number if you enable the option 'Copy Document number to Transaction number' in the Invoice batch source.
    Hope that helps.
    Thanks,
    Anil

  • Besides throwing exceptions and the "return;" statement

    Besides throwing exceptions and the "*return*" statement, what else clauses could complete a code block abruptly?
    Originally I thought System.exit() should be one of that kind, and I was totally puzzled by the fact that finally clause dose not work with System.exit(). But after a few thoughts, it becomes clear to me that System.exit() dose not even complete a code block, let alone completing a code block abruptly. So is there other logic that could make a code block complete abruptly?
    My question originates from paragraphs in <Thinking in JAVA>, which claim that, I quote,
    "Unfortuantely, there's a flaw in Java's exception implementation. Although exceptions are an indication of a crisis in your program and should never be ignored, it's possible for an exception to simply be lost. This happens with a particular configuration using a finally clause"..."This is a rather serious pitfall, since it means that an exception can be completely lost, and in a far more subtle and difficult -to-detect fashion..."..."Perhaps a future version of Java will repair this problem"...
    After check with JLS, it seams that it is legitimate to ignore the reason for the abrupt completion of the try block, if the corresponding finally block completes abruptly. I think whether this is a "pitfall, flaw" or not depends on how deeply we language users understand the purpose of the finally clause and it is better for me to know all the possible reasons for a code block to complete abruptly.
    So, besides throwing exceptions and the "*return*" statement, what else clauses could complete a code block abruptly?

    warnerja wrote:
    Case 1: Normal flow (no exception is about to be bubbled to the caller before getting to the finally block) - I'd say we want an exception back due to the failure to close the stream.
    Case 2: The finally block was entered through an exception about to be bubbled to the caller - the caller can only get one or the other exception back, either the original exception or the one indicating the failure to close the stream. The finally block has no access to the pending exception however and is unaware of whether there is an exception pending or not. All it knows is an exception occurred during the execution of the finally block, and should throw that or wrap it in another exception - same handling as in Case 1.
    try {
      write();
      flush();
    finally {
      try {
        close();
      catch (...) {
        log();
    }The flush() at the end of try seems kind of redundant, since close() calls flush() anyway. The benefit is that the try statement completion matches the try block ("real work") completion.
    If we get to the end of the try block with no exception, then write() and flush() have succeeded and the data is where it needs to be. All that's left is to release the I/O resource, which will always be done in finally.
    If there's an exception in the try block, it is propagated out, so we know of any failure that occurred doing the "real work." The I/O resource is still released in finally.
    Regardless of how the try block completed, releasing the resource does not affect how the try statement completes, and hence does not supersede how our "real work" completes, which is all we care about. We still log any close() errors for later investigation. What matters to our program is whether all the data was written, and the completion of write() and flush() tells us that.

  • Diferrence Between RRM and Clean Air

    Hello Everyone.
    I want to say thank you for read my post.
    Well I'm having some problems here, because I don't get the correct Idea for RRM & Clear Air. For me they do the same.
    Can anyone explain me the differente?
    Thank you.

    Hi Ordonez,
    CleanAir:
    With Cisco CleanAir technology, if an interference source
    is strong enough to completely jam a Wi-Fi channel, the
    system will change channels within seconds to avoid the
    interference, resuming client activity on another channel
    outside of the affected area. The system remembers
    intermittent interference from persistent sources such
    as a microwave ovens, wireless bridges, or wireless
    video cameras. Through tight integration with Cisco radio
    resource management technology, the CleanAir solution
    indicates the channels where these devices operate so
    that system administrators can optimize performance and
    minimize future disruption.
    Others claim to have integrated spectrum intelligence
    but can’t effectively distinguish between Wi-Fi and non-
    Wi-Fi interference. Spectrum intelligence products from
    other manufacturers typically falsely interpret any network
    noise as interference and randomly switch channels,
    which jeopardizes network stability and may reduce
    overall network performance.
    Source:  http://www.cisco.com/c/dam/en/us/solutions/collateral/enterprise-networks/cleanair-technology/aag_c22-594304.pdf
    RRM:
    The RF Group Name is an ASCII string configured per wireless LAN controller (WLC). The grouping algorithm elects the RF Group leader that, in turn, calculates the Transmit Power Control (TPC) and Dynamic Channel Assignment (DCA) for the entire RF Group. The exception is Coverage Hole algorithm (CHA), which is run per WLC. Because RF Grouping is dynamic, and the algorithm runs at 600-second intervals by default, there might be an instance where new neighbors are heard (or existing neighbors are no longer heard). This causes a change in the RF Group that could result in the election of a new Leader (for one or multiple logical RF Groups). At this instance, the Tx Power Threshold of the new group leader is used in the TPC algorithm. If the value of this threshold is inconsistent across multiple controllers that share the same RF Group Name, this can result in discrepancies in resultant Tx power levels when the TPC is run
    Source: http://www.cisco.com/c/en/us/support/docs/wireless-mobility/wireless-lan-wlan/71113-rrm-new.html
    RRM and CleanAir perform approximatley the same.
    Only difference being in CleanAir they have implemented spectrum level intelligence which can differentiate between different wireless interfering devices for ex: microwave oven , cordless phone. With this if youre using NCS you can easily plot and mitigate the source of interfernce with exact device type.

  • Connection between SDM client and server is broken

    Dear All,
    First of all this is what I have
    -NW04 SPS 17
    -NWDS Version: 7.0.09 Build id: 200608262203
    -using VPN connection
    -telnet on port 57018 is succesfull
    I can login to SDM server (from NWDS and from SDM GUI) I can see the state of SDM(green light), restart it, can navigate through tabs in GUI, but every time I am trying to deploy an ear i have this error:
    Deployment exception : Filetransfer failed: Error received from server: Connection between SDM client and server is broken
    Inner exception was :
    Filetransfer failed: Error received from server: Connection between SDM client and server is broken
    I have already read a lot of topics,blogs,notes but didn't find the solution.
    Can anybody help me?
    Best Regards

    Having same issue. Nothing helped so far... Using NWDS 7.0 SP18.
    I have turned SDM tracing on and this is what I see on client side after sending first data package:
    com.sap.sdm.is.cs.cmd.client.impl.CmdClientImpl: debug "20120224140253 0280/17 Client: finished sending string part"
    com.sap.sdm.is.cs.cmd.client.impl.CmdClientImpl: debug "20120224140253 0280/0 Client: receive String part from Server"
    com.sap.sdm.is.cs.cmd.client.impl.CmdClientImpl.receiveFromServer(NetComm ..): Entering method
    com.sap.bc.cts.tp.net.NetComm.receive(): Entering method
    com.sap.bc.cts.tp.net.NetComm: debug "Method "receive(char[])" could not read all requested bytes. There are still 12 bytes to read"
    com.sap.bc.cts.tp.net.NetComm: debug "Caught IOException during read of header bytes (-1,          43):Connection reset"
    com.sap.bc.cts.tp.net.NetComm: debug "  throwing IOException(net.id_000001)"
    com.sap.bc.cts.tp.net.NetComm.receive(): Exiting method
    com.sap.sdm.is.cs.cmd.client.impl.CmdClientImpl: Exiting method
    com.sap.sdm.is.cs.cmd.client.impl.CmdClientImpl: debug "20120224140253 0281/1 Client: connection was broken"
    com.sap.sdm.is.cs.cmd.client.impl.CmdClientImpl: Exiting method
    com.sap.sdm.is.cs.cmd.client.impl.CmdClientImpl: debug "20120224140253 0281/0 Client: finshed sendAndReceive"
    com.sap.sdm.is.cs.cmd.client.impl.CmdClientImpl: Exiting method
    My connection on server is still active so I have to restart SDM server to reset and try it again.
    Anyone have idea whats happening?
    Edited by: skyrma on Feb 24, 2012 2:46 PM
    Edited by: skyrma on Feb 24, 2012 2:47 PM
    Edited by: skyrma on Feb 24, 2012 2:47 PM

  • Difference between conn.close() and conn=null;

    Hi All,
    Can anybody please let me know the difference between conn.close()
    and conn=null;
    where conn is reference to Connection.
    Thanks and Regards
    -sunjavadeveloper

    Thanks for your response.
    Is there any other good approach to close() & then
    null the Obj. can u give us your opinion.
              finally
                try{
                         if(dbconn != null)     dbconn.close();
                         if(stmt != null) stmt.close();
                         if(rs != null) rs.close();
                         if(con != null) con.close();
                catch (Exception e)
                       logger.fatal(e.getMessage(),e);
    throw new Exception ("Exception -- Vendor.java --
    a -- authenticate -- " + e.getMessage() );
                   dbconn = null;
                   rs = null;
                   stmt=null;
                   con = null;
    Putting the close() calls in finally block is good, but having them in individual try/catch blocks is better. That way you can still try to close the connection if closing the statement throws an exception.
    I don't bother setting them to null. GC is smart enough to know that they've gone out of scope. I don't think it helps.
    %

  • Difference between Free goods and BOM (ERLA)

    Hi,
    Could any body throw some light on the Difference between Free goods and BOM(ERLA) to clarify my weired thought.
    AS of what i know is Free goods is 1:1 ratio.
    The main item will be prices and sub item will be free .
    Than same thing is also With BOM (ERLA)
    Regards,
    Venksys

    Hi Venksys
    Please note as given below :
    Free Goods : This function allows you to offer your customers a product free of charge in the form of free goods when a certain quantity of products is ordered. Free goods is a kind of quantity discount, and is granted in the form of a goods delivery that is free of charge when a certain quantity is purchased. There are Two types of free goods :
    1.Inclusive : The customer only pays for part of the goods ordered. The rest of the products are provided at no extra cost. For example, a customer orders  for 3 bottels but pays for 2 bottels  and 1 is supplied free .
    2.Exclusive - The customer pays for the goods ordered, and also receives additional products for free. The materials delivered as free goods will not be the same as that of ordered onces. For examples customer orders 5 bottels , but will receive 1 Bottle opener free.
    BOM : It consists  of 2 or more items combined and sold as an package : Example : Combination of 1 Tooth paste  + 1 tooth brush  packed as BOM.
    The Higher level Material ( BOM) is  not relevant for pricing but relevant for picking : The tooth paste and brush is relevant for pricing  and also can be sold independently : The Item cat group of the Header BOM material will be ERLA  and for Tooth paste and brush material the Item category group will have TAN.
    For more details , please refer to the  link below:
    http://www.sap-img.com/sap-sd/what-is-bom-referring-to-sap-sd.htm
    Thanks and regards
    Veera
    Edited by: veera PV on Jan 24, 2011 9:06 AM

  • No connection between EIS Server and EIS Console

    Hi AllWhile saving a meta model I get this error message:"There is currently no connection between the console and intgeration server. Ensure the server is running and try reconnecting"I have checked properly that EIS server is installed and also running, but don't know why throwing this errors...I am unable to save the metamodel....any suggestions ?Thanks in advance !

    Any Help on this please!!!

  • Phase 2 tunnel is not going up between PIX 525 and Watchguard

    Hi Folks,
    Can you please help me in knowing where is the problem liying, currently I am trying to establish a VPN tunnel between PIX firewall and Watchguard , all the parameters of both devices are the same though Phase two tunnel is not coming up.
    here is the debug :
    crypto_isakmp_process_block:src:212.37.17.43, dest:212.118.128.233 spt:500 dpt:500
    OAK_MM exchange
    ISAKMP (0): processing KE payload. message ID = 0
    ISAKMP (0): processing NONCE payload. message ID = 0
    ISAKMP (0:0): Detected NAT-D payload
    ISAKMP (0:0): NAT does not match MINE hash
    hash received: b3 8f bb 0 93 3b 65 e8 35 6f 54 6 c4 6f 59 cc
    my nat hash : dd 70 9 ac 35 58 40 da 3b 5b fc 1b 4c 87 d2 11
    ISAKMP (0:0): Detected NAT-D payload
    ISAKMP (0:0): NAT does not match HIS hash
    hash received: ba 72 c5 e 5b fb 88 f0 1e f7 8a ba c9 c6 c1 cc
    his nat hash : c 4c 89 a5 66 c1 dd 80 76 48 3f a5 b0 f0 56 ed
    ISAKMP (0:0): constructed HIS NAT-D
    ISAKMP (0:0): constructed MINE NAT-D
    return status is IKMP_NO_ERROR
    crypto_isakmp_process_block:src:212.37.17.43, dest:212.118.128.233 spt:4500 dpt:4500
    OAK_MM exchange
    ISAKMP (0): processing ID payload. message ID = 0
    ISAKMP (0): processing HASH payload. message ID = 0
    ISAKMP (0): SA has been authenticated
    ISAKMP: Created a peer struct for 212.37.17.43, peer port 37905
    ISAKMP: Locking UDP_ENC struct 0x3cbb634 from crypto_ikmp_udp_enc_ike_init, count 1
    ISAKMP (0): ID payload
    next-payload : 8
    type : 2
    protocol : 17
    port : 0
    length : 23
    ISAKMP (0): Total payload length: 27
    return status is IKMP_NO_ERROR
    ISAKMP (0): sending INITIAL_CONTACT notify
    ISAKMP (0): sending NOTIFY message 24578 protocol 1
    VPN Peer: ISAKMP: Added new peer: ip:212.37.17.43/4500 Total VPN Peers:16
    VPN Peer: ISAKMP: Peer ip:212.37.17.43/4500 Ref cnt incremented to:1 Total VPN Peers:16
    crypto_isakmp_process_block:src:212.37.17.43, dest:212.118.128.233 spt:4500 dpt:4500
    ISAKMP (0): processing NOTIFY payload 24578 protocol 1
    spi 0, message ID = 3168983470
    ISAKMP (0): processing notify INITIAL_CONTACT
    return status is IKMP_NO_ERR_NO_TRANS
    crypto_isakmp_process_block:src:212.37.17.43, dest:212.118.128.233 spt:4500 dpt:4500
    OAK_QM exchange
    oakley_process_quick_mode:
    OAK_QM_IDLE
    ISAKMP (0): processing SA payload. message ID = 484086886
    ISAKMP : Checking IPSec proposal 1
    ISAKMP: transform 1, ESP_3DES
    ISAKMP: attributes in transform:
    ISAKMP: SA life type in seconds
    ISAKMP: SA life duration (basic) of 28800
    ISAKMP: SA life type in kilobytes
    ISAKMP: SA life duration (basic) of 32000
    ISAKMP: encaps is 61433
    ISAKMP: authenticator is HMAC-MD5
    ISAKMP (0): atts not acceptable. Next payload is 0
    ISAKMP (0): SA not acceptable!
    ISAKMP (0): sending NOTIFY message 14 protocol 0
    return status is IKMP_ERR_NO_RETRANS
    crypto_isakmp_process_block:src:212.37.17.43, dest:212.118.128.233 spt:4500 dpt:4500
    ISAKMP: phase 2 packet is a duplicate of a previous packet
    ISAKMP: resending last response
    ISAKMP (0:0): sending NAT-T vendor ID - rev 2 & 3
    crypto_isakmp_process_block:src:212.37.17.43, dest:212.118.128.233 spt:4500 dpt:4500
    ISAKMP: phase 2 packet is a duplicate of a previous packet
    ISAKMP: resending last response
    crypto_isakmp_process_block:src:213.210.211.82, dest:212.118.128.233 spt:500 dpt:500
    ISAKMP (0): processing NOTIFY payload 36136 protocol 1
    spi 0, message ID = 287560609
    ISAMKP (0): received DPD_R_U_THERE from peer 213.210.211.82
    ISAKMP (0): sending NOTIFY message 36137 protocol 1
    return status is IKMP_NO_ERR_NO_TRANSdebug
    ISAKMP (0): retransmitting phase 1 (0)...
    Thanks,
    Ismail

    Hi Kanishka,
    The Phase 2 Parameters are the same also PFS is disabled !
    There are some curious things in the debug msg, could you please throw some light on them
    ISAKMP (0): Checking ISAKMP transform 1 against priority 1 policy
    ISAKMP: encryption 3DES-CBC
    ISAKMP: hash MD5
    ISAKMP: auth pre-share
    ISAKMP: life type in seconds
    ISAKMP: life duration (VPI) of 0x0 0x1 0x51 0x80
    ISAKMP: default group 1
    ISAKMP (0): atts are acceptable. Next payload is 0
    ISAKMP (0): processing vendor id payload
    ISAKMP (0:0): vendor ID is NAT-T
    ISAKMP (0): processing vendor id payload
    what does the vendor ID is NAT-T above mean ? Is it say that both sides are using Nat traversal.
    Also in ecryption its says encryption 3DES-CBC
    i am not sure if this CBC is the culprit. Because thats what watchgaurd uses only it does not have an option for only 3DES.
    strange enought that Phase 1 is getting up, I am also questioning myself about the following message appearing in Phase 1:
    ISAKMP (0:0): Detected NAT-D payload
    ISAKMP (0:0): NAT does not match MINE hash
    hash received: b3 8f bb 0 93 3b 65 e8 35 6f 54 6 c4 6f 59 cc
    my nat hash : dd 70 9 ac 35 58 40 da 3b 5b fc 1b 4c 87 d2 11
    ISAKMP (0:0): Detected NAT-D payload
    ISAKMP (0:0): NAT does not match HIS hash
    hash received: ba 72 c5 e 5b fb 88 f0 1e f7 8a ba c9 c6 c1 cc
    his nat hash : c 4c 89 a5 66 c1 dd 80 76 48 3f a5 b0 f0 56 ed
    ISAKMP (0:0): constructed HIS NAT-D
    ISAKMP (0:0): constructed MINE NAT-D
    return status is IKMP_NO_ERROR
    how come Phase 1 is coming up though the PIX is claiming that his HASH is not the same as HIS HASH :(
    the log messages on WATCH GUARD states that there is no proposal chosen!
    why both firewalls are not friends?
    I appreciate any input

  • Error 2032 in communication between Flex Client and WCF

    Hi All,
    I'm trying to establish communication between Flex Client
    and WCF service.
    WCF service accepts gZip compressed data and returns gZip
    compressed results.
    So I used Flex ByteArray.compress() and
    ByteArray.uncompress() for this purpose. However, it throws error
    2032.
    The gZip compression/decompression uses MemoryStream class in
    C#. Based on my previous experience, memory stream communication
    between Flex and C# gives erro 2032.
    Is there a work around for this?
    Thanks,
    Vishal

    I read some thread in the forum, and found somebody had the similar problem with me. Just want to know how to settle this problem.
    In the client/server program. Client is a JAVA program and Server a
    VC++ program. The connection works, and the problem appears after some time. The Client sends a lots of requests to Serverm, the server seems receive nothing. But at the same time, the server is able to send messages to Client. The Client also can get the messages and handle them. Don't understand why there this problem and why it appears when it wants.
    The client is a Win2k platorm with JDK1.3.1 and the server is also a Win2K platform with VC++ 6.0.
    In the Client, using:
    inputFromServer = new BufferedReader(new InputStreamReader(socket.getInputStream()));
    outputToServer = new PrintWriter(new BufferedWriter(new OutputStreamWriter(socket.getOutputStream())),true);
    Hope can get your help.

  • APP-PAY-06841: Person change exit between the old and the new date.

    Hi,
    Please help me by answering this question as very urgent basis.
    ABC employee Effective date should be of future dated 10-jan-2011.
    But ABC employee joining date has been entered on 10-Aug-2010.
    amd also this date is also ended by updating on 10-Dec-2010.
    But these records are wrong.This employee's effective date should be form 01-Jan-2011.
    how to datetrack.
    if iam changing the date bye keeping effective date as 10-Dec-2010 an an iam changing the record to 01-jan-2011,its throwing the error as "**APP-PAY-06841: Person change exit between the old and the new date**"
    Thanks&Regards,
    Sowmya.K

    What is the application release?
    Please see these docs.
    Error: APP-PAY-06841: Person changes exist between the old date and the new date [ID 399056.1]
    APP-PAY-06841 When Changing Latest Start Date Of An Employee Who Was An Ex-Contingent Worker [ID 1146414.1]
    Unable To Change Start Date for Employee, Get Error "APP-PAY-06841: Person Changes Exist Between The Old Date And The New Date" [ID 603233.1]
    Correcting Latest Start Date in People Screen Gives Error APP-PAY-06841 [ID 368289.1]
    How To Change the Latest Start Date of an Employee? [ID 329692.1]
    Thanks,
    Hussein

  • Between SAP Licenses and Employee Records Realtinship

    Hi Experts
    <u>The Scenario of the issue is as below.</u>
    <b>SAP Licenses held by the company is -- numbers.
    And the employee records including PD(appraisal),PA  & OM exceeds the allowed records numbers.</b>
    Qn1 Whats the realtion between SAP license and records ?
    Qn2 How to go about in this scenario?
    Qn3. Should i prioritise the existance of records in appraisals and delete the least priority after consulting the client?anyway OM & PA records should not be deleted.
    Please throw some light on the issue.

    Abhilash,
    Usually the SAP Licenses are with respect to named users and their rights to the system....
    If you have N licences of various types and M employees accessing SAp ( M > N ) then it will be an issue .. usually for services like ESS - you have a licence called employee user and for more access you have professional licenses etc...
    You could check the type of licenses that the company has and the number of licenses of each type and also the Contract signed with SAP as to the licensing policy..
    Arun
    Hope it helps...

  • Differential pricing between the US and UK/anywhere else

    I'm just curious... can anyone throw any (rational) light on the price discrepancy between the US pricing and the prices for everyone else?
    What are the actual differences between the UK and the US versions of CS4 that demand such a discrepancy? Since (for the UK at least) the language is the same, what constitutes a localised version that is worthy of these price differences for upgrades...
    $599 CS3-CS4 against £515 ex VAT in the UK (equates to $945 give or take a few cents)
    I know some smart response will be "you don't have to buy it", but as a professional, freelance designer I'd have to disagree with you... please just accept that otherwise we could go wildly off topic.
    I don't object to paying for software, I just hate to feel taken advantage of because of where I live.

    Since the "powers that be" saw fit to turn off the forum where I posted my issue, I'm going to repost it here:
    Hitting a brick wall with Adobe Customer Service . . .
    Alon - 05:19pm Sep 23, 2008 Pacific
    This probably isn't the right forum to get feedback, but, it's the closest I can find . . .
    I was left on hold today for over 2.5 hours, waiting for a manager, before the call was dropped. NOT FUN!
    Basically, it's an upgrade issue.
    In July, I upgraded to CS 3.3 (with Adobe announcing that this was the latest and greatest upgrade). I forked out $600 -- of course, assuming since it was the latest and greatest, that it would remain the latest and greatest for a reasonable amount of time. OOPS! Wrong assumption! 2 months later they announce another "latest and greatest" with CS4.
    Up until July, I avoided the upgrade because of the CS3/Leopard compatibility issues. Even with 3.3, I have to reboot (on average) a couple of times a day to re-stabilize my OS. Adobe products bog down the OS and grind away on the hard drive to the point where all applications begin suffering.
    So, all-in-all, I purchased a "brand new release" 2 months ago for $600, and there's another "brand new release" announced today. And they want me to fork over another $440 for that one -- every sales and customer service rep saying: "There's nothing I can do."
    Was on with customer service again for another 37 minutes while I was typing this. Guess what? That freaking call was dropped just this second.
    That's 2 dropped calls over a half an hour, and another dropped call over 2.5 hours.
    Frustrating.
    Been using Adobe products since 1988, and this is the first time I am unhappy with how I've been treated.
    How about the usual array of gadflies stay out of this one and allow people who have legitimate concerns about this sort of thing have some reasonable communication.

  • What is the relation between req type and checking group

    Could any1 please explain me the link between requirement type and checking group?
    Also please throw some light on the other terms in ATP like requirement class and checking rule.
    Thanks in advance

    Dear VGR,
    The requirement type refers to the origin type, for example, goods receipt for purchase order (Type B) or goods issue to cost centers (Type K).
    The criterion that groups together all checking rules for all application areas for a material.
    In conjunction with the checking rule, the checking group defines the scope of the availability check for each business event, that is, which stocks, goods receipts, and goods issues are taken into account in the availability check, and whether replenishment lead time is checked.
    Checking rule
    A rule that defines how the availability check is performed.
    The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts, and issues are included in the availability check and whether the check is performed with or without the replenishment lead time.
    I hope this will help you,
    Regards,
    Murali.

Maybe you are looking for

  • How do I assign a new Apple ID to iPhoto?

    It all began back in 2010 when I bought a used PowerMac G5 to see how I got along with MacOS. When I got it, the OS was already set up, along with a few Apps, such as iPhoto and iMovie. I didn't have an apple ID back then, and it didn't matter, becau

  • Keeping original pitch when loading samples in EXS

    doing some sample replacing for a live drum recording. recorded my own samples instead of using Logic's. when i drag the WAVs into EXS (after clicking on 'edit' on the EXS GUI) the pitch of the samples are bummed to whatever pitch/key i put the sampl

  • Auto-update and start-up disk

    Can anybody tell me how to free up space on the start-up disk as my PowerBook G4 is telling me to do this? Also how do I check what version of OS X the machine is running? Thx

  • Clipping of SwingLabel

    Hi, does anyone know how to clip SwingLabel or controls in general? I'd like to create a component that displays HTML formatted text. I've got a rectangle that should contain SwingLabel and this SwingLabel has a ScrollBar attached to it. So far, I ha

  • G5 losing sync in FCP

    We have a G5 at work that periodically loses the ability to play video clips in sync in FCP. The audio drifts badly over time, quickly becoming unusable. It has been happening on this machine for several years, and we have never been able to get to t